HY-DTII型固定帶式輸送機英文說明書_第1頁
HY-DTII型固定帶式輸送機英文說明書_第2頁
HY-DTII型固定帶式輸送機英文說明書_第3頁
HY-DTII型固定帶式輸送機英文說明書_第4頁
HY-DTII型固定帶式輸送機英文說明書_第5頁
已閱讀5頁,還剩13頁未讀, 繼續(xù)免費閱讀

下載本文檔

版權說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權,請進行舉報或認領

文檔簡介

HengyuanInternationalEngineeringGroupCo.,Ltd

Beltconveyoroperationmanual

18/18

HY-DTIIfixedbeltconveyor

OperationManual

HengyuanInternationalEngineeringGroupCo..Ltd

may2010

Application:

ThetypeofHY-DTIIfixedbeltconveyer(hereinafterreferredtoasHY-DTIItype)asconveyingcapacity,simplestructure,easymaintenance,lowcost,versatilityandextensiveadvantagesinmetallurgy,coal,transport,utilitiesandotherdepartmentsusedtotransportbulkmaterialsorasitems.Accordingtotherequirementsoftransportationtechnologycanbestand-alonecarrier,andalsobemorethanoneformorotherhorizontalorinclinedconveyordeliverysystem.

HY-DTIItypecanbeworkedatambienttemperature+40degreesCelsiusto-40degreesCelsius,andtransportingmaterialtemperaturebelowthe50℃.Forproof,waterproof,anti-corrosionandheat,cold,andotherspecialrequirementsoftheoccasion,shouldbetakecorrespondingmeasures.

Technicalcharacteristicsandmainparameters:

HY-DTIItypecantransportbulkdensity,thefollowingshouldbe2.5t/m3

TheseserieswereDividedbythebandwidthof:500,650,800,1000,1200,1400mminthesixspecifications.

Bydrivingpowerisdividedinto:1.5,2.2,3.0,4.0,5.5,7.5,11(10),15(13),18.5(17),22,30,37,40,55,60,75,100,115,130,155,185(180)KW,etc

AsthebandSpeeddivided:0.8,1.0,1.25,1.6,2.0,2.5,3.15,4.0m/sandothereight.

Additionalincludedthe0.3m/sband-speedconveyorsystemhand-selectedspecial.

MaximumtransportcapacityofthisseriesseeTable1

throughputinthetablewascalculatedbythematerialbulkdensityR=1t/m3,conveyorangle1degreeto7degrees,dynamicangleofreposeofmaterialsunderconditionsof30degrees.

Rollersform

Beltspeed(m/s)

BeltwidthB(mm)

500

650

800

1000

1200

1400

Conveyingcapacity:Q(t/h)

GrooveRollers

0.8

78

131

/

/

/

/

1.0

97

164

278

435

655

891

1.25

122

206

348

544

819

1115

1.6

156

264

445

696

1048

1427

2.0

191

323

546

853

1284

1748

2.5

232

391

661

1033

1556

2118

3.15

/

/

824

1233

1858

2528

4.0

/

/

/

/

2202

2996

ParallelRoller

0.8

41

67

118

/

/

/

1.0

52

88

147

230

345

460

1.25

66

110

184

288

432

588

1.6

84

142

236

368

553

753

2.0

103

174

289

451

677

922

2.5

125

211

350

546

821

1117

Table1

StructureOverview:

1)MachineLayout:

HY-DTIItypeofmachinelayoutwerecalculatedbythedesigneraccordingtomaterialhandlingtechnologyandotherrequirementsofthemainparametersandselectthevariouspartsofthisseriestoformacompleteconveyor.Themanufacturershallfabricateandsupplytheproductionacc.toGeneralplanandorder.TheMachinedesignersshouldberesponsibleforthemajordimensions.GeneralmachinelayoutconsistsofFigure1-5ofseveralbasicforms.

2)ConveyerBelt:

Theconveybeltismaincomponentformaterialsdraggingandloading.TheHY-DTIIusethetwokindsofcommonbeltaretherubberandplastic.TheConveyorbeltjointcanbeconnectedwithmechanicalcardorsulfuration(plastic).Whiletheconnectionwithmechanicalcard,theBeltstrengthshallbereducethevaluetousesincethelowstrengthofthejoints.Therefore,themechanicalcardnumbercanbechoicewiththicknessaccordingtoTable2.

