1、110notesthere documents are shipbuilding quality standard implemented by our yard presently. they consist of two parts like quality control through production and construction accuracy taken as a main basis for the shipbuilding in our yard, this construction accuracy is made according to the shipbui
2、lding quality standard in advanced shipbuilding nations, international conventions as well as rules and regulations of some well-known classification societies. for this purpose, we require:1. detailed workmanship and drawings, if no other specific restriction, comply with the respective requirement
3、s stated in this standard. in case of difference, this standard shall govern all.2. should there be some items in the newbuilding contract or technical specification of higher requirement than this standard, these items should be regarded as an exception and performed according to specific requireme
4、nt otherwise announced.contents part 1 quality control through production1 steel material and processing61.1 steel material .61.2 steel processing .62 fixing and assembling72.1 fixing and assembling of parts and members.72.2 block assembling73 welding.83.1 preparation before welding.83.2 welding pro
5、cess.83.3 welding inspection.83.4 key points of quality control.94 tightness test.95 fabrication,fixing,tightness testing and flushing of pipes105.1 fabrication of pipes.105.2 fixing of pipes and fittings .115.3 tightness testing of piping system.125.4 flushing of pipes126 painting.136.1 pre-treatme
6、nt of steel surface136.2 shop primertouch-up.136.3 secondary derusting and surface cleaning.136.4 painting work.137 hull outfitting137.1 pre-outfitting of ship equipment137.2 approval of ship equipment.137.3 installation of ship equipment147.4 key points of quality control.148 machinery installation
7、.158.1 shafting and propeller.158.2 main engine and accessories178.3 auxiliary machinery.188.4 boiler199 electric installation.199.1 electric fittings.199.2 cable laying.209.3 installation and earthing of electric equipment209.4 connection and earthing of metal covering of cables.2110 automatic cont
8、rol and remote control,telemetry equipment and their testing.2110.1 sensors.2110.2 automatic control and remote control.2210.3 monitoring and alarming.2210.4 test of unattended engine room.2311 mooring test and sea trial.2311.1 mooring test and sea trial for hull part.2311.2 mooring test and sea tri
9、al for machinery part.2411.3 mooring test and sea trial for electric part.2512 completion and delivery.2512.1 delivery of cabin equipment, spares and supplies2512.2 inspection of marking and operation instructions.2512.3 as-built drawings and ship delivery documents2612.4 certificates to be handed o
10、ver26part 2 plans for approval and inspecitions and tests for acceptance1 plans for approval.271.1 general .271.2 plans and documents to be submitted for review and approval272 inspections and tests for acceptance.322.1 general.322.2 items of inspection and tests.33part 3 construction accuracy1 hull
11、 construction341.1 steel materials.341.2 marking .361.3 cutting.371.4 forming.391.5 fixing and assembling421.6 welding.491.7 fairness and finishing.511.8 principal dimensions and deformation561.9 draught and freeboard marks.572hull outfitting.582.1 rudder 582.2 mast, deck crane post and derrick boom
12、612.3 cargo hold hatch cover.632.4 weathertight closing devices.732.5 cabin outfitting803 machinery installation.833.1 diesel main engine833.2 shafting 853.3 auxiliary machinery.863.4 deck machinery883.5 installation of steering gear and fastening liner.893.6 fabrication and installation of piping.8
13、94 electric installation.984.1 cable laying.984.2 electric equipment installation.1005 painting.1025.1 pretreatment of steel surface1025.2 secondary derusting.1035.3 surface cleaning.1055.4 quality of coating1075.5 film thickness of coating.108part 1quality control through production1 steel material
14、 and processing1.1 steel material1.1.1 upon arrival in the yard, all marine steel materials are to be checked against quality certificates. visual inspection is to be done to confirm their quality.1.1.2 all steel materials are to be stowed in pile according to sizes and brand andkept flat.1.1.3 all
15、steel materials shall be served out against material allocation sheetaccording to the production plan.1.1.4 visual inspection is to be done to the steel materials before processing.1.1.5 key points of quality control:a) size, brand, heat number, batch number;b) minus tolerance in thickness for plate
16、s and sections;c) surface qualities;d) any defects in large forgings and castings.1.2 steel processing1.2.1 marking and cutting1.2.1.1 necessary pre-treatment such as levelling, straightening and derusting are tobe done to the plates and sections before cutting.1.2.1.2 numerical controlled cutting a
17、nd other high efficient high-precision cuttingmeans are to be used as far as possible to improve marking and cutting accuracy.1.2.1.3 material property, heat number, batch number and thickness are to be noteddown for primary members according to the requirement.1.2.1.4 key points of quality control
18、for marking:a) size deviation;b) anglar deviation;c) markings such as processing symbols, codes and marks.1.2.1.5 key points of quality control for cutting:a) cutting accuracy;d) dimensional size;e) lamination.1.2.2 forming1.2.2.1 bending forming by cold or hot bending of steel plates and sections i
