文檔簡介
Thedesignprojectforgraduationmainlypresentsthedesignprocedureofofficebuilding,includingbuildingdesignandonstructiondesign.Designprojectforgraduationisspecialfieldofstudyrequiredcourseofcivilengineering.Itisthattheofficebuildingdesignstooriginallydesign.Thisschemeadoptsthecast-in-placeframestructureofarmoredconcrete.Structurerandorderis5layers.Structuretotalheightis15-meterandsurfaceareais5159.70-suquaremeter,thefloorspaceofgroupflooris1031.94
.Accordingtotherequirement,theearthquakeintensityis6degreestosetupdefences,thegradeofantidetonationistwograde,andthegroupofearthquakeistwo,consideringaseidmaticdesign.Designprojectincludesstructurepart、constructurepartandfoundation,accordingtoassignmentbookdefineeverylayerblueprlineandplarearrang.ntstructureisatwo-waybearingframe,horizontalfram,etc.Accordingtothedesigningrequirement,thebiuueprintsandtheplanarestepped.Thecrosswiseload-bearingschemeischosenforthedesignAftercalculatingandcomponentsectionestimatingchooseonePinframecalculatetoloadtogoon,considerationsubstareceincludeselectframecolumnsectionmeasurementandthreadrigidity;calculatedeadloadsandliveloadsandseismicactionproduceroofbeamextremityandcolumnextremitybendingmoment、shearandaxlepower;Frameinterralforcemakeup;Matesteel;Stairsmatesteelandfoundationmatesteelcalculate.ThisofficebuildingadouptLmodelarragnge.FramebesubjecttopowersteeladoptⅡlevelandhoopsteeladoptlevelThewholeconceptualdesignaccordswiththedesignandstructuredemandbasically,havecertaincreativityandrationality.Throughthedesignofmarketfloorconstruction,anddrawingfloorplan,constructedprofileandconstructionaldrawing,Iamfamiliarwiththeprincipledesignofconstruction,andcontrolledthebasicmethodsofcomputationoftheconstructiondesign,andmyworkiscreative.Atthesametime,Ihaveadeeperunderstandingofthefirstseveralyears’professionlearningandthefoundationkNowledge,asaresult,myabilitythatyzingandsolvingtheactualproblemsisincreased.:reinforcedconcretestructureframestructure,foundation,designvalueofa putationconceptdesignconstruction前 建筑設 建筑設計依 建筑設計說 結構設 工程概 框架計算簡圖及梁柱線剛 豎向荷載計 抗震計 風荷載計 重力荷載代表值作用下的內力計 內力組 梁柱截面設計與配筋計 基礎設 施工組織設 工程概 施工組織機 施工部 施工準 施工方 實施目 ——質量、工期、安全、文明施工、環(huán)保、科技目 工程施工的關鍵點、難點及處理措 要求執(zhí)行的施工及驗收規(guī) 結 致 參考文 附 10務書”采用對稱造型,這是大多數辦公樓建筑造型的一般手法。根據辦公樓建筑主要以活動單元按一定規(guī)律組合成辦公樓的主體建筑。這就構成了在體型上對稱關系。建筑強調整體感,但又不是地將所有活動單元毫無區(qū)分地組成單調的形體,而可以突出活動單元組成富于韻律感的形態(tài),并在細部處理上強調同一符號的重復運用,但不可因過多的變化而破壞整體性和統(tǒng)一感。本設計采用現(xiàn)澆鋼筋混凝土框架結構,主240mm建筑設計說辦公樓指機關、企業(yè)、事業(yè)單位行政管理,業(yè)務技術等辦公的業(yè)務用房。按層數有低層、多層、和層之分;按總體布局有集中式和分散式之分。此外,按平面形式、結構造型和所用材料,又可分為若干類型。如按平面交通組織形式來分,有內走廊式、外走廊式、雙走廊式和無走廊式(大空間靈活隔斷)等。辦公樓的規(guī)模分為:辦公樓按規(guī)模有小型、中型、大型和特大型之分,辦公樓規(guī)模以小中型為宜。辦公樓選辦公樓應有獨立的建筑,并應根據城鎮(zhèn)及工礦區(qū)的建設規(guī)劃合理安排布點。辦公樓的選擇應滿足下列要求:應遠離各種污染源,并滿足有關衛(wèi)生防護標準的要求;方便出入,避免交通干擾;日照充足,場地干燥,排水通暢,環(huán)境優(yōu)美或辦公樓應根據設計任務書的要求對建筑物、停車場地、綠化用地及雜物院等進行總體布置,做到功能分區(qū)合理,方便管理,朝向適宜,場地日照充足,創(chuàng)造符合人的生理、心理特點的環(huán)境空間。辦公樓室外停車場地應滿足下列要求:設置的室外停車場地。場地面積不應小于60m2。各場地之間宜采取分隔措施。辦公樓宜有集中綠化用地面積,并嚴禁種植有毒、帶刺的植物。辦公樓宜在供應區(qū)內設置雜物院,并單獨設置對外出。邊界、停車場地、綠化等用的圍護、遮攔設施,應安全、美觀、通透。辦公樓應具備辦公用房、公共用房、服務用房等功能房間。