Vulcanizing(plastication)connectioncanextendtheoperatinglifeofconveyorbelt,andthestrengthofjointpartsisslightlylowerthanstrengthofbelt.

Beltsthickness(mm)

8-10

>10-12

>12-13

>13-18

Mechanicalclipcode

45

55

65

75

Table2

3)Drive:

ThereareseveralofdriveswhichcanmakeHY-DTIItypeadapttodifferentuse.Instructingrespectivelyasthefollowing:

(1)Openingdrive:whichconsistofamotor,reducer,high-speedcouplingorfluidcoupling,brakes,lowspeedcoupling,roller,orwithbackstopandothercomponents.TheyorassembledonthebaseblockwhichbeweldedbyProfilesteelorwereinstalledintheconcretebase(generallypowerover115KW).

1)Motor:usingofYserieswhilethepowerratebelowthe110KW,thepowerinthe115-185KWusingJSandJRseriestwo.

2)High-speedcoupling:withlessthan37KWmatchwiththeY-seriesmotorisnylonelasticpincoupling.ItisaccordingtoGB5014-85designandmanufacturing.Thehalf-couplingmaterialhavetwotypesofmaterialwere45#steelandHT20-40castiron.Elasticcomponents(dowelpin)ofthematerialgenerallyaretookintheMCnylon.37KWoroverandusedtomatchthemotorisfluidcouplingtoachievesoft-start,canprotectthetransmissionandconveyorbelt.

3)Brake:Fordeliveryordowntheleveloftransportandparkingtimehasstrictrequirementsontheoccasion,istocalculatethebrakingtorquebyselectingelectromagneticbrakehydraulicbrake(Q/ZB119--73).Atthispoint,high-speedcouplingcorrespondingchangesfor"flexiblenylonwheelwithbrakepincoupling"(wheeldiameter300mm),hydraulicbrakewheelcouplingtoahydrauliccoupling

4)Reducer:UseZQ,ZL,ZSY,DCY,etc.involutescylindricalgearreducerandNGWplanetarygearreducerandotherproducts.Which,ZQ,ZSY,DCYandNGWseveralYseriesmotorreducerrespectivelymatch;ZLreducerrespectivelyandJS,JRMotormatch.Beltintheelectionathand,inordertoobtain0.3m/slowbandspeedreducerwithZGWmatchwiththeYseriesmotor.

5)Low-speedshaftcoupling:HY-DTIItypeusedZLflexiblepincouplinginall,thematerialsarecastironandsteelHT20-40ZG35Ⅱ.thematerialofelasticcomponents(dowelpin)generallyusedintheMCnylon.

6)Backstop:Fortheupwardsinclinedconvey,inordertopreventretrogradeloadconveyorbeltstopping,shouldhaveabackstop.HY-DTIIhastheroller-typebackstopandbackstopwithtwoforms.Backstopisactuallyarollerclutch.AndmatchtoreducerofZQ650-1000andZL,putinanotherlow-speedshaftatitsbasewiththereducerinstalledonthesamebase,withabackstopforthereversaloftorqueisrelativelysmall,inthenormaloperationconveyor,conveyorbeltunderthebranchtothefrictionmadebackstop.withcurledinsidethelimiter.Checkbackdevicetoblockonlythistimewiththeflatend,sothatwillnotturnwithabackstop,backstopstateatanytimeinpreparation.Oncetheconveyorloadisstop,whentheconveybeltstarttoreverseundertheactionofthematerial,theconveyorbeltfrictionwilldrivethebackstopmovement.Checkwithafolderuntilthetubeandthebeltbetweenthedriveandwasstraightenedupandplayabackstoprole.Installationinthefieldwasrequestedbytheweldinginthefirstshelfbackstop.Followingthearrangerequirementofthemachine.

OpendrivewereseparatedintoI-,II-typeIII-typethreekindsofassemblyforms,thepatternshowninDiagram6.Allcomponentsaboveanditsmatchingequipmentssuchasthebrakes,magnet,siliconrectifier,brakewheelshallbesuppliedunificationthebyfactory.

