樁基礎(chǔ)監(jiān)理評估報(bào)告_第1頁
樁基礎(chǔ)監(jiān)理評估報(bào)告_第2頁
樁基礎(chǔ)監(jiān)理評估報(bào)告_第3頁
樁基礎(chǔ)監(jiān)理評估報(bào)告_第4頁
樁基礎(chǔ)監(jiān)理評估報(bào)告_第5頁
已閱讀5頁,還剩2頁未讀, 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡介

1、我公司受業(yè)主委托,對該工程樁基本子分部進(jìn)行施工階段的工程監(jiān)理, 該工程樁基本子分部工程于2013年4月2日開端施工,經(jīng)業(yè)主方.監(jiān)理方. 施工方三方配合盡力于2013年6月7日完成,該工程樁基本子分部今朝已 具備驗(yàn)收據(jù)件,我監(jiān)理部對該樁基本子分部工程施工進(jìn)程中的現(xiàn)實(shí)監(jiān)理情形 及工程質(zhì)量的評價(jià)看法如下:工程概況扶植單位:勘探單位:設(shè)計(jì)單位:施工單位:監(jiān)理單位:樁基工程簡述根據(jù)地質(zhì)勘查陳述及現(xiàn)場現(xiàn)實(shí)情形,本工程樁基本采取的是抗拔樁,抗 拔樁樁型:AZH-50-16B,樁砼標(biāo)號:C35,樁長為16m.樁數(shù)目和規(guī)格:樁型樁型號數(shù)目(根)樁長(m)工程樁AZH-50-16B57216建筑設(shè)計(jì)標(biāo)高0.000

2、,其絕對標(biāo)高為+9.500m.監(jiān)理質(zhì)量評估根據(jù):國度和地方當(dāng)局宣布的工程扶植尺度強(qiáng)迫性條則和相干的施工質(zhì)量 驗(yàn)收規(guī)范.本工程有關(guān)設(shè)計(jì)圖紙.技巧審定單.有關(guān)的尺度圖集及解釋等技巧文 件.監(jiān)理合同.施工合同.設(shè)計(jì)委托合同.經(jīng)總監(jiān)審批的施工組織設(shè)計(jì).監(jiān)理計(jì)劃和監(jiān)理實(shí)行細(xì)則.扶植工程監(jiān)理規(guī)范地基基本設(shè)計(jì)規(guī)范重要監(jiān)理工作內(nèi)容施工企業(yè)現(xiàn)場治理軌制履行情形施工企業(yè)現(xiàn)場施工,安然包管體系,質(zhì)量包管體系健全,特種功課人員持 證上崗,在樁基子分部工程施工中,.施工班組在每道工序完成落后行自檢, 施工完成后在自檢及格后報(bào)施工單位進(jìn)行復(fù)檢,認(rèn)定工程質(zhì)量相符設(shè)計(jì)和規(guī) 范請求后報(bào)驗(yàn),對消失的問題實(shí)時(shí)整改.監(jiān)理樁基工程質(zhì)量

3、掌握要點(diǎn)1)施工前起首進(jìn)行圖紙會(huì)審,審核壓樁施工計(jì)劃.2)對樁基施工單位天資審查,施工機(jī)械裝備,特種功課人員審查;審查 出場成品樁.接樁用焊條等廠家天資及產(chǎn)品及格證,做外不雅磨練,并做好記 載,并留有影像材料;3)對壓樁用壓力表.規(guī)格及質(zhì)量應(yīng)進(jìn)行檢討,并審查壓力表和油壓體系 配套校驗(yàn)證書.4)基本樁工程施工前,先輩行壓樁實(shí)驗(yàn),以肯定壓樁的有關(guān)參數(shù).5)接樁時(shí)應(yīng)保持上.下節(jié)樁身軸線一致,并盡可能縮短接樁時(shí)光間隙. 當(dāng)采取焊接法接樁時(shí),應(yīng)兩人同時(shí)對角對稱的進(jìn)行,焊縫應(yīng)持續(xù)飽滿,并用墊 塊填實(shí)接樁處的裂痕,以防止節(jié)點(diǎn)變形不平均引起樁身豎直;6)施工進(jìn)程中,對樁的定位.接樁和送樁終止的標(biāo)高進(jìn)行旁站并留

4、有影 像材料;做好壓樁監(jiān)理日志,重點(diǎn)記載壓樁壓力.樁垂直度.接樁間歇時(shí)光.樁的 銜接質(zhì)量及壓入深度.送樁留下的樁孔,應(yīng)立刻用碎石或道渣回填密實(shí).磨練批.分項(xiàng)分部驗(yàn)收情形1.工程質(zhì)量驗(yàn)收及評定情形1).預(yù)應(yīng)力鋼筋混凝土管樁,采取靜壓沉樁方法;質(zhì)量掌握按建筑地基基 本工程施工質(zhì)量驗(yàn)收規(guī)范進(jìn)行驗(yàn)收.檢討樁位安插尺寸和測量定位,對基樁 定位.樁身垂直度.沉樁.接樁焊接.樁頂標(biāo)高掌握實(shí)行全進(jìn)程監(jiān)控和旁站,并 做好具體的旁站檢討記載,樁基施工處于受控狀況.施工質(zhì)量驗(yàn)收規(guī)模驗(yàn)收結(jié)論主控項(xiàng)目1樁體質(zhì)量磨練相符設(shè)計(jì)及驗(yàn)收規(guī)范請求,詳見基樁低應(yīng)變動(dòng)測陳述編號2樁位誤差相符設(shè)計(jì)及驗(yàn)收規(guī)范請求3承載力相符設(shè)計(jì)及驗(yàn)收規(guī)