19、s to be performed according to the specified requirements for materials of different properties and grades.1.2.2.2 key points of quality control:a) heating temperature;b) accuracy of forming.2 fixing and assembling2.1 fixing and assembling of parts and members2.1.1 the accuracy requirements of block
20、 assembling is to be met for the fixingand assembling of parts and members. shop pnmer is to be applied after welding.2.1.2 key points of quality control:a) geometrical dimensions of parts and members;b) installation locations;c) deformation.2.2 block assembling2.2.1 block assembling is to be genera
21、lly carried out on the platform or jig.2.2.2 pre-outfitting of parts and members is to be done according to the design drawings.2.2.3 the accuracy that meets the requirements of general assembling is to be applied for block assembling.2.2.4 block assemblies are to be painted after inspection.2.2.5 k
22、ey points of quality control:a) marking accuracy;b) installation accuracy of internal structure joints inside the block;c) accuracy of block configuration and its dimensional size; d) accuracy of block edges; e) correctness of assembling reference lines; f) levelness of face plate and location devia
23、tion of main engine bed; g) installation locations of key components, such as shaft boss, rudder horn, etc; h) accuracy of jig manufacturing2.3 erection on shipway2.3.1 carry out marking on the shipway with corresponding symbols and marks.2.3.2 place the reference block in position, and then proceed
24、 with successiveblocks according to the shipway assembling schedule.2.3.3 carry out erection on shipway.2.3.4 during construction process, all temporary openings in the primary membersand their closing-up are to comply with the requirements set out in the technical documents.2.3.5 remove temporary w
25、elding pieces and lifting eye pieces according to usualpractice.2.3.6 after completing shipway assembling, the hull is to be painted according tothe specified requirements.2.3.7 key points of quality control:a) accuracy of marking on the shipway;b) correctness of location of the reference blockc) fr
26、ame spacing at block junctions;d) alignment accuracy of structural members;e) deflection of the centerline of the keel;f) alignment accuracy of shaft centerline;g) marking accuracy of loadline and draft marks;h) principal dimensions of the hull.3 welding3.1 preparation before welding3.1.1 welding ma
27、terials, preparation of weld joints and assembling accuracy are tocomply with relevant requirements set out in quality control documents.3.1.2 the welding zone is to be free of rust, scales, grease, moisture or other dirty.3.1.3 the environmental condition of the welding area is to be kept in good o
28、rder.3.1.4 tack welding is to be carried out according to specified technologicalprocedures.3.1.5 wherever new materials or new welding technologies are adopted, test reports and welding procedures are to be submitted to the classification society for approval.3.2 welding processall welding shall be
29、 carried out according to the methods and conditions as required by the welding technology procedures. proper measures for minimizing welding deformation are to be taken.3.3 welding inspection3.3.1 inspection of welding is to be carried out throughout the whole process ofwelding including inspection
30、s before, during and after welding as well as the inspection of finished weldments.3.3.2 all welds are to be visually examined first.3.3.3 quality inspection of welded seams is to be carried out according to thespecified requirements. either x-ray detection, ultrasonic detection or other inspection
31、methods approved by the classification society may be adopted.3.3.4 leg sizes of fillet welds are to comply with the design plan and relevantcodes.3.3.5 welded joints on the strength deck, shell plate and interior strength membersin the mid-length region are to be inspected in accordance with the no
32、n-destructive inspection plan approved by the classification society.3.3.6 welds not conforming to the requirements of quality standards are to berectified and repaired as required, and are to be inspected again.3.4 key points of quality controla) qualification of welders;b) welding materials;c) wel
33、ding codes;d) groove sizes and seam clearance;e) cleanness of welding region;f) preheating and heat-retaining;g) welding deformation;h) sizes of welded seams;i) integrity of all-around welds;j) surface and inner defects in welding seam.4 tightness test4.1 tightness test is to be conducted after main
34、 hull and the structure to be tested are completed, all accessories affecting the tightness are fixed and non-destructive testing are properly completed.4.2 all welding seams having concern with tightness test are to be free of scales, slugs, paints(excluding primers)or any grease.4.3 tightness test
35、 to the hull structure may be performed with either hose test, hydraulic test, air test or other equivalent methods depending upon the hull strength and tightness requirement.4.4 tightness test may be performed on blocks.4.5 the location and requirements for tightness test are to be in compliance wi
36、th the requirements of the classification society.4.6 key points of quality control:a) cleaning of welded seams;b) test pressure;c) test procedure;d) test duration;e) inspection for deformation and leakage.5 fabrication, fixing, tightness testing and flushing of pipes5.1 fabrication of pipes5.1.1 ma
