![接地裝置安裝方案_第1頁(yè)](http://file4.renrendoc.com/view/7229d974f1ec4ec278fe28c5e6272e04/7229d974f1ec4ec278fe28c5e6272e041.gif)
![接地裝置安裝方案_第2頁(yè)](http://file4.renrendoc.com/view/7229d974f1ec4ec278fe28c5e6272e04/7229d974f1ec4ec278fe28c5e6272e042.gif)
![接地裝置安裝方案_第3頁(yè)](http://file4.renrendoc.com/view/7229d974f1ec4ec278fe28c5e6272e04/7229d974f1ec4ec278fe28c5e6272e043.gif)
![接地裝置安裝方案_第4頁(yè)](http://file4.renrendoc.com/view/7229d974f1ec4ec278fe28c5e6272e04/7229d974f1ec4ec278fe28c5e6272e044.gif)
![接地裝置安裝方案_第5頁(yè)](http://file4.renrendoc.com/view/7229d974f1ec4ec278fe28c5e6272e04/7229d974f1ec4ec278fe28c5e6272e045.gif)
版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、04-上海-IIP-SHF-501上海聯(lián)合異氰酸脂工程項(xiàng)目Shanghai Integrated Isocyanates Project (IIP)防雷接地裝置安裝方案Installation Scheme for LightningProtection and Earthing Device合同號(hào):A0ZH00-SL-C3041D/SB-C2041D編制 Edit:馮啟勝審核 Review:邱祥明批準(zhǔn) Approval:甘繼榮南化集團(tuán)建設(shè)公司上海工程項(xiàng)目部NCIGCC Shanghai Project DepartmentJan 2005上海聯(lián)合異氤酸脂工程項(xiàng)目施工方案防雷接地裝置安裝方案第
2、2頁(yè)共7頁(yè) TOC o 1-5 h z 工程概況General 3編制依據(jù) Edit reference 3施工程序及施工技術(shù)措施 Construction Procedure and Technical Measure ofConstruction 4上海聯(lián)合異氤酸脂工程項(xiàng)目施工方案防雷接地裝置安裝方案第3頁(yè)共7頁(yè)工程概況General該工程由我單位承建的接地裝置部分主要包括A400,B400,B600,A520,A545周 圍的主接地網(wǎng),并接連到A500和A600區(qū)的接地網(wǎng),并提供和安裝 B501,B545,B609,B620,B648,A520,A545 和 B541 的接地連接到主接地
3、網(wǎng),SBPC 接地 連接到SLIC北和SLIC南接地網(wǎng),安裝圍墻和街燈的接地棒并連接到主接地網(wǎng),安 裝管廊柱的接地并連接到主接地網(wǎng)。安裝SLIC北的主接地 網(wǎng),B343,B342,B345,B350,B330,B325,B301,B321,B330 和 B341 接地連接到主接地網(wǎng), SLIC北的接地連接到SBPC,SLIC南和HPS接地網(wǎng),安裝圍墻和街燈的接地棒并連接到 主接地網(wǎng),安裝管廊柱的接地并連接到主接地網(wǎng).The main earthing device, which constructed by our company, included the main earthing net
4、 at peripheral of A400, B400, B600, A520, and A545. And also connect to the earthing net of A500 and A600 area, supply and install the earthing connecting of B501, B545, B609, B620, B648, A520, A545 and B541 to the main earthing net, SBPC earthing connect to north of SLIC and south of SLIC, install
5、the ground rod of fence and streetlamp and connect to the main earthing net, install the earthing of pipe rack column and connect to the main net. As well as the earthing net at north of SLIC, make the earthing net of B343, B342, B345, B350, B330, B325, B301, B321, B330 and B341 connect to the main
6、net, connect the earthing from north of SLIC to SBPC, south of SLIC and earthing net of HPS, install the ground rod of fence and streetlamp and connect to the main earthing net, install the earthing of pipe rack column and connect to the main net.編制依據(jù) Edit reference由中國(guó)成達(dá)工程公司提供的相關(guān)施工圖及配套的安裝圖集Related c
