版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、采礦專業(yè)英語安全爆破器材safety blasting material安全平臺(tái)safety berm安全信號(hào)裝置safety signal device銨銻炸藥ammonite銨油炸藥ammonium nitrate-fuel oil agent凹陷露天礦open-pit in rolling terrain扒礦機(jī)slusher爆破工程blasting engineering保安礦柱safety pillar刨鏟挖掘機(jī)excavator with planning operation爆堆muck pile爆轟detonation爆力detonation power爆力運(yùn)搬blasting-p
2、ower handling爆破安全blasting safety爆破測(cè)試measurements of blasting action and effect爆破飛石flyrock爆破聚能效用effect of cumulative energy爆破漏斗blasting crater爆破落礦ore break by blasting爆破質(zhì)量qulity of blasting爆破作用指數(shù)index of blasting action爆燃deflagration爆速velocity of detonation爆炸explosion備采礦量stoping reserve崩落采礦法caving mi
3、ning methed崩落礦巖墊層cushioned mat of caved rock or ore崩落巖石覆蓋下放礦ore drawing under caved rock閉坑地質(zhì)工作geological work for mine closure壁式充填采礦法long-wall fill stoping邊坡slope邊坡地質(zhì)工程engineering geology of side slope邊坡掛網(wǎng)噴漿meshing and grouting邊坡檢測(cè)slope monitoring邊坡破壞模式mode of slope failure邊坡設(shè)計(jì)slope design邊坡疏水slope
4、drainage邊坡穩(wěn)定分析概率統(tǒng)計(jì)法probabilistic method for slope stability analysis邊坡穩(wěn)定分析剛體平衡法rigid equilibrium method for slope stability analysis邊坡穩(wěn)定分析數(shù)值法numerical value method for slope stability analysis邊坡穩(wěn)定性系數(shù)分析parameter analysis for slope stability變電所substation變形觀測(cè)deformation measurement 變質(zhì)巖metamorphic rock
5、并聯(lián)通風(fēng)網(wǎng)絡(luò)parallel flow network 剝采比stripping ratio剝離stripping補(bǔ)償空間compensating space采剝量驗(yàn)收測(cè)量acceptance surveying of excavated volume采剝總量total excavation quantity 采場(chǎng)測(cè)量surveying stope 采場(chǎng)底部結(jié)構(gòu)sill structure of stope 采場(chǎng)地壓控制ground control of stope 采場(chǎng)空硐測(cè)量chamber surveying 采場(chǎng)通風(fēng)stope ventilation采場(chǎng)圍巖加固reinforcement
6、 of surrounding rock of stope采出礦石extracted ore 采掘比development ratio 采掘工作面配電點(diǎn)electric distribution box at workings 采掘機(jī)械mining machinery采掘技術(shù)計(jì)劃extraction-development plan of mine 采掘平衡balance between development and extraction 采空區(qū)處理goaf management采礦mining采礦工程mining engineering 采礦工業(yè)mining industry 采礦工藝mi
7、ning technology采礦系統(tǒng)工程mining system engineering 采礦學(xué)mining science 采礦專家系統(tǒng)expert system in mining 采砂船dredge采砂船采挖法digging procedure of dredging采砂船采礦方法dredging method采砂船采區(qū)防凍preventing ground freeze in dredging area 采砂船采區(qū)解凍thrawing of dredging area 采砂船采區(qū)供水water supply in dredging area采砂船開采dredging采砂船開拓dev
8、elopment of dredging 采砂船碎散分級(jí)breaking and screening of dredging 采砂船選礦washing process on the dredge采準(zhǔn)stope preparation 采準(zhǔn)工作量ratio of preparation work 采準(zhǔn)礦量prepared reserve殘積層eluvium槽井探trench and shallow-shaft explorations側(cè)斜鏟斗裝載機(jī)side triping bucket loader測(cè)風(fēng)站station for air measurement柴油鏟運(yùn)機(jī)diesel-powered
