xx工程

懸挑承插型盤扣腳手架專項施工方案

編制:

審核:

審批:

中建一局集團裝飾工程有限公司

2023.1

目錄

第一章工程概況........................................................................................................................6

1.1參建方概述...........................................................................................................................6

1.2工程概述...............................................................................................................................6

1.3現(xiàn)場情況照片.......................................................................................................................6

1.4工程重難點及解決思路.......................................................................................................7

1.4.1工程重難點................................................................................................................7

1.4.2工程重難點及解決思路............................................................................................8

1.4.3懸挑層及主體架構(gòu)造亮點.......................................................................................8

1.4.4應(yīng)用說明...................................................................................................................9

1.5編制依據(jù)...............................................................................................................................9

第二章施工組織架構(gòu)及施工目標(biāo)............................................................................................10

2.1施工組織機構(gòu).....................................................................................................................10

2.2工期進度目標(biāo).....................................................................................................................11

2.3質(zhì)量目標(biāo).............................................................................................................................11

2.4安全文明施工目標(biāo).............................................................................................................11

2.5其他目標(biāo).............................................................................................................................11

第三章腳手架搭設(shè)及拆除.......................................................................................................11

3.1施工準(zhǔn)備.............................................................................................................................11

3.1.1技術(shù)準(zhǔn)備..................................................................................................................11

3.1.2勞務(wù)人員準(zhǔn)備..........................................................................................................11

3.1.3懸挑架體材料準(zhǔn)備..................................................................................................11

3.1.4工具準(zhǔn)備..................................................................................................................12

3.1.5試驗準(zhǔn)備..................................................................................................................12

3.1.6懸挑層及盤扣腳手架構(gòu)配件描述..........................................................................13

3.2總體搭設(shè)概述.....................................................................................................................15

3.2.1構(gòu)造原理..................................................................................................................16

3.2.2懸挑第一段腳手架搭設(shè)描述..................................................................................17

3.2.3懸挑第二段、第三段腳手架搭設(shè)方案描述...........................................................18

3.2.4懸挑第四段腳手架搭設(shè)方案描述..........................................................................19

3.2.5懸挑第五段腳手架搭設(shè)方案描述..........................................................................19

懸挑第六段19-21層圓弧懸挑結(jié)構(gòu)部分搭設(shè)..................................................................19

3.3懸挑承插型盤扣腳手架重要節(jié)點.....................................................................................24

3.3.1懸挑層搭設(shè)要求......................................................................................................24

3.3.2連墻件及防護欄桿..................................................................................................26

3.3.3窗洞口挑架..............................................................................................................27

1

3.3.4墻角位置懸挑腳手架..............................................................................................27

3.3.5外挑網(wǎng)......................................................................................................................28

3.3.6內(nèi)爬梯......................................................................................................................28

3.3.7三角結(jié)構(gòu)凸出架體搭設(shè)..........................................................................................29

3.3.8拆除前洞口加固......................................................................................................30

3.3.9安全水平防護..........................................................................................................30

水平防護網(wǎng)................................................................................................................................30

3.4懸挑層及主體盤扣腳手架的搭設(shè).....................................................................................31

3.4.1主體架體搭設(shè)要求..................................................................................................31

3.4.2懸挑段及腳手架安裝順序......................................................................................31

懸挑段及腳手架搭設(shè)流程.................................................................................................32

3.4.4搭設(shè)作業(yè)注意事項..................................................................................................37

3.5腳手架拆除.........................................................................................................................37

3.5.1懸挑層腳手架拆除.................................................................................................37

3.5.2圓弧位置懸挑平臺拆除.........................................................................................38

3.5.3腳手架拆除注意事項.............................................................................................39

第四章腳手架驗收和檢查.......................................................................................................40

4.1驗收程序.............................................................................................................................40

4.2腳手架驗收要求.................................................................................................................41

4.3驗收人員.............................................................................................................................42

4.4驗收時間點.........................................................................................................................42

4.5腳手架維修與保養(yǎng).............................................................................................................42

第五章安全文明施工..............................................................................................................43

5.1安全目標(biāo).............................................................................................................................43

