版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報或認(rèn)領(lǐng)
文檔簡介
1、三峽工程·壇子嶺變電站SEL587變壓器差動保護(hù)誤動分析熊德勇(長江三峽水電工程有限公司三峽供電局,湖北省宜昌市三峽壩區(qū) 443133)Analyzing the mis-operation of TanZiLing Transformer substation differential protection relay in Three Gorges engineering Xiong deyongmail to: xdy_2000Three Gorges power supply bureau Yangtse River hydro-electric engineering co
2、rporation摘要三峽工程壇子嶺變電站內(nèi)兩臺主變壓器差動保護(hù)皆采用的是美國SEL公司(Schweitzer Engineering Laboratories Inc.)SEL587型繼電保護(hù)裝置,該保護(hù)在國內(nèi)有一定的市場占有率。本文從該站SEL587差動保護(hù)誤動原因分析入手,闡述了其故障查尋方法、差流及比率制動特性的定量分析方法;并提出了在繼電保護(hù)設(shè)備安裝、調(diào)試過程中應(yīng)重視的幾點建議。SummarySEL587 type relay of Schweitzer Engineering Laboratories inc. of U.S. is used in the two transfor
3、mer differential protections of TanZiLing transformer substation in Three Gorges engineering , it is used widely by China. The mis-operation reasons of the substation relay were analyzed by the paper. The paper described the method of fault solution and vector analyze , and several suggests in the p
4、rotection relay installing and testing are brought forward in the end .關(guān)鍵詞壇子嶺SEL587變壓器差動保護(hù)測量精度CT多繞組穿越性故障KeywordsTanZiLingSEL587transformerdifferential protectionMeasuring accuracyCTmulti-windingthrough fault¨ 故障現(xiàn)象某日12: 02,三峽工程壇子嶺變電站(以下簡稱壇站)1BSEL587變壓器差動保護(hù)裝置動作,跳1B高低壓側(cè)開關(guān); 10KV出線柜G4K31的過流保護(hù)裝置SEL35
5、1A發(fā)trip命令,但并未跳閘。故障時系統(tǒng)接線方式見圖1所示。(圖中用紅色填充的短路器表示合閘,否則為斷開)¨ 收集故障信息檢修人員首先對壇站的1B差動保護(hù)裝置SEL587故障錄波文件進(jìn)行了翻查。文件顯示該日12:02:39. 953 ,A、B、C三相差動保護(hù)動作。故障時,1B高壓側(cè)CT二次電流AW1 =9.011.8°A,BW1 =7.4258.3°A,CW1 =7.7135.3°A,IQW1 =0.9A(負(fù)序電流),INW1 =2.4A(矢量和零序電流);1B低壓側(cè)CT二次電流AW2 =14.3207.1°A,BW2 =11.893.2
6、176;A,CW2 =13.8346.3°A,IQW2 =0.9A,INW2 =0.7A。其次,查看G4K31柜的SEL351A過流保護(hù)裝置故障錄波文件,事件記錄顯示:12: 01: 04.61 A B C T , IA =4527A, IB =5043A, IC =4563A, IN =0A, IG =9A(零序電流), 3I2 =3707A(均為一次電流值)。表明該出線有三相接地短路故障發(fā)生,保護(hù)發(fā)trip(跳閘)命令。后經(jīng)對時,SEL587事件記錄時間比SEL351A快1分多。再者,對壇站的上級站陳家沖站(簡稱陳站)1B高壓側(cè)電流、35kv I母電壓錄波文件翻查,故障錄波顯示該
