1、.A1 three layer fireproof gypsum board wallA1三層防火石膏板隔墻Construction scheme施工方案Organizer: wang jing編制人: 王靜Auditor :審核人:Date : 2013-08-16日 期: 2013-08-16Fire prevention board partition wall construction plan.下載可編輯 .防火板隔墻施工方案1. scope of application適用范圍This chapter is applicable to industrial and civil co
2、nstruction of light steel keel man-made board partition installation project.本章適用于工業(yè)與民用建筑中輕鋼龍骨人造板隔墻安裝工程。2. Preparation of reference standards and specifications編制參考標(biāo)準(zhǔn)及規(guī)范(1) 中華人民共和國(guó)國(guó)家標(biāo)準(zhǔn) GB50210 2001建筑裝飾裝修工程質(zhì)量驗(yàn)收規(guī)范(2) 中華人民共和國(guó)國(guó)家標(biāo)準(zhǔn) GB50300 2001建筑工程施工質(zhì)量驗(yàn)收統(tǒng)一標(biāo)準(zhǔn)(3) 中華人民共和國(guó)國(guó)家標(biāo)準(zhǔn) GB50325 2001民用建筑工程室內(nèi)環(huán)境污染控制規(guī)范(4)
3、 中華人民共和國(guó)國(guó)家標(biāo)準(zhǔn) GB50326 2001建設(shè)工程項(xiàng)目管理規(guī)范(5) 重慶市建筑工程施工安全操作規(guī)程DCQ0162 2002(6) 建筑安裝分項(xiàng)工程施工工藝規(guī)程DCQ01 26 96。3. Terms, symbols術(shù)語(yǔ)、符號(hào)(1) Handover Inspection交接檢驗(yàn)The undertaking by the construction side and complete examination by both parties and can continue to make construction activities identified.由施工的承接方與完成方經(jīng)雙
4、方檢查并對(duì)可否繼續(xù)施工做出確認(rèn)的活動(dòng)。(2) The main control program主控項(xiàng)目On the safety of Construction Engineering、 health、 Environmental Protectionand The public interest tests play a decisive role in the project建筑工程中的對(duì)安全、衛(wèi)生、環(huán)境保護(hù)和公眾利益起決定性作用的檢驗(yàn)項(xiàng)目。(3) The general project一般項(xiàng)目In addition to the main control inspection items
5、 outside the project除主控項(xiàng)目以外的檢驗(yàn)項(xiàng)目。(4) Base layer基層Directly bear the weight of construction decoration the surface layer.直接承受裝飾裝修施工的面層。4. Construction preparation施工準(zhǔn)備4.1 Technical preparation技術(shù)準(zhǔn)備Preparation of light steel gypsum board partition wall engineering construction plan, and the workers are w
6、ritten technical clarification and safety.編制輕鋼骨架石膏板隔墻工程施工方案,并對(duì)工人進(jìn)行書(shū)面技術(shù)及安全交底。4.2 Three hours refractory aging gypsum board partition system三小時(shí)耐火時(shí)效石膏板隔墻系統(tǒng)Double layer three 12mm paper fireproof gypsum board +75 keel +50mm thick, 60kg/m 3 density rock wool.雙面三層 12mm紙面防火石膏板+75龍骨 +50mm厚, 60kg/m 3容重巖棉。4.3
7、 Material requirements.材料要求(1) Various keel, gypsum board materials and accessories and auxiliary materials.下載可編輯 .shall comply with existing national standards and industry standards. When the decorative material examination, found not to comply with the design requirementsand the relevant provisio