辦公用房包括辦公室、會議室、多功能廳、財務室等,應根據實際情況和使用人數考 面積,作開敞式大空間辦公區(qū),也可作中??;公共用房包括、貴賓室、接待1.11.301.501.21.2注:窗地比為該房間側窗洞口面積與辦公用房、會議室、接待室等允許噪聲不應大于55db(A聲級),總機房、計算機房、打字室、閱覽室等允許噪聲級不應大于50db(A聲級)。普通的每人使用面積不應小于3平方米,單間凈面積不宜小于10平方米。設計繪圖室,每人使用面積不應小于5平方米。研究,每人使用面積不應430議室使用面積宜為601.800.80服務用房:服務用房包括一般性服務用房和技術性服務用房,一般性服務用房為打字室、室、資料室、閱覽室、儲藏間、汽車停車庫、自行車停車庫、衛(wèi)生管理設施間等;技術性服務用房為:總機房、計算機房、電傳室、復印室、曬圖室、設備機房等。打字室。多的打字室可分設收發(fā)校樣間、打字間、油印間、裝訂間等。打字間應光線充足,通風良好,避免西曬。設多臺打字機的打字間宜考慮隔聲措施。室、資料室、閱覽室??筛鶕?guī)模大小和工作需要分設若干不同用途的房間。、資料庫和書庫應采取防火、防潮、防塵、防蛀、防紫外線等措施。地面應用不起塵,易清潔的面層,并設機械排風裝置。、資料查閱間和閱覽室應光線充足,通風良好,避免陽光直射及眩光。汽車停車庫。汽車停車庫的設計應符合現(xiàn)行的《汽車庫設計防火規(guī)范》的規(guī)定。小汽車每輛停放面積應根據車型、建筑平面、結構形式與停車方式確定,一般為平方米。汽車停車庫應符合下列要求:應設置排氣通風裝置;應設封閉樓梯間至地面層,并不與上層樓梯間連通;設有三臺以上電梯的辦公建筑,宜將一臺電梯通至護欄高度、欄桿間距、安裝位置必須符合設計要求,護欄安裝必須牢固。室內共900mm,水平扶手500mm長時其高度不宜低于1000mm。室外共用樓梯欄桿高度不宜低于1050mm,中住宅不應低于1100mm。樓梯井寬度大于200mm時,不宜選用使兒童易110mm梯等臨空處應設置防護欄桿,并應符合下列規(guī)定:欄桿應以堅固、耐久的材料制作,并能承受荷載規(guī)定的水平荷載;欄桿高度不應小于1.05m,建筑的欄桿高度應再1.20.1場所,欄桿應采用不易攀登的構造。宜為暖性、彈性地面。經常出入的通道應為防滑地面。衛(wèi)生間應為易清洗、不滲水并防滑的地面。嚴寒、寒冷地區(qū)主體建筑的主要出應設擋風門斗,其1.6m。平面設7800×60001200mm,打印室與間隔設置,便與辦公。接待室與門廳之間布置展覽室、茶水間和衛(wèi)生間。南面為展覽室與閱覽室等,利于學習,交流,北面為等。在附近各設置一個樓梯。空間構成和平面布置上注重推敲對稱建筑的關系。東西向建筑一層布置3900×6000。屋頂在建筑體形上占有重要地位,是豐富建筑形態(tài)、色彩和輪廓線的重要因素。所以本建筑在女兒墻上做了凹凸造型,本辦公樓建筑采用平屋頂與攢尖屋頂形式,其優(yōu)點是結構形式優(yōu)美,易獲得美感,設計中利用平屋頂的分段,高低以及檐口變化等處理取得親切的、小尺度的效果。立面設建筑立面是表示建筑物四周的外部形象,本設著重從立面比例尺度處理、虛實凹凸處理、立面的線條處理、色彩與質感處理、重點和細部處理來表現(xiàn)辦公樓的外部形象和個性。底層層高4.00米,其余各層層高3.00米,以滿足與會議室的凈要求。茶水間、衛(wèi)生間與主體建筑層高不同,利用細部設計來增強結構的層次感。剖面設根據規(guī)范規(guī)定采光通風的相關要求及辦公樓建筑的特點,與會議室窗高均1800,500mm,2100mm2100mm采用平屋頂女兒墻內排水,水落管設置在屋頂的兩側以及中部??紤]到此屋面為不上2.0%。樓梯設根據特點,樓梯踏步寬設為270mm,高度125mm。梯井凈寬為90mm,不用另外100mm。工程概建筑面積:5159.70m2建筑等級:結構安全等級為二級,設計使用年限為50年,抗震設防類別為標準設防類(即丙類),耐久等級為二級,環(huán)境類別:室內正常環(huán)境為一類,與水或土壤接觸的環(huán)境(主要是基礎)為二b類,耐火等級為二級,地礎設計等級為丙級。2.1層數與層高:53.0m,如房間尺寸較大可適當增加;各層可根據情設計標高:±0.000相當于絕對標高39.480m地質條2.2℃,雨季施工起止日期:71~930冬季施工起止日期:125~35B表 各巖土層力學指標匯總fak(kPa(MPa(kN/m3(m1——27.6/318.7/439/水文地質概況:最高水位-3.0m,常年水位-3.6m,無腐蝕性,土0.5m使用環(huán)境類別:二b荷抗震設防烈度為6度,設計分組為第二組,設計基本加速度值0.050w0.60kN00s0.20kNm20C25技術經濟條本工程在郊區(qū)可利用性公路,工具主要是汽車②現(xiàn)場水、電源情況:工地附近有自來水和高壓線可供使用315~1015材料選HRB335240mm×120mm×60mm,重度=18kN/㎡290mm×240mm×140mm,重度=9.8kN/㎡窗:鋼塑門窗=0.35kN/㎡門:=0.2kN/結構選型及布180180框架梁高度宜取hc=(1/12~1/8)l0,bb(1/3~1/2)hb,且框架柱長邊hc(1/12~1/8)Ho,且00mm,bc350mm,柱截面尺寸尚應滿bh300bh300
bh250500bh300700bh600確定框架計算底層柱高從基礎頂面算至二層樓面,基頂標高根據地址條件、室內高差,定為-1.00m,二層樓面標高為3.0m,故底層柱高為4.0m,其余各層柱高從樓面算至上一層樓面(即層高)3.0m,由此可繪出框架計算簡圖如下圖 2.2梁柱相對線剛度圖主梁取b×h=300mm×700mm中跨梁b×h=250mm×500mm縱向梁b×h=300mm×700mm基礎梁框架梁柱的線剛度計I=2
I=1.5
=EI/l=2.8×107kN/㎡×2×
×0.30×0.703/6.0m=8.0×104
=EI/l=2.8×107kN/×2×
×0.25(05m3
=EI/l=8.0×104底層柱:i
=EI/l=2.8×107kN/×
×(0.6m)4/4.0m=7.6×104標準層:i
EI/l=2.8×107kN/
×(0.6m)?4/3.0m=10.1×104令i標準層=104KNi左右邊跨10.1104KN5.4104KN10.1104KN7.610410.1104KN7.6104KNmi底層柱恒載標準值計