5.2組織管理措施.....................................................................................................................43

5.3腳手架安全使用及監(jiān)測.....................................................................................................43

5.4底層安全防護棚.................................................................................................................44

5.5建立安全施工制度.............................................................................................................45

5.5.1落實安全責(zé)任制......................................................................................................45

5.5.2制訂安全技術(shù)措施..................................................................................................45

5.5.3定期檢查與跟蹤相結(jié)合的檢查制度......................................................................45

5.5.4堅持執(zhí)行安全技術(shù)交底措施..................................................................................46

5.5.5堅持安全教育制度及防疫教育..............................................................................46

5.5.6堅持上崗證制度......................................................................................................46

5.5.7堅持準(zhǔn)用證制度......................................................................................................46

5.5.8堅持“安全三寶”使用制度..................................................................................47

5.6安全生產(chǎn)技術(shù)措施.............................................................................................................47

2

5.6.1高空作業(yè)安全防護..................................................................................................47

5.6.2臨時用電安全防護..................................................................................................48

5.6.3防火安全要求..........................................................................................................48

5.6.4防雷措施..............................................................................................................48

5.7文明施工措施.....................................................................................................................49

第六章事故應(yīng)急準(zhǔn)備與響應(yīng)預(yù)案............................................................................................49

6.1腳手架整體倒塌應(yīng)急預(yù)案.................................................................................................49

6.1.1目的..........................................................................................................................49

6.1.2組織網(wǎng)絡(luò)及職責(zé)......................................................................................................49

6.1.3應(yīng)急措施..................................................................................................................50

6.1.4應(yīng)急物資..................................................................................................................50

6.1.5應(yīng)急通訊聯(lián)絡(luò)..........................................................................................................50

6.1.6注意事項..................................................................................................................51

6.2火災(zāi)事故應(yīng)急準(zhǔn)備與響應(yīng)預(yù)案.........................................................................................51

6.2.1目的..........................................................................................................................51

6.2.2組織機構(gòu)及職責(zé)......................................................................................................51

6.2.3火災(zāi)事故應(yīng)急措施..................................................................................................51

6.2.4應(yīng)急物資.................................................................................................................52

6.2.5注意事項..................................................................................................................52

6.2.6善后處理..................................................................................................................52

6.2.7要求..........................................................................................................................52

6.3高處墜落事故應(yīng)急準(zhǔn)備與響應(yīng)預(yù)案.................................................................................53

6.3.1目的..........................................................................................................................53

6.3.2組織機構(gòu)及職責(zé)......................................................................................................53

6.3.3高處墜落事故應(yīng)急措施..........................................................................................53

6.3.4應(yīng)急物資..................................................................................................................54

6.3.5通訊聯(lián)絡(luò)..................................................................................................................54

6.3.6注意事項..................................................................................................................54

第七章腳手架設(shè)計計算書.......................................................................................................54

7.1盤扣腳手架架體計算書(距離主體結(jié)構(gòu)400mm)..........................................................54

7.1.1腳手架參數(shù).............................................................................................................54

7.1.2荷載設(shè)計.................................................................................................................55

7.1.3橫向橫桿驗算.........................................................................................................57

7.1.4間橫桿驗算.............................................................................................................58

7.1.5縱向橫桿驗算.........................................................................................................59

7.1.6荷載計算.................................................................................................................61

7.1.7立桿穩(wěn)定性驗算.....................................................................................................63

3

7.1.8連墻件承載力驗算.................................................................................................63

7.1.9可調(diào)底座承載力驗算.............................................................................................64

7.2懸挑梁驗算(距離結(jié)構(gòu)400mm).....................................................................................64

7.2.1基本參數(shù).................................................................................................................64

7.2.2荷載布置參數(shù).........................................................................................................65

7.2.3主梁驗算.................................................................................................................66

7.2.4下?lián)螚U件驗算.........................................................................................................68

7.2.5懸挑主梁整體穩(wěn)定性驗算.....................................................................................69

7.2.6錨固段與樓板連接的計算.....................................................................................69

