


版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報或認(rèn)領(lǐng)
文檔簡介
1、AFirstissuestage修改-GUANGXIFANGCHENGGANGNUCLEARPOWERSTATIONPROJECT PHASE I (2x1000MW)廣西防城港核電廠一期(2x1000MW)工DOC.BL917SES005GJS045GN題SYSTEMDESIGNHOTWATERPRODUCTIONANDDISTRIBUTION(SES) CHAPTER 5 OPERATING PRINCIPLES熱水生產(chǎn)及分配系統(tǒng)設(shè)計手第五章行參A:B: C: Issued by證書號GEDI 廣東省電力設(shè)計研究GUANGDONGELECTRICPOWERDESIGN44-H0201S-J
2、3510-InternalIdentificationThis document is the property of GEDI. It must not be used, reproduced, transmitted or disclosed without the prior written permission of GEDI. 本文件之產(chǎn)權(quán)屬于廣東省電力設(shè)計研究院。未獲我批準(zhǔn):張審核:張校對:鄭編寫:孫軼- PAGE 6GUANGDONGELECTRICPOWERDESIGNCHAPTER5-OPERATING Normal operation is with one of the
3、two circulating pumps (201PO or 202PO) in operation. TheotherpumpisreadyforautomaticstartingintheeventoflowpumpdischargeThe admission of auxiliary steam to the calorifier is controlled by the outlet temperature of the water which regulates a steam control valve (202VV) to maintain the water temperat
4、ure at 95. Normal drainage of condensate from this calorifier is via a steam trap to the steam transformer system STR.Anyleakagefromthesystemis madeupbywaterfromtheheadtank(201BA). Any air entrained in the system is released via the same head tank.Water quality is maintained by operation of the Chem
5、ical Sampling System SIT and the Chemical Reagents Injection System SIR.Hot water distributes at a temperature of 95to the different heating coils. After circulation through the building heating systems it returns to outside nuclear island at a temperature of about 60 which may vary depending on the
6、 heat load.ABCDEFGGUANGDONGELECTRICPOWERDESIGN NotABCDEFGGUANGDONGELECTRICPOWERDESIGN NotABCDEFGGUANGDONGELECTRICPOWERDESIGNSTARTUPANDNORMALStartWiththecirculatingsystemfullofwatercheckThemakeupisolator(201VD)totheheadtankisopenandthewatersystemisThesuctionanddischargevalvesofbothpumpsareopen(201VL,
7、202VL,205VL&The inlet and outlet isolators (212VL & 207VL) of the normally operating drain trap are open and the inlet and outlet isolators (213VL & 214VL) of the standby drain trap and bypass valve (228VL) are closed.The drain isolator 229VL to the Steam Transformer system STR is open, and the drai
8、n isolator 215VL to the blowdown vessel system VVP is closed.Start the selectedpump then openthe inlet isolating valve (203VV) oftheauxiliary steamcontrol Closetheinletisolatingvalve(203VV)oftheauxiliarysteamcontrolvalve. Shut down the pumps.ABCDEFGGUANGDONGELECTRICPOWERDESIGNOTHER AlternativeIn the
9、 event of the STR system being unavailable then the calorifier condensate drain may be diverted to the blowdown vessel on system VVP. To do this the operator must close the isolator valve 229VL to the STR system and open the isolator valve 215VL to access the VVP system.In the event of a failure of
10、drain trap 9SES201PU a low temperature alarm at the calorifier water outlet will be activated on the CCR DCS. In this case the operator must close the inlet and outlet isolators (212VL & 207VL) of the normally operating drain trap and open the inlet (213VL) and outlet isolator (214VL) of the emergen
11、cy drain trap.ABCDEFGGUANGDONGELECTRICPOWERDESIGNCONTROLWater Circulating Pumps (201PO & 202PO) Localandremotecontrolwithrunningindication. Prevent start if low water level in header tank.Pumpshavedischargepressuregaugeandcommondischargepressuresensor. Header tank has level sensor and water level in
12、dicator.Autostartofstandbypumpwhencommondischargepressurefallsbelowlowpressuresetpoint. Auto stop when header tank level falls below low level set point.AuxiliarySteamInletValvetoCalorifierThe auxiliary steam supply to the calorifier is regulated by means of a modulating control valve. The position of the valve is dependent upon the outlet water temperature.Calorifier Th
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025-2030年中國鐵路物流行業(yè)十三五規(guī)劃與投資戰(zhàn)略研究報告
- 2025-2030年中國車燈模具行業(yè)市場前景規(guī)模及發(fā)展趨勢分析報告
- 2025-2030年中國蓮藕粉行業(yè)運(yùn)行態(tài)勢及發(fā)展趨勢分析報告
- 2025-2030年中國花露水市場風(fēng)險評估規(guī)劃分析報告
- 2025-2030年中國胡麻油市場競爭狀況及發(fā)展趨勢分析報告
- 2025-2030年中國聚碳酸酯板(陽光板)行業(yè)發(fā)展趨勢規(guī)劃研究報告
- 2025-2030年中國縫制機(jī)械市場運(yùn)行現(xiàn)狀及發(fā)展趨勢分析報告
- 2025-2030年中國紙制品市場運(yùn)行現(xiàn)狀及發(fā)展前景預(yù)測報告
- 2025-2030年中國電玩行業(yè)運(yùn)行狀況及發(fā)展前景分析報告
- 2025-2030年中國電容筆行業(yè)發(fā)展?fàn)顩r及營銷戰(zhàn)略研究報告
- 《井中分布式光纖聲波傳感數(shù)據(jù)采集規(guī)程》標(biāo)準(zhǔn)報批稿
- 人音版 音樂 八年級下冊 第一單元 我和你教案
- 代理法人免責(zé)協(xié)議書版本
- 2024年青島港灣職業(yè)技術(shù)學(xué)院單招職業(yè)適應(yīng)性測試題庫必考題
- 門診導(dǎo)診課件
- python程序設(shè)計-說課
- 《糖尿病患者血脂管理中國專家共識(2024版)》解讀
- 廣州石牌村改造規(guī)劃方案
- GB/T 22919.12-2024水產(chǎn)配合飼料第12部分:鯽魚配合飼料
- IP承載網(wǎng)架構(gòu)規(guī)劃及路由部署N
- (完整word版)現(xiàn)代漢語常用詞表
評論
0/150
提交評論