1、長(zhǎng)壽晏家樂(lè)至·尚城七期十標(biāo)段項(xiàng)目 模板工程專項(xiàng)方案 43目錄1 編制依據(jù)···········································&

2、#183;···················22工程概況·····························&

3、#183;·································33 勞動(dòng)力準(zhǔn)備···············

4、;···············································34 技術(shù)準(zhǔn)備·

5、3;·················································

6、3;···········45施工工藝流程·····································&#

7、183;·····················46主要施工方法···························

8、································47 施工技術(shù)要求················

9、83;·········································158 模板系統(tǒng)驗(yàn)算·······

10、;··················································

11、;169 模板拆除················································

12、83;·············3210 質(zhì)量保證措施及注意事項(xiàng)··································

13、;········3311 成品保護(hù)措施········································

14、················3512、 安全文明施工································

15、········3513 環(huán)保措施········································

16、83;················3914 項(xiàng)目施工組織管理體系框架圖······························

17、83;····4015 模板工程質(zhì)量控制程序圖··········································42模板及

18、清水模板施工方案本工程我司施工要求混凝土施工質(zhì)量達(dá)到中級(jí)抹灰的質(zhì)量標(biāo)準(zhǔn),故應(yīng)按清水混凝土的標(biāo)準(zhǔn)來(lái)組織施工。1 編制依據(jù)序號(hào)資料名稱編號(hào)1混凝土結(jié)構(gòu)施工施工質(zhì)量驗(yàn)收規(guī)范GB50204-20022地下工程防水技術(shù)規(guī)范GB50208-20013建筑工程施工質(zhì)量驗(yàn)收統(tǒng)一標(biāo)準(zhǔn)GB50300-20014建筑施工扣件式鋼管腳手架安全技術(shù)規(guī)范.JGJ130-20015施工手冊(cè)第四版6樂(lè)至尚城D區(qū)D-6棟建筑施工圖7樂(lè)至尚城D區(qū)D-6棟結(jié)構(gòu)施工圖8樂(lè)至尚城D區(qū)D-6棟施工組織設(shè)計(jì)2 工程簡(jiǎn)況本工程為重慶樂(lè)至置業(yè)發(fā)展有限公司建設(shè)的樂(lè)至·尚城D區(qū)D-6樓高層定向銷售房及小商業(yè)工程,位于長(zhǎng)壽區(qū)晏家鎮(zhèn)育才路旁

19、,工程施工圖紙由重慶市得森建筑規(guī)劃設(shè)計(jì)研究院設(shè)計(jì)。(一)建筑概況建設(shè)單位重慶市樂(lè)至置業(yè)發(fā)展有限公司設(shè)計(jì)單位重慶市得森建筑規(guī)劃設(shè)計(jì)研究院工程名稱樂(lè)至·尚城D區(qū)D-6高層定向銷售房及小商業(yè)工程工程地址長(zhǎng)壽區(qū)晏家鎮(zhèn)育才路旁單位工程名稱建筑面積(m2)建筑高度(m)結(jié)構(gòu)類型層數(shù)主樓1700081.6框剪結(jié)構(gòu)體系地上26層小商業(yè)6644.4412.2框架結(jié)構(gòu)體系地上2-3層本工程主樓結(jié)構(gòu)形式為框剪結(jié)構(gòu)體系、小商業(yè)為框架結(jié)構(gòu)體系。本工程采用人工挖孔灌注樁基礎(chǔ),基礎(chǔ)持力層為中風(fēng)化砂質(zhì)泥巖.基礎(chǔ)置于中風(fēng)化砂質(zhì)泥巖時(shí),基礎(chǔ)及配筋按圖表中施工,中風(fēng)化砂質(zhì)泥巖天然單軸抗壓強(qiáng)度標(biāo)準(zhǔn)值frk=9.78Mpa.

20、砼強(qiáng)度等級(jí):樁基C30,地梁DL1、DXL*為C30,JL*為C40,墊層為C20,樁基封底為C30.3 勞動(dòng)力準(zhǔn)備:本工程總工期為450個(gè)日歷天,為了達(dá)到總工期的要求,順利完成該分項(xiàng)工程,應(yīng)緊密配合其它工種的施工作業(yè)。模板工人在基礎(chǔ)至三層配備80個(gè),在三層以上配備40個(gè),以此確保本分項(xiàng)工程的工期。施工準(zhǔn)備4 技術(shù)準(zhǔn)備:1)開(kāi)工立即組織有關(guān)人員熟悉施工圖和模板設(shè)計(jì)方案。針對(duì)模板工程的特點(diǎn),學(xué)習(xí)混凝土結(jié)構(gòu)工程施工及驗(yàn)收規(guī)范、建筑安裝分項(xiàng)工程施工工藝規(guī)程,及時(shí)編制加工訂貨計(jì)劃及材料機(jī)具計(jì)劃,認(rèn)真做好施工技術(shù)交底。根據(jù)工程的實(shí)際情況施工人員進(jìn)行詳細(xì)的技術(shù)交底。2)模板準(zhǔn)備:本工程結(jié)構(gòu)工程中地上部分墻

21、體木模板,面板為竹夾板,樓梯模板采用定型加工模板,面板進(jìn)場(chǎng)后進(jìn)行核對(duì)、驗(yàn)收,并進(jìn)行試組裝完后,要按圖進(jìn)行編號(hào),編號(hào)字跡要醒目。木方、竹夾板、穿墻螺栓、早拆柱頭等材料按計(jì)劃數(shù)量及時(shí)進(jìn)場(chǎng)并要進(jìn)行質(zhì)量數(shù)量檢驗(yàn),不合格的要堅(jiān)決修整。3)竹夾板進(jìn)場(chǎng),應(yīng)對(duì)板厚進(jìn)行認(rèn)真驗(yàn)收,偏差小于1mm。角部方正,板面光滑,平整不得有翹曲。5 施工工藝流程:材料準(zhǔn)備按工程量準(zhǔn)備模板(各種規(guī)格齊備),楞木、支撐架料及各種所需附件,操作抄平、放線抄平水平基準(zhǔn)線,放出各條軸線及墻、柱、梁邊線交接檢下一工序應(yīng)認(rèn)真檢查工程質(zhì)量,保證構(gòu)件滿足設(shè)計(jì)模板拆除模板拆除時(shí)間應(yīng)滿足規(guī)范要求,先拆支撐后拆模板,拆除時(shí)不應(yīng)操作砼表面保養(yǎng)拆除模板后