7、日12:05:29:5535 ,陳站1B 高壓側(cè)A、B、C三相一次電流高達(dá)165A,為故障前8倍;同時陳站35kv I母A、B、C三相一次相電壓峰值垮至20kv,約為正常電壓的0.7倍。后經(jīng)對時,陳站故障錄波時間比壇站的快2分多。檢查差流相關(guān)回路經(jīng)分析故障時系統(tǒng)接線方式及上述故障錄波文件,發(fā)現(xiàn)1B差動保護(hù)高壓側(cè)回路中二次電流有相移,中性點電流也較大,于是重點檢查高壓側(cè)電流回路。在31DL開關(guān)柜內(nèi)進(jìn)行了如下項目的檢查:分別檢查三相CT二次繞組的對地及組間絕緣(2500v搖表),未見異常; 由于CT資料欠缺,不清楚CT本體內(nèi)部二次繞組的連接方式,因此分別檢查三相CT二次繞組的直流電阻。由試驗數(shù)據(jù)得
8、知(參見附表2):該型號CT的 1-2繞組、3-4繞組分別為抽頭方式;在柜內(nèi)端子排上,發(fā)現(xiàn)繞組1、3被短接(俗稱封住)。分別檢查三相CT的伏安特性(參見附表3),未見異常;. 檢查SEL587差動裝置的測量精度,發(fā)現(xiàn)裝置的高壓側(cè)測量回路中A相測量精度超標(biāo),約達(dá)20%(參見附表4)。這是本次誤動的主要原因所在。圖1. 故障時系統(tǒng)接線方式2B1B陳船I-船壇線陳壇II線2G4k31出線35kv10kvSel587差動方向過流2k4k35kv開關(guān)柜10kv開關(guān)柜YY3003231d3o永久船閘壇子嶺站Fig1. The connections of the system fault happenin
9、g動作原因分析在上述檢查過程中:發(fā)現(xiàn)壇站1B高壓側(cè)每相CT的四個繞組中有兩個二次繞組1、3被短接;但由檢查過程中所測量的CT二次直流電阻推斷:CT二次繞組1、2為抽頭式,繞組3、4為抽頭式。該型號CT本體內(nèi)部繞組連接方式見圖所示。(僅以A相為例,B、C相同此圖) 對于二次為抽頭式、多繞組的CT,如果有一個繞組使用,則在其本體內(nèi)部互連的其它繞組端子不能封住。這可以用磁勢平衡方程式來解釋。2k11k12k2(1k2)3k1(4k1)3k24k2至差動回路500/5A至方向過流回路500/5AI11k1-1k2、3k1-3k2要開路,不能封!圖. 壇站主變壓器高壓側(cè)CT本體內(nèi)部繞組連接示意(A相)F
10、ig2. The connections inside of CT以該差動保護(hù)使用的繞組2k1-2k2為例。在電流互感器正常運行時,根據(jù)磁勢平衡方程式: I1 N1-I2 N2k1-2k2 =I0 N1 ,因一次磁勢I1 N1絕大部分被二次磁勢I2 N2k1-2k2所抵消,所以總的磁勢I0 N1很小,即激磁電流I 0很小,只有一次電流 I1 的百分之幾,因此在鐵芯中的磁通很小,而二次繞組中感應(yīng)的電動勢2不大。如果短接1k1-1k2,則有電流I2 流過1k1-1k2,磁勢平衡方程式變?yōu)椋?I1 N1-(I2 N2k1-2k2 + I2 N1k1-1k2 )=I0 N1 ,因I0 N1 很小,基本
11、不變,因此,流過2k1-2k2 的電流I2變小,由此使得差動保護(hù)的不平衡電流增大。檢查該保護(hù)的有關(guān)整定值知:TAP1=3.3(變壓器高壓側(cè)電流調(diào)節(jié)變比:);TAP2=3.85(變壓器低壓側(cè)電流調(diào)節(jié)變比:);(相對于國內(nèi)的稱謂,TAP1,2值為變壓器在額定負(fù)荷下的高、低壓側(cè)CT二次差動臂上的電流。當(dāng)CT接線采用Y形時,TAP1,2值為CT二次額定電流;當(dāng)CT接線采用時,為CT二次額定電流的倍。SEL587的相關(guān)運算一般以變壓器高壓側(cè)為基準(zhǔn)。)O87P=0.3(制動元件動作電流啟動值,設(shè)置為TAPmin的倍數(shù));SLP1=40(制動折線1百分比率,亦即折線斜率K=0.4);SLP2=OFF(制動折
12、線2停用);上述式中:MVA變壓器的額定容量;VWDG1高壓側(cè)線電壓;VWDG2低壓側(cè)線電壓;CTR1變壓器高壓側(cè)CT變比;CTR2變壓器低壓側(cè)CT變比;TAPmin取TAP1、TAP2中的較小值。SEL587保護(hù)裝置的比率制動特性曲線如圖所示。IoIopIRT圖. 差動比率制動特性曲線dFig3. The characteristic based to differential rating restraining圖中:Io=O87P*TAP1=0.3*3.3=0.99(A),為差流平臺值(門檻)。(當(dāng)使用單相電流在高壓側(cè)做差動保護(hù)門檻值試驗時,Io=*O87P*TAP1=*0.99=1.7