8、ns of indoor environmental pollution control norms, prohibited the use of.(1) 各類龍骨、配件和石膏板材料以及輔材的材質(zhì)均應(yīng)符合現(xiàn)行國(guó)家標(biāo)準(zhǔn)和行業(yè)標(biāo)準(zhǔn)的規(guī)定。當(dāng)裝飾材料進(jìn)場(chǎng)檢驗(yàn),發(fā)現(xiàn)不符合設(shè)計(jì)要求及室內(nèi)環(huán)保污染控制規(guī)范的有關(guān)規(guī)定時(shí),嚴(yán)禁使用。1) Light steel keel main parts: The keel along the top, along the keel to strengthen the keel, vertical keel, transverse keel should meet the
9、 design requirements and the relevant provisions of the standards.輕鋼龍骨主件 : 沿頂龍骨、沿地龍骨、加強(qiáng)龍骨、豎向龍骨、橫撐龍骨應(yīng)符合設(shè)計(jì)要求和有關(guān)規(guī)定的標(biāo)準(zhǔn)。2) Light steel frame accessories: Support card, Cato, Angle, fittings, suchas fixed and layering accessories should comply with the design requirements輕鋼骨架配件: 支撐卡、卡托、角托、連接件、固定件和壓條等附件應(yīng)符合
10、設(shè)計(jì)要求。3) Fastening material: pull anchors, expansion bolts, galvanized self-tapping screws and paste caulking material shall meet the design requirements.緊固材料 : 拉錨釘、膨脹螺栓、鍍鋅自攻螺絲和粘貼嵌縫材,應(yīng)符合設(shè)計(jì)要求。4) Gypsum board surface should be smooth, neat edge, there should be no dirt, cracks, chipping, warping, peeli
11、ng, color, pattern incomplete defects.石膏板應(yīng)表面平整、邊緣整齊、不應(yīng)有污垢、裂紋、缺角、翹曲、起皮、色差、圖案不完整的缺陷。(2)Fillsoundinsulationmaterial:Rockwoolshouldmeetthedesignrequirements of selection.填充隔聲材料: 巖棉應(yīng)符合設(shè)計(jì)要求選用。(3) Quality requirements: see table below質(zhì)量要求 : 見(jiàn)下表paperbacked gypsum board size allowable deviationunit: mm紙面石膏板規(guī)
12、格尺寸允許偏差單位: mmItemLengthWidthThickness 厚度項(xiàng)目長(zhǎng)度寬度9.512尺寸偏差0, 60, 5±0.5±0.5Annotate :Plate surface should be cut into rectangles, two diagonal length isnot more than 5mm.注:板面應(yīng)切成矩形,兩對(duì)角線長(zhǎng)度差不大于5mm.下載可編輯 .Paperbacked gypsum board fracture load values紙面石膏板斷裂荷載值Plate thickness ( mm)The fracture load
13、, N板材厚度( mm)斷裂荷載, N縱向橫向9.536014012.050018015.065022018.080027021.095032025.01100370Paperbacked gypsum board weight per unit area value紙面石膏板單位面積重量值Plate thickness( mm)Weight per unit area kg/m2板材厚度( mm)單位面積重量 kg/m29.59.512.012.015.015.018.018.021.021.025.025.0Light steel keel to allow the section siz
14、e deviation unit: mm輕鋼龍骨斷面規(guī)格尺寸允許偏差單位: mmItem項(xiàng)目ClassyFirst grade一 Qualifiedarticle等品products優(yōu)等品合格品Length長(zhǎng)度 L 30, 10Cladding keelSize尺寸A 30± 1.0Section sizeAA>30± 1.5覆面龍骨Size尺寸± 0.3±0.4± 0.5斷面尺寸BOther keelSize尺寸± 0.3±0.4± 0.5Section sizeA其它龍骨Size尺寸30± 1.