22、應(yīng)對(duì)模板進(jìn)行表面清理和幾何尺寸的修理,涂惻脫模劑。按規(guī)堆放模板安裝熟悉圖紙,了解各構(gòu)件的幾何尺寸、位置,按圖拼出各后間的模板支撐體系保證模板有足夠的剛度及強(qiáng)度,保證構(gòu)件的垂直度、水平度及截面幾何尺寸自檢檢查各構(gòu)件的軸線、邊線行政度、水平度、平整度、幾何尺寸等基層處理砼表面清洗干凈,模板應(yīng)有牢固的支撐點(diǎn),墻柱腳模板下口作出水泥砂漿找平帶。鋼筋辦好隱蔽驗(yàn)收6 主要施工方法(基礎(chǔ)及主體)6.1基礎(chǔ)模板本工程基礎(chǔ)共分兩種形式,筒體部位為底板下反梁設(shè)計(jì),下反梁采用磚胎模,如圖1,其它部位為框架式基礎(chǔ)梁,采用普通木膠合板模板施工,如下圖212止水對(duì)拉螺栓18厚竹膠合模板50×100木方背楞鋼板止

23、水帶圖1 核心筒底板模板大樣根據(jù)梁高確定胎模厚度鋼管斜撐混凝土墊層木枋背楞模板木墊木枋對(duì)拉螺桿模板普通對(duì)拉螺桿雙鋼管蝴蝶結(jié)螺帽圖2 基礎(chǔ)梁模板大樣6.2基礎(chǔ)外墻地下外墻為抗?jié)B混凝土,模板采用18厚木膠合板模板支設(shè),施工時(shí)先支內(nèi)模板,再支外墻模板。16600止水對(duì)拉螺栓。底板面以上500高設(shè)一道水平施工縫,施工縫設(shè)鋼板止水帶或遇水膨脹止水條如圖3。外墻模板如圖4。 圖3 圖46. 3核心筒墻模板地下室核心筒處的剪力墻,采用18厚木膠合板模板支設(shè),50×100木方背楞,M16對(duì)拉螺栓間距600。由于核心筒處混凝土墻不要求抗?jié)B,故采用對(duì)拉螺栓外設(shè)PVC套管的方式,螺栓拆模板后回收重復(fù)使用,

24、核心筒在三層以下高度有4米多,圖中對(duì)拉螺栓更換為止水螺桿。核心筒處剪力墻模板見(jiàn)圖5。6. 4框架柱模板框架柱分方柱和附墻柱,方柱和附墻柱采用雙面覆塑膠合板模板。若有圓柱按圖6施工,方柱及附墻柱按圖7和圖8施工。圖6圓柱支模圖,僅參考參考圖.5 混凝土墻體模板圖圖.8 附墻柱模板圖圖37 方柱模板圖6. 5框架梁模板采用12厚竹膠板50×100木方配制成梁幫梁底模板。規(guī)格尺寸要精確,加固梁幫采用雙鋼管對(duì)拉螺栓,梁上口用鋼筋支撐以保證梁上口寬度。梁下部支撐采用碗扣腳手架,設(shè)水平拉桿和斜拉桿。采用早拆支撐體系和木夾板,木夾板與早拆支撐體系中的托梁之間用50×100mm木枋支承。具

25、體實(shí)施過(guò)程中,應(yīng)根據(jù)結(jié)構(gòu)圖繪制模板圖,包括支撐間距、位置,模板組合等。6. 6砼樓板模板支撐采用碗扣腳手架,縱橫間距為1200,主龍骨為雙鋼管,上部鋪設(shè)18厚竹膠板,用釘子釘牢。見(jiàn)模板圖10.圖.9 框架梁支模圖6. 7電梯井內(nèi)模采用整體筒子模,四角采用鋼板制成的活動(dòng)鉸鏈,四角支撐采用花籃螺栓,中部設(shè)碗扣腳手架作支撐。筒壁用穿墻對(duì)拉螺栓加固。經(jīng)檢查合格后,澆筑砼,砼強(qiáng)度達(dá)到規(guī)定要求后即可拆模。塔吊提升筒模做法見(jiàn)筒模圖11。圖11 電梯井筒模圖10 樓板支模圖6. 8樓梯模板采用踏步式定型封閉式鋼模。配制鋼模,按照樓梯的寬度、高度和長(zhǎng)度,踏步的步數(shù)來(lái)配制。梯段的底板模板施工完后,綁扎鋼筋。鋼筋綁

26、好后,然后把定型鋼模用塔吊吊入梯段上部固定。做法見(jiàn)樓梯鋼模圖7.2.4-10。6. 9剪力墻門窗洞口、預(yù)留洞口模板采用竹膠板及木板、角鐵、螺栓制作而成的定型鋼模。定型鋼模尺寸,根據(jù)墻厚,洞口的高度和寬度來(lái)制作。利用洞邊的鋼筋控制洞口模板的位移。如果是窗洞口,洞模下口模要鉆出氣孔,保證砼的密實(shí)度。見(jiàn)模圖13。圖.13 剪力墻內(nèi)留洞模板圖6. 10后澆帶的模板方案及外防水方案(若地下有后澆帶者按此方案執(zhí)行)。砼底板和墻體分成多條后澆帶??紤]到后澆帶外來(lái)的水壓力,土壓力,砼墻板拆模后在后澆帶外則砌240厚的磚墻,用M5水泥砂漿砌筑磚墻,外用15厚1:2水泥砂漿抹平壓光,干燥后同砼墻同時(shí)作外防水。防水