7.3盤扣腳手架架體計算書(距離主體結(jié)構(gòu)900mm)..........................................................70

7.3.1腳手架參數(shù).............................................................................................................70

7.3.2荷載設(shè)計.................................................................................................................70

7.3.3橫向橫桿驗算.........................................................................................................72

7.3.4間橫桿驗算.............................................................................................................73

7.3.5縱向橫桿驗算.........................................................................................................74

7.3.6荷載計算.................................................................................................................76

7.3.7立桿穩(wěn)定性驗算.....................................................................................................78

7.3.8連墻件承載力驗算.................................................................................................78

7.3.9可調(diào)底座承載力驗算.............................................................................................79

7.4懸挑梁驗算(距離結(jié)構(gòu)900mm).....................................................................................79

7.4.1基本參數(shù).................................................................................................................79

7.4.2荷載布置參數(shù).........................................................................................................79

7.4.3主梁驗算.................................................................................................................80

7.4.4下?lián)螚U件驗算.........................................................................................................82

7.4.5懸挑主梁整體穩(wěn)定性驗算.....................................................................................83

7.4.6錨固段與樓板連接的計算.....................................................................................84

7.518F懸挑平臺(盤扣式)計算書.........................................................................................84

7.5.1腳手架基本參數(shù).....................................................................................................84

7.5.2荷載布置參數(shù).........................................................................................................85

7.5.3橫向橫桿驗算.........................................................................................................86

7.5.4間橫桿驗算.............................................................................................................87

7.5.5縱向橫桿驗算.........................................................................................................88

7.5.6荷載計算.................................................................................................................90

7.5.7鋼絲繩卸荷計算.....................................................................................................92

7.5.8立桿穩(wěn)定性驗算.....................................................................................................93

7.5.9連墻件承載力驗算.................................................................................................94

7.618F懸挑平臺梁驗算(圓弧懸挑位置).........................................................................94

4

7.6.1基本參數(shù).................................................................................................................94

7.6.2荷載布置參數(shù).........................................................................................................95

7.6.3主梁驗算.................................................................................................................96

7.6.4下?lián)螚U件驗算.........................................................................................................98

7.6.5懸挑主梁整體穩(wěn)定性驗算.....................................................................................99

7.6.6錨固段與樓板連接的計算.....................................................................................99

7.719.1m高型鋼懸挑腳手架-結(jié)構(gòu)梁驗算.........................................................................100

7.7.1主梁與結(jié)構(gòu)連接處-結(jié)構(gòu)梁驗算.........................................................................100

7.7.2下?lián)闻c結(jié)構(gòu)連接處-結(jié)構(gòu)梁驗算.........................................................................103

7.818F型鋼懸挑平臺腳手架-結(jié)構(gòu)梁驗算.........................................................................107

7.8.1主梁與結(jié)構(gòu)連接處-結(jié)構(gòu)梁驗算.........................................................................107

7.8.2上拉與結(jié)構(gòu)連接處-結(jié)構(gòu)梁驗算.........................................................................111

7.8.3下?lián)闻c結(jié)構(gòu)連接處-結(jié)構(gòu)梁驗算.........................................................................115

7.922F平臺屋面小吊具結(jié)構(gòu)驗算.......................................................................................119

7.1019.1m高型鋼懸挑腳手架(盤扣式)-聯(lián)梁18#工字鋼計算書及驗算.........................123

7.10.1基本參數(shù).............................................................................................................123

7.10.2荷載設(shè)計.............................................................................................................123

7.10.3橫向橫桿驗算.....................................................................................................124

7.10.4間橫桿驗算.........................................................................................................125

7.10.5縱向橫桿驗算.....................................................................................................126

7.10.6荷載計算.............................................................................................................128

7.10.7立桿穩(wěn)定性驗算.................................................................................................129

7.10.8連墻件承載力驗算.............................................................................................130

7.10.9懸挑梁驗算-基本參數(shù).......................................................................................131

7.10.10懸挑梁驗算-荷載布置參數(shù).............................................................................131

7.10.12懸挑梁驗算-聯(lián)梁驗算.....................................................................................132

7.10.13懸挑梁驗算-主梁驗算.....................................................................................134