15、0斷面尺寸B>30± 1.5Light steel keel sides and straightness of the groundunit: mm/1000mm.下載可編輯 .輕鋼龍骨側(cè)面和地面的平直度單位: mm/1000mmClassyQualifiedCategoryVarietyDetection siteFirstgradearticleproducts類別品種檢測(cè)部位一等品優(yōu)等品合格品Transverse keel andSide 側(cè)面0.50.71.0vertical keelWallBottom 底面橫龍骨和豎龍骨墻體Through keelSide and
16、 bottom貫通龍骨側(cè)面和底面1.01.52.0Bearing the keelandCondole topCladding keelSide and bottom吊頂側(cè)面和底面承載龍骨和覆面龍骨Angle of light steel keel allowable deviation輕鋼龍骨角度允許偏差ForminganglesClassy articleFirst gradeQualified productsShortest edge size mm優(yōu)等品一等品合格品成形角的最短邊尺寸 mm10 18± 1° 15± 1° 30±2
17、176;00>18± 1° 00± 1° 15±1°30Light steel keel appearance、 Surface qualityunit: G/m2輕鋼龍骨外觀、表面質(zhì)量單位: g/m2缺ClassyFirst gradeQualified products陷article一等品合格品腐蝕種優(yōu)等品、損類壞NotNo more seriouscorrosion、 Damagedspots 、黑斑permittedpitting .Areaofnot more than1cm2 ofspotsper meter、麻不
18、允許within the length of not more than five.無(wú)較嚴(yán)重腐蝕、損壞黑斑、麻點(diǎn)。面積不大于1cm2 的黑斑每米長(zhǎng)度內(nèi)不多于5處。ItemClassyFirst gradeQualified products項(xiàng)目article一等品合格品優(yōu)等品Double-sided12010080galvanized雙面鍍鋅量4.3 Main machines and tools主要機(jī)具Every teams and groups with a list of major machinery and equipment.下載可編輯 .No.序號(hào)12.每班組主要機(jī)具配備一覽表M
19、achinery,QuotapowerPerformType ofequipmentSpecificationQtyor capacityance 性Remarks機(jī)械、設(shè)備名數(shù)work規(guī)格型號(hào)定額功率或容能備注稱量量工種Calculatedin accordanceElectricGoodcarpenteTE 150.65kw2with 8-10 people a teamsr按 8-10 人班組電錘良好and groups木工計(jì)算Calculatedin accordanceHand drillGoodcarpenteJIZ ZD 10A0.43kw1with 8-10 people a
20、teamsr按 8-10 人班組手電鉆良好and groups木工計(jì)算GrindingwheelGoodCalculatedinaccordancecarpentewith 8-10 people a teams3cuttingJIG SDG 3501.25kw1machine砂輪切割機(jī)良好r木工and groups 按 8-10 人班組計(jì)算PullrivetGoodCalculatedinaccordancecarpentewith 8-10 people a teams4gun2拉鉚槍良好r木工and groups 按 8-10 人班組計(jì)算aluminumGoodCalculatedina
21、ccordancecarpentewith 8-10 people a teams5screed2m3鋁合金靠尺良好r木工and groups 按 8-10 人班組計(jì)算6789Horizontalruler600mm4水平尺AdjustableWrench or HexWrenchwrench8扳手活動(dòng)扳手或六角扳手Tapemeasure5m8卷尺Line hammer0.5kg4線錘Good良好Good良好Good良好Good良好Calculatedinaccordancecarpentewith 8-10 people a teamsrand groups按 8-10 人班組木工計(jì)算Cal
22、culatedinaccordancecarpentewith 8-10 people a teamsrand groups按 8-10 人班組木工計(jì)算Calculatedinaccordancecarpentewith 8-10 people a teamsrand groups按 8-10 人班組木工計(jì)算Calculatedinaccordancecarpentewith 8-10 people a teamsrand groups按 8-10 人班組木工計(jì)算.下載可編輯 .(1) Electric machinery :Hand drill、 Impact hammer 、 Cuttin
23、g machine.電動(dòng)機(jī)具 : 手電鉆、沖擊電錘、切割機(jī)。(2) Hand tools :Pull rivet gun 、Hand saw 、Pliers 、hammer、screw driver 、spanner 、 Line drop 、 screed 、 steel rule 、 Steel horizontal ruler Etc.手動(dòng)工具 : 拉鉚槍、手鋸、鉗子、錘、螺絲刀、扳子、線墜、靠尺、鋼尺、鋼水平尺等。4.4 Operating conditions作業(yè)條件(1) Before the construction of light steel frame partition