27、層外作保護(hù)層,然后回填土。后澆帶兩側(cè)的模板。利用易收口網(wǎng)代替。支護(hù)采用鋼筋網(wǎng)片及鋼筋用支護(hù)。見(jiàn)后澆帶墻板施工圖14。樓板后澆帶,砼后澆帶兩側(cè)作法與墻體后澆帶相同,作法見(jiàn)底板后澆帶施工圖15。圖14 擋土墻后澆帶做法35d35d加強(qiáng)筋按板筋間距加大一倍頂板密目鐵絲網(wǎng)、=4鋼板網(wǎng)后設(shè)25300 鋼筋圖.15 地上樓板后澆帶做法6.11 主體部分本工程地上部分混凝土結(jié)構(gòu)為框筒結(jié)構(gòu),柱、梁、板、墻以及電梯井道和門窗洞口模板應(yīng)根據(jù)圖紙尺寸進(jìn)行配模。設(shè)計(jì)概況:主樓短邊約26000,長(zhǎng)邊33700,梁高300800之間,梁寬200300,板厚100120,為保險(xiǎn)起見(jiàn),模板按主梁300×1000.板

28、厚150設(shè)計(jì)。18厚九夾模板,50×100方木小楞,100×100主龍骨設(shè)計(jì)。如圖16。7 施工技術(shù)要求本工程模板方案。采取大模板施工方案,竹膠板木龍骨。用整張竹膠板制作成大模板。拼縫少不易漏漿。大小,機(jī)動(dòng)靈活,根據(jù)需要配制規(guī)格。拼縫處貼海棉膠條,然后用螺栓連接防止漏漿。A、柱、墻、梁模板施工,在鋼筋未綁扎之前,必須根據(jù)圖紙尺寸平面放線、柱、墻、梁的位置,經(jīng)有關(guān)部門檢查后,無(wú)誤后,墻,柱可以綁扎鋼筋,綁扎保護(hù)層墊塊,鋼筋經(jīng)檢查合格后,安裝墻模和柱模。加固校正垂直度檢查模板是否位移,在模板下口設(shè)清掃口,有雜物,能及時(shí)清掃出去 . B、電梯井筒模板采用竹膠板,8槽鋼間距300用

29、機(jī)制沉頭螺栓連接間距200四角用鋼板做的鉸鏈,拼裝成筒模??缮炜s易脫模??烧w提升(專項(xiàng)方案設(shè)計(jì)過(guò)程中筒模的重量必須在塔吊的起重范圍內(nèi))。筒模內(nèi)設(shè)十字支撐。模板就位后,采用48×3.0腳手架鋼管及50×100方木,用穿墻對(duì)拉螺加固。C、柱、墻交合處的模板施工柱、墻模板在交合處易造成脹模、跑?,F(xiàn)象,因此優(yōu)化組合該處的模板固定體系尤為重要,柱、墻模板組合固定如下圖: 柱、墻交合處模板加固圖D、剪力墻模板安裝及砼澆筑注意事項(xiàng)剪力墻模板安裝時(shí)須同樓層梁底模板相互對(duì)撐,對(duì)撐體系以鋼管相互頂緊。在頂撐施工過(guò)程中,控制設(shè)計(jì)尺寸,不得影響樓層梁標(biāo)高。在進(jìn)行砼澆筑時(shí),須對(duì)所澆窗臺(tái)位置上的梁內(nèi)

30、先注入一定量的砼,對(duì)窗上梁進(jìn)行配重處理,防止窗臺(tái)封口模板因振搗而上浮,導(dǎo)致模板變形,影響砼成形質(zhì)量。墻、柱校正垂直利用滿堂腳手架來(lái)固定,垂直支撐縱橫設(shè)剪刀撐。(4)為了確保砼梁和墻的斷面尺寸,模板安裝時(shí),在模板內(nèi)設(shè)置30×30×梁或墻寬的同梁砼標(biāo)號(hào)的砼條作內(nèi)支撐,間距為:墻500×800成梅花狀布置,梁沆小于500時(shí)高一排,間距為1200,梁高大于或等于550的設(shè)二排內(nèi)撐,間距為1200,呈梅花狀布置.8 模板系統(tǒng)驗(yàn)算(包括地下、地上全部模板)8.1計(jì)算標(biāo)準(zhǔn)荷載:模板及支架自重標(biāo)準(zhǔn)值(全部采用竹膠模板及木楞(次龍骨)取F1=0.40KN/m3新澆砼自重標(biāo)準(zhǔn)值 取F

31、2=25.00 KN/m3鋼筋自重標(biāo)準(zhǔn)值 樓板 取F3=1.1KN/m3框架梁 取F3= 1.5KN/m3;施工荷載 取F4=2.5 KN/m2振搗砼產(chǎn)生荷載標(biāo)準(zhǔn)值 水平模板 取F5=4.0KN/m2垂直模板 取F5=2.0 KN/m2新澆筑混凝土對(duì)模板側(cè)面的壓力標(biāo)準(zhǔn)值F=0.22Ct0121/2F=CH 其中:C混凝土的密度 取為25KN/m3t0 =200/(T+15) T混凝土的溫度取T=25t0=200/(25+15)=5.01外加劑修正系數(shù),因采用泵送砼故取為1.22砼坍落度影響系數(shù) 采用泵送砼,坍落度在110140之間,故2取為1.15澆筑速度 根據(jù)施工經(jīng)驗(yàn)取=1m/h則:F=0.