13、1A;在低壓側(cè)做差動保護(hù)門檻值試驗時,Io= O87P*TAP20.3*3.85=1.16A。)根椐該保護(hù)裝置故障錄波文件所載的數(shù)據(jù),進(jìn)行差流向量計算如下:|OP1|=|da/(*TAP1)|=|(AW1-BW1)/(*TAP1)+AW2/TAP2|=|(9.011.8°-7.4258.3°)/(*3.3)+ 14.3207.1°/3.85|=1.51;|OP2|=|(BW1-CW1)/(*TAP1)+BW2/TAP2|=|(7.4258.3°-7.7135.3°)/(*3.3)+ 11.893.2°/3.85|=1.0;|OP3|=
14、|(CW1-AW1)/(*TAP1)+ 13.8346.3°/3.85+CW2/TAP2|=|(7.7135.3°-9.011.8°)/(*3.3)+ 13.8346.3°/3.85 |=1.01;制動電流為:IRT1=(AW1-BW1)/(*TAP1)+AW2/TAP2/2 | (9.011.8°-7.4258.3°) / (*3.3) | + | 14.3207.1°/3.85 | /2 =3.06IRT2=(BW1-CW1)/(*TAP1)+BW2/TAP2/2 | (7.4258.3°-7.7135.3
15、176;) / (*3.3) | + | 11.893.2°/3.85 | /2 =2.7 IRT3=(CW1-AW1)/(*TAP1)+CW2/TAP2/2 | (7.7135.3°-9.011.8°) / (*3.3) | + | 13.8346.3°/3.85 | /2 =3.09從上述計算中得出: A相差流位于差動保護(hù)制動特性的折線之上(參見圖,a點),因此動作;而B、C相差流均位于折線之下,并不動作(參見圖,b、c點)。由于本次三相故障是因受電端三相接地線未拆除,誤合線路而引起,所以差動保護(hù)、三相動作行為應(yīng)一致,但從上述分析中得知僅相動作;為此
16、,對保護(hù)動作行為進(jìn)一步分析,得出結(jié)論:裝置的高壓側(cè)測量回路中A相測量精度超標(biāo)達(dá)-20%,最終引起差流增大而致保護(hù)誤動。當(dāng)裝置無誤差時,保護(hù)不會動作。向量分析如下圖示,同時參見圖3中d點。圖4.測量精度無-20%誤差時,差流向量分析Fig4. Analyze of the differential current vector with -20% measuring error為確保本保護(hù)在發(fā)生變壓器區(qū)外穿越性三相短路故障時能正確可靠不動作,在現(xiàn)有整定參數(shù)下,對本裝置高壓側(cè)測量通道的整體誤差(指CT誤差、裝置精度誤差累計值)容許值展開了定量分析,結(jié)果表明:若整體誤差達(dá)到-20%時(以A相為例),
17、向量分析結(jié)果為:K=0.4(這里不再詳述),保護(hù)處于臨界狀態(tài),極可能動作。也屬巧合,假設(shè)本次誤動中高壓側(cè)CT回路正常、無誤差,僅裝置測量精度有-20%誤差,保護(hù)同樣也會動作。因此,針對本變壓器保護(hù)裝置,高壓側(cè)測量通道的整體誤差必需小于20%,才能保證其可靠性。G4K31出線的SEL351A電流保護(hù)雖檢測到故障并發(fā)跳閘令,但因1B差動保護(hù)先動作跳閘,所以SEL351A的出口中間繼電器返回而未跳閘。在永久船閘處,靠近故障點的電流保護(hù)(反時限特性)動作(據(jù)船閘處有關(guān)人員講);但未去證實。對此尚存疑問,如果該處保護(hù)先跳,差動就不會動作?事實上,差動動作時,故障電流仍然存在,除非其保護(hù)有跳閘自保持回路,
18、或剛巧與差動同時跳閘(可能性極小)。一般而言,微機差動保護(hù)因其軟件算法要求較為嚴(yán)格(如半波傅立葉、采樣值差動算法等),動作速度最快;而一般電流保護(hù)的動作速度不及它。解決問題,恢復(fù)運行針對上述故障原因,檢修人員對SEL587裝置進(jìn)行了更換,并將CT的繞組1、3拆封。在1B送負(fù)荷時,測量差動保護(hù)六角圖如下。Ûb=57.58vÛa=57.9vÛaÛcÛbÎaÎbÎca=28.2ºb=31.2ºc=31º圖5. 低壓側(cè)六角圖Fig5. Hexagon vector of the low vol
19、tage sideÛc=58.08vÎa=0.099AÎc=0.096AÎb=0.098AUaUb=119.5°°UbUc=119.8°UcUa=120.7°IaIb=122.1°IcIa=117.8°IbIc=120.2°注意:低壓側(cè)CT二次電流的角差超過2°,說明CT質(zhì)量不是太好。因此,在整定時需考慮這種誤差,并躲過。ÛaÛcÛbÎcÎaÎba=204.8ºb=206.6ºc=204.8