7、onstruction drawing and allocated installation drawing which offered by China Chengda Engineering Company.由中國(guó)石化集團(tuán)上海工程有限公司提供的相關(guān)施工圖及配套的安裝圖集Related construction drawing and allocated installation drawing which offered by China Petrochemical Group Shanghai Engineering Company Ltd.電氣裝置安裝工程電纜線路施工及驗(yàn)收規(guī)范GB50
8、168-92 GB50168-92電氣裝置安裝工程接地裝置施工及驗(yàn)收規(guī)范GB50169-92 GB50169-92上海聯(lián)合異氤酸脂工程項(xiàng)目施工方案防雷接地裝置安裝方案第4頁(yè)共7頁(yè)施工程序及施工技術(shù)措施 Construction Procedure and Technical Measure of Construction1施工前準(zhǔn)備:首先組織施工班組及有關(guān)人員熟悉有關(guān)施工圖、資料、規(guī)范、標(biāo)準(zhǔn)等,主管技術(shù)人員向施工班組作技術(shù)交底并作好技術(shù)交底資料,使施工人員熟悉該工程 的技術(shù)要求及要領(lǐng),以便順利完成電氣安裝工作。Previous construction: Organize constructi
9、on team and related personnel to be acquainted with respective construction drawing, data, specification and standard etc. Chief technician shall make technical orientation for construction team and let them familiar with key technical requirement in convenience to finish electrical installation fav
10、orably.隱蔽工程隱蔽之前,應(yīng)辦理隱蔽工程驗(yàn)收記錄,經(jīng)自檢和工程監(jiān)理驗(yàn)收合格后方可 隱蔽。Previous to concealment, prepare conceal work acceptance records, conceal work could only start after self-checking and approved by construction supervision company.電氣安裝工程總則 General code for electrical installationa)必須按照?qǐng)D紙中的施工說(shuō)明進(jìn)行施工;Construction accordi
11、ng to the illustration of construction drawing;b)所有電氣設(shè)備安裝應(yīng)嚴(yán)格按照施工圖及有關(guān)規(guī)范要求及施工程序進(jìn)行;All electrical equipment shall strictly as per construction drawing and related requirement of specification as well as construction procedure.c)所有在室內(nèi)安裝的電氣設(shè)備在運(yùn)至安裝地點(diǎn)之后方能開(kāi)箱并進(jìn)行最初檢驗(yàn);All electrical equipment for room installa
12、tion could only be opening after delivery to the installation site and perform primary inspection at site.d)危險(xiǎn)區(qū)域的電氣設(shè)備安裝應(yīng)嚴(yán)格按(防火、防腐)要求進(jìn)行;Electrical equipment installation for danger zone shall be performed as per requirement of fireproofing and antisepsis.防雷接地裝置安裝 Installation for lightning protection
13、 and earthing device1)防雷、接地裝置安裝應(yīng)嚴(yán)格按施工圖施工。Installation for lightning protection and earthing device shall be constructed according to the construction drawing stringent.2)防雷接地裝置所用材料應(yīng)符合規(guī)定及設(shè)計(jì)要求,并且有合格證。The material for lightning protection and earthing device shall conform to the requirement of stipulat
14、ion and designing along with qualified certificate.3)接地裝置的埋地和隱蔽部分,經(jīng)驗(yàn)收合格后方可隱蔽,并做好記錄。上海聯(lián)合異氤酸脂工程項(xiàng)目施工方案防雷接地裝置安裝方案第5頁(yè)共7頁(yè)Embedded and concealment part of earthing device could only be concealed after inspection and qualified together with records.4)接地電阻值應(yīng)符合設(shè)計(jì)要求。The value of earthing resistance shall be in