32、22×25×5.0×1.2×1.15X11/2=37.95KN/m2F=CH=6.1×25=152.5KN/m2取F與F二者之間的大值則標(biāo)準(zhǔn)值為F6=F=37.95KN/m2 傾倒砼產(chǎn)生的荷載標(biāo)準(zhǔn)值 取F7 =2KN/m2 8.2墻體模板系統(tǒng)驗(yàn)算1)計(jì)算參數(shù):模板性能參數(shù):本工程混凝土墻體大面積采用1830×915×18(l×b×h)的木膠合模板,對(duì)于模板模數(shù)不足的采用木板補(bǔ)縫。模板的彈性模量:4.0×103N/mm2 ,靜彎曲強(qiáng)度:30 N/mm2,鋼管性能參數(shù):48×3.0鋼管的性

33、能指標(biāo)如下:A=4.24×102mm2 i=15.9mm I=10.52×104 =5.00×103mm3 =l/150, Q235鋼管抗拉和抗彎強(qiáng)度設(shè)計(jì)值f=205N/mm2,彈性模量E=2.06×105N/mm2,容許長(zhǎng)細(xì)比=210。扣件性能參數(shù):直角扣件承載力設(shè)計(jì)值為8.00木方性能參數(shù):截面性能為:E=1×104N/mm2,=87N/mm2,I=416cm2,w=83cm2對(duì)拉螺栓性能參數(shù):M14對(duì)拉螺栓參數(shù):A=105mm2 N=17.80 kNM16對(duì)拉螺栓參數(shù):A=76mm2 N=24.50kN2)計(jì)算荷載組合:承載能力計(jì)算荷載:

34、F=1.2F6×0.9+1.4×F7=43.76KN/m2剛度驗(yàn)算荷載:F=1.2F6×0.9=40.99KN/m2其中0.9為計(jì)算折減系數(shù)。1墻體模板驗(yàn)算:(按四等跨連續(xù)梁計(jì)算):300300300300化為線型均布荷載:q1=F×0.3/1000=43.76×0.3/1000=0.01313×1000=13.13N/mm q2=F×0.3/1000=12.30N/mm2抗彎強(qiáng)度驗(yàn)算:=M/W其中:M=-0.107×q1×l2=-0.107×13.13×3002 =1.26×

35、;105N/mm2W=b×h2/6=1200×122/6=28800mm3則:=4.4N/mm2<fm=80N/mm23抗剪強(qiáng)度驗(yàn)算:=Q/A其中: Q=-0.607×q1×l=2.40×103N A=2/3×b×h=2/3×1200×12=9600mm2則:=0.25N/mm2<fv=55 N/mm24撓度驗(yàn)算:=0.632×q2×l4/(100×E×I)其中:E表示彈性模量:4500N/mm2I表示慣性矩 I=b×h3/12=1200

36、15;123/12=172800mm4 則:=0.81mm<=3.5mm即:說(shuō)明該模板符合施工設(shè)計(jì)要求。5次龍骨驗(yàn)算:計(jì)算示意圖(按二等跨連續(xù)梁計(jì)算):200500500200化為線型均布荷載:q1=F×0.5/1000=21.88N/mm q2=F×0.5/1000=20.50N/mm抗彎強(qiáng)度驗(yàn)算:=M/W其中:M=0.107×q1×l2=-0.107×21.88×5002 =5.85×105N/mm2W=b×h2/6=100×502/6=41667mm3則:= M/W =5.85×10

37、5/41667=14.04N/mm2<fm=17N/mm2抗剪強(qiáng)度驗(yàn)算:l=500=Q/A其中:Q=0.5×q1×l=5.50×103N A=2/3×b×h=2/3×100×50=3333mm2則:=1.64N/mm2<fv=17N/mm2撓度驗(yàn)算:=0.273×q2×l4/(100×E×I)其中:E表示彈性模量:1×104N/mm2I表示慣性矩 I=b×h3/12=100×503/12=104×104mm4 則:=0.34mm<

38、;=l/250=2mm即:說(shuō)明該模板次龍骨符合施工設(shè)計(jì)要求。主龍骨驗(yàn)算:計(jì)算示意圖(按簡(jiǎn)支梁計(jì)算):150600150化為線型均布荷載:q1=F×0.6/1000=26.26KN/mm q2=F×0.6/1000=24.60N/mm抗彎強(qiáng)度驗(yàn)算:=M/W其中:M=0.5×q1×m2=-0.5×26.26×1502=3.0×105N/mm2W=4.405×103mm3則:= M/W =3.0×105/4.405×103=68N/mm2<fm=215N/mm2抗剪強(qiáng)度驗(yàn)算:=Q/A其中:Q=0

39、.5×q1×l=7.90×103N A=4.24×102mm2則:= Q/A =7.90×103N /4.24×102mm2=18.63N/mm2<fv=125N/mm2撓度驗(yàn)算:=q2×m4/(24×E×I)×(-l3+6m2×l+3m3)其中:E表示彈性模量:2.06×105N/mm2 I表示慣性矩 I=10.52×104mm4 則:=0.38mm<=3mm即:說(shuō)明該模板的主龍骨符合施工設(shè)計(jì)要求。對(duì)拉螺栓驗(yàn)算:對(duì)拉螺栓的拉應(yīng)力 =N/A其中:N=F&

40、#215;次龍骨間距×主龍骨間距 =43.76×0.5×0.3 =6.56KN A=144mm2則:=45.60N/mm2fc=170N/mm2普通螺栓的設(shè)計(jì)抗拉強(qiáng)度該對(duì)拉螺栓滿足要求。8.3框架梁模板系統(tǒng)驗(yàn)算計(jì)算參數(shù):框架梁截面尺寸為h×b=300650×200300及300500×6501000,模板采用高強(qiáng)覆塑竹膠模板,對(duì)于模板模數(shù)不足的采用木板補(bǔ)縫。次龍骨采用b×h=100×50400落葉松木方,主龍骨采用481200的Q235雙鋼管,底模板采用立桿間距900×600的步距為1200的碗扣式腳手架