9、 load-haul-damp unit 鏟插裝載機(jī)power shovel with tilting boom and conveyor 長(zhǎng)巷道掘進(jìn)通風(fēng)long dead-end driving face ventilation 超前探水detecting water with pilot hole超聲波測(cè)量ultraacoustic measurement 車鏟比ratio of truck to shovel 車廂式裝運(yùn)機(jī)auto loader沉積巖sedimentary rock承載索track rope遲爆postponed explosion赤平極射投影stereographic
10、projection充填filling充填倍線multiple ratio pipe length-to-column in filling充填材料filling material 充填材料沉縮率rate of fill settlement 充填材料管道輸送pipelining of filling material 充填材料滲透系數(shù)permeability coefficient or fill 充填材料制備filling material preparation 充填采礦法mining method employing fill 充填機(jī)械stowing machine充填接頂fill t
11、ightenning 充填井filling shaft 充填井場(chǎng)地總平面布置general layout for filling shaft area充填料制備自動(dòng)化automation of filling material preparation充填體作用function of fill mass 充填系統(tǒng)filling system 沖擊式鑿巖percussive drilling 抽出式通風(fēng)exhaust ventilation 除塵裝置dust remover 儲(chǔ)槽振動(dòng)裝運(yùn)機(jī)vibrating auto loader 儲(chǔ)量剝采比tripping to reserve ratio 觸變
12、泥漿collaidal mud穿孔drilling 串車提升train hoisting 串聯(lián)通風(fēng)網(wǎng)絡(luò)series flow network垂直分條充填采礦法perpendicular slot fill stoping 垂直深孔階段礦房采礦法block open-stoping with vertical longhole 措施井shaft for speedening development excavation 大爆破后通風(fēng)ventilation after large blasting大塊boulder大陸架砂礦床開采continental shelf placer mining 大水
13、礦床開采extraction of water-contained ore body 帶式輸送機(jī)belt conveyor帶式輸送機(jī)自動(dòng)化automation of belt conveyor帶式提升conveyor hoisting帶式轉(zhuǎn)載機(jī)belt transfer 單層崩落采礦法single slice caving 單斗挖掘機(jī)single-bucket excavator單斗挖掘機(jī)采裝single-bucket excavator loading 單斗挖掘機(jī)排土waste disposal with power shovel 擋土墻retaining wall導(dǎo)爆管detonating
14、 tube 導(dǎo)爆索detonating cord 導(dǎo)風(fēng)板baffle 導(dǎo)軌式鑿巖機(jī)drifter導(dǎo)火索safety fuse 導(dǎo)向輪deflection pulley 倒堆采礦法over-casting mining method 等值線圖contour sheet地表保護(hù)等級(jí)protection rank of surface ground地表移動(dòng)surface movement地表移動(dòng)計(jì)算概率積分法probability integration method for calculation of surface movement地表鉆孔抽水dewatering through well 地
15、下采礦方法underground mining method 地下采礦方法設(shè)計(jì)的計(jì)算機(jī)方法computerized design of underground mining method 地下采礦方法的選擇choice of underground mining method 地下采礦鉆車underground mining jumbo地下采區(qū)變電所underground section substation地下鏟運(yùn)機(jī)load-haul-dump unit 地下開采underground mining 地下礦電纜線路cable line of underground mine地下礦電氣設(shè)備安全
16、接地safe grounding of underground electrical equipment地下礦開拓development of underground mine 地下礦開拓方法development method of underground mine 地下礦開礦系統(tǒng)development system of underground mine 地下礦排水drainage in underground mine地下礦配電electric power distribution of underground mine地下礦山underground mine地下礦深孔爆破longhol