24、, Should be arranged outside,Install gypsum board should wait for roofing、 ceiling and After completingthewallplaster.Basementmoisturecontentmeettherequirementsofdecoration,Should generallybe less than 8%-12%。And afterthe relevantunits 、Department's acceptance。 The completion of the handover for
25、malities。 If thedesign to pillow, After the pillow should meet the design strength can beinstalled in the above partition keel.輕鋼骨架隔斷工程施工前,應(yīng)先安排外裝,安裝石膏板應(yīng)待屋面、頂棚和墻體抹灰完成后進(jìn)行。基底含水率達(dá)到裝飾要求,一般應(yīng)小于 8 12以下。并經(jīng)有關(guān)單位、部門(mén)驗(yàn)收合格。辦理完工種交接手續(xù)。如設(shè)計(jì)有地枕時(shí),地枕應(yīng)達(dá)到設(shè)計(jì)強(qiáng)度后方可在上面迸行隔墻龍骨安裝。(2)Installationofvarioussystemsofpipes 、 Box elast
26、iclineandotherpreparatory work already in place.安裝各種系統(tǒng)的管、線盒彈線及其他準(zhǔn)備工作己到位。5. Critical quality points關(guān)鍵質(zhì)量要點(diǎn)5.1 Materials Key requirements材料的關(guān)鍵要求(1) Various keel、 Fitting and Gypsum board material And adhesive auxiliarymaterialsshallcomply withexistingnationalstandardsand industrystandards.各類龍骨、配件和石膏板材料
27、以及膠粘劑輔材的材質(zhì)均應(yīng)符合現(xiàn)行國(guó)家標(biāo)準(zhǔn)和行業(yè)標(biāo)準(zhǔn)的規(guī)定。5.2 Key technology requirements技術(shù)關(guān)鍵要求Elasticlinemust be accurate , Aftera reinsertionwillcontinueafterthe nextprocess 。 Secure the top and bottom of the keel ,Aftereach handover keel , Shouldremain flat vertical, Securely installed.彈線必須準(zhǔn)確, 經(jīng)復(fù)驗(yàn)后方可進(jìn)行下道工序。 固定沿頂和沿地龍骨, 各自交接后的
28、龍骨,應(yīng)保持平整垂直,安裝牢固。5.3 The key requirement of quality質(zhì)量關(guān)鍵要求(1) Prohibited partition wall connecting member using shooting nail fixed on the brickwall 。 Should use the embedded parts or expansion bolt connection。Upper and lowerthreshold must be firmly connected with the main body。嚴(yán)禁隔斷墻上連接件采用射釘固定在磚墻上。應(yīng)采用
29、預(yù)埋件或膨脹螺栓進(jìn)行連接。上下檻必須與主體結(jié)構(gòu)連接牢固。(2)Gypsum board should undergo a rigorous selection, Surfaces should be flat.下載可編輯 .and smooth 。Install gypsum board should be strictly checked the verticality and smoothness keel 。石膏板應(yīng)經(jīng)嚴(yán)格選材,表面應(yīng)平整光潔。安裝石膏板前應(yīng)嚴(yán)格檢查龍骨的垂直度和平整度。5.4 Occupation health safety critical requirements職
30、業(yè)健康安全關(guān)鍵要求(1) When using power tools , Electricityshouldfollowthe constructionsitetemporary electrical safety technical specifications" JGJ46-88 。在使用電動(dòng)工具時(shí),用電應(yīng)符合施工現(xiàn)場(chǎng)臨時(shí)用電安全技術(shù)規(guī)范JGJ46 88。(2)when work high above the ground, Scaffolding erection should follow theChongqing Municipality building constru
31、ction safety practices.。在高空作業(yè)時(shí),腳手架搭設(shè)應(yīng)符合重慶市建筑工程施工安全操作規(guī)程。(3)Prevent the dust pollution during the process of construction should takethe corresponding protective measures。施工過(guò)程中防止粉塵污染應(yīng)采取相應(yīng)的防護(hù)措施。5.5 Environment the key requirements環(huán)境關(guān)鍵要求(1)Duringthe constructionprocessshouldbe consistentwithcivilbuildin
32、gengineering environmental pollution control norms"GB50325-2001。在施工過(guò)程中應(yīng)符合民用建筑工程室內(nèi)環(huán)境污染控制規(guī)范GB50325 2001。(2)During the construction process should prevent noise pollution, At theconstruction site boundary noise sensitive areas should choose to uselow-noise equipment, Can also take other measures t