41、支撐。(見(jiàn)模板圖)計(jì)算荷載組合:梁底模板及支撐系統(tǒng):承載能力計(jì)算荷載:F=(F1+F2+F3)×1.2×0.9+F5×1.4×0.9其中:模板自重:F1=0.4k3×0.8×0.012=3.84×10-3N/mm砼自重:F2=25×0.8×0.75=15N/mm鋼筋砼:F3=1.5×0.8×0.75=0.9N/mm砼振搗荷載:F5=2.0×0.8=1.6N/mm則:q1=F=18.90N/mm剛度驗(yàn)算荷載:q2=F=( F1+F2+F3)×1.2×0.9=

42、17.2N/mm其中:式中0.9為計(jì)算析減系數(shù)。梁側(cè)模板系統(tǒng):承載能力計(jì)算荷載:F=(F5×1.4+F6×1.2)×0.9=43.51 KN/m2剛度驗(yàn)算荷載:F=F6×1.2×0.9=40.99KN/m2(因本工程梁板一起現(xiàn)澆,有部分板荷載直接傳遞到梁上。)梁底模板系統(tǒng)驗(yàn)算:計(jì)算示意圖(按三等跨連續(xù)梁計(jì)算):400400400抗彎強(qiáng)度驗(yàn)算:l=400=M/W其中:M=0.10×q1×l2=0.10×18.9×4002=3.03×105N/mm2W=b×h2/6=(800+2×

43、;12)×122/6=19776mm3則:=14.96N/mm2<fm=80N/mm2抗剪強(qiáng)度驗(yàn)算:=Q/A其中:Q=0.60×q1×l=0.6×18.9×400=4.54×103N A=2/3×b×h=2/3×824×12=6592mm2則:=0.69N/mm2<fv=55N/mm2撓度驗(yàn)算:=0.677×q2×l4/(100×E×I)其中:E表示彈性模量:4500N/mm2 I表示慣性矩 I=b×h3/12=824×12

44、3/12=1.4×106mm4 則:=0.47mm<= 3.5mm即:說(shuō)明該模板符合施工設(shè)計(jì)要求。.梁底模板次龍骨驗(yàn)算:計(jì)算示意圖(按二等跨連續(xù)梁計(jì)算):100600100抗彎強(qiáng)度驗(yàn)算:l=600=M/W其中:M=0.5×q1×l2=0.5×18.90×6002=9.44×104N/mm2W=b×h2/6=42×103mm3則:=2.25N/mm2<fm=17N/mm2抗剪強(qiáng)度驗(yàn)算:=Q/A其中:Q=0.5×q1×l=0.5×18.9×600=5.67×

45、103N A=2/3×b×h=2/3×100×50=3333mm2則: =1.7N/mm2<fv=17N/mm2撓度驗(yàn)算:=q2×m/(24×E×I)×(l3+6m2×l+3m3)其中:E表示彈性模量:1×104N/mm2I表示慣性矩 I=b×h3/12=100×503/12=104×104mm4 則:=1.22mm<=l/250=2mm模板次龍骨滿足要求。梁底模板主龍骨驗(yàn)算:計(jì)算示意圖(按三等跨連續(xù)梁計(jì)算):2009002000900900抗彎強(qiáng)度驗(yàn)算

46、: l=900 =M/W 其中:M=0.084×q1×l2 =0.084×18.90×9002 =12.9×105 N/mm2W=4.405×103×2=8.81×103mm3則:=146N/mm2<fm=215 N/mm2抗剪強(qiáng)度驗(yàn)算:=Q/A其中:Q=0.5×q1×l=0.5×18.9×900=8.51×103N A=4.80×102mm2則:=17.8N/mm2<fv=125N/mm2撓度驗(yàn)算:=0.273×q2×l4

47、/(100×E×I)其中:E表示彈性模量:2.06×104×2=4.12×105N/mm2 I表示慣性矩 I=10.52×104mm4 則:=0.71mm<=3mm模板的主龍骨滿足要求。梁側(cè)模板驗(yàn)算: 計(jì)算示意圖(按三等跨連續(xù)梁計(jì)算):400400400化為線型均布荷載:q1=F×0.4/1000=43.76×0.4/1000=17.5N/mm q2=F×0.4/1000=40.99×0.4/1000=16.40N/mm抗彎強(qiáng)度驗(yàn)算:l=400=M/W其中:M=0.10×q1&#

48、215;l2=-0.10×17.5×4002=2.8×105N/mm2W=b×h2/6=1200×122/6=28800mm3則: =9.70N/mm2<fm=80N/mm2抗剪強(qiáng)度驗(yàn)算:=Q/A其中: Q=0.60×q1×l=4.2×103N A=2/3×b×h=2/3×1200×12=9600mm2則: =0.44N/mm2<fv=55N/mm2撓度驗(yàn)算:l=400=0.677×q2×l4/(100×E×I)其中:E表示

49、垂直方向的彈性模量:6500N/mm2 I表示慣性矩 I=b×h3/12=1200×123/12=172800mm4 則:=2.50mm<=3.5mm模板滿足要求。次龍骨驗(yàn)算:計(jì)算示意圖(按簡(jiǎn)支梁計(jì)算):1504500150化為線型均布荷載:q1=F×0.45/1000=19.69N/mm q2=F×0.45/1000=18.45N/mm抗彎強(qiáng)度驗(yàn)算:l=450=M/W其中:M=0.5×q1×l2=2.2×105N/mm2W=b×h2/6=100×502/6=41667mm3則: =5.30N/mm

