版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)
文檔簡介
1、®U.S. Registered TrademarkCopyright © 1997 Honeywell Inc. All Rights Reserved BEFORE INSTALLATIONE-Bus Free Topology Transceiver (FTT/Linked PowerTransceiver (LPT networks require termination. Dependingon the network topology, one or more FTT/LPT TerminationModules may be required, see Fig
2、. 1. If an FTT Repeateror a LPT device is required in the network, their on-boardterminators can be used in place of the 209541BTermination Module. Refer to the E-Bus Wiring Guidelines, form 74-2865, for complete rules on network topology andtermination module locations. Refer to the Q7740A,B FTTRep
3、eater Installation Instructions, form 95-7555, forinformation on enabling the on-board network terminators.FTT networks are very flexible and convenient forinstallation and maintenance. However it is imperative tocarefully plan the network layout, and create and maintain accurate layout documentatio
4、n.INSTALLATIONThe FTT/LPT Termination Module can be attached to thenetwork at a controller node (the easiest place; In a wallmodule that is attached to standard utility junction box (themodule will not fit in a 60 mm junction box; At a wiringjunction (using wire nuts. See Fig. 6 when connecting twow
5、ires at a controller or wall module terminal. If thetermination module must be located at a surface mountedwall module, and does not fit inside the wall modulehousing, extend a pair of E-Bus wires from the wall moduleback to the nearest junction box or controller, and wire inthe termination module.
6、The module has three lead wires,but only two are attached to the E-Bus network .To installthe termination module, connect the brown and yellowwires to the E-Bus when the network requires single termination ; connect the brown and orange to the E-Buswhen the network requires double termination. In ei
7、thercase, always cover the unused wire with a wire nut toprevent potential grounding problems. As with other E-Busconnections, polarity is not important. Fig. 2 shows themodule attached to typical FTT/LPT network topologies fora single termination .Fig. 2. FTT/LPT termination module wiring for singl
8、etermination network topologies.Excel 10 FTT/LPT 209541BTERMINATION MODULEEXCEL 10 FTT/LPT 209541B TERMINATION MODULE Home and Building ControlHome and Building ControlHome and Building Control ProductsHoneywell Inc.Honeywell Limited-Honeywell LimiteeHoneywell AGHoneywell Plaza155 Gordon Baker RoadB
9、oblinger Strae 17P.O. Box 524North York, OntarioD-71101 SchomaichMinneapolis, MN 55408-0524M2H 3N7Phone (49-7031 637-01Fax (49-07031 637-493 95-7554 J.D. 3-97Printed in MexicoFig. 3 shows the physical connection of the module for asingle termination network. Fig. 4 shows the modulesattached to a typ
10、ical FTT/LPT network for a double termination . Fig. 5 shows the physical connection of themodules for a double termination network. Doubletermination is only applicable when a network is wired in adaisy-chain topology and the total wire length is greaterthan 1640 ft (500m. Refer to the E-Bus Wiring
11、 Guidelines, form 74-2865, for complete rules on network topology andtermination module locations.Fig. 3. Physical connection of module for a singletermination network.Fig. 4. FTT/LPT termination module wiring for doubletermination network topology.Fig. 5. Physical connection of modules for a double
12、termination network.STRIP 1/2 IN. (13 MM FROM WIRES TO BE ATTACHED AT ONE TERMINAL.1.2. TWIST WIRES TOGETHER WITH PLIERS (A MINIMUMOF THREE TURNS.3. CUT TWISTED END OF WIRES TO 3/16 IN. (5 MMBEFORE INSERTING INTO TERMINAL AND TIGHTENING SCREW. THEN PULL ON EACH WIRE IN ALL TERMINALSTO CHECK FOR GOOD MECHANICAL CONNECTION.M8945Fig. 6. Attaching two wires at controller or wall module terminals.NOTE:T
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2024年某科技公司2024云計算服務(wù)與支持合同
- 2024年汽車維修中心駕駛員技能培訓及聘用合同3篇
- 托班戶外情感課程設(shè)計
- 2024年水電站水陸聯(lián)運電力設(shè)備運輸與維護合同2篇
- 2024中鐵七局新建西康高鐵XKZQ段施工監(jiān)理服務(wù)合同3篇
- 2024年版物流托盤采購合同
- 民族服裝課程設(shè)計
- 2024年度汽車零部件研發(fā)與維修定制合同3篇
- 直縮法PET課程設(shè)計
- 2024全新劇組演員檔期安排聘用合同下載3篇
- 2023年6月上海高考英語卷試題真題答案解析(含作文范文+聽力原文)
- 公路工程施工監(jiān)理規(guī)范2016版
- 2024年越南重油(HFO)發(fā)電機行業(yè)現(xiàn)狀及前景分析2024-2030
- 2024-2029年中國普通導爆索行業(yè)市場現(xiàn)狀分析及競爭格局與投資發(fā)展研究報告
- 2024全新競業(yè)保密限制協(xié)議下載
- 遼寧省沈陽市五校2023-2024學年高一1月期末考試生物試題(解析版)
- 房地產(chǎn)開發(fā)成本明細科目一覽表
- 電熔焊作業(yè)指導書
- DB11∕T 2035-2022 供暖民用建筑室溫無線采集系統(tǒng)技術(shù)要求
- 2024年天津生態(tài)城投資開發(fā)有限公司招聘筆試參考題庫附帶答案詳解
- 催化材料智慧樹知到期末考試答案2024年
評論
0/150
提交評論