33、o reduce noise。在施工過(guò)程中應(yīng)防止噪聲污染,在施工場(chǎng)界噪聲敏感區(qū)域宜選擇使用低噪聲的設(shè)備,也可以采取其他降低噪聲的措施。6.Construction technology施工工藝6.1Process flows工藝流程snap the line Installation heaven and earth keel Install vertical keelInstall the system pipe, line Installing the card blocked lateral keel Installgypsum board in the outboard Filled
34、with rock woolInstall inner gypsum board彈線安裝天地龍骨安裝豎向龍骨安裝系統(tǒng)管、線安裝橫向卡擋龍骨安裝外側(cè)石膏板填充巖棉棉安裝內(nèi)測(cè)石膏板6.2 Operation process操作工藝(1)Snap the line彈線Pop up on the substratehorizontaland verticallinesvertical, Used to controlthe position of installation partition keel、 Keel flatness and fixed-point。在基體上彈出水平線和豎向垂直線,以控制
35、隔斷龍骨安裝的位置、龍骨的平直度和固定點(diǎn)。(2) The partition keel installation隔斷龍骨的安裝1) Fixed position along the elastic line along the top and along the keel,Aftereach handoverkeel , Should remain straight。 Fixed-pointspacingshouldnot exceed 800m,The keel to the top portionmust be fixedfirmly。Between border.下載可編輯 .keel
36、and matrix沿彈線位置固定沿頂和沿地龍骨,各自交接后的龍骨,應(yīng)保持平直。固定點(diǎn)間距應(yīng)不大于 800m,龍骨的端部必須固定牢固。邊框龍骨與基體之間,應(yīng)按設(shè)計(jì)要求安裝密封條。2) Whenchoosing support card series keel , Support the card should be installed on the vertical keel opening , The card distance is 400 mm , Distance of 20-25mm at both ends of the keel。選用支撐卡系列龍骨時(shí),應(yīng)先將支撐卡安裝在豎向龍骨的
37、開(kāi)口上,卡距為400mm,距龍骨兩端的為 20253)when Choose penetrationkeel , Heightoflessthan3m installationonepartition wall;3-5 m to install two ;5m above installation three。選用通貫系列龍骨時(shí),高度低于 3m的隔墻安裝一道 ;3 5m時(shí)安裝兩道 ;5m以上時(shí)安裝三道。4)The holeisnotmore than600 mm on bothsidesstandverticalkeel,respectively, Plus a fixed upper and
38、 lower Horizontal keel hole, More than600 mmon both sidesstand verticalkeel,respectively, Plus a fixedupper andlower horizontal keel hole。門(mén)窗或特殊節(jié)點(diǎn)處,應(yīng)使用附加龍骨 , 洞口不超 600mm兩邊分別立豎龍骨,洞口上下加橫龍骨固定,超過(guò) 600 mm 兩邊分別立豎龍骨,洞口上下加橫龍骨和立豎立龍骨固定、加強(qiáng)等安裝應(yīng)符合設(shè)計(jì)要求。Partition frame allowable deviation龍骨詳細(xì)布置見(jiàn)下圖:.下載可編輯 .5)Skeletona
39、llowabledeviationofinstallation,Shallconformtotable 3·3·5·2.骨架安裝的允許偏差,應(yīng)符合表3· 3· 5· 2規(guī)定,Partition frame allowable deviation隔斷骨架允許偏差TheItemAllowableInspection methodsserial項(xiàng)目deviation檢驗(yàn)方法number允許偏差項(xiàng)次( mm)1Elevation of vertica3The care with 2m cable board inspectionl 立面垂直用
40、 2m托線板檢查2Surface is flatand 2In 2 m ruler and wedge feeler check用level2m直尺和楔型塞尺檢查表面平整(3) Installation of gypsum board石膏板安裝1) Before install the gypsum board , Partition should be embedded in the pipes and attached to the walls of the device to take measures to strengthen partial 。安裝石膏板前,應(yīng)對(duì)預(yù)埋隔斷中的管道和附
41、于墻內(nèi)的設(shè)備采取局部加強(qiáng)措施。2) Gypsum board should be laid vertically, Long side seam should fall on the.下載可編輯 .vertical keel。石膏板應(yīng)豎向鋪設(shè),長(zhǎng)邊接縫應(yīng)落在豎向龍骨上。3) Double-sided gypsum board installation, Should be one side of the insideand outside two layers of gypsum board and keel staggered joints to arrangejoint and shoul