50、2<fm=17N/mm2抗剪強(qiáng)度驗(yàn)算:=Q/A其中:Q=0.5×q1×l=4.4×103N A=2/3×b×h=2/3×100×50=3333mm2則: =1.32N/mm2<fv=1.7N/mm2撓度驗(yàn)算:=q2×m/(24×E×I)×(l3+6m2×l+3m3)其中:E表示彈性模量:1×104N/mm2 I表示慣性矩 I=b×h3/12=104×104mm4 則:=0.23mm<=l/250=2mm模板次龍骨滿足要求。主龍骨

51、驗(yàn)算:計(jì)算示意圖(按簡(jiǎn)支梁計(jì)算):400100400100化為線型均布荷載:q1=F×0.4/1000=17.40N/mm q2=F×0.4/1000=16.40N/mm抗彎強(qiáng)度驗(yàn)算:l=400=M/W其中:M=0.105×q1×l2=0.105×17.40×4002=2.92×105N/mm2W=4.405×103 mm3則: =66.3N/mm2<fm=215N/mm2抗剪強(qiáng)度驗(yàn)算: =Q/A其中:Q=0.5×q1×l=3.48×103N A=4.8×102mm2則

52、: =7.25N/mm2<fv=125N/mm2撓度驗(yàn)算: =0.237q2×l4/(100×E×I)其中:E表示彈性模量:2.06×1055N/mm2 I表示慣性矩 I=10.52×104mm4 則: =0.046mm<=3mm模板的主龍骨滿足要求。對(duì)拉螺栓驗(yàn)算:對(duì)拉螺栓的拉應(yīng)力 =N/A其中:N=F×次龍骨間距×主龍骨間距 =43.51×0.4×0.45=7.83KN A=76mm2則:=103N/mm2fc=170N/mm2普通螺栓的設(shè)計(jì)抗拉強(qiáng)度8.4對(duì)拉螺栓滿足要求。1、梁板及支撐應(yīng)根

53、據(jù)模板配置的層數(shù),按以下原則對(duì)荷載進(jìn)行組合后進(jìn)行計(jì)算受力分析條件1)、支撐縱向壓縮變形忽略不計(jì),在新增加荷載作用下,各層樓蓋的撓度相同:2)、當(dāng)樓蓋混凝土強(qiáng)度達(dá)到一定值時(shí)(10MPa),該層樓蓋即可參與承受荷載:3)、參與承載荷載的樓蓋(包括地面)剛度相同,即在撓度相同的情況下,平均分?jǐn)偝薪有略黾拥暮奢d:4)、樓蓋處于彈性變形階段,每次增加荷載后,可用疊加原理計(jì)算;5)、新增加荷載的第一種類型,為新澆灌混凝土重量q0及模板支撐重量q1。如參加承接荷載的樓層為n,則每層樓蓋的承接荷載為(q0q1)/n,而支撐承接荷載逐層遞減,即往下第1層為(q0q1),第2層為(11/n)(q0q1),第3層為

54、(12/n)(q0q1),第n層為(q0q1)/n;6)、新增加荷載的第二種類型,為被拆除支撐在拆除前的承接荷載平均分配給上面各層樓蓋,而支撐往上逐層遞減:7)、計(jì)算各層支撐承接荷載時(shí),略去本層模板和支撐的重量。8)、計(jì)算中略去施工荷載,但計(jì)算支撐強(qiáng)度及穩(wěn)定性時(shí),應(yīng)考慮施工荷載。8.5支撐體系驗(yàn)算8.5.1、扣件抗滑移的計(jì)算:按照建筑施工扣件式鋼管腳手架安全技術(shù)規(guī)范培訓(xùn)講座劉群主編,P96頁(yè),雙扣件承載力設(shè)計(jì)值取16.00kN,按照扣件抗滑承載力系數(shù)0.80,該工程實(shí)際的旋轉(zhuǎn)雙扣件承載力取值為12.80kN 。縱向或橫向水平桿與立桿連接時(shí),扣件的抗滑承載力按照下式計(jì)算(規(guī)范5.2.5): R

55、Rc其中 Rc - 扣件抗滑承載力設(shè)計(jì)值,取12.80 kN; R - 縱向或橫向水平桿傳給立桿的豎向作用力設(shè)計(jì)值;計(jì)算中R取最大支座反力R=11.805 kN;R < 12.80 kN,所以雙扣件抗滑承載力的設(shè)計(jì)計(jì)算滿足要求! 8.5.2、立桿的穩(wěn)定性計(jì)算:立桿的穩(wěn)定性計(jì)算公式 1.梁兩側(cè)立桿穩(wěn)定性驗(yàn)算:其中 N - 立桿的軸心壓力設(shè)計(jì)值,它包括: 橫桿的最大支座反力: N1 =2.757 kN ; 腳手架鋼管的自重: N2 = 1.2×0.136×3.15=0.514 kN; 樓板的混凝土模板的自重: N3=1.2×(1.00/2+(1.40-1.00)

56、/2)×0.40×0.35=0.118 kN; 樓板鋼筋混凝土自重荷載: N4=1.2×(1.00/2+(1.40-1.00)/2)×0.40×0.200×(1.50+24.00)=1.714 kN; N =2.757+0.514+0.118+1.714=5.103 kN; - 軸心受壓立桿的穩(wěn)定系數(shù),由長(zhǎng)細(xì)比 lo/i 查表得到; i - 計(jì)算立桿的截面回轉(zhuǎn)半徑 (cm):i = 1.59; A - 立桿凈截面面積 (cm2): A = 4.24; W - 立桿凈截面抵抗矩(cm3):W = 4.405; - 鋼管立桿軸心受壓應(yīng)力計(jì)

57、算值 ( N/mm2); f - 鋼管立桿抗壓強(qiáng)度設(shè)計(jì)值:f =205 N/mm2; lo - 計(jì)算長(zhǎng)度 (m);如果完全參照扣件式規(guī)范不考慮高支撐架,按下式計(jì)算 lo = k1uh (1) k1 - 計(jì)算長(zhǎng)度附加系數(shù),取值為:1.155 ; u - 計(jì)算長(zhǎng)度系數(shù),參照扣件式規(guī)范表5.3.3,u =1.7;上式的計(jì)算結(jié)果:立桿計(jì)算長(zhǎng)度 Lo = k1uh = 1.155×1.7×1.5 = 2.945 m;Lo/i = 2945.25 / 15.9 = 185 ;由長(zhǎng)細(xì)比 lo/i 的結(jié)果查表得到軸心受壓立桿的穩(wěn)定系數(shù)= 0.209 ;鋼管立桿受壓應(yīng)力計(jì)算值 ;=5102.