Diagram6OpeningDrive

(2)Closeddriveelectricdrum,thisisawaytoslowdownthesystemonthedrummotorandthenewdrive.Comparedwithopen-drive,compactstructure,safeoperation,smallsize,lightweight,neatappearance,andlowcost.HY-DTIItypewithapowerof1.5-110kW,drumdiameter320-1000mm,beltspeed0.8-4.0m/s,bandwidthof500-1400mminthevariousspecificationsof2000kindsofroller,thedetailedspecificationsandinstallation,use,maintenanceinstructionsrefertothe"YTH-typeoil-cooledelectricdruminstructionmanual"

4)Drum:

Sub-drivingDrumandReversingDrum

Drivedrumisthemaincomponentforpowertransmission.Theconveyorbeltwasrunbythefrictionbetweendrums.andtheImprovethefrictionwillincreasetheloadofconveyor.Besidethefrictioninwiththebelttension,thesizeofwrapandthefrictioncoefficientbetweentherollersandtheconveyorbelt.HY-DTIItypewithsmoothandplasticsurfaceroller.Thetransfertorqueisdesignedbytwokindsofsurfacefrictioncoefficientbaseonmaximumbelttensionatthewrapangleof180degrees.

Reversingconveyorbelttochangedirectionandincreasetheoperationofdrivingdrumwrapangle.HY-DTIItypeofdeflectordrumcannotbeusedasaheaddischargereversingdrums.allrollerbearingwithwholefixedtotherack.

5)Roller:

TheRollerkeepssupportingtheconveyorbeltandmaterialsinstableoperation.Thechannelrollersforthetransportofbulkmaterials;parallelrollersusedtotransportitemsintoandsupporting.Thenormallydistanceis1.2mbetweentheupsub-rollersconveyorbelt.And3mdistancebetweenthelowsub-roller.Theconvexandconcavearcoftherollerspacingshouldbedecidedbycalculation.Inordertopreventthebeltdeviationaffectstheoperation.Itthegeneraltroughrollersevery10group(parallelonrollers),parallellowerrollersetupwithparallelupperandlowerwitharolleranti-deviationinonegroup.Materialreceivingplacehatherubberring-typebufferrollers.Whenheightbetweenthe800-1200mm,ortransportmaterialsweighingover50kgperblock,itshoulduseabufferrubberring-typeheavy-dutyroller.ThespacebetweenBufferidlersgenerally100-600mm,determinedunderdifferentworkingconditions.HY-DTIIrollertyperadialmazeplasticringseal,dustitbetter,butnotwaterproof.Specialsteelrollertubeandreinforcedplastictube,bearingblockhascastironseats,steelstamping,andthreetypesofreinforcedplasticseat,acarsystemshaftsteppedshaftandtwocold-drawingsteelshaft.Somematerialinstalledoverthesamesize,accordingtothesituationbythemanufacturerselectacombinationoftheproduction

6)Tensioningdevice:

Conveyorbeltneedshouldbewiththetensionforcenormaloperation,HY-DTIItypewithscrewtension,car-typestrainandverticalstraininthreeforms,accordingtotherequiredtensionforce,tension,andtensiondevicethesizeofstrokeofdifferentoptions.Someneedtoaccountforalargebackroom,butwiththecharacteristicsofconstanttensionforce,tensionisalsoalargerstrokeforalongerconveyor.

7)TensionSection:

Whenitcomestothemiddleofthedischargeconveyor,thesmallparticlesizematerial,designatedunloadingsmalltrafficmayusemanualorpneumaticplow,donotusefixed-pointdischargewhenunloadingvehicles(forlargevolumesoforetypematerialscanbeusedforheavyunloadingvehicles).Unloadingtruckshavetwo,threefunneltwo,threefunneldischargeandsimultaneouslyonbothsidesofthemiddleofunloading,twosidesofthesametimecanonlydischargethroughthefunnel,selectedbytheuser.Whenitcomestounloadingthematerialareperpendiculartotheaxiswiththeconveyormorethanallthesilosmaymakeuseofreversibleconveyorwithstorage.Itmaybethemainconveyor(orfeeder)feedmaterialdeliveredtotheleftorrightendofunloadingintothehopper,itisnotsuitablefordeliverybyalargebulkdensityoforeandmaterialsdividethelargeroccasion.

8)Cleanserdevice:

(1)Aircleaningdevicesection:tocleannon-stickconveyorbeltbearingsurfaceadhesionproperties.Topreventthematerialstuckintherearoftheverticaltensiondevicerollerorrollersintension.Itisgenerallyinstalledinthefielditweldedtothefrontofthetworollersinthemiddleoftheshelf,itsspringboardandunderthebranchestouchestheconveyor.