15、 conformance with design requirement.5)按照設(shè)計(jì)要求,不帶電的金屬殼體均要接地。According to design requirements, all metal shell without electriferous shall be earthing.6)下列情況,均應(yīng)接地:All following instance shall be earthing:變壓器中性點(diǎn)應(yīng)工作接地。Neutral point of transformer shall work earthing.開(kāi)關(guān)柜基礎(chǔ)、電機(jī)、變壓器和其它電氣設(shè)備的金屬外殼和底座均應(yīng)接地。Found
16、ation of switch cabinet, outside shell and pedestal of electrical machinery, transformer and other electrical equipment shall be earthing.電力電纜、控制電纜的金屬護(hù)套、保護(hù)鋼管、電纜支架均應(yīng)接地。Cable of electric power, metal jacket, and protection steel pipe along with cable support for controlling cable shall be earthing.電流互
17、感器的二次線圈應(yīng)接地。Secondary coil of current mutual inductor shall be earthing.施工技術(shù)措施:根據(jù)接地裝置平面布置圖標(biāo)出的接地體和接地線的位置放線,接地體距建筑物至少3m,并根據(jù)設(shè)計(jì)圖標(biāo)出的接地體和接地線的材質(zhì)、規(guī)格備料。Construction technical measure: Pulling the line as per the position of earthing object and grounding cable which marked in plane drawing of earthing device,
18、minimum distance from earthing object to building shall be 3m, and prepare material according to the texture and dimension of earthing object and grounding cable which marked in the designing drawing.1)接地極安裝:接地極采用熱鍍鋅鋼棒20mmDIA. X3OO0mml。按設(shè)計(jì)圖紙要求沿接 地體的路線挖一深0.81m、寬0.5m的溝,然后用手錘將接地體垂直地打入地中。 接地體的頂端應(yīng)露出溝底300
19、mm,以便與接地線連接,每根接地極都配有300X 350mm混凝土檢查井(詳見(jiàn)安裝圖例)。Installation for earthing pole: Utilizing of hot galvanized rod 20mmDIA. X 3OO0mml for earthing pole. Dig a drench with depth of 0.8 1m and width of 0.5m along with the route of earthing object as per designing drawing, then drive the earthing object into
20、 ground by using a hammer. The top of earthing object shall be protrudent with 300mm at the bottom of the drench in convenience to connect with earthing cable, each grounding pole allocate with防雷接地裝置安裝方案300 x 350mm concrete inspection well (See details of legend of installation)2)接地線敷設(shè):主接地網(wǎng)采用70mm2裸銅
21、絞線,分支接地線采用黃/綠PVC絕緣護(hù)套 線,接地線水平埋設(shè)于地下0.6m處,敷設(shè)時(shí)可先挖一深度不小于0.6m、寬0.5m的 溝,將接地線水平埋入溝中,所有接地線均采用壓縮連接。Laying for earthing cable: Main earthing net using 70mm2naked copper twist cable, branch earthing cable using yellow/green PVC insulated jacket cable, earthing cable embedded in level to the ground at the depth
22、of 0.6m. While laying, first dig a drench with depth of no less than 0.6m and width of 0.5m, embedded the earthing cable in level to the drench, all earthing cable using compress connecting.3)接地電阻測(cè)量:各裝置區(qū)接地施工完后,均應(yīng)采用接地電阻測(cè)試儀進(jìn)行測(cè)量,接 地電阻不大于4歐姆,如不滿足要求,另在設(shè)計(jì)及甲方認(rèn)可后增設(shè)接地極。Earthing resistance measurement: After
23、finished construction for each device area earthing work, should be measured by earthing resistance measurement instrument, the earthing resistance shall be no less than 4 ohm, if can not meet requirement, add earthing pole after approved by the client.4)路燈電纜敷設(shè):Streetlamp cable laying:a)電纜及其附件到達(dá)現(xiàn)場(chǎng)后,
