下載本文檔
版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、S Drafted Checked ReviewedApprovedACHENGGANG NUCLEARPLANT PHASE I (21000MW)文件編碼 DOC. S Drafted Checked ReviewedApprovedACHENGGANG NUCLEARPLANT PHASE I (21000MW)文件編碼 DOC. SAT System Design Manual Chapter 6.6,6.7 Operating principle and supply failureProject文件類Sub-ItemEngineeringCAA:B:C:國(guó)家甲級(jí)工咨甲中廣核工程設(shè)C
2、ertificationNO:NationalAgradeengineeringCertificationNO:編ernal CP0905-YK-GN-is the property of CNPDC It must not be used、reproduced、transmitted or disclosed without the prior written permis of CNPDC 本文件之 屬于中廣核工程設(shè)計(jì) 。未獲本公司 ,任何人不得擅自使用、 、傳遞或 該文件。SATSystemDesignManualChapter6.6,6.7OperatingprincipleRev s
3、upply版版日狀編Drafted 校Checked 審Reviewed 批Approved 修改說(shuō)明Modification-ASATSystemDesignManualChapter6.6,6.7OperatingprincipleRev supply版版日狀編Drafted 校Checked 審Reviewed 批Approved 修改說(shuō)明Modification-ASATSystemDesignManualChapter6.6,6.7OperatingprincipleRev supplyPLANTPHASEISATSystemDesignManualChapter6.6,6.7Ope
4、ratingprincipleRev supplyPLANTPHASEISATSystem Design Manual Chapter 6.6,6.7OperatingprincipleandsupplyCHINAJUN.,SATSystemDesignManualChapter6.6,6.7OperatingprincipleRev supplySATSystemDesignManualChapter6.6,6.7OperatingprincipleRev supply文件修版日章頁(yè)修改范圍及依據(jù)ASAT System Design Manual Chapter 6.6,6.7 Operat
5、ing principleSAT System Design Manual Chapter 6.6,6.7 Operating principle and Rev 6.6 OPERATING ER SUPPLY SAT System Design Manual Chapter 6.6,6.7 Operating principle and SAT System Design Manual Chapter 6.6,6.7 Operating principle and Rev 6.6 OPERATING The air re upstream of the slam shut valve kee
6、ps the valve open via a valve. On receipt of a low re signal from the BOP header the air is diverted theactuator and thevalve XSAT301VAisclosedby Startup NoShutdown NoOperationincaseofincidentand/orA reduction of the air supply pre re from the compressed air production system (SAP) below 0.86MPa abs
7、 will be detected by pre re switch SAT201SP and cause valve XSAT301VA to slam shut. This occurs in order to preserve the air supply for the NI under this condition. As the air supply pre re is restored, valve XSAT301VA On occurrence of a low air prere alarm derived from XSAT202SP, the supply of air
8、is reduced or loseach tool poand at all equipmentd from the CI ring main. The service air supply prere from the CI to the BOP is also reduce or lost. To determine the action of equipment in other systems on failure of the service airsupply reference is to be made to the SDM SAT System Design Manual Chapter 6.6,6.7 Operating principleSAT System Design Manual Chapter 6.6,6.7 Operating principle and Rev ER SUPPLY Lack of control Air failure will affect the slamshut valve XSAT301VA, the valve will remain in close L
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 專業(yè)路燈購(gòu)銷協(xié)議:2024年版詳規(guī)版A版
- 個(gè)人二手房買賣合同二零二四年版
- 2025年度農(nóng)業(yè)機(jī)械設(shè)備產(chǎn)品區(qū)域總代銷及維修服務(wù)協(xié)議4篇
- 2025年工業(yè)廠房租賃與智能化升級(jí)改造合同4篇
- 上海房屋買賣合同范本.(2024版)
- 2024年04月廣東中信銀行信用卡中心社會(huì)招考筆試歷年參考題庫(kù)附帶答案詳解
- 2025年度廠房裝修工程進(jìn)度與資金支付合同4篇
- 2024年04月上海浦發(fā)銀行風(fēng)險(xiǎn)管理部社會(huì)招考(416)筆試歷年參考題庫(kù)附帶答案詳解
- 2024版廣西體育館大院
- 2025年度城市垃圾分類與回收利用項(xiàng)目合同3篇
- 2023年上海英語(yǔ)高考卷及答案完整版
- 西北農(nóng)林科技大學(xué)高等數(shù)學(xué)期末考試試卷(含答案)
- 金紅葉紙業(yè)簡(jiǎn)介-2 -紙品及產(chǎn)品知識(shí)
- 《連鎖經(jīng)營(yíng)管理》課程教學(xué)大綱
- 《畢淑敏文集》電子書
- 頸椎JOA評(píng)分 表格
- 員工崗位能力評(píng)價(jià)標(biāo)準(zhǔn)
- 定量分析方法-課件
- 朱曦編著設(shè)計(jì)形態(tài)知識(shí)點(diǎn)
- 110kV變電站工程預(yù)算1
- 某系統(tǒng)安全安全保護(hù)設(shè)施設(shè)計(jì)實(shí)施方案
評(píng)論
0/150
提交評(píng)論