(2)Carbidescrapercleaningdevices:tocleanupstickyadhesivesurfaceoftheconveyorbeltcarryingmaterial,topreventtheadhesivematerialontotheconveyorbeltcausedbypollutionoftheenvironmentandthedeviation.WhenInstalleditinthefieldintheweldingitontherackunderthedischargedrum.

9)Frame,guidechute,headhopperandhood:

HY-DTIItyperackframeseparately,tailrack,themiddleframe,themiddleleg,theverticaltensionbracket,driveracksseveralpartscanbeusedforbulkdensityof2.5tones/cubicmeterofmaterial.Tomeetthedifferentlayoutofconveyorangle,0degreeand20degreeinclinationoftherackvariety.Amongthem,thefirstframeandthedriveracktocenterofthehighrollersweredividedintolow-style,high-style,Chinesethreecategoriesfortheusertochoose.HY-DTIIbasedonmorethan1000mmdiameterdrivepulleyisnotconfiguredfirstframe,fordiametergreaterthan800mmofbendconveyortailplanesarenotconfigured,noconfigurationontheZLreducerdriverack,theuserself-preparedaccordingtothespecificcircumstances.Themiddleframeastwoseparate,redsteelagoodhole,attheinstallationsiteandthemiddlelegswelded,boltedbetweeneachother.Themiddleframeofeachsectionofthestandardlengthofsixmeters,inadditiontonon-standardlengthofthemiddleframeandtworadiusofcurvatureofconvexandconcaveZhangmiddlerackandwalkwithunloadingvehiclesinthemiddleofthesteelrailframefortheusertochoose

Guidetroughwiththreetypesofsegmentoflead,middleandposterior,each1.5metersinlength.Italwaysconsistwithoneafterthesegment,anposteriorandseveralmiddletoformaguidetrough.Thetotallengthofthedecisionbythedesignersasneeded.

Generalandtheheadguardheadfunnelsupportingtheuseofrackmountedintheheadbydischargingrollerdiametertoselect.HY-DTIItypeofguidetroughandheadfunnelisonlyapplicabletobulkdensityoflessthan1.6tons/cubicmetersofmaterial.

ManualBeltConveyor:

ThespecialdesignedconveyorInordertomeettherequirementofnonferrousmetallurgyselectionwithitsspeedof0.3meters/second,bandwidthhas800,1000,1200mminthreetyperespective,thecaptainfrom6-50m,dependbydesignerandthestructureoftheconveyorbeltdivedintolowbranchrowpopandnot.MachineonbothsidesofMulanboardunitsinstalledbyusingself-configuration,manufacturersdonotsupply.

ThebasicparameterandsupplyscopeofbeltconveyorsforBelorussia5000T/Dcementproductionline:

1701beltconveyor(refertoannex.1):

BasicData

Type

B1000X338540mm

DrawingNo.

HY-E1701-1001

Material

Coal

Widthofbelt(mm)

1000

Volumeweight(t/m3)

0.8

lengthofbelt(m)

694

Max.block(mm)

50

Speed(m/s)

1.25

Naturalangleofslope(°C)

30

Horizontaltransporting

distance(m)

338.54

Workingconditions

Designaccordingtostandard,mediumfrictioncoefficient

Max.tensionofbelt(kN)

31.5

Operationconditions

Cleanthemoisture

Liftingheight(m)

-3.2

Transportingvolume(t/h)

350

Transportingobliquity

(°C)

5

Typeofbelt

Groove(35°)

Typeofmotor

Y225S-4-37KW

Beltspecification

Polyestercanvasbelt

EP200*5*(4.5+1.5)

Typeofgearbox

DCY280-50

1708beltconveyor(refertoannex.2):

BasicData

Type

B1000X141544mm

DrawingNo.

HY-E1708-1001

Material

Coal

Widthofbelt(mm):

1000

Volumeweight(t/m3)

0.8

lengthofbelt(m)

297

Max.block(mm)

50

Speed(m/s)

1.25

Naturalangleofslope(°C)

30

Horizontaltransporting

distance(m)

141.544

Workingconditions

Designaccordingtostandard,mediumfrictioncoefficient

Max.tensionofbelt(kN)

31.5

Operationconditions

Cleanthemoisture

Liftingheight(m)

10.1

Transportingvolume(t/h)

350

Transportingobliquity

(°C)

5

Typeofbelt

Groove(35°)

Typeofmotor

Y225S-4-37KW

Beltspecification

Polyestercanvasbelt

EP200*5*(4.5+1.5)

Typeofgearbox

DCY280-50

1801beltconveyor(refertoannex.3):

BasicData

Type

B1000X391300mm

DrawingNo.