防水層(剛性)30厚C20細石混凝土防 1.0kN/ 0.4kN/㎡找平層:15厚水泥砂 0.015m×20kN/m3=0.30kN/找平層:15厚水泥砂漿 0.015m×20kN/m3=0.30kN/㎡找坡層:40厚水泥石灰焦渣砂漿3‰找平 0.04m×14kN/m3=0.56kN/㎡保溫層:80厚礦渣水泥 0.08m×14.5kN/m3=1.16kN/㎡結構層:180厚現(xiàn)澆鋼筋混凝土板 0.18m×25kN/m3=4.5kN/㎡抹灰層:10厚混合砂漿 0.01m×17kN/m3=0.17kN/㎡V型輕鋼龍骨吊 0.12kN/合計:8.51kN/水磨石地面(10200.65kN/結構層:180厚現(xiàn)澆鋼筋混凝土板 0.18m×25kN/m3=4.5kN/㎡抹灰層:10㎜厚混合砂漿 0.01m×17kN/m3=0.17kN/㎡V型輕鋼龍骨吊 0.12kN/合計:5.44kN/大理石面層,水泥砂漿擦縫、30厚1:3干硬性水泥砂漿,面上撒2㎜ 結構層:180厚現(xiàn)澆鋼筋混凝土板 0.18m×25kN/m3=4.5kN/㎡抹灰層:10厚混合砂漿 0.01×17kN/m3=0.17kN/㎡V型輕鋼龍骨吊 0.12kN/5.95kN/b×h=250×500 抹灰層:10厚混合砂 合計 抹灰層:10厚混合砂 合計基礎梁b×h=250×400梁自 25kN/m3b×h=600×600 抹灰層:10厚混合砂 0.01m×0.6m×4m×17kN/m合計縱墻 0.5m×0.24m×18kN/m3=2.16鋁合金 水刷石 0.42kN/m水泥粉刷 0.30kN/m合計縱墻 (4.0-1.8-0.7-0.4)×0.24×18kN/m3=4.75鋁合金 0.63水刷石 0.42kN/m水泥粉 0.3kN/m合計縱墻 2.3m×0.24m×18kN/m3水泥粉刷內 1.38合計內隔 2.3m×0.24×9.8kN/m3水泥粉 1.38kN/m合計內隔墻 (4.0-0.7-0.4)×0.24×9.8kN/m3水泥粉 1.23kN/m合計活荷載標準值樓面:2.0kN/sk=1.0×0.2kN/㎡=0.2kN/豎向荷載作用下框架內力計7.8m,2荷載如圖中的陰影線所示,計算單元范圍內的其余樓面荷載,則通過縱向框架梁以集中力的形式傳給橫向框架使用于各節(jié)點上,由于縱向框架梁的中心線與柱的中心線不重合,因此在框架節(jié)點上還作用有集中力矩。2.3(2)A-B5恒載 8.51kN/㎡×3.0m×8×2=31.91kN/5活載 0.5×3.0×85恒載 5.95kN/㎡×3.0×85活載 2.0×3.0×8梁自重 A-B軸間框架荷載為屋面梁:恒載=梁自重+板傳荷載=4.13kN/m+31.39kN/m=35.52活荷載=板傳荷 樓面梁:恒載=梁自重+板傳荷 =4.13kN/m+22.31kN/m=26.44活荷載=板傳荷 (3)B-C5恒載 8.51kN/㎡×1.35m×8×2=14.365活載 0.5kN/㎡×1.35m×8×2=0.845恒載 5.95kN/㎡×1.35×8×2=10.045活載 2.0kN/m×1.35kN/㎡×8梁自重 B-C軸間框架荷載為屋面梁:恒載=梁自重+板傳荷 =2.15活荷載=板傳荷 恒載=梁自重+板傳荷 =2.15kN/m+10.04活荷載=板傳荷 A、D頂層柱:女兒墻自重:(1100,100=0.24m×1.1m×18kN/m3+25kN/㎡×0.1m×0.24m+(1.2m×2+0.24m)×0.5kN/=6.67kN/m×7.8m+4.13kN/m×(7.8m-0.6m)+8.51kN/m×3.0×[1-+0.593]×7.8頂層柱活荷載=板傳荷 =0.5×3.0×0.51×7.8=5.97=3.51×(7.8-0.6)+4.13×(7.8-標準層柱活載=板傳活 =6.10kN/m×(7.8m-0.6m)+2.5kN/m×(7.8m-0.6m)=61.92=4.13×(7.8-0.6)+8.51×0.51×7.8×3+8.51×1.35×0.97×7.8=218.22頂層柱活載=板傳荷載=0.5×1.35×0.97×7.8+0.5×3.0×0.51×7.8=11.07=(4.13+11.32)×(7.8-5.44×1.35×0.97×7.8=237.81標準層柱活載=板傳活載=2.0×1.35×0.97×7.8+2.0×3×0.51×7.8=44.30=(8.05+2.5)×(7.8-2.42.5使用分層法計算框架A-B:35.52kN/m標準層:26.44kN/mB-C:16.51kN/m標準層:12.19kN/mC-D:35.22kN/m標準層 圖 頂層彎矩分配2.3圖 標準層彎矩分配圖2.4圖 底層彎矩分配2.9彎矩重分配后框架彎矩圖2.10彎矩調幅后框架彎矩圖活載作用下梁端彎矩計算:(分層法2.11活荷載作用下框架彎矩圖圖 調幅后活荷載作用下框架彎矩圖0.85,調幅后橫載和活載彎矩圖見以上各圖。
VVq
梁上均布荷載引起的剪力
ql2Vm梁端彎矩引起的剪力,Vm
Ml
M右NV中:V圖 恒載作用下的最終剪力圖 活載作用下的最終剪力圖 恒載作用下的最終軸力
圖 活載作用下的最終軸力重力荷載代表值計集中于各樓層標高處的重力荷載代表值Gi①屋面恒載:=8.51×(1031.94-②50%屋面雪荷載:=1/2×(1031.94-③縱梁自重④橫梁自重⑤下半層柱自重:⑦女兒墻G5 ①樓面恒載:5.95×[(7.8-0.24)×(6-0.24)×10+(3.9-0.24)×(6-12]=走道自重:5.44×(2.7-0.24)×(70.2-②50%樓面活載2.0×[(7.8-0.24)×(6-0.24)×10+(3.9-0.24)×(6-走道活載2.0×(2.7-0.24)×(70.2-③縱梁自重橫梁自重G4 G1=樓面橫荷載+樓面活載50%+梁自重+上下各半層柱自重+上下各半層墻G1 圖 各層重力荷載代橫向框架側移剛度的ibicD
12ic計算,式中系數c 關表可查得。(根據梁柱的線剛度比k的不同框架結構內力計算中,由于樓板作為框架梁的翼緣參與工作,使得梁的剛度有所提高,通常采用簡化方法進行處理。根據翼緣參與工作的程度,現(xiàn)計算矩形截面梁的慣性矩再乘以不同的增大系數。梁截面慣性矩取值見下表,表中I0為梁矩形部分的截面慣性矩。表 橫梁線剛度ib計算ENmm2cbll512502.7柱線剛度ichcmmENmm2cbhmm2Imm4cEcIcN2-6001600表 中框和邊框架線剛度分布2.9kib(層 (一般層 kDciEIC kib(底層k0.5(底層 kkkckki1kkcki1i2i3kki1kki1kEIc 104=kc 2D=kCcx10350.640.630.620.610.6表 B/C抗側移剛度計算bHkEIc kbkkc 2DkCc50.640.630.620.610.6 橫向水平作用下框架結構的內力和側移D按頂點位移計算框架的自振周期,頂點位移法是求結構基頻的一種近似方法,將結構按質量分布情況簡化為無限質量懸臂桿件,導出以直桿頂點位移便是基頻公式。D按式T1
2j
計算周期T表 橫向框架頂點位?對位移54321
T自振周期T1
橫向作用計算及樓層剪力計在B類場地,6度設防烈度,結構的特征周期T和影響系數Tg
amax
0.04(最大影響系數本工程建筑物高度不超過40m,質量和剛度沿高度變化均勻,變形以剪切變形為主,故采用底部剪力法計算水 作用,結構總水 作用標準值按公FEK=a1Geq即:Geq1
)0.9
(0.40)0.9因為:T1=0.431s<1.4Tg
dn=
1Geq0.03740.85Gi0.037450460.54表 各層橫 作用及樓 剪Fi
nn
FEK(1GiHinGk54321nj—1—各質點水平作用及了樓層剪力沿屋高分布圖 各質 作用分布圖 剪力沿房屋高度分布水平作用下框架位移計算
nn(ui)Vi/水 作用下框架結構的層間位 i和頂點位移i分別按公
nnu
(ui
計算,計算過程如表(11)表中e