20、86;圖6. 高壓側(cè)六角圖Fig6. Hexagon vector of the high voltage sideÛa=59.47vÛc=59.29vÛb=59.24vIcIa=118.9°IbIc=118.9°IaIb=122.3°UcUa=119.9°UbUc=119.8°Îc=0.051AÎb=0.052AÎa=0.052AUaUb=120.2°注意:高壓側(cè)CT的角差亦超過了2°。檢查SEL587裝置,顯示參數(shù)如下:差流:Iop1=0A , Iop2=0A
21、, Iop3=0A ;制動電流:Irt1=0.2A , Irt2=0.2A , Irt3=0.2A; 由此得出結(jié)論: 保護(hù)裝置已恢復(fù)正常。¨ 設(shè)備安裝、調(diào)試過程中應(yīng)重視的幾點建議在設(shè)備安裝、調(diào)試過程中一定要重視保護(hù)裝置測量精度的調(diào)試及搞清楚CT本體內(nèi)部二次繞組結(jié)構(gòu)。對于工程施工供電系統(tǒng),由于受電用戶在現(xiàn)場臨時搭接電源、用電管理素質(zhì)差錯不齊,事故發(fā)生率很高,因此對繼電保護(hù)的測量精度要求就相當(dāng)高,尤其是差動保護(hù)裝置,當(dāng)其測量精度有偏差時,不平衡電流就會增大,在區(qū)外有穿越性故障時極易誤動。CT的內(nèi)部結(jié)構(gòu)有著其不同于變壓器、電壓互感器的特殊性,因其每個二次繞組的用途不同,如測量、保護(hù)精度等級
22、、變比以及飽和特性曲線的不同,因此,在每個鐵芯上僅繞一個二次繞組(抽頭式中只能接一個繞組,其他內(nèi)部互連端需開路;CT二次繞組不能開路并非指的這種情況),繞組間經(jīng)絕緣后層疊,最后整體由環(huán)氧樹脂等絕緣體封狀。如不清楚其結(jié)構(gòu)方式,隨意開路、短接CT二次將造成人身和設(shè)備事故。¨ 附表1:壇站1B高壓側(cè)CT銘牌數(shù)據(jù)(31DL柜內(nèi))型號:RDZD -35B廠家:上海華通開關(guān)廠絕緣水平:40.5/95/180kv額定變比:200-500/5準(zhǔn)確等級:200/5 10P20 , 500/5 P204K14K2 500/5 4P20 3K13K2 200/5 10P201K11K2 200/5 10P
23、20 2K12K2 500/5 P20額定輸出:1K11K2 10VA , 2、3繞組 20VA , 4K14K2 40VA額定短時熱電流:2s 40KA¨ 附表2:CT二次直阻測量數(shù)據(jù)繞組直流電阻(m)1k1-1k293.652k1-2k2224.23k1-3k21514k1-4k2371.3繞組間直流電阻(m)1k1-2k113961k1-2k294151k2-2k122451k2-2k24.53k1-4k13713k1-4k236913k2-4k115413k2-4k222672k1-3k11k2-4k2結(jié)論推斷:繞組1、2為抽頭式結(jié)構(gòu),繞組3、4為抽頭式結(jié)構(gòu)2k11k12k2(1k2)3k1(4k1)3k24k2 ¨ 附表3:CT二次伏安特性數(shù)據(jù)(用250v 、12A/3000VA調(diào)壓器)A相 2K12K2(差動
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 《網(wǎng)店色彩設(shè)計》課件
- 《神經(jīng)癥年制》課件
- 《證券上市》課件
- 2024年農(nóng)業(yè)部門抗旱工作總結(jié)范文
- 2025年高考數(shù)學(xué)一輪復(fù)習(xí)之冪函數(shù)、指數(shù)函數(shù)、對數(shù)函數(shù)
- 單位管理制度匯編大全人力資源管理
- 單位管理制度合并匯編【人事管理】
- 單位管理制度分享合集人員管理十篇
- 單位管理制度范例匯編人事管理
- 單位管理制度呈現(xiàn)大全人事管理十篇
- 期末模擬卷 2024-2025學(xué)年人教版數(shù)學(xué)六年級上冊(含答案)
- GB/T 44351-2024退化林修復(fù)技術(shù)規(guī)程
- 《比特幣完整介紹》課件
- 江蘇省2023年生物小高考試題含答案解析
- 2019年同等學(xué)力(教育學(xué))真題精選
- [轉(zhuǎn)載]鄭桂華《安塞腰鼓》教學(xué)實錄
- 泵管清洗專項方案
- 門診手術(shù)室上墻職責(zé)、制度(共6頁)
- 邊坡土壓力計算(主動土壓力法)
- 鉆孔壓水試驗計算EXCEL表格
- 機電安裝項目施工組織計劃方案
評論
0/150
提交評論