17、e blasting in underground mine 地下礦用自卸汽車dump truck for underground mine 地下礦中深孔爆破medium-longhole blasting in underground mine 地下連續(xù)采礦機(jī)continuous underground miner地下水groundwater地下主變電所underground main substation 地壓觀測(cè)ground pressure measurement 地質(zhì)構(gòu)造geological structure 地質(zhì)構(gòu)造圖geological structure map 地質(zhì)平面圖g
18、aological plan電耙electronic powered slusher電爆檢查儀表checking instrument of electric blasting電爆網(wǎng)絡(luò)electric priming circuit電鏟electric excavator電動(dòng)鏟運(yùn)機(jī)electric powered load-haul-dump unit 電動(dòng)輪自卸汽車motorized wheel dump truck 電動(dòng)鑿巖機(jī)electric rock drill電動(dòng)破碎巖石rock breaking with electric heating吊罐r(nóng)aise cage 調(diào)度絞車car sp
19、otting hoist 凍結(jié)孔freezing hole 凍結(jié)循環(huán)freezing circuit 凍結(jié)壓力freezing pressure 硐室爆破chamber blasting 硐室掘進(jìn)chamber excavation 斷層fault斷層破碎帶礦柱pillar for fault fracture zones斷裂構(gòu)造fracture structure 堆浸heap leaching 對(duì)角式通風(fēng)系統(tǒng)diagonell ventilation system 蹾罐事故cage bumping多點(diǎn)位移計(jì)multiplepoint displacement meter多斗挖掘機(jī)multi
20、-bucket excavator 多功能車multi-function vehicle 多級(jí)機(jī)站通風(fēng)系統(tǒng)multistage fan-station ventilation system 多金屬結(jié)核開采polymetallic nodule mining二次爆破secondary blasting 二次開采secondary mining 翻車機(jī)car dumper 反鏟挖掘機(jī)backhoe方框支架充填采礦法square-set with fill method防洪溝flood ditch防火列車train for fire prevention防火墻fire barrier防水溝water
21、 ditch防火門fire door防水礦柱water barrier防水墻bulk-head防水帷幕water-sealing curtain防水閘門water door房柱采礦法room-and-pillar method 放礦計(jì)劃圖表chart of ore drawing 放礦截止品位cut-off gradeof ore drawing 放礦制度procedure of ore drawing非均質(zhì)流充填材料管道輸送pipelining of fill with heterogeneous flow非耦合裝藥decoupling loading非鈾礦山排氡通風(fēng)ventilation
22、for exhausting radon in non-uranium mine廢石waste廢石場(chǎng)waste dump廢石場(chǎng)穩(wěn)定the stability of waste pile 廢石堆瀝濾水防治leaching water control of waste dump 廢石混入率waste rate廢石排棄waste disposal 分層崩落采礦法top slicing 分層剝采比bench stripping ratio 分層掘溝法layer trenching分段崩落采礦法sublevel caving method分段礦房采礦法sublevel open stoping分段落礦階
23、段礦房采礦法block opening with ground breaking from sublevel分區(qū)通風(fēng)系統(tǒng)zone ventilation system 風(fēng)井ventilating shaft 風(fēng)流局部阻力local resistance of airflow 風(fēng)流摩擦阻力friction resistance of airflow 風(fēng)流正面阻力frontal resistance of airflow 風(fēng)門air door風(fēng)墻air bulkhead 風(fēng)橋air bridge 風(fēng)筒air tube風(fēng)障air brattice風(fēng)阻ventilation resistance fa
24、ctor封閉圈contourline passing the lowest point of topage in final pitlimit風(fēng)扇調(diào)節(jié)風(fēng)量regulating air volumn by booster fan復(fù)合井壁multiple-shaft wall 復(fù)雜通風(fēng)網(wǎng)絡(luò)complex ventilation network 副井a(chǎn)uxiliary shaft干式充填系統(tǒng)dry-stowing system 干式鑿巖捕塵dust-collecting in dry drilling 鋼繩沖擊式鉆機(jī)churn-drill rig 鋼繩牽引帶式輸送機(jī)cable belt convey
25、or 鋼繩芯帶式輸送機(jī)steel belt conveyor 鋼絲繩提升設(shè)備hoisting equipment with wire rope 鋼弦壓力計(jì)wire pressuremeter高度補(bǔ)償器height compensator for mine car 高山礦床開采mining at high elevation 高臺(tái)階爆破high bench blasting高壓水射流破碎巖石rock cutting by high pressure water jet隔水層impermeable layer根底toe rock 工業(yè)儲(chǔ)量industrial reserve 工作幫working