表2.16橫向水平作用下的位移計VijFi/5432.6721由表中可知最大層間位移發(fā)生在第一層,其指為5.25104滿足式中uh=1/550表查的框架柱彎矩,剪力,及軸力計算,采用D根據總層數m,該柱所在層數nKyo根據上下橫梁線剛度比值來查得修正值y1,根據上下層高度變化查得修正值y2y3反yh=(yoy1y2y3)h表(2.17)邊柱(AD中柱(BC5層a1y1a1y1a2y2a2y2a3y3a3y34層a1y1a1y1a2y2a2y2a3y3a3y33層a1y1a1y1a2y2a2y2a3y3a3y3邊柱(AD中柱(BC2層a1y1a1y1a2y2a2y2a3y3a3y31層a1y1a1y1a2y2a2y2a3y3a3y3柱端及梁端的
=V(1
MD=Vyh
Vi表(2.19)各柱剪力及彎矩值(kN)DyMbV MuV(1 58.220.1858.220.81514.800.3014.800.70413.470.28513.470.71524.270.4024.270.60317.560.4017.560.6031.630.4531.630.55220.480.5020.480.536.890.5036.890.50111229/91827023.080.7523.080.2519380/91827039.830.64739.830.353--0.79650.790.79.--17.7140.796(22.890.79(43.136-17-171733.01(32.650.790.7990.796--2851.522(42.700.790.7900.796--4072.001(44.800.790.79梁端剪力計
圖 荷載作用下框架彎矩2.21各柱軸力計ik圖 柱軸力風荷載計為了簡化計算,作用在外上的風荷載可近似作用在屋面梁和樓面梁處的等效集中荷載代替。作用在屋面梁和樓面梁節(jié)點處的集中風荷載標準值:Wkzszw0hihjB/200式中ww=0.6kN/00zBs——風荷載體型系數,根據建筑物的體型查得s1.3z——風振系數,基本自振周期對于鋼筋混凝土框架結構可用T10.08n(n數)估算,大約為0.40〉0.25s,應考慮風壓脈動對結構發(fā)生順風向風振的影響。z1vzhihj2B——迎風面的寬度,B=7.8mH31T0.25H31計算z時,取H=16.00查表得
計算過程見表.10.12.20z/w0/kN/hi/hj/Wk/載作用下的位移驗側移剛度0.3
uj
2.212~5Dic2Di12/kN/cchD 表 22橫向底層D值的計稱ic0.52Dci12/kN/chADBCD 式中Vj——第jDiy——第juj——第j值,各樓板標高處的側移值是該層以下各層層間側移之和。頂點側移是所有各層層間側移之和。j
jjujjnn
uujj3Wj/Vj/D/(kN/uj/uj/h54321uuj層間側移最大值:1/2000<1/550(風荷載下的彎矩、剪力及軸圖 風荷載下彎矩圖 風荷載下的梁端剪圖 風荷載下的柱子軸重力荷載代表值作用下的內力重力荷載代表值作用下的彎矩、剪力及屋面梁上的線荷載設計值:恒載+0.5ABqWCD35.536.30kN/mqWBC16.517.29kN/m樓面梁上的線荷載標準值:恒載+0.5CD26.440.527.834.24kN/qBC12.190.527.819.99kN/2.24圖 重力荷載代表值作用下的彎矩圖 重力荷載代表值作用下的剪力2.28邊緣處軸力計MMVb,VV 作用MMVb,V MVMVMVMVMVMVMVMV5AD4AD3AD2AD1AD內力組內力基本組合表(不考慮荷載作考慮荷載作135SGK14CSQ14WK12SGK14SQ14WKK5層左MV--中MV右MV4層左MV--中MV右M--V3層左MV--中MV右MV2層左MV--中MV右MV1層左MV--中MV右M--V內力基本組合表(不考慮荷載作考慮荷載作135S14S14S12S14S14 WKK5層左MV--中MV右MV4層左MV中MV右MV3層左MV中MV右MV2層左MV中MV右MV1層左MV中MV右MV內力基本組合表(框架A不考慮荷載作考慮荷載作135SGK14CSQK112SGK14SQ14WKRE[12(SGK05SQK5層上M--N--V下M--N--V4層上M--N--V下M--N--V3層上M--N--V下M--N--V2層上M--N--V下M--N--V1層上M--N--V下MN--V內力基本組合表(框架B不考慮荷載作考慮荷載作135SGK14CSQK14W12SGK14SQ14WKRE[12(SGK05SQK5層上MN--V--下MN--V--4上M層N--V下MN--V3層上MN--V下MN--V2層上MN--V下MN--V1上M層N--V下MN--V
f=11.9N/mm
f=1.27N/mmctycty
f300N/mm2f270N/y框架y以底層Bcf=11.9N/mm2,fy=300N/mm2,fyv270N/ch0has=600-NmaxN N 0.648
11.9
選M=112.93kNm,N=1826.00kN,V=47.72kN進行截面計算。按對稱配筋計 =1/121/12600IA=IA=
3412M
34120.68lci4000/173.223.09e0N
,eaeie0ea61.8520eeh
81.85+30045 AsAs,fyf
Nb1fcbbh01.011.96000.555552179.4851826.00為大偏壓
1826
0.461f 11.9600 1 Ne1fcbh210.5AsAs
1826103336.851.011.960055520.46110.5 300555
0.55%6002/2418,
M
3.0,
。N1826.00kN0.3fcA0.311.96002/10001282.2N=1282.2kN
1.27600555+0.071285.210348@150, nAsv1450.3
svmin0.24
0.241.27 架梁配筋計AC
IIIIV
V 圖 選取截面及受力梁端彎梁截面下部受拉時,翼緣在梁的受拉區(qū),此時截面可按T形截面進行配筋計算;當梁承受負彎矩時上部受拉,即翼緣在梁的受拉區(qū),受拉區(qū)的混凝土開裂后,翼緣對承載力就不起作用了,故梁承受負彎矩時按矩形截面進行配筋計算。ABft=1.27N/mm2fy=300N/mm2AB按翼緣高度hf′考慮:bf=2000mmAB hf 1801fcbfhfh021.011.920001806602 2441.80kNmM85.44kN則該TTs
1fcbf
1.011.920006602
s
0.0100b1212s12As f
3
3000.9950AsAs
300
0.287%
45 f
451.27ABAM=-81.79kNs
1fcbf
1.011.9300
s
0.054b1212s12As f
ysh0=3000.9730S3S
A
300700
0.287%
且
ft451.27 BM=-173.02kNs
1fcbf
1.011.93006602
1212s
12sAs f
1021.60mm 1021.60mm
3000.94093
ASS
300700
0.682%
45ft451.27
表 頂層框架梁的正截面計ⅠⅡⅢⅣⅤb× fbh 112s<bs0.5(112sA fsy32%(As框架截面設Ahw4801.60
混凝土強度等級為C25,,取 25N/mm250N/mm2, 0.25cfcbh0=0.251.011.9300660=589.05kN>V=115.720.7ftbh0=0.71.27300取箍筋8@200,加密區(qū)配8@100nAsv1250.3