42、d not fall on the same root keel ;According to the designrequirements of 3 hours fire protection ,After a good should be installed atthe side of the keel gypsum plasterboard,Carried rock wool padding; Usingrock wool 50mm ,60kg / m3 of rock wool board fire treatment. Then the otherside of the enclose
43、d board。雙面石膏板安裝,應(yīng)與龍骨一側(cè)的內(nèi)外兩層石膏板錯(cuò)縫排列接縫不應(yīng)落在同一根龍骨上 ; 根據(jù) 3小時(shí)防火失效的設(shè)計(jì)要求, 應(yīng)在龍骨一側(cè)安裝好石膏石膏板后,進(jìn)行巖棉填充;采用巖棉 50mm, 60kg/m3的巖棉板進(jìn)行防火處理. 再封閉另一側(cè)的板。4) Gypsum board should adopt self-tappingscrews 。 Surroundingthe screw spacingshould not exceed 200 mm ,Middle part of the screw spacing should not exceed30Omm, Screws from
44、 the edge of the plate should be 10-16 mm。 1, 2, 3 layersofgypsum board,respectively,with25 mm, 35 mm, 50 mmscrew fixedto the keel ,F(xiàn)irst and second floors screw spacing should be enlarged,The third layer ofthe screws should be tightly nailed; Since the outer steel frame block,Can'tconstruction,
45、 Gypsum board is fixed outside the side of the 300 mm from thetop place, Self-tappingscrews from theinsidetothe outsideofgypsum boardfixed keel。石膏板應(yīng)采用自攻螺釘固定。周邊螺釘?shù)拈g距不應(yīng)大于200,中間部分螺釘?shù)拈g距不應(yīng)大于 30Ommn,螺釘與板邊緣的距離應(yīng)為10 16。第一、二、三層石膏板分別采用25mm、 35mm、 50mm的螺釘固定于龍骨上,一、二層螺釘間距應(yīng)放大,第三層螺釘應(yīng)緊密釘固;由于外側(cè)鋼架擋住,無(wú)法施工,外側(cè)距頂部300mm處石膏
46、板固定時(shí),自攻螺釘從內(nèi)側(cè)龍骨向外側(cè)石膏板固定。5)When installingdrywall, Shouldbe startedfrommiddle part ofthe platetoplate edges fixed。 Nail head slightly buried plate, But not damage the papersurface; Nail hole should use gypsum putty screwing.安裝石膏板時(shí), 應(yīng)從板的中部開(kāi)始向板的四邊固定。釘頭略埋人板內(nèi), 但不得損壞紙面 ;釘眼應(yīng)用石膏膩?zhàn)幽ㄆ健?) )Gypsum board should b
47、e based on accurate a grid size cutouts; Should be inplace and tight against a grid,But cannot be forced.石膏板應(yīng)按框格尺寸裁割準(zhǔn)確; 就位時(shí)應(yīng)與框格靠緊,但不得強(qiáng)壓。7) Gypsum plate and the top wall around the wall or pillar should have a notch 3mm。When laying gypsum board , Should first where the rabbet sealing fillingpaste , Then planking and extrusion sealing paste the panel closely contact with adjacent surface.隔墻端部的石膏板與周圍的墻或柱應(yīng)留有 3mm的槽口。施鋪石膏板時(shí),應(yīng)先在槽口處加注嵌縫膏,然后鋪板并擠壓嵌縫膏使面板與鄰近表層接觸緊密。8) In the Ding typeor cross-shapedconnectingpoint , As forthe
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 娛樂(lè)行業(yè)前臺(tái)接待工作總結(jié)
- 快遞物流行業(yè)后勤管理工作概述
- 幼兒園工作總結(jié)溫情陪伴
- 中班科學(xué)走進(jìn)家鄉(xiāng)的橋
- 床上用品行業(yè)銷售工作總結(jié)
- 如果我能看得見(jiàn)十篇
- 春天的花朵6篇
- 舞臺(tái)服裝設(shè)計(jì)師的職責(zé)總結(jié)
- 糖尿病護(hù)理工作總結(jié)
- 條形碼生成課程設(shè)計(jì)
- 2024北京西城初一(上)期末數(shù)學(xué)(教師版)
- 北京市朝陽(yáng)區(qū)2023-2024學(xué)年四年級(jí)上學(xué)期期末英語(yǔ)試題
- 追求“真實(shí)、樸實(shí)、扎實(shí)”的語(yǔ)文課堂
- 工業(yè)機(jī)器人論文
- UC2845的應(yīng)用和PWM變壓器設(shè)計(jì)
- 螺桿空壓機(jī)操作規(guī)程完整
- 圓柱螺旋扭轉(zhuǎn)彈簧計(jì)算公式EXCEL計(jì)算