58、695/(0.209×424) = 57.58 N/mm2;鋼管立桿穩(wěn)定性計(jì)算 = 50.41 N/mm2 小于 鋼管立桿抗壓強(qiáng)度的設(shè)計(jì)值 f = 205 N/mm2,滿足要求!2.梁底受力最大的支撐立桿穩(wěn)定性驗(yàn)算:其中 N - 立桿的軸心壓力設(shè)計(jì)值,它包括: 梁底支撐最大支座反力: N1 =11.805 kN ; 腳手架鋼管的自重: N2 = 1.2×0.136×(3.15-2.1)=0.514 kN; N =11.805+0.514=11.977 kN; - 軸心受壓立桿的穩(wěn)定系數(shù),由長(zhǎng)細(xì)比 lo/i 查表得到; i - 計(jì)算立桿的截面回轉(zhuǎn)半徑 (cm):i

59、= 1.59; A - 立桿凈截面面積 (cm2): A = 4.24; W - 立桿凈截面抵抗矩(cm3):W =4.405; - 鋼管立桿軸心受壓應(yīng)力計(jì)算值 ( N/mm2); f - 鋼管立桿抗壓強(qiáng)度設(shè)計(jì)值:f =205 N/mm2; lo - 計(jì)算長(zhǎng)度 (m);如果完全參照扣件式規(guī)范不考慮高支撐架,按下式計(jì)算 lo = k1uh (1) k1 - 計(jì)算長(zhǎng)度附加系數(shù),取值為:1.155 ; u - 計(jì)算長(zhǎng)度系數(shù),參照扣件式規(guī)范表5.3.3,u =1.7;上式的計(jì)算結(jié)果:立桿計(jì)算長(zhǎng)度 Lo = k1uh = 1.155×1.7×1.5 = 2.945 m;Lo/i =

60、2945.25 / 15.9 = 185 ;由長(zhǎng)細(xì)比 lo/i 的結(jié)果查表得到軸心受壓立桿的穩(wěn)定系數(shù)= 0.209 ;鋼管立桿受壓應(yīng)力計(jì)算值 ;=11976.636/(0.209×424) = 135.15 N/mm2;鋼管立桿穩(wěn)定性計(jì)算 = 135.15 N/mm2 小于 鋼管立桿抗壓強(qiáng)度的設(shè)計(jì)值 f = 205 N/mm2,滿足要求!8.5.3、立桿的地基承載力計(jì)算: 立桿基礎(chǔ)底面的平均壓力應(yīng)滿足下式的要求 : p fg 地基承載力設(shè)計(jì)值: fg = fgk×kc = 150 kpa; 其中,地基承載力標(biāo)準(zhǔn)值:fgk= 150 kpa ; 腳手架地基承載力調(diào)整系數(shù):kc

61、 = 1 ; 立桿基礎(chǔ)底面的平均壓力:p = N/A =47.221 kpa ;其中,上部結(jié)構(gòu)傳至基礎(chǔ)頂面的軸向力設(shè)計(jì)值 :N = 11.805 kN;基礎(chǔ)底面面積 :A = 0.25 m2 。p=47.221 fg=150 kpa 。地基承載力滿足要求!8.5.4、模板支架立桿荷載標(biāo)準(zhǔn)值(軸力):作用于模板支架的荷載包括靜荷載、活荷載和風(fēng)荷載。1.靜荷載標(biāo)準(zhǔn)值包括以下內(nèi)容:(1)腳手架的自重(kN):NG1 = 0.138×5 = 0.692 kN;鋼管的自重計(jì)算參照扣件式規(guī)范附錄A。(2)模板的自重(kN):NG2 = 0.35×1×1 = 0.35 kN;(

62、3)鋼筋混凝土樓板自重(kN):NG3 = 25×0.2×1×1 = 5 kN;經(jīng)計(jì)算得到,靜荷載標(biāo)準(zhǔn)值 NG = NG1+NG2+NG3 = 6.042 kN;2.活荷載為施工荷載標(biāo)準(zhǔn)值與振倒混凝土?xí)r產(chǎn)生的荷載。經(jīng)計(jì)算得到,活荷載標(biāo)準(zhǔn)值 NQ = (2.5+2 ) ×1×1 = 4.5 kN;3.不考慮風(fēng)荷載時(shí),立桿的軸向壓力設(shè)計(jì)值計(jì)算N = 1.2NG + 1.4NQ = 13.55 kN; 8.5.5、立桿的地基承載力計(jì)算: 立桿基礎(chǔ)底面的平均壓力應(yīng)滿足下式的要求: p fg 地基承載力設(shè)計(jì)值: fg = fgk×kc = 68