svnAsv1
2300
fsvminfy
0.241.27Bhw4801.604 C25,fcu,k25Nmm250Nmm2c10.25cfcbh0=0.251.011.9300660=589.05kN>V=118.790.7ftbh0=0.71.27300按構造配筋:取箍筋8@200,加密區(qū)配8@100nAsv1250.3則
250.3300200
svmin
f
0.241.270.113% AABB密BBCb--VGb/--1.3(MlMrV b n-1.3(18.0418.04)23.34-106.13-106.13- 0.2cfcbh0AsvV0.42 888888@8@箍筋最大間距min(8d1h4配筋率 本工程基礎采用柱下獨立基礎,以一榀框架結構的B軸為例,進行柱下獨立基礎的設計,選粘土層為持力層,fak 240kN/m2,根據地質條件基礎埋置深度取2.1m,1000mmC25fc11.9kNmm2mf
360kN/
。取基礎高度1000㎜。粘土 19.2kN/
G 17.8kN/G
(d
0.5圖 B柱下獨立基礎計算簡尺寸及埋置深a.271.1+1.0=2.1m,100b. 受壓基礎初步估算基底面fafckdm(d0.5)2401.019.2(2.10.5)
1.2Nk,
0 14.51/fa14.51/
275
b 2.6
lnb5.2mC.mMkm
Nk
VkGk202.65.2(2.10.450.5)ek
MkNk
25.29kN2776.02kN0.0074m6
Pk,maxNkGk(16ek)2776.02628.68160.0074{253
251k,min
2.6
PPk,maxPk
持力層承載力Pk252.90kPafat取as60mmh0100060940mmtC25
f1.27N/atac600mm(柱寬ab6002940am(2480600)/21540mm1.54A(lach)b(bbch
0.942.6
0.94
252.903.5324893.34
0.7hft2.9.3筋計
MPn(la)2(2bb 1253.985.20.6222.60.6mmyHRB400(f360Nmm2y
0.9h0f
1298.771060.99403608
m2);另一方向選用 25@120(As=3927mm22.9.4震設Mk112.93kN
Nk
Vkek
MkNk
mm0.0460ml6Pk,maxNkGk(16ek)1826.00
60.0460
191
1
{171k,min
5.2
A
Pk,max191.20kPa1.2faE1.2afa1.21.3af240kNm2,根據地質條件基礎埋置深度取為1.7m,a基礎高度為600mm?;A采用C25混凝土,fc11.9kNm鋼筋選用三級鋼筋,2yf300kNm2。由上部結構傳到基礎的荷載為.取基礎高度600㎜.粘土y 18.9kNm3,回填土17.8kNm3。(
0.5 圖 A柱下獨立基礎計算簡a.271.1+0.6=1.7m,100FkGkmMk=26.37+63.64x0.08=31.46m1.2A0FkGkfaab ab3.4m
fafakb(b3)dm(d0.5)2400.519.8(3.43)18.9(1.70.5)266.641.2A0FkGkfa1.2ab 3.21.2C.mMkm
VkGk203.23.2(1.70.450.5)394.24ek
MkNk
0.0134m6Pk,maxNkGk(16ek
1960.83394.24
60.0134
208
{198k,min
PPk,maxPk
fafa1.2取as60mmh060060C25
ft1.27N/acat600mm(柱寬ab6002540am(1680600)/21140mm
A(lach)b(bbch
0.543.4
0.54
h0.7hft
MPn(la)2(2bb
208.543.40.62mmHRB400fy360Nmm2
0.9h0f
0.90.543608
m2);另一方向選用 20@120(As=2513mm2Mk81.26kN
Nk
Vkek
MkNk
0.0482m6
NkGk
6ek
60.0482
k,min
本工程位于青島市,為五層鋼筋混凝土框架結構辦公樓,建筑面積5159.70平方米。設防烈度為6度;結構抗震等級為2級;屋面防水等級為2級;耐火等級為級。本工程除包含有土建工程外,還有給排水、采暖工程,弱電管道敷設、動力、照明工程。工程質量:達到省級優(yōu)質質量等級標準,施工工期:216主要裝飾做法:外墻刷涂料,內墻刷乳膠漆,衛(wèi)生間鋪地板磚,樓地面采用水磨地面。所有門窗采用彩色塑鋼窗。場組織機構設本工程由我公司承建,將由公司挑選管理經驗豐富、技術水平高、責任心強的優(yōu)秀管理組建工程項目部,從組織上確保嚴格按本施工組織設計制定的各項技術要求,對本工程實施科學規(guī)范化的項目管理,加強對施工過程的質量預控工作。公司將本工程列為創(chuàng)優(yōu)質重點工程,從技術管理,施工力量,機械配置,材料供應,調度等方面,全方位對本工程給予支持。由公司技術部、質安部派專人對本工程施工的全過程實施管理和,以確保本工程按合同如期竣工,驗收一次達標。本工程的施工組織管理采用項目部集中管理施工技術、材料供應、專業(yè)工種調財務組:負責財務及預決政工后勤組:負責思想教育和現(xiàn)場工作主要職責施工全過程的有效控制,確保影響產品質量的所有因素處于受控狀態(tài);負責組織生產協(xié)調,以滿足合同對工程的要求;負責材料設備購置計劃,對施工中所用各類物資的管理負責;對所分管的實施有效管理。負責對各項技術性文件、的有效性進行監(jiān)督管理;負責審核、檢驗、測量、試驗和設備購置;負責處理重大事故技術方面的問題,組織事故分析會,評審和處置重大質量事故;負責項目質量計劃的;對所分管的實施有效管理。能責組織本項目經理部質量計劃編制,實施工作;負責簽訂分包合同,并對分包工質量。對工程技術質量管理全面負責,編制本工程質量計劃;負責制定成品保護措施;QC會審及時填報技術核定單;做好各分項工程施工技術交底工作。施工原本工程的施工組織管理采用項目部集中管理施工技術、材料供應、專業(yè)工種調按先后地上的原則,將工程劃分為基礎及室結構、主體結構、內外裝基礎工程:測量放線,基坑支護及土方開挖,人工挖孔樁施工,樁承臺、地梁土方開挖,搗砼墊層,砌磚模,做底板防水層,承臺、地梁、底板鋼筋綁扎,搗承臺、地梁、底板砼,室鋼筋砼結構工程。主體結構:要密切圍繞模板、鋼筋、砼這三大工序組織施工,注意計算好支模所需材料及鋼筋供應。水電安裝:密切配合結構施工,完成設備基礎砼澆搗,預埋套管及樓面預留孔洞工作。施工段根據本工程特點,成立現(xiàn)場項目經理部,由項目經理部總承包并承擔土建施工,公司各專業(yè)部門配合。水電隊承包水電安裝工程,裝飾處承包裝修及裝飾工程。鋁合金門窗、幕墻工程、地板工程、木門防火門工程以及機電安裝工程由建設單位委托專業(yè)施工單位進行施工,不銹鋼扶手等由經理部委托生產廠家制作并安裝,防水工程由經理部委托生產廠家施工。一切工序必須根據總包安排的綜合進度計劃合理穿插作業(yè)。在進行工程施工時,施工綜合隊1和施工綜合隊212施工順基坑放線定位→基坑支護及土方開挖→測量放線→人工挖孔樁施工→承臺、基礎梁開挖→搗砼墊層→砌磚?!