7.10.14懸挑梁驗算-下?lián)螚U件驗算.............................................................................136

7.10.15懸挑梁驗算-主梁懸挑整體穩(wěn)定性驗算..........................................................137

7.10.16懸挑梁驗算-錨固段與樓板連接的計算..........................................................137

5

第一章工程概況

1.1參建方概述

工程名稱

工程地址

建設(shè)單位

設(shè)計單位

施工單位

監(jiān)理單位

1.2工程概述

xx工程位于上海市黃浦區(qū)福建中路188號,浦西外灘地區(qū)、人民廣場地區(qū)的重疊區(qū)域,

距離南京路步行街直線距離約100m,屬上海市中心城區(qū)最繁華的黃金地帶,地上主樓建筑高

度約111.1m,共33層,標(biāo)準(zhǔn)層層高均為3.2m。是一座建成并投入使用近20年的高層辦公

建筑。大廈西、南立面臨街,底層商鋪正常營業(yè),人行及車流量大;東、北立面距離居民區(qū)

直線距離小于13m。

此次施工區(qū)域為中外運大廈建筑外墻改造施工(整體幕墻進行更新),主樓幕墻施工高度

超過100m,裙樓幕墻施工高度為13.8m,幕墻整體改造面積約為1.9萬平方米。

1-5層原外幕墻為石材,需進行拆除基層及面層;6-33層原外幕墻為瓷磚飾面,采用傳統(tǒng)

濕貼工藝粘接,外墻瓷磚飾面局部已有破損并有較為嚴(yán)重的脫落現(xiàn)象;19-21層西立面局部有

弧形懸挑結(jié)構(gòu),最長挑出距離為4m,懸挑最遠點切線投影即為底層車道邊線。加之上海地處

臺風(fēng)多發(fā)地區(qū)。綜述,此項目改造難度極大。

1.3現(xiàn)場情況照片

6

福建中路側(cè)(主樓入口位置)福建中路側(cè)(一層)

主樓福州路側(cè)

正立面(福建中路側(cè))背立面(大廈院內(nèi))

1.4工程重難點及解決思路

1.4.1工程重難點

?既有超高層建筑外幕墻飾面鑿除及后續(xù)幕墻改造施工,施工過程中不能對原始結(jié)構(gòu)過大

損傷。

?本項目腳手架搭設(shè)最高點超過100m,項目臨街、距離周邊居民區(qū)近,直線距離小于13m、

特殊地理位置、較高環(huán)境保護要求等,不利施工因素多且周邊條件極為復(fù)雜;

?福建中路19-21層結(jié)構(gòu)上有17.2m長*4.5m寬懸挑圓弧造型,底面為鋁板裝飾面,搭設(shè)腳

7

手架及幕墻安裝極為不便;

?一層商鋪正常營運,邊車道有公交車電纜影響,行人流量較大,拆除有高處墜物的風(fēng)險;

?施工安全防護措施及防護通道設(shè)置及與小商鋪間的溝通以及和周邊政府部門的對接;

?懸挑拉結(jié)點結(jié)構(gòu)設(shè)置及懸挑架體計算及驗算;

?施工場地狹小,不能大面積進場材料;

?施工時間段正直上海臺風(fēng)多發(fā)月份,有不可抗力因素;

1.4.2工程重難點及解決思路

此項目的幕墻改造若整體采用吊籃施工,外墻剔鑿的墜落物外濺,無法有效的保證底層

行人及行車安全,存在重大安全隱患,加之西立面弧形懸挑,無法解決吊籃升降問題,且現(xiàn)

場29層女兒墻位置寬度較小只有1.4m,無法搭設(shè)吊籃基礎(chǔ)支撐及相關(guān)設(shè)備,純吊籃施工不

可??;若采用雙排全落地腳手架,項目樓層高,易產(chǎn)生架體水平偏移,造成架體失穩(wěn),有塌

落的風(fēng)險,并且大廈底層混凝土地面整體承載力不足。因此綜合考慮,整體大樓33層幕墻改

造需要使用腳手架為工具進行施工作業(yè),采用組合腳手架最為可行,具體描述如下:

1)1-5層采用雙排落地鋼管腳手架,既能快速拆除原外墻石材,并在作業(yè)層有位置可臨

時放置原石材幕墻的拆除物,又可以為第一段懸挑層主梁及斜撐的安裝提供操作空間;

2)6層及以上采用懸挑方式,分5段懸挑,每段懸挑高度不超過20m,分別在6層、12

層、18層、24層、29層做懸挑層,每段懸挑采用組合式花籃懸挑承插型盤扣腳手架作為登

高措施進行幕墻作業(yè)。

1.4.3懸挑層及主體架構(gòu)造亮點

1)綜合性:以花籃式拉桿懸挑腳手架的形式為框架,標(biāo)準(zhǔn)承插型盤扣腳手架為主體架,

結(jié)合化學(xué)錨栓固定方式,搭配鋼管連墻件連接架體與建筑結(jié)構(gòu);用沖孔鋼制腳手板、扣接式

鋼爬梯等多種構(gòu)配件組合施工,并以受力計算及驗算為保證,綜合現(xiàn)場條件,考慮了施工可

行性、經(jīng)濟性、安全性等多方面因素。

2)預(yù)制加工性:主懸挑梁、連墻件、花籃拉桿等組合構(gòu)件采用預(yù)加工,廠內(nèi)拼裝組合焊

接構(gòu)件,現(xiàn)場直接組裝,大量減少架體上手工焊接工作,可加快施工進度,并有利于環(huán)保要

求。

3)安全施工性強:腳手架外部設(shè)置4道加長安全挑網(wǎng)、層間安全平網(wǎng)、每一段懸挑設(shè)置

硬質(zhì)隔離及下兜網(wǎng)、同方向鋼爬梯、外立桿側(cè)雙道護欄、內(nèi)立桿側(cè)單道護欄;當(dāng)建筑標(biāo)高50m

(16層)以上,錨固點不進行剔鑿作業(yè),不剔鑿處提前做拉拔試驗,并提高錨固螺栓型號,

最大程度減少因剔鑿?fù)鈮︼椕嫠a(chǎn)生物體高墜的可能,確保安全性。

4)結(jié)構(gòu)損傷性低:傳統(tǒng)懸挑施工錨固點采用對穿螺桿,基礎(chǔ)懸挑梁直接在土建預(yù)埋套管

8

位置安裝即可,但因舊改項目,大廈已建成,無法在結(jié)構(gòu)梁板內(nèi)預(yù)留相應(yīng)埋點。若此項目施

工采用對穿螺桿固定主懸挑梁,則需要打穿原始層間梁,破壞原有受力鋼筋,對混凝土結(jié)構(gòu)

造成不可逆的損傷,存在后續(xù)的施工風(fēng)險;并且對穿螺桿拆除后需要對梁孔洞進行修補,修

補的交接處可能有漏水的隱患,不利于幕墻后續(xù)的施工。所以本項目錨固點采用化學(xué)錨栓固

定,既能形成和建筑結(jié)構(gòu)的有效連接,又能減少錨固點施工對原始結(jié)構(gòu)梁的損傷,消除幕墻

在此處的漏水隱患,達到事半功倍之效。

5)標(biāo)準(zhǔn)化:主體架選用承插型盤扣腳手架,因其系統(tǒng)構(gòu)配件尺寸統(tǒng)一,安裝簡單,便于

拆卸,在高層位置搭接穩(wěn)定性較好,鍍鋅鋼管美觀等特點,可以有利于腳手架標(biāo)準(zhǔn)化、單元

模塊化的搭設(shè)。

6)程序簡易化:分段懸挑的架體高度不超過20m,只需在施工前進行公司級審批,不用

進行專家論證,和專家論證相比,節(jié)省了施工前方案審批的流轉(zhuǎn)時間。

1.4.4應(yīng)用說明

1)落地架是為拆除1-4層老舊的石材幕墻面板及安裝后續(xù)石材使用,并且在最上一步可

輔助懸挑架搭設(shè);

2)懸挑架是為外幕墻拆除及后續(xù)安裝鋁板使用;