63、 kpa; 其中,地基承載力標(biāo)準(zhǔn)值:fgk= 170 kpa ; 腳手架地基承載力調(diào)整系數(shù):kc = 0.4 ; 立桿基礎(chǔ)底面的平均壓力:p = N/A =54.202 kpa ;其中,上部結(jié)構(gòu)傳至基礎(chǔ)頂面的軸向力設(shè)計(jì)值 :N = 13.55 kN;基礎(chǔ)底面面積 :A = 0.25 m2 。p=54.202 fg=68 kpa 。地基承載力滿足要求!8.6柱模板系統(tǒng)驗(yàn)算計(jì)算參數(shù):本工程混凝土方形柱。方柱采用的九夾板,采用b×h=45×90垂直4500落葉松木方做外楞,并用14450×450的對(duì)拉螺栓穿墻對(duì)拉固定外楞。計(jì)算荷載組合:承載能力計(jì)算荷載:F=(F5

64、15;1.4+F6×1.2)×0.9=43.51KN/m2(柱澆灌速度應(yīng)大于1米,直接采用墻的荷載不一定適用。)剛度驗(yàn)算荷載:F,=F6×1.2×0.9=40.99KN/m2其中0.9為計(jì)算析減系數(shù)。方柱模板驗(yàn)算:計(jì)算示意圖(按二等跨連續(xù)梁計(jì)算):450450化為線型均布荷載:q1=F×0.45/1000=19.60N/mm q2=F×0.45/1000=18.45N/mm抗彎強(qiáng)度驗(yàn)算:=M/W其中:M=0.125q1×l2=0.125×19.60×4502=4.96×105N/mm2W=b&#

65、215;h2/6=900×122/6=21600mm3則: =22.96N/mm2<fm=80N/mm2抗剪強(qiáng)度驗(yàn)算:=Q/A其中: Q=0.625×q1×l=0.55×103N A=2/3×b×h=2/3×900×12=7200mm2則: =0.77N/mm2<fv=55N/mm2撓度驗(yàn)算:=0.521×q2×l4/(100×E×I)其中:E表示彈性模量:6500N/mm2 I表示慣性矩 I=b×h3/12=172800mm4 則:=03.2mm<

66、;=3.5mm模板滿足要求。方柱外楞驗(yàn)算:計(jì)算示意圖(按二等跨連續(xù)梁計(jì)算):450450化為線型均布荷載: q1=F×0.45/1000=19.60N/mm q2=F×0.45/1000=18.45N/mm抗彎強(qiáng)度驗(yàn)算:=M/W其中:M=0.125×q1×l2 =0.125×19.60×4502 =4.96×105N/mm2W=b×h2/6=100×502/6=41667mm3則:=11.91N/mm2<fm=17N/mm2抗剪強(qiáng)度驗(yàn)算:=Q/A其中:Q=0.625×q1×l=5

67、.51×103N A=2/3×b×h=2/3×100×50=3333mm2則: =1.65N/mm2<fv=1.7N/mm2撓度驗(yàn)算:=0.521×q2×l4/(100×E×I)其中:E表示彈性模量:1×104N/mm2 I表示慣性矩 I=b×h3/12=104×104mm4 則: =0.38mm<=l/250=2mm模板次龍骨滿足要求。對(duì)拉螺栓驗(yàn)算:14對(duì)拉螺栓的拉應(yīng)力 =N/A其中:N=F×次龍骨間距×主龍骨間距 =43.51×0

68、.45×0.0.45 =8.81KN A=105mm2則:=83.92N/mm2fc=170N/mm2普通螺栓的設(shè)計(jì)抗拉強(qiáng)度對(duì)拉螺栓滿足要求(計(jì)算公式中的上、下標(biāo)應(yīng)全部核對(duì)一啟遍)作業(yè)條件(1) 在會(huì)審圖紙后,根據(jù)工程特點(diǎn).計(jì)劃合同工期及現(xiàn)場(chǎng)環(huán)境等完成各分部.分項(xiàng)混凝土結(jié)構(gòu)模板設(shè)計(jì)及模板配料工作。(2)模板涂刷脫模劑,并分規(guī)格堆放。(3)根據(jù)圖紙要求,放好軸線和模板邊線,定好水平控制標(biāo)高。(4)墻.柱鋼筋綁扎完畢,水電管及預(yù)埋件已安裝,綁好鋼筋保護(hù)層塊,對(duì)圓池隔離橡膠已墊好預(yù)埋件控制,并辦理完隱蔽驗(yàn)收手續(xù)。9 模板拆除1)對(duì)豎向結(jié)構(gòu)在砼澆注48h后,待其自身強(qiáng)度能保證構(gòu)件不變形.不缺

69、棱掉角時(shí)方可拆模。2.)由于本工程小商業(yè)柱距較大,基本上都大于7M,為加快施工進(jìn)度,降低對(duì)周轉(zhuǎn)材料的壓力,本工程梁采用早拆體系模板。結(jié)構(gòu)部位拆模時(shí),應(yīng)通過(guò)同條件養(yǎng)護(hù)的砼試件強(qiáng)度的試驗(yàn)結(jié)果,結(jié)合結(jié)構(gòu)尺寸和支撐間距進(jìn)行驗(yàn)算來(lái)確定。拆模時(shí)間應(yīng)由項(xiàng)目技術(shù)負(fù)責(zé)人確定并報(bào)監(jiān)理批準(zhǔn),模板拆除前,專業(yè)工長(zhǎng)應(yīng)對(duì)操作工人進(jìn)行交底,同類水平構(gòu)件首次拆模以及大跨度.高支模等特殊部位拆模時(shí)應(yīng)有管理人員現(xiàn)場(chǎng)跟班檢查。模板拆除后,應(yīng)隨即進(jìn)行修整及清理,然后集中堆放以便周轉(zhuǎn)使用。3)梁板底模拆除時(shí),混凝土強(qiáng)度應(yīng)符合下表要求。構(gòu)件構(gòu)件跨度達(dá)到設(shè)計(jì)混凝土立方體抗壓強(qiáng)度標(biāo)準(zhǔn)值的百分率(%)板2502,8758100梁8758100懸臂構(gòu)件1004)采用普通

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

最新文檔

評(píng)論

0/150

提交評(píng)論