HY-E1801-1001

Material

Coal

Widthofbelt(mm):

1000

Volumeweight(t/m3)

0.9

lengthofbelt(m)

840

Max.block(mm)

30(90%)

Speed(m/s)

1.25

Naturalangleofslope(°C)

38

Horizontaltransporting

distance(m)

391.3

Workingconditions

Abrasivemediumandsmallblock

Max.tensionofbelt(kN)

35.56

Operationconditions

Plentydustnormalhumidity

Liftingheight(m)

9.665

Transportingvolume(t/h)

360

Transportingobliquity

(°C)

16

Typeofbelt

Groove(35°)

Typeofmotor

Y250M-4-55KW

Beltspecification

Polyestercanvasbelt

EP200*5*(4.5+1.5)

Typeofgearbox

DCY315-50

1804beltconveyor(refertoannex.4):

BasicData

Type

B800X397230mm

DrawingNo.

HY-E1804-1001

Material

Coal

Widthofbelt(mm):

800

Volumeweight(t/m3)

0.9

lengthofbelt(m)

815

Max.block(mm)

50

Speed(m/s)

1.6

Naturalangleofslope(°C)

38

Horizontaltransporting

distance(m)

397.23

Workingconditions

Abrasivemediumandsmallblock

Max.tensionofbelt(kN)

19.6

Operationconditions

Plentydustnormalhumidity

Liftingheight(m)

16.865

Transportingvolume(t/h)

300

Transportingobliquity

(°C)

12.414

Typeofbelt

Groove(35°)

Typeofmotor

Y250M-4-55KW

Beltspecification

Polyestercanvasbelt

EP200*5*(4.5+1.5)

Typeofgearbox

DCY280-31.5

1805beltconveyor(refertoannex.5):

BasicData

Type

B800X153200mm

DrawingNo.

HY-E1805-1001

Material

Coal

Widthofbelt(mm):

800

Volumeweight(t/m3)

0.8

lengthofbelt(m)

330

Max.block(mm)

50

Speed(m/s)

1.6

Naturalangleofslope(°C)

30

Horizontaltransporting

distance(m)

153.2

Workingconditions

Designaccordingtostandard,mediumfrictioncoefficient

Max.tensionofbelt(kN)

33.3

Operationconditions

Cleanthemoisture

Liftingheight(m)

30.85

Transportingvolume(t/h)

300

Transportingobliquity

(°C)

12.5

Typeofbelt

Groove(35°)

Typeofmotor

Y250M-4-55KW

Beltspecification

Polyestercanvasbelt

EP200*5*(4.5+1.5)

Typeofgearbox

DCY315-40

5504beltconveyor(refertoannex.6):

BasicData

Type

B800X21000mm

DrawingNo.

HY-E5504-1001

Material

Coal

Widthofbelt(mm):

800

Volumeweight(t/m3)

0.8

lengthofbelt(m)

47

Max.block(mm)

50

Speed(m/s)

1.6

Naturalangleofslope(°C)

30

Horizontaltransporting

distance(m)

21

Workingconditions

Designaccordingtostandard,mediumfrictioncoefficient

Max.tensionofbelt(kN)

12.892

Operationconditions

Cleanthemoisture

Liftingheight(m)

4.615

Transportingvolume(t/h)

300

Transportingobliquity

(°C)

12.4

Typeofbelt

Groove(35°)

Typeofmotor

Y180M-4-18.5KW

Beltspecification

Polyestercanvasbelt

EP200*5*(4.5+1.5)

Typeofgearbox

DCY200-31.5

5511beltconveyor(refertoannex.7):

BasicData

Type

B800X9500mm

DrawingNo.