26、slope 工作幫坡角angle of working slope 構(gòu)造等高線圖structure-concour map固井sealing of drop-shaft bottom to rock刮板輸送機(jī)scraper chain conveyor灌漿滅火法fire extinguishing with mud罐道shaft guide 罐籠cage 罐籠提升cage hoisting光面爆破smooth blasting滾刀破碎巖石rock breaking with rolling disk海濱砂礦床開采beach placer mining 海洋采礦marine mining 海洋礦
27、產(chǎn)資源marine mineral resource 含水層aquifer毫秒雷管millisecond detonator 橫向工作線采礦法transverse cutmining method 橫巷cross cut后卸鏟斗裝載機(jī)overshot loader護(hù)坡slope covering滑坡反分析back analysis of slope failure滑坡防治prevention and remedy of slope failure環(huán)形工作線采礦法annular cut mining method回采stoping 回采單元extraction unit 回采工作面stope f
28、ace 回轉(zhuǎn)鉆眼rotary drilling 混凝土泵concrete pump 混凝土澆灌機(jī)concrete placer 混凝土噴射機(jī)shotcrete machine 混凝土噴射機(jī)械手shotcrete robot混凝土裝配式砌塊支護(hù)support of precast concrete set火力鉆機(jī)jet piercer火區(qū)重開 re-opening of fire zone 火區(qū)檢測(cè) monitoring of fire zone 機(jī)車 locomotive機(jī)械充填mechanical filling 機(jī)械落礦mechanical ore breaking 機(jī)械運(yùn)搬mechani
29、cal handling 機(jī)械裝礦machine loading ore 箕斗skip箕斗提升skip hoisting 箕斗卸載裝置skip dumping arrangement 箕斗裝載裝置skip loading arrangement 擠壓爆破tight blasting繼爆管detonating relay假頂mat架空索道aerial tramway架棚機(jī)timbering machine 檢修車repair truck 漿狀炸藥slurry降落漏斗cone of depression 膠帶提升設(shè)備belt hoisting equipment 膠結(jié)充填系統(tǒng)cement-fill
30、ing system 角聯(lián)通風(fēng)網(wǎng)絡(luò)diagonal flow network 階段level階段崩落采礦法block caving method 階段高度interval of level 階段開采順序mining sequence of level 階段礦房采礦法block open stoping 階段強(qiáng)制崩落采礦法forced block caving method 階段水平布置layout of level 階段通風(fēng)系統(tǒng)stage ventilation system階段自然崩落采礦法spontaneous block caving mining method節(jié)理joint節(jié)理玫瑰花圖
31、rose diagram of joint 金剛石鉆機(jī)diamond drill 金剛石鉆進(jìn)diamond drilling 金屬支架支護(hù)metal support近井點(diǎn)測(cè)量near shaft-point surveying 經(jīng)濟(jì)合理剝采比break-even stripping ratio 井底車場(chǎng)shaft station 井底水窩排水drainage at shaft bottom井點(diǎn)降水法lowering the water table by well-point井架headframe 井塔tower 井筒保安礦柱shaft pillar 井筒布置方式layout of the sh
32、aft 井筒鉆進(jìn)shaft drilling井下電機(jī)車運(yùn)輸underground electric locomotive haulage井下硐室underground rooms 井下高程測(cè)量underground elevation surveying 井下經(jīng)緯儀導(dǎo)線測(cè)量underground theodolite traversing 井下排泥mud drainage in underground mine 井下破碎站underground crusher station 井下破碎站通風(fēng)除塵dust control in station of treaker 井下牽引車undergroun
33、d tow vechicle 井下水泵房underground pump room井下水倉underground sump 井下水倉清理underground sump cleaning 井下無軌運(yùn)輸underground trackless haulage 井下運(yùn)輸underground haulage井下運(yùn)輸自動(dòng)控制automatic control of underground haulage井下炸藥庫underground explosive magazine井巷風(fēng)速air velocity in airway井巷復(fù)合支護(hù)conpound support of shaft-and-dr