37、terial of pipes5.1.1.1 upon arrival in the yard, visual inspection is to be conducted to the pipesagainst technical documents. the pipes are to be properly stowed separately according to their material quality, heat number, batch number, grade and size.5.1.1.2 key points of quality control:a) certif
38、icate of qualification;b) size and visual appearance;c) separate stowing.5.1.2 blanking of pipes5.1.2.1 before blanking, check is to be made to the pipe size, grade, material quality, heat number and batch number. after blanking and temporary sealing, the pipe sections are to be properly numbered an
39、d stowed in accordance with technical document.5.1.2.2 key points of quality control:a) size and visual appearance;b) blanking length and serial number;c) stowing and maintenance.5.1.3 bending of pipes5.1.3.1 either cold bending or hot bending may be used for pipe bending. in case of cold bending, t
40、he bending radius of the curvature of the pipe is to be in general not less than three times the outside diameter of the pipe. for special pipes such as tank heating pipe and pipes to be fixed in confined space, the radius of curvature is to be in general not less than two times the outside diameter
41、 of the pipe. when pre-fabricated bend is adopted, the bending radius of the curvature is to be not less than the outside diameter of the pipe.5.1.3.2 key points of quality control:a) circularity of the pipe bend;b) height of bending corrugation of the pipe bend;c) mechanical damage or defect;d) ben
42、d angle, rotating angle and length of pipe segment after bending.5.1.4 fixing of pipes5.1.4.1 the material, size and type of pipe fittings are to be in compliance with therequirements of the technical documents. the mating clearance or groove of the pipe with its connector, of the branches with main
43、 pipe and between connection butts of pipes are to be in conformity with the relevant technical requirements.5.1.4.2 key points of quality control:a) marks of pipe;b) correct use of connector;c) mating clearance and groove;d) assembling dimensions;e) position welding.5.1.5 welding of popes5.1.5.1 th
44、e welder shall hold proper qualification certificate for conducting welding.measures are to be taken to avoid deformation of the welding for large diameter pipe. welding is to be carried out in accordance with the requirements of the welding procedures.5.1.5.2 key points of quality control:a) cleani
45、ng of welded parts;b) welding material;c) welding deformation;d) welding quality.5.1.6 pipe cleaning and strength testing5.1.6.1 the pipes are to maintain smooth surface after machining and welding, andare subject to hydraulic test in accordance with the requirements of the technical documents.5.1.6
46、.2 key points of quality control:a) no welding slag, spray, sharp cut nor burr on the surface;b) strength test;c) seal blocking of pipe ends.5.1.7 surface treatment of pipes5.1.7.1 after machining, pipe surface is to be treated in accordance with therequirements of the technical documents. pipes wit
47、h different surface treatment shall be segregated and stowed separately.5.1.7.2 key points of quality control:a) cleaning and protection of pipes;b) quality of galvanizing and painting;c) stowing of pipes after surface treatment.5.2 fixing of pipes and fittings5.2.1 handling of pipes5.2.1.1 pipes to
48、 be installed are to be counted and served out in accordance with thetechnical documents.5.2.1.2 key points of quality control:a) protection of non-ferrous and specially treated pipes;b) prevention of impact or squeezing;c) prevention of sand or dirt from entering the pipe.5.2.2 fixing of pipes5.2.2
49、.1 pipes, in general, are to be fixed in stages of unit assembling, blockassembling, overall assembling and fixing on board.5.2.2.2 key points of quality control:a) fixing sequence and accuracy of coordinate dimensions;b) cleaning of pipe end mating surface and removal of foreign matters inside the
50、pipe;c) size and material quality of pipe connection bolt;d) sealing material for pipe connection;e) connecting accuracy of pipe to equipment.5.2.3 fixing of pipe fittings and supports5.2.3.1 the fixing of pipe fittings and supports is to be in compliance with therequirements of the classification s
51、ociety.5.2.3.2 key points of quality control:a) type, size, position and flow direction of pipe fittings;b) visual quality of fittings;c) connecting accuracy of pipe to the equipment;d) supporting type and spacing of supports;e) welding of support;f) gasket between non-ferrous pipe and support.5.3 tightness testing of piping system5.3.1 tightness test of the piping system is to be carried out in accordance with thetechnical documents.5.3.2 key points of qua
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 公共安全培訓課件
- 2025年度石油化工企業(yè)滅火器維保及應急預案合同
- 湖北省隨州市部分高中2024-2025學年高二上學期1月期末聯(lián)考歷史試題(含答案)
- 2025年度私人住宅出售與綠化養(yǎng)護合同
- 二零二五年度銀行卡借用與金融科技創(chuàng)新合同
- 導游基礎知識說課課件
- 2025年度二零二五餐飲企業(yè)兼職廚師工作合同
- 2025年度液化氣配送站經(jīng)營權(quán)及品牌使用權(quán)轉(zhuǎn)讓合同
- 湖南省岳陽市岳陽樓區(qū)2024-2025學年八年級上學期期末考試英語試題(含答案)
- 供電線路知識
- 2025年度土地經(jīng)營權(quán)流轉(zhuǎn)合同補充條款范本
- Python試題庫(附參考答案)
- GB 19079.6-2005體育場所開放條件與技術要求第6部分:滑雪場所
- 1超分子化學簡介
- 聚酯合成副反應介紹
- DB37-T 1342-2021平原水庫工程設計規(guī)范
- 電除顫教學課件
- 廣東省藥品電子交易平臺結(jié)算門戶系統(tǒng)會員操作手冊
- DB32T 3960-2020 抗水性自修復穩(wěn)定土基層施工技術規(guī)范
- 大斷面隧道設計技術基本原理
- 41某31層框架結(jié)構(gòu)住宅預算書工程概算表
評論
0/150
提交評論