HY-E5511-1001

Material

Coal

Widthofbelt(mm):

800

Volumeweight(t/m3)

0.8

lengthofbelt(m)

23

Max.block(mm)

50

Speed(m/s)

1

Naturalangleofslope(°C)

30

Horizontaltransporting

distance(m)

9.5

Workingconditions

Designaccordingtostandard,mediumfrictioncoefficient

Max.tensionofbelt(kN)

6.3

Operationconditions

Cleanthemoisture

Liftingheight(m)

0

Transportingvolume(t/h)

50

Transportingobliquity

(°C)

0

Typeofbelt

Groove(35°)

Typeofmotor

YTHNd--G-5.5-1-800-630

Beltspecification

Polyestercanvasbelt

EP200*5*(4.5+1.5)

Typeofgearbox

5.5

Installation,commissioningandrectification:

Installation:

Inspectionandacceptanceaccordingtostandardsandregulationsshouldbeexecutedbeforeinstallation,andoperatorsshouldhaveacquaintancewiththerequirementsofinstallationtechniqueanddrawingsofconveyor.Therequirementsofinstallationtechniquereferto<Mechanicalequipmentinstallationprojectexecutionandacceptancespecification>TJ231(1)--75.

(1)Installationsequence:

Generallyitshouldbeasfollow:markthecenterline–installtheframe(head–middle–end)–installthelowersupportingrollerandturnaboutdrum–laytheconveyorbeltonthelowersupportingroller–installuppersupportingroller–installtensiondevice,transmissiondrum,anddriveunit–havetheconveyorbeltgothroughbothheadpulleyandendpulley–connectthebelt–tensethebelt–installcleanser,beltbackstopdevice,guidechute,andcoverpiece,etc.

(2)Notice:

1)Allthedrums,supportingrollersanddriveunitsshouldmoveeasilyafterinstallation.

2)Thepre-tighteningforceofthespringshouldbeensuredaccordingtodrawingswheninstallheavyabsorberidler.

3)Putthetensiondruminthemostfrontpositionandtensethebeltwhenconnectingbelt.

4)Whileinstallcentringroller,thestoppingwheelshouldbeinthebackoftheroller,whichisonthemovingdirectionofthebelt(refertogeneralinstallationdrawings).

5)Springcleanser,non-loadedcleanserandbeltbackstopdeviceshouldbeweldedatthepositionaccordingtogeneraldrawings.Theworkingstrokeofpressingspringshouldbeensuredasmorethan20mmwhenweldingspringcleanserandframe,andkeepthecleaned-downmaterialfallintothehopper.Thecleaningeasinessofeachmaterialisdifferent,soadjustthetightnessofpressingspringtochangethepressthatscraperworksontheconveyorbeltbasedonpracticalsituation,inordertocleanadheringmaterialbutnotcausetheexcessiveresistence.

6)Wheninstalltheverticaltensiondevice,steelplatecouldbeusedascoveronthetopoftwoturnaboutdrumsinordertopreventthematerial,whichwillfalldownintotensiondrum,fromdamagingconveyorbelt.

7)Thepressbetweenguidechuteandconveyorbeltshouldbecompatible.

8)wheninstallthedrivedevice,shouldpayattentiontotheconcentricityofmotoraxisandgearboxhigh-speedaxis,andshouldensuretheparalleldisplacementofthetwohalf-partsofnylonpincouplingtobelessthan0.1mm,andtheaxialclearanceonthemax.circumferencetobelessthan0.5mm.(thenylonpincouplingwithbrakedrumisrequiredasthesame)

9)Wheninstallthehydraulicelectromagnetismblockbrake,thebackwarddistanceshouldbeadjustedtomeettherequirements.

10)Wheninstallpowercoupling,shouldbepayattentiontoadjusttheclearanceofimpellerandhousingsidecovertobelessthan1mm.Dividethesteelbeadandredleadpowerintosixequalpartsasperspecifications,theweighttoleranceofeachpartofsteelbeadshouldnotexceed1/1000,thenpackeachpartwithseveralpaperbagsandputthemintothesixgridsofimpellerthroughsidecover,finallytightentheboltsforfixingsidecover.

11)Wheninstalltherollerbrake,shouldpulldownthesidecoverandtakeouttherollerandpressingspring,carefullyadjusttheclearanceofstarwheelandcasingtobelessthan0.15mm,thentightentheanchorboltsofthecasingofbackstopdevice,anddonotplacetherollerandpressingspringinforthemoment(refertoCommissioning).