34、ift井巷貫通測(cè)量surveying for drivage of two approaching headings井巷錨桿支護(hù)rockbolt support of shaft-drift井巷錨索支護(hù)cable bolt support of shaft-drift井巷噴錨索聯(lián)合支護(hù)combined support of shotcrete with rock bolt and wire-mesh井巷噴射混凝土支護(hù)support of shaft-drift with shotcrete井巷支護(hù)support of shaft-drift 井巷支護(hù)監(jiān)測(cè)monitoring of suppor
35、t 靜電防護(hù)electrostatic protection靜態(tài)膨脹劑破碎巖石rock breakage with static expansive agent境界剝采比stripping ratio of pit limit境界礦柱boundary pillar 局部通風(fēng)local ventilation 局扇通風(fēng)local fan ventilation 拒爆misfire聚晶金剛石鉆頭polycrystalline diamond bit掘溝trenching 掘進(jìn)盾構(gòu)tunnelling sheld 掘進(jìn)鉆車tunnel jumbo均壓滅火法 fire extinguishing by
36、 pressure balancing 均流質(zhì)充填材料管道輸送 pipelining of fill with homogeneous flow 卡他度 kata degree開采強(qiáng)度mining intensity 開采順序mining sequence 開拓井巷development opening 開拓礦量development reserve 抗滑樁pile坑道勘探opening exploration坑口mining productive unit坑線haul way空?qǐng)霾傻V法open stope mining method 空氣過濾裝置air-filtering arrangeme
37、nt 空氣幕調(diào)節(jié)風(fēng)量regulating air volume by air curtain 空氣壓縮機(jī)air compressor 空氣壓縮機(jī)的冷卻系統(tǒng)air-compressor cooling system 空氣壓縮機(jī)站air-compressor plant控制爆破controlled blasting礦倉ore bin 礦產(chǎn)儲(chǔ)量ore reserve 礦產(chǎn)資源mineral resource礦產(chǎn)資源保護(hù)protection of mineral resource 礦產(chǎn)資源法the law of mineral resource 礦產(chǎn)資源綜合利用comprehensive utiliz
38、ation of mineral resource礦車mine car 礦塵mine dust 礦塵測(cè)定dust measurement 礦床ore deposit礦床成因類型genetic type of ore deposit 礦床工業(yè)類型commercial type of ore deposit 礦床開采步驟mining stage of deposit 礦床開采技術(shù)條件technical condition of mining 礦床開采順序sequence of mineral mining 礦床勘探exploration of ore deposit 礦床勘探程度explorato
39、ry degree of deposit礦床勘探方法exploratory method of deposit礦床勘探類型exploratory method of deposit礦床模型orebody model礦床評(píng)價(jià)evaluation of ore deposit 礦床疏干dewatering of ore-deposit 礦工互救mutual rescue of miner 礦井安全出口escapeway of underground 礦井爆炸性氣體mine explosive gas 礦井等積孔mine equivalent orifice礦井反風(fēng)裝置reversing arran
40、gement of mine ventilation礦井防凍prevention frostbite of mine 礦井防火fire prevention in mine 礦井放射性氣體mine radioactive gas礦井風(fēng)量 volume of air flowing in mine 礦井風(fēng)量調(diào)節(jié) regulating air volume in mine 礦井風(fēng)流 air flow in mine礦井火災(zāi)mine fire礦井進(jìn)風(fēng)流凈化purification of mine in-take air礦井空氣mine air礦井空氣調(diào)節(jié)air conditioning in min
41、e 礦井聯(lián)系測(cè)量shaft connecting surveying 礦井漏風(fēng)air leakage in mine 礦井滅火fire extinguishing in mine 礦井熱環(huán)境enviroment of heat in mine 礦井熱源sourse of heat in mine 礦井人工制冷降溫refrigeration of mine air 礦井提升安全卡safety dog of hoist 礦井提升安全門safety door for hoisting 礦井提升防墜器safety catch 礦井提升鋼絲繩mine hoisting rope礦井提升過卷保護(hù)裝置ove