龇浪畬印壴信_、底板鋼筋→基線復核→插柱及剪力墻筋→鋼筋及隱蔽驗收→澆筑砼→砼養(yǎng)護→柱放線→綁扎柱鋼筋→鋼筋及隱蔽驗收放線→墻、柱鋼筋綁扎→防雷焊接及專業(yè)管線、洞預埋預留→墻柱支模板→梁、板支模板→墻、柱砼澆筑→梁、板鋼筋綁扎→水電等專業(yè)管線、洞預埋預留→梁、板砼澆筑→砼養(yǎng)護→拆?!?→至結構完。結構處理→放線→隔墻砌筑→門窗框安裝→搭腳手架→天花及抹灰→水、電、設備管線安裝→飾面工程→拆腳手架等→樓地面施工→門窗扇安裝工程→粉刷油漆→燈具安裝→清理→竣工。屋面工程→結構處理→由五層向上打底子灰→從頂層向下做面層→裝飾工程→臺階散水→清理。施工準備是為擬建工程建立必要的技術和物資條件,統(tǒng)籌安排施工力量和施工現(xiàn)場,是土建施工和設備安裝順利進行的根本保證。組織準技術準認真學習、施工圖紙,土建、水電專業(yè)綜合會審。進行設計交底和施工技術交底。編制施工方案和施工操作要點,組織施工學習。組織有關抽工料,及時訂貨加工。測設基準線。在此基礎上,對各主要工程進行定位和標高引測,并設置座標和標高的控制點,埋設半控制樁。設備準施工現(xiàn)場準現(xiàn)場的"三通一平"工作已由甲方做好,進場后應做好臨建的搭設工作,做好施工用水用電管線的架(鋪)設工作。根據以往的施工經驗,施工用電可采用BLV-75mm2鋁芯橡皮線,用水主管采用φ50鍍鋅,支管采用φ25鍍鋅可滿足施工要求。根據施工實際情況搭設臨時設施,按施工機具需要量計劃安排施工機具進場,并進行安裝調試。其他準組織調配勞動力,進行施工前的技術、質量、安全、文明施工等各項教育,并分工種進行技術操作規(guī)程的培訓。設置工程項目標牌、安全標牌和文明施工標牌,完善各項安全設施。測量工成立由測量工程師和技術員等四人組成的測量小組,專門負責工程的定位、軸施工放線前,應提前復核建筑與周邊紅線的距離,經規(guī)劃部門現(xiàn)場驗線及設計單位確認后方能正式施工。土方開挖前,要作好工程測量控制,根據工程場地實際情況,采用主軸線控制設平面控制樁。經過閉合后達到要求精度,即為平面控制標樁。并據此測量出建筑物各軸線??刂泣c測定后,在控制樁上,應用紅三角標記和注明軸線號;地面上的控制點用砼澆筑成300×300×1000mm樁,頂面復以200×200×4mm鋼板,板面上刻為樁點標志,并砌筑窨井形式加以保護。由于本工程較大,至少要設三個現(xiàn)場水準點,以控制和引測建筑物標高,并構成閉合圖形,以便閉合校核。根據現(xiàn)場情況設三個水準點樁(利用平面控制樁。實際測S3±0.00柱或樓梯間等向上豎直進行。水準標高應由三處向上引測,以便相互校核。三處用鋼尺向上引測投點后,把水準儀架設到施工層上,核測三點誤差在3mm以內,再以引測點在施工層上抄測標高??蚣懿鹉:?,在柱和墻壁上彈出每樓層500水平線,砌塊墻500該工程垂直度(豎向)的控制采用激光經緯儀外控法中的延長軸進行,方法是將激光經緯儀安置在延長軸線的控制樁上,后視首層軸線后,抬起望遠鏡將軸線直接投測在施工層上。③測前要對經緯儀的軸線關系進行嚴格的檢校,觀測時要精密定平水平度盤水準管,以減少豎軸不垂直的誤差。④軸線的延長樁點要準確,標志要準確、明顯,并妥善保護好。必須以首層軸層線位置為準,直接向施工層投測,避免逐層上投造成誤差積累。⑤取正倒鏡向上投測的平均位置,以抵消經緯儀的視準軸不垂直橫軸和橫軸不垂直視軸的誤差影響。M60"/V。D'/P"2M豎=H/P×t/5H,D'為向上投測時的斜視線長,tVP"①觀測時應做到前后視線等長,測水平線時,最好是用直接調整水平儀的儀器高度,使后視時的視線正對準水平線,前視時則可直接用鉛筆標出視線標高的水平線。③該工程±0.000±0.000復線校核,誤差則進行修正,修正后再采用直角或極坐標(圓弧形部分)法將控制軸線重新測出,以此為準來控制以上的軸線標高。土方工性工程挖方的標高、邊坡、應符合設計要求,若發(fā)現(xiàn)工程地質與設計資料不符時,承包人應報告工程師處理,待工程師下達修改設計命令后才能施工。土方開挖宜從上到下分層分段依次進行,隨時做成一定坡度,以利排水,并不得在影響邊坡穩(wěn)定的范圍內積水。挖方的棄土堆,應按施工總平面圖規(guī)劃確定,不能影響周圍的建筑物,構筑物道路和排水等,工程師同意,承包人不得將好土外運,廢棄土需外運,工程師同意后,運出本工程范圍以外有關方面允許存放的地方。停止施工,必要時,所有和機械撤至安全地點;提出處理方案送工程師審基底上的樹墩及主根應拔除,坑穴應清除積水、淤泥和雜物,并分層回填夯實(或壓實0.5m。填土前,應對填方基底和已完陷蔽工程進行檢查和中間驗收,并作出記錄?;硬垓炇詹坏眠M行填土施工。碎石類土、砂土(使用細、粉砂時應取得工程師同意;含水量符合要求的粘性土,可用作各層填料;碎塊草皮和有機質含量大雨8%的土,僅用于無壓實要求的填方;淤泥和淤泥質土不能用作填料。(填工前,承包人應根據工程特點、填料種類、設計壓實系數、施工條件等合理選擇壓實機具,并通過現(xiàn)場的壓實試驗確定填料含水量控制范圍,鋪厚度和壓實遍數等參數。填工前,承包人應根據設計圖紙要求,通過現(xiàn)場的系列試驗,求出填土的壓實系數和相應的干容量,并作出對應表格,提交工程師批準后執(zhí)行。填工應接近水平的分層填土、壓實和測定壓實后土的干容量,檢驗其壓實系數和壓實范圍符合設計要求后,才能填筑上層。填料為粘土或排水不良的砂土時,其最佳含水量與相應的最大干容量,宜按《土方與工程施工及驗收規(guī)范(GB201-83)附錄五的擊實試驗測定。如無擊實試驗條GBJ201-83填料為粘性土,填土前應檢驗其含水量,必須在控制范圍內。如含水量偏高或偏低,均應采取有效措施處理。填料為碎石類土(充填物為砂)時,碾壓前應充分灑水濕透,以提高壓實效果。填方每層鋪土厚度和壓實遍數應根據土質,壓實系數和機具性能確定;碾壓時,輪(夯)0.5m-1.0m;上、下層錯縫距離不小1m。回填土夯壓實時,不得出現(xiàn)"橡皮土",若出現(xiàn)"橡皮土"必須挖除,重新回填好土基坑槽開挖或回填應連續(xù)進行,盡快完成。施工中應防止地面水流入坑、溝內以免過坡或基土遭到破壞。雨期施工或基坑槽挖好了后不進行下一工序時,可在基底標高以上150mm--300mm采用機械開挖基坑槽時,可在基底標高以上預留一層人工清理,其厚度應根據施工機構確定?;硬鄣撞康拈_挖寬度,除基礎底部寬度外,應根據施工需要增加工作面,其厚度應根據施工機構確定?;A底部開挖寬度,應增加工作面寬度。每個工作面寬度應符合《工程施工及驗(GBJ201-83)土方工程的要求。基槽開挖需要放坡的需要放坡或支撐等辦法,由實際施工確定,但必須保證槽邊坡的穩(wěn)定?;弁诤煤螅瑧皶r進行結構和安裝工程長期施工過程匯總,應經常檢查坑壁的穩(wěn)定情況?;凵疃龋临|條件,水位、施工方法,相鄰建筑物和構筑物等情況進行選擇和設計。支撐必須牢固可靠確保安全施工。并應防止附近建筑物和構筑物等產生下沉和破壞,必須時采取加固措施。基槽不得超過基底標高。如個別地方超挖時,應用與基土相同的料填補,并夯實至要求的密實度。在重要部位超時,可用低標號混凝土填補,并應取得工程師同意。