24、應(yīng)按下列要求進(jìn)行檢查:產(chǎn)品的技術(shù)文件齊全。電纜型號(hào)、規(guī)格、長(zhǎng)度應(yīng)符合要求,附件齊全,電纜外觀不應(yīng)受損。After the cable and attachment arrived site, perform inspection according to the following requirement: whole set of technical documents. Type, size and length of cable conforms to the requirements together with whole set of accessory, no damage on
25、the appearance of the cable.b)敷設(shè)前應(yīng)按設(shè)計(jì)和電纜表對(duì)號(hào)入座進(jìn)行敷設(shè),敷設(shè)前電纜試驗(yàn)合格。Check the number with the seat as per design and cable list previous to lay, and the testing for cable shall be qualified previous to lay.c)電纜在終端頭與接頭附件宜留有備長(zhǎng)度。Cable shall keep spare length at the terminal end and joint accessory.d)電纜各支持點(diǎn)間的距離
26、及最小彎曲應(yīng)符合要求:The distance between each cable support point and the minimum curve shall be in conformance with requirement:e)電纜上應(yīng)按規(guī)定裝設(shè)標(biāo)志牌。Identification plate shall be furnished on the cable as per stipulation.f)直埋電纜的敷設(shè)應(yīng)按下列要求:Laying for directly embedded cable shall meet the following requirement:上海聯(lián)合異
27、氤酸脂工程項(xiàng)目施工方案防雷接地裝置安裝方案第7頁(yè)共7頁(yè)g)電纜表面距地面距離0.6m。The distance from the surface of cable to the ground should be 0.6m.h)電纜之間平行和交叉時(shí)的最小凈距應(yīng)符合規(guī)范要求。The minimum net distance between parallel and cross of cables shall conform to the specification requirement.i)電纜穿過(guò)道路時(shí),應(yīng)加保護(hù)管。The cable shall be protected with protection pipe while through the road.j)直埋電纜的上、下都應(yīng)鋪不小于100mm厚的沙層,并加保護(hù)蓋板。The top and bottom of directly embedded cable shall be paved wi
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 現(xiàn)代企業(yè)現(xiàn)金流分析與優(yōu)化策略
- 國(guó)慶節(jié)漢服節(jié)活動(dòng)方案
- 環(huán)境安全教育在校園的推廣與實(shí)踐
- Unit 4 Natural disasters Project 說(shuō)課稿-2024-2025學(xué)年高中英語(yǔ)人教版(2019)必修第一冊(cè)
- 3 地球的形狀說(shuō)課稿-2023-2024學(xué)年大象版科學(xué)四年級(jí)下冊(cè)
- 2023六年級(jí)語(yǔ)文上冊(cè) 第三單元 12 故宮博物院說(shuō)課稿新人教版
- Unit1 Making friends Part C(說(shuō)課稿)-2024-2025學(xué)年人教PEP版(2024)英語(yǔ)三年級(jí)上冊(cè)001
- 2024年四年級(jí)品社下冊(cè)《第三單元 交通連著你我他》說(shuō)課稿 山東版
- 27巨人的花園 說(shuō)課稿 -2023-2024學(xué)年語(yǔ)文四年級(jí)下冊(cè)統(tǒng)編版
- Module 3 Unit 2 You can use the computers.(說(shuō)課稿)-2023-2024學(xué)年外研版(一起)英語(yǔ)五年級(jí)下冊(cè)001
- 國(guó)家安全教育課程教學(xué)大綱分享
- 養(yǎng)殖場(chǎng)獸醫(yī)服務(wù)合同
- 電氣工程及其自動(dòng)化基礎(chǔ)知識(shí)單選題100道及答案解析
- HR六大板塊+三支柱體系
- 慢性病患者門(mén)診身份管理方案
- 2025年高考英語(yǔ)一輪復(fù)習(xí)講義(新高考)第2部分語(yǔ)法第23講狀語(yǔ)從句(練習(xí))(學(xué)生版+解析)
- 連鑄工職業(yè)技能大賽考試題庫(kù)-上(單選、多選題)
- 2024年全國(guó)統(tǒng)一高考數(shù)學(xué)試卷(新高考Ⅱ)含答案
- 十七個(gè)崗位安全操作規(guī)程手冊(cè)
- 爆花(2023年陜西中考語(yǔ)文試卷記敘文閱讀題及答案)
- 自主簽到培訓(xùn)課件-早安!幼兒園
評(píng)論
0/150
提交評(píng)論