采用此種腳手架搭設(shè)可解決繁華城區(qū)臨街超高建筑幕墻改造的施工可行性,定型式的材

料構(gòu)配件可采用既有建筑室內(nèi)電梯進行垂直運輸,材料運輸快捷;上拉下?lián)问浇Y(jié)構(gòu)提高了架

體整體穩(wěn)定性,對臺風(fēng)多發(fā)地區(qū)項目更有其必要性;架體搭設(shè)快捷,作業(yè)層安全可靠,可為

后續(xù)幕墻安裝提供良好的施工作業(yè)面,且施工外立面有觀感較好,有利于環(huán)境保護要求。

此方案針對主樓花籃拉桿式型鋼懸挑(盤扣)腳手架搭設(shè)及相關(guān)施工進行詳細(xì)綜合性描

述,1-4層的落地腳手架暫不贅述。

1.5編制依據(jù)

1、xx工程施工需求及業(yè)主需求;

2、現(xiàn)場實地勘察及周邊環(huán)境對腳手架搭設(shè)工程的要求;

3、施工及驗收規(guī)范標(biāo)準(zhǔn):

序號標(biāo)準(zhǔn)名稱標(biāo)準(zhǔn)編號

01《建筑施工承插型盤扣式鋼管支架安全技術(shù)規(guī)程》JGJ231-2010

02《建筑施工高處作業(yè)安全技術(shù)規(guī)范》JGJ80-2016

03《建筑施工安全檢查標(biāo)準(zhǔn)》JGJ59-2011

04《工程建筑標(biāo)準(zhǔn)強制性條文》2015版

05《危險性較大的分部分項工程安全管理規(guī)定》住建部第37號

06《危險性較大的分部分項工程安全管理規(guī)定》(建辦質(zhì)〔2018〕31號)

9

07《建筑施工腳手架安全技術(shù)統(tǒng)一標(biāo)準(zhǔn)》GB51210-2016

08《懸挑式腳手架安全技術(shù)規(guī)程》DG/TJ08-2002-2006

09《施工現(xiàn)場安全生產(chǎn)保證體系》DGJ08-903-2010

10《建筑物防雷設(shè)計規(guī)范》GB50057-2010

11《建筑結(jié)構(gòu)荷載規(guī)范》GB50009-2012

12《建筑施工現(xiàn)場環(huán)境與衛(wèi)生標(biāo)準(zhǔn)》JGJ146-2014

13《鋼結(jié)構(gòu)工程施工質(zhì)量驗收規(guī)范》GB50205-2001

14《直縫焊接鋼管》GB/T13793

15《鋼管腳手架扣件》GB15831

16《鋼結(jié)構(gòu)設(shè)計標(biāo)準(zhǔn)》GB50017-2017

17《索具旋轉(zhuǎn)扣》CB3818-2013

18《一般用途鋼絲繩》GB/T20118-2006

4、上海市安檢、質(zhì)檢站,有關(guān)建筑工地施工要求;

5、行業(yè)與企業(yè)標(biāo)準(zhǔn)化現(xiàn)場管理有關(guān)規(guī)定、細(xì)則;

6、幕墻施工圖紙及設(shè)計說明文件等;

7、其他。

第二章施工組織架構(gòu)及施工目標(biāo)

2.1施工組織機構(gòu)

現(xiàn)場管理人員配置:

序號職務(wù)姓名聯(lián)系方式

1項目經(jīng)理于金哲

2技術(shù)總工張亞妮

3生產(chǎn)經(jīng)理陸壹巖

4安全總監(jiān)徐蘭軍

5質(zhì)量總監(jiān)陳玉璞

6其他管理人員都參與現(xiàn)場管理

根據(jù)本工程特點,分包配置管理人員:

序號職務(wù)姓名聯(lián)系方式

1執(zhí)行經(jīng)理程普

2安全員陳勇

3安全員查利平

10

4其他人員若干

2.2工期進度目標(biāo)

本工程計劃搭設(shè)周期約為40天。但根據(jù)施工進度

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

最新文檔

評論

0/150

提交評論