42、rwind protector of hoisting礦井提升機(jī)mine hoist礦井提升限速器speed regulator of hoist礦井提升自動(dòng)控制automatic control of shaft hoisting礦井通風(fēng)mine ventilation 礦井通風(fēng)構(gòu)筑物mine ventilation structure 礦井通風(fēng)檢查mine ventilation survey 礦井通風(fēng)設(shè)計(jì)design of mine ventilation 礦井通風(fēng)網(wǎng)絡(luò)mine ventilation network 礦井通風(fēng)系統(tǒng)mine ventilation system礦井通風(fēng)系統(tǒng)
43、鑒定指標(biāo)criteria for mine ventilation evaluation 礦井通風(fēng)自動(dòng)化automation of mine ventalation 礦井有毒氣體mine toxic gas礦井有效風(fēng)量efficiency rate of mine air quantity礦井自然通風(fēng)natural ventilation 礦塊地質(zhì)圖geological map of oreblock 礦塊結(jié)構(gòu)要素constructional element of oreblock 礦塊開采順序mining sequence of oreblock礦區(qū)地質(zhì)地形圖topographical ge
44、ological map of mining area 礦區(qū)高程控制測(cè)量vertical control surveying of mine area 礦區(qū)工程地質(zhì)圖engineering geological map of ore field 礦區(qū)開發(fā)規(guī)劃development plan of mine area 礦區(qū)勘探線剖面圖exploratory profile of mine area 礦區(qū)控制測(cè)量control surveying of mine area 礦區(qū)平面控制測(cè)量plane control surveying of mine area 礦區(qū)水文地質(zhì)圖hydrogeolog
45、ical map of ore field礦區(qū)圖根導(dǎo)線測(cè)量topographic control with traversing in mine area 礦區(qū)圖根三角測(cè)量topographic control with triangulation in mine area 礦山綜合地質(zhì)圖comprehensive geological map of mine area 礦山安全mine safety礦山安全管理mine safety management 礦山爆破安全距離safety distance from blasting ceter in mine 礦山爆破地震ground vibr
46、ations due to blasting in mine礦山爆破地震效應(yīng)觀測(cè)observation of ground vibration effect from blasting in mine 礦山爆破公害控制control of public nuisance from blasting in mine 礦山爆破空氣沖擊波air blasting wave in mine 礦山采掘進(jìn)度計(jì)劃編制的計(jì)算機(jī)方法conputerized method for the production scheduling in mines礦山測(cè)量mine surveying礦山測(cè)量?jī)x器mine-surv
47、eying instrument 礦山柴油機(jī)廢氣凈化purification of mine diesel exhaust gas 礦山場(chǎng)地選擇selection of mine site礦山穿孔作業(yè)防塵dust provention of drilling operation in mine 礦山達(dá)產(chǎn)期period to attain planned annual output of mine 礦山大氣污染防治mine air pollution control礦山大氣污染擴(kuò)散dispersion of mine air pollution 礦山大氣污染源sourse of mine air
48、 pollution 礦山地表沉陷防治control of surface subsidence in mine 礦山地面運(yùn)輸mine surface transport礦山地質(zhì)編錄mining geological logging礦山地質(zhì)工作work of mining geology 礦山地質(zhì)取樣mining goelogical sampling 礦山電力負(fù)荷分級(jí)classification of mine electric load 礦山電力牽引供電power supply for mine electric traction 礦山電能計(jì)算mine electric energy me
49、asurement 礦山電氣照明electric illumination of mine礦山防塵dust control in mine 礦山防水water control in mine 礦山放射性固體廢物處理disposal of solid radioactive waste in mine 礦山放射性污染防治control of radiation contamination in mine 礦山廢水處理waste water treatment in mine 礦山廢水控制waste water control in mine礦山服務(wù)年限service life of mine 礦
