1、XXXXXX FIELD DEVELOPMENT PROJECTCOSIGNDISCIPLINESIGNATUREDATEMATERIAL INSPECTION PROCEDUREFORPIPING FABRICATIONPAGE X OF XREV.DATEDESCRIPTIONBYCH K.APPRO.CLIENTMATERIAL INSPECTION PROCEDURE FOR PIPNG FABRICATIONOFFSHORE OIL ENGINEERING CO.,LTD.CNOOCDOCUMENT NO.REV.CERTIFI. NO.DOC-XXXXXX0XXXXXCONTENT

2、S 1.0SCOPE2.0REFERENCE STANDARD3.0MATERIAL RECEIVING INSPECTION4.0MATERIAL INSPECTION/TRACEABILITY5.0MARKING TRANSFERENCE FOR SURPLUS MATERIALS6.0 REPORT FORMS1.0 SCOPEThis procedure covers the methods, techniques and acceptance standards for material inspection of piping fabrication of XXXXXX proje

3、ct.2.0REFERENCE STANDARD· Clients Specification· ASTM A6· ASME B31.33.0 MATERIAL RECEIVING INSPECTIONAll materials for this project purchased by contractor or supplied by client shall be placed in either the yard storage area designated for the project or placed in the project warehou

4、se area. There they shall be examined for compliance with the purchase order, invoice and clients specifications. The warehouse supervisor, engineer, user and QC material inspector shall verify such items as quality, quantity, markings wall thickness, dimensions, and condition.3.1 MATERIAL VERIFICAT

5、IONMaterials shall be verified according to the packing list, Mill certificate, and specification. The inspectors shall sign the verification record when the materials are acceptable.3.2 CONFORMANCE MATERIALMaterial, which meets specification, shall be marked or tagged with all relevant information.

6、 Material supply department shall have the materials stored separately from materials of other project and kept in dry and tide protection circumstance. Materials shall be given adequate protection for preventing from deforming and foreign hitting.3.3 NON-CONFORMANCE MATERIALSNon-conformance materia

7、ls shall be marked, recorded, evaluated and removed to quarantine. 3.4 JUDGMENT OF NON-CONFORMANCE MATERIALSThe judgment shall be performed by experienced person in quality control, production and workmanship.3.5 NON-CONFORMANCE MATERIAL REPAIRMaterial that may be repaired to bring them into specifi

8、cation requirements shall only be carried out by approved methods and personnel strictly in accordance with the manufacturer instructions, thereby in no way compromising the warranty or guarantees on the material in question. Client to approve any repairs to client supplied material.3.6 REJECTION AN

9、D SCRAPPINGMaterial that can not reach to conformance by repair shall be rejected or scrapped. Client to approve all rejection or scrapping of client supplied material.4.0 MATERIAL INSPECTIONQC inspector shall inspect material specification, grade, heat no. (control no.) in accordance with material

10、issuing list and Mill Certificates before material are used, QC inspector shall prepare the inspection report and sign on when the items/parts he has inspected is acceptable to the specified requirements. Inspection report shall be submitted to Client or the Certification Authority for review. 4.1Ce

11、rtification and inspection requirements for procured bulk piping items shall be defined on a form to be produced by the construction contractor. This form shall become an attachment to the majority of material requisitions and purchase orders. 4.2 Information included on the form shall be:a.The leve

12、l of Company, certifying authority which is unanimously agreed and the Contractor surveillance inspection required for each item.b. The requirements for certifying authority design appraisal for each item, if any. c.The requirements for certification documentation for each item.4.3 Material will be

13、rejected unless a certification and inspection form is attached or a written note from Certification Engineer confirms that no certification is required special conditions apply. 4.4 The following certification documentation shall be specifically checked for conformance to specification:a.Pipe Mill Material Certificates.b.Steel Mill Material Certificates.c. Manufacturers Certificate for flange, fittings and valves etc.5.0 MARKING TRANSFERENCE FOR SURPLUS MATERIALIn principle, the end of material with mar

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
  • 4. 未經(jīng)權益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
  • 6. 下載文件中如有侵權或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論