5、范請求,詳見靜載荷實(shí)驗(yàn)陳述一般項(xiàng)目1成品樁質(zhì)量成品樁出場后經(jīng)外不雅檢討,樁身無蜂窩.露筋.裂痕,平整度等均相符 設(shè)計(jì)請求.2接樁焊接情形相符設(shè)計(jì)及驗(yàn)收規(guī)范請求3樁頂標(biāo)高(5cm)開挖后對樁頂標(biāo)高進(jìn)行全數(shù)檢討.成品預(yù)應(yīng)力樁的質(zhì)量相符設(shè)計(jì)和規(guī)范劃定,出廠及格證和相干材料 齊備.單樁靜載荷實(shí)驗(yàn),根據(jù)設(shè)計(jì)請求,甲方委托南京東南建筑構(gòu)造技巧研 討所,于2013年8月28日至9月5日對A期非人防工程樁基進(jìn)行了單樁豎 向靜載荷試柱.樁檢測陳述匯總表樓棟號檢測類型檢測陳述編號檢測樁號檢測結(jié)論A期人防A期人防A期人防A期人防靜載JZ13092622-1184.427.79.135.568.360知足設(shè)計(jì)請求小應(yīng)

6、變小應(yīng)變小應(yīng)變201311036-9201311036-9201311036-91.2.3.4.5.6.7.8.9.10.11.12.13.14.15.16.17.18.19.20.21.22.23.24.25.26.27.28.29.30.31.32.33.34.35.36.37.38.39.40.41.42.43.44.45.46.47.48.49.50.51.52.53.54.55.56.57.58.59.60.61.62.63.64.65.66.67.68.69.70.71.72.73.74.75.76.77.78.79.80.81.82.83.84.85.86.87.88.89.90

7、.91.92.93.94.95.96.97.98.99.100.101.102.103.104.105.106.107.108.109.110.111.112.113.114.115.116.117.118.119.120.121.122.123.124.125.126.127.128.129.130.131.132.133.134.135.136.137.138.139.140.141.142.143.144.145.146.147.148.149.150.151.152.153.154.155.156.157.158.159.160.161.162.163.164.165.166.167.

8、168.169.170.171.172.173.174.175.176.177.178.179.180.181.182.183.184.185.186.187.188.189.190.191.192.193.194.195.196.197.198.199.200.201.202.203.204.205.206.207.208.209.210.211.212.213.214.215.216.217.218.219.220.221.222.223.224.225.226.227.228.229.230.231.232.233.234.235.236.237.238.239.240.241.242.

9、243.244.245.246.247.248.249.250.251.252.253.254.255.256.257.258.259.260.261.262.263.264.265.266.267.268.269.270.271.272.273.274.275.276.277.278.279.280.281.282.283.284.285.286.287.288.289.290.291.292.293.294.295.296.297.298.299.300.301.302.303.304.305.306.307.308.309.310.311.312.313.314.315.316.317.

10、318.319.320.321.322.323.324.325.326.327.328.329.330.331.332.333.334.335.336.337.338.339.340.341.342.343.344.345.346.347.348.349.350.351.352.353.354.355.356.357.358.359.360.361.362.363.364.365.366.367.368.369.370.371.372.373.374.375.376.377.378.379.380.381.382.383.384.385.386.387.388.389.390.391.392.

11、393.394.395.396.397.398.399.400.401.402.403.404.405.406.407.408.409.410.411.412.413 .414.415.416.417.418.419.420.421.422.423.424.425.426.427.428.429.430.431.432.433.434.435.436.437.438.439.440.441.442.443.444.445.446.447.448.449.450.451.452.453.454.455.456.457.458.459.460.261.462.463.464.465.466.467

12、.468.469.470.471.472.473.474.475.476.477.478.479.480.481.482.483.484.485.486.487.488.489.490.491.492.493.494.495.496.497.498.499.500.501.502.503.504.505.506.507.508.509.510.511.512.513.514.515.516.517.518.519.520.521.522.523.524.525.526.527.528.529.530.531.532.533.534.535.536.537.538.539.540.541.542.543.544.545.546.547.548.549.550.551.552.553.554.555.556.557.558.559.560.561.562.563.564.565.566.567.568.569.570.571.572強(qiáng)檢399.400.401.418.421.432.435.472.473.481.484.485.494.495.497.519.522.524.525.526.527.528.534.540.549.551.565.152.153.154.155.179.180.181.1

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論