50、山工程地質(zhì)工作engineering geological work in mine 礦山工程質(zhì)量管理mining engineering qualitative management 礦山工業(yè)場(chǎng)地mine industrial site礦山工業(yè)場(chǎng)地道路road for mine industrial site 礦山工業(yè)場(chǎng)地地表水截流shut off surface water for mine industrial site 礦山工業(yè)場(chǎng)地管線pipeline for mine industrial site 礦山工業(yè)場(chǎng)的排水drainage for mine industrial site
51、礦山工業(yè)場(chǎng)地豎向布置longitudinal arrangement for mine industrial site 礦山工業(yè)場(chǎng)地總平面布置general layout for mine industrial site 礦山公路運(yùn)輸防塵dust prevention of mine road transport礦山供電mine electric power supply礦山構(gòu)筑物mine structure礦山固體廢物處理disposal and reclamation of solid waste in mine 礦山管理信息系統(tǒng)management information system
52、in mine 礦山規(guī)模scale of mine礦山軌道m(xù)ine track礦山環(huán)境地質(zhì)工作enviromental geology work of mine礦山環(huán)境工程mine environmental engineering礦山機(jī)電安全safety in mining mechanical and electric equipments 礦山機(jī)修廠總平面布置general layout for mine mechanical work-shop 礦山基本建設(shè)mine capital construction礦山集中監(jiān)控centralized monitoring of mine wor
53、k 礦山計(jì)算機(jī)輔助設(shè)計(jì)computer aided design in mine 礦山技術(shù)經(jīng)濟(jì)指標(biāo)mining technical economic index礦山建設(shè)施工的網(wǎng)絡(luò)計(jì)劃技術(shù) network sche-duling technique in mine construction 礦山建設(shè)項(xiàng)目經(jīng)濟(jì)評(píng)價(jià) economic evaluation of construction project in mine 礦山景觀 mine landscape礦山救護(hù)mine rescue礦山局扇消聲器muffler of auxiliary fan in mine礦山開發(fā)地區(qū)規(guī)劃的計(jì)算機(jī)方法the c
54、omputer method of district programming in mine development礦山勞動(dòng)生產(chǎn)率mine labour productivity礦山內(nèi)部運(yùn)輸mine interal transport礦山年產(chǎn)量annual output of mine 礦山排水mine drainage 礦山排水設(shè)備mine drainage equipment 礦山排水系統(tǒng)mine drainage system 礦山企業(yè)mine enterprise礦山汽車修理廠總平面布置圖general laybout for truck maintenance shop 礦山設(shè)備安裝
55、測(cè)量surveying for installing mine equipment 礦山設(shè)備計(jì)算機(jī)管理computer management for mine equipment 礦山設(shè)備遙控remote control of mine machinery 礦山設(shè)備自動(dòng)化automation of mine machinery礦山設(shè)計(jì)mine design礦山設(shè)計(jì)的優(yōu)化方法the optimization method in mine design 礦山生產(chǎn)地質(zhì)工作geological work in the producing stage of mine 礦山生產(chǎn)過程計(jì)算機(jī)模擬conputer simulation in mining operation
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 2024年度農(nóng)機(jī)化服務(wù)協(xié)議
- 解除車位合同范本
- oem白酒合同范本
- 2024年派遣人力服務(wù)協(xié)議規(guī)范文本
- 簡(jiǎn)單工人合同范本
- 2024年設(shè)計(jì)資料保護(hù)協(xié)議樣本
- 2024年針對(duì)外籍人士的工作協(xié)議樣本
- 賓館雇傭合同范本
- 產(chǎn)品制造加工服務(wù)協(xié)議樣本2024
- 房租改造合同范本
- 2024年河南省軍隊(duì)文職(臨床醫(yī)學(xué))高頻備考核心試題庫(含答案詳解)
- 2023年國(guó)家公務(wù)員錄用考試《行測(cè)》副省級(jí)卷-解析
- 2024年銀行考試-招商銀行考試近5年真題附答案
- 2024年公開招聘大社區(qū)工作人員報(bào)名表
- 2024年上海市普通高中學(xué)業(yè)水平等級(jí)性考試(物理)附試卷分析
- 服務(wù)營(yíng)銷《(第6版)》 課件 第5章 服務(wù)產(chǎn)品與服務(wù)品牌
- 甘肅省慶陽市2023-2024學(xué)年六年級(jí)上學(xué)期語文期中試卷(含答案)
- 廣州中醫(yī)藥大學(xué)-中藥學(xué)模擬試題
- 2024年高考政治考試題海南卷及參考答案
- 食品供應(yīng)商遴選制度(一)
- 吉林旅游外宣翻譯策略探析
評(píng)論
0/150
提交評(píng)論