(3)Conveyorbeltvulcanizing(plastication)connection:

1)Vulcanizing:

cuttherubberbeltintostairshape(onecanvasonestair),widthofstairBis150mm,refertodiagram7.Thecuttingfaceshouldbeflat,andshouldnotdamagethecanvaslayer,thenfilethefaceandsmeartherubberpasteforconnection.pastethesheetrubberonthebutt-jointedofupperandlowerlayers.Vulcanizingbyheatingandpressing.Pressforceis5-10kg/cm2,andtemperatureisaround140oC(ifitisheatedbysteam,theairpressureshouldbe4-4.5kg/cm2),slowlyheatup,andensurethetemperatureofeachpointontheplateishomogeneous.Heatholdingtimeshouldbestartedfrom140oC,andcalculatedasT=16+(T-3)*2(minutes),Tmeanslayernumberofcanvasafterreachingtheholdingtime,stopheatingandletitnaturallycooldownuntilnormaltemperature,thenstoppressingandtakeitout.

2)Plastication:

forplasticconveyor,connectionlengthshouldbe500mmwhenbeltwidthis650mmand800mm,striptheupperoverlapofoneendandloweroverlapoftheotherendbeforeplastication,thenputonepieceofPVCplasticsheetwiththicknessof1mmbetweenthetwoends.Pressingandheatingforplastication.Slowlyheatup,thetemperatureriseto170oCin30minutes.Thenpressingagain,thencooldowntothenormaltemperatureandstoppressing.Formulti-layerplasticconveyor,itcanbestrippedtostairshapeaccordingthetothesizeofmulti-layerrubberbelt,thenplastication,thetemperature,pressandtimeisthethreeessentialfactorsforbothvulcanizingandplastication.Theyaredifferenttoeachotherasformula,temperature,andaeration,etc.conditions,whichareinterrelated.Upmentioneddataareonlyforreference,theownershouldhaveseveraltestsforexperienceandrevisedthedatabeforeformalconnection.

Commissioning:

(1)Beforethenewconveyortobeputintooperation,thereshouldbe2hoursno-loadrunningand8hoursloadrunning.Beforecommissioning,exceptgeneralinspectionofinstallation,followingshouldalsobeinspected:

gearboxandelectricdrumshouldbefilledwithlubricationoilasperspecifications;

whethertheinstallingdirectionofthestarwheelofrollerbrakeisconformtothedirectionofbraking;

theinstallationofretainerforcleanser,beltbackstopdevice,anddischargingcar;

theaccuracyofelectricalsignal,controllingdeviceandwiring.

startthemotorandobservewhethertherotatingdirectionofdrumsarecorrect;

thepartswithrollerbrakeshouldbeequippedwithpressingspringandrollerafteruppermentioneditemsarequalified,thenputonthesidecoverandtightenthebolt.

(2)Followingworksshouldbeexecutedduringcommissioning:

Checkalltherunningpartsofconveyorandthereshouldbenoobviousnoise;

Noabnormaltemperatureriseineachbearing;

Thestatusofrotatingandtighteningofeachdrumandsupportingroller;

Theeffectivenessofcleaser;

Thestatusofforward/backwardrunningofdummycarwithmaterial,andthereshouldbenoslippingafterstopping;

Noobviousshockwhendummycarjointthroughrail;

Nofrictionbetweenconveyorandmovingdummycar;

Theflexibilityandeffectivenessofcentringroller;

Thetightnessofconveyor;

Thepress-buttonofeachelectricalequipmentsshouldbesensitiveandreliable;

Measurethebeltspeed,no-loadpowerandfull-loadpower

Adjustment:

adjusttheoff-trackingofconveyorbelt;

1)Ifbeltisofftrackingatthehead,adjusttheheadtransmissiondrum.Thedirectionrefertodiagram8.Afteradjustment,weldandfixthelocatingpieceatthebearingblock.Thedrivedeviceisallowednottofollowthemovingatthismoment.

2)Ifbeltisofftrackingattheend,adjusttheendturnaboutdrumorscrewtighteningposition,thedirectionrefertodiagram9.Afteradjustment,weldandfixthelocatingpieceatthebearingblock.

3)Ifbeltisofftrackingatthemiddle,adjusttheuppersupportingroller(tothetopset)andlowersupportingroller(tothelowset),thedirectionrefertodiagram10.Ifadjustmentofonesetsupportingrollerisnoteffective,severalsetscouldbeadjusted,buttheoutsetangleofeachsetshouldnotbeexcessive.

4)Ifbeltisofftrackinginacertainpositionandcertainperiod,itcouldbeautomaticallyadjustedbycentringroller.

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
  • 4. 未經(jīng)權益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
  • 6. 下載文件中如有侵權或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論