(50kg/cm2)不致因填土而受損傷且經過基礎結構驗收合格后,方可回填;回填土料,每層鋪填厚度和壓實要求,應按有關規(guī)定執(zhí)行;基槽回填順序,應按基底排水方向由②表面標高人工清土--±50mm;機械清理--③長度、寬度(由設計中心線向兩邊量)④邊坡坡度:人工施工--表面平整,不應偏陡,機械施工一基本成型,不應偏⑤地基水平標高偏關--0~50mm,平整度偏差(2m)--20~50m3100~500m2400~900m2質量目標:確保工程達到省優(yōu)良工確保每道工序受控,建造業(yè)主滿意工程。具體目標:分項工程100%,分項為達到此目標,我們結合本工程實際建立完整的質量保證體系,制定了詳細的質量計劃,建立質量控制點,使質量管理落到實處。工期目本工程業(yè)主要求工期為217日歷天,我公司本著"為用戶著想"的原則,根據我公司的實力,結合以往施工中的質量、管理經驗,周密布置,精心安排,盡快發(fā)揮本工210 期:216日歷安全目杜絕事故和重大傷亡事故,輕傷率控制在1.50%以內。嚴格按國家建設部安全"一標、三規(guī)范"安全施工的各項規(guī)定,執(zhí)行、創(chuàng)建施工標準化工地,安全達標率現(xiàn)場文明施場內建筑材料堆放整齊,實行禁煙、無管理,保持場地道路暢通,保持場容90%施工,特制定下列標準,定期檢查,嚴格執(zhí)行。平面有圖,按圖施工,圖物相符;大宗材料,碼方成垛,分類堆放;暫設水電,桿正線直,安全不漏;道路暢通,排水無阻,沒有;暫設料房,規(guī)格整齊,防雨防潮;宿舍整潔,衛(wèi)生,紀律嚴明;科學管理,機構健全,制度完善;責任到人,掛牌施工,獎罰分明;限額領料,隨干隨清,工完料凈;按圖施工,精心操作,保護成品;施工腳手,搭設標準,規(guī)格整齊;施工工具,用完弄凈,整齊保管;機械設備,運轉正常,保養(yǎng)清潔;包裝用品,保存完整,回收交庫;按期交工,質量優(yōu)良,清潔衛(wèi)生。環(huán)保目采取有效措施,減少施工噪音和環(huán)境污染,確保施工期間不擾民、不影響城市道路及環(huán)境衛(wèi)生??萍歼M步目積極采用目前國內先進的新技術、新工藝和先進的管理,優(yōu)質高效的建設本工程。(1)本工程施工的各關鍵點、難點可分為四大部分,分別是基礎工程、主體工程、裝修工程、安裝工程。各部分關鍵點、難點分述如下:(1)(2)工(3)(3)《地基與基礎工程施工及驗收規(guī)范 GBJ202-《混凝土結構工程施工及驗收規(guī)范 GB50204-《磚石工程施工及驗收規(guī)范 GB203-《地面與樓面工程施工及驗收規(guī)范 GBJ209-《屋面工程施工及驗收規(guī)范 GBJ207-《建筑裝飾工程施工及驗收規(guī)范 JGJ73-《建筑安裝工程質量檢驗評定統(tǒng)一標準 GBJ300-《建筑工程質量檢驗評定標準 GBJ301-《鋼筋焊接及驗收規(guī)范 JGJ18-《建筑電氣安裝工程質量檢驗評定標準 GBJ303-《建筑采暖衛(wèi)生與煤氣工程質量檢驗評定標準 GBJ302-《加氣混凝土砌塊墻及保溫屋面構造 《采暖衛(wèi)生工程施工及驗收規(guī)范 幾個月緊張的畢業(yè)設計,已經進入尾聲了,這對影響是巨大的。這讓我對土木工程整個方向有了全新的認識,也讓我對土木工程設計有了責任感和榮譽感。經過兩個月的時間,我完成了本次畢業(yè)設計─青島財經學院辦公樓設計,本次設計經過了收集整理資料、建筑手繪草圖、天正繪圖、結構計算、PKPM建模出圖和施工組織設計等過程,使我明確了畢業(yè)設計所包含的各項內容,并對設計過程中遇到的問題進行了探討和解決。在設計的過程中,遇到的問題是不斷的。前期的建筑方案有各種疏忽之處,此后在指導老師和的幫助下,通過查閱書籍、建筑規(guī)范以及各種設計資料,使設計漸漸趨于合理。在計算機制圖的過程中,我更熟練AutoCAD、天正建筑等建筑設計軟件。在此過程中,我對制圖規(guī)范有了較為深入地了解,對平、立、剖面圖的內容、線形、尺寸標注等問題上有了更為清楚地認識。中期進行對選取的一榀框架進行結構手算更是重頭戲,對各門專業(yè)課程知識貫穿起來加以運用,比如恒載,活載與抗震的綜合考慮進行內力組合等。開始的計算是錯誤,稍有不慎,就會出現(xiàn)與規(guī)范不符的現(xiàn)象,此外還時不時出現(xiàn)筆誤,于是反復參閱各種規(guī)范,設計例題等,把上的知識轉化為自己的東西。后期的計算書電腦輸入,由于以前對各種辦公軟件應用不多,以致開始的輸入速度相當的慢,不過經過一段時間的練習,逐漸熟練。緊張的畢業(yè)設計終于劃上了一個滿意的,回想起過去這段時間的設計收獲是很大的,看到展現(xiàn)在眼前的畢業(yè)設計成果,不僅使我對四年來大學所學專業(yè)知識的進行了一次比較系統(tǒng)的復習和總結歸納,而且使正體會了設計的艱辛和一種付出后得到了回報的滿足感和成就感。同時也為以后的工作打下了堅實的基礎,也為以后的人生作好了鋪墊。因此,通過本畢業(yè)設計,掌握了結構設計的內容、步驟、和方法,全面了解設計的全過程;培養(yǎng)正確、熟練的結構方案、結構設計計算、構造處理及繪制結構施工圖的能力;培養(yǎng)我們在建筑工程設計中的配合意識;培養(yǎng)正確、熟練運用規(guī)范、手冊、標準圖集及參考書的能力;通過實際工程訓練,建立功能設計、施工、經濟全面協(xié)調的思想,進一步建立建筑、結構工程師的。歲月如梭,如歌。轉眼間,四年的大學求學生活即將結束,站在畢業(yè)的門檻上,回首往昔,奮斗和辛勞成為絲絲的,甜美與歡笑也都塵埃落定。琴院以其優(yōu)良的學習風氣、嚴謹的教學氛圍教我求學,以其博大包容的情懷胸襟、浪漫充實的校園生活育我成人。值此畢業(yè)設計完成之際,我謹向所有關心、愛護、幫助人們表示最誠摯的感謝與最美好的祝愿。本計算書是在老師的悉心指導之下完成的。導師淵博的專業(yè)知識,嚴謹的治學態(tài)度,精益求精的工作作風,誨人不倦的高尚師德,樸實無華、對我影響深遠。本設計的完成也離不開各位老師、同學和朋友的關心與幫助。在此對他們的關心和幫助表示感謝,感謝在我最美好的年華里遇見了他們。在以后的生活中,我會秉承會計嚴謹治學的態(tài)度去對待,嚴謹做人,科學求實,絕不辜負老師和同學的期望。四年對現(xiàn)在的我們來說真的猶如彈指一揮間在我們身邊就這樣過去了,四年的辛勤四年汗水,四年的歡聲四年的笑語就這樣隨著我們畢業(yè)設計的完成即行將結束了。通過畢業(yè)設計這個過程,我鞏固了大學四年所學的專業(yè)知識,也學到了很多新的知識,培養(yǎng)了能力和動手能力,很好的將理論學習與實際研究相結合,這為日后盡快融入工作打下了基礎??傊舜卧O計的過程,我收獲了很多。畢業(yè)設計的完成為大學四年劃上了一個完美的,也為將來的人生做了一個很好的鋪墊。由于時間倉促、自身等原因,計算書有錯誤疏漏之處,懇請各位老師和同學斧1,朱金銓.混凝土結構及砌體結構.中國建筑工業(yè)黃棠,王效通.結構設計原理(上冊).中國鐵道莫海鴻,楊小平.基礎工程.中國建筑工業(yè).混凝土及砌體結構.華南理工大 王萍.混凝土結構及砌體結構.大連理工大學張延年.建筑抗震設計.機械工業(yè)7.混凝土結構設計原理.重慶大學黃雙華.房屋結構設計.重慶大學陳樹華.建筑地礎.哈爾濱工程大學侯治國.砼結構.工業(yè)大學11.建筑結構課程設計指導.工業(yè)大學沈滿生,蘇三慶.高等學校建筑工程專業(yè)畢業(yè)設計指導.中國建筑工業(yè)賈韻綺,紅.工業(yè)與民用建筑專業(yè)課程設計指南.中國建筑工業(yè)陳登鰲.建筑設計資料集(1、2、3、8、9).中國建筑工業(yè)建筑抗震設計規(guī)范GB50011-2010.中國建筑工業(yè)混凝土結構設計規(guī)范GB50010-2010.中國建筑工業(yè)建筑地礎設計規(guī)范GB50007-2002.中國建筑工業(yè)建筑抗震設防分類標準GB50223-95.中國建筑工業(yè)建筑結構荷載規(guī)范GB50009-2001.中國建筑工業(yè)建筑地礎設計規(guī)范GB50007-2002.中國建筑工業(yè)托兒所、辦公樓建筑設計規(guī)范JGJ39—87.中國建筑工 Concretestructurereinforcement:structureinthelong-termnaturalenvironmentandundertheuseenvironment'sfunction,itsfunctionisweakeninevitablygradually,ourstructuralengineering'sdutynotmustfinishthebuildingearlierperiodtheprojectwork,butmustbeablethesciencestructuredamageobjectivelawandthedegree,andadoptstheeffectivemethodguaranteestructurethesecurityuse,thatthestructurereinforcementwill eanimportantwork.Whatmayforeseewillbethe21stcentury,thehumanbuildingalsobytheconcretestructure,thesteelstructure,thebricking-upstructureandsoonprimarily,thepresentstageIwillthinkusinthestructurereinforcementthisaspectresearchshouldalsotakethisasthemainbreakthroughdirection.Keyword:Concretestructurereinforcementbricking-upstructurereinforcement structurereinforcementConcretestructureConcretestructure'sreinforcementdividesintothedirectreinforcementandreinforcestwokindsindirectly,whenthedesignmayactaccordingtotheactualconditionandtheoperationrequirementschoicebeingsuitablemethodandthenecessarytechnology.thedirectreinforcement'sgeneralmethod1)EnlargesthesectionreinforcementlawAddstheconcretescast-in-placelevelinthereinforcedconcretememberinbendingcompressionzone,mayincreasethesectioneffectiveheight,theexpansioncrosssectionalarea,thusenhancesthecomponentrightsectionanti-curved,theobliquesectionanti-cutsabilityandthesectionrigidity,playsthereinforcementreinforcementtherole.Inthesuitablemusclescope,theconcreteschangecurvedthecomponentrightsectionsupportingcapacityincreasealongwiththeareaofreinforcementandtheintensityenhance.Intheoriginalcomponentrightsectionratioofreinforcementnottoohighsituation,increasesthemainreinforcementareatobepossibletoproposetheplateaucomponentrightsectionanti-curvedsupportingcapacityeffectively.Ispulledinthesectiontheareatoaddthecast-in-placeconcretejackettoincreasethecomponentsection,throughnewCanadapartialandoriginalcomponentjointwork,butenhancesthecomponentsupportingcapacityeffectively,improvementnormaloperationalperformance.Enlargesthesectionreinforcementlawconstructioncraftsimply,compatible,andhasthematuredesignandtheconstructionexperience;IssuitableinLiang,th,thecolumn,thewallandthegeneralstructureconcretesreinforc
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2024年招標代理服務協(xié)議
- 2024教育培訓費用協(xié)議協(xié)議
- 2024年車展參展商協(xié)議范本
- 保健食品區(qū)域代理協(xié)議(2024年)
- DB11∕T 1602-2018 生物防治產品應用技術規(guī)程 白蠟吉丁腫腿蜂
- 2024裝飾監(jiān)理服務化協(xié)議
- 2024年專業(yè)物流服務協(xié)議全書修訂
- 2024年度電力工程技術合作協(xié)議
- 2024年企業(yè)萬股股權融資合作協(xié)議
- 文書模板-《承重架使用協(xié)議書》
- JTT791-2010 公路涵洞通道用波紋鋼管(板)
- 2024年航空職業(yè)技能鑒定考試-無人機AOPA駕駛證考試(視距內駕駛員視距內駕駛員)筆試歷年真題薈萃含答案
- 科研的思路與方法
- 山東聯(lián)通公司招聘筆試題
- 2024年新智認知數字科技股份有限公司招聘筆試參考題庫含答案解析
- 金屬探測器檢測記錄
- 安全教育記錄范文(25篇)
- 2024年供應鏈管理競賽考試題庫
- 三年級語文下冊第二單元群文閱讀教學設計
- 習思想教材配套練習題 第七章 社會主義現(xiàn)代化建設的教育、科技、人才戰(zhàn)略
- led顯示屏工藝流程
評論
0/150
提交評論