版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領
文檔簡介
滬科版七年級上數學知識點總結1滬科版七年級上數學知識點總結(一)2014年10月第一章:有理數一、有理數的意義1-1正數和負數1、為什么初中數學要引入負數,答:正數和負數是在實際需要中產生的,我們可以用正數和負數來表示相反意義的量。2、在生產和生活中,相反意義的量主要有哪些,請列舉:答:常見的有:(1)溫度高于0度記作“+”,低于0度記作“-”。(2)高度高于海平面記作“+”,低于海平面記作“-”。(3)高于正常水位記作“+”,低于正常水位記作“-”。(4)超過標準重量記作“+”,低于標準重量記作“-”。(5)儲蓄中存入為正,取installationpartmainincludingYunnanprovincetengchongCountyyongxingRiverprimaryandsecondaryhydropowerstationintheofpressurepipeandthepowerstationmetalstructure,whichlevelpowerstationpressurepipetotalabout562t(containingannex);IIlevelpowerstationpressurepipeabout733t(containingannex);levelpowerstationmetalstructureabout52.5t,containingdischargeGate2hole,rushedsandGate1hole,watermouthworkdoorandthestoppeddirtgatethe1hole,Qianpoolworkdoorandthestoppeddirtgatethe1hole;Secondarypowerstationmetaljunctionatabout19.5t,containingsandGate1hole,waterinletwatergateandtrashthe1hole;theirauxiliaryhoistequipmentandelectricalequipment.Concretepressurepipe,gate,trashandhoistingdeviceprojectpropertylist1-1~1-3.Table1-1themaincharacteristicsofthepenstocknumberitemparametertypecontrollersizeheadalongpipediameterpipelength11hydropowerstationpenstockopen-airexposedpipe,singlepipejointwatersupply1.3M931m0.8M8.3*2m22hydropowerstationpenstockopen-airexposedpipe,singlepipejointwatersupply1.4m1063.506m0.8M10*2mtable1-2hydropowerstationMaincharacteristicsofhydraulicmetalstructurenumberprojectnamegate,trashrack,door(gate...Pressurepipeandthemetalstructureinstallation9.1mainengineeringprofileyongxingriverlevelhydropowerstationpressurepipepipelineplaneShangalongRidgeislinelayout,andslopesurfacecontourclosevertical,GuanPowithoriginalgroundlinechanges,usedopentypeMingtube,singletubejointwaterway,competentdiameter1.3M,long931.00m,tworootnon-symmetric"Bu"typesupporttube,diameter0.8M,singlerootlong8.3M.Competenttoestablish12townPier,107buttress,telescopicsection11.SupportPierspacing8M,side-slidingbearing.Townpierfortheclosed-endstructureofgravity,basesurfaceintobedrock,pipeexcavationslope1:0.75withM5groutedrubbleslopeprotection,0.3M,bottomsidesewer,0.25mwide,deep0.3m,M5groutedrubblemasonry,setmaintenancestepladderontheleftside,1.0Mwide.Yongxinghe-?hydropowerstationpenstockpipesarrangedalongtheridgelineontheplane,andnearlyverticalslopecontourlines,GuanPochangeswiththeoriginalgroundline,withshallowbackfill-pipe,single-pipewatersupply,thecompetent1.4m,long1063.506m,twoasymmetric"y"pipe,diameter0.8M,single10m.Competenttoestablish12townPier,8expansionjoint.Townpierfortheclosed-endstructureofgravity,placedonsoftrockbasesurface,pipeconcreteC20onapedestal.Pipetrenchexcavationslope1:0.75,aftertheinstallationofsteeltube,compactedgravel出為負。(6)收入為正,支出為負。(7)盈余為正,虧損為負。(8)上升為正,下降為負。(9)進為正,出為負。(10)增加為正,減少為負。(11)向東為正,向西為負。??3、你了解以下各種數的定義和范圍嗎,并舉例。正數:大于0的數,叫做正數。分為正整數和正分數。(a,0)負數:小于0的數,叫做負數。分為負整數和負分數。(a,0)0:既不是正數,也不是負數。整數:正整數、0、負整數統(tǒng)稱整數。分數:正分數、負分數統(tǒng)稱分數。有理數:整數和分數統(tǒng)稱有理數。有理數又分為正有理數、0、負有理數。非負數:通常又把0和正數稱為非負數。(a?0)非正數:0和負數稱為非正數。(a?0)4、有理數的兩種分類方法是什么,installationpartmainincludingYunnanprovincetengchongCountyyongxingRiverprimaryandsecondaryhydropowerstationintheofpressurepipeandthepowerstationmetalstructure,whichlevelpowerstationpressurepipetotalabout562t(containingannex);IIlevelpowerstationpressurepipeabout733t(containingannex);levelpowerstationmetalstructureabout52.5t,containingdischargeGate2hole,rushedsandGate1hole,watermouthworkdoorandthestoppeddirtgatethe1hole,Qianpoolworkdoorandthestoppeddirtgatethe1hole;Secondarypowerstationmetaljunctionatabout19.5t,containingsandGate1hole,waterinletwatergateandtrashthe1hole;theirauxiliaryhoistequipmentandelectricalequipment.Concretepressurepipe,gate,trashandhoistingdeviceprojectpropertylist1-1~1-3.Table1-1themaincharacteristicsofthepenstocknumberitemparametertypecontrollersizeheadalongpipediameterpipelength11hydropowerstationpenstockopen-airexposedpipe,singlepipejointwatersupply1.3M931m0.8M8.3*2m22hydropowerstationpenstockopen-airexposedpipe,singlepipejointwatersupply1.4m1063.506m0.8M10*2mtable1-2hydropowerstationMaincharacteristicsofhydraulicmetalstructurenumberprojectnamegate,trashrack,door(gate...Pressurepipeandthemetalstructureinstallation9.1mainengineeringprofileyongxingriverlevelhydropowerstationpressurepipepipelineplaneShangalongRidgeislinelayout,andslopesurfacecontourclosevertical,GuanPowithoriginalgroundlinechanges,usedopentypeMingtube,singletubejointwaterway,competentdiameter1.3M,long931.00m,tworootnon-symmetric"Bu"typesupporttube,diameter0.8M,singlerootlong8.3M.Competenttoestablish12townPier,107buttress,telescopicsection11.SupportPierspacing8M,side-slidingbearing.Townpierfortheclosed-endstructureofgravity,basesurfaceintobedrock,pipeexcavationslope1:0.75withM5groutedrubbleslopeprotection,0.3M,bottomsidesewer,0.25mwide,deep0.3m,M5groutedrubblemasonry,setmaintenancestepladderontheleftside,1.0Mwide.Yongxinghe-?hydropowerstationpenstockpipesarrangedalongtheridgelineontheplane,andnearlyverticalslopecontourlines,GuanPochangeswiththeoriginalgroundline,withshallowbackfill-pipe,single-pipewatersupply,thecompetent1.4m,long1063.506m,twoasymmetric"y"pipe,diameter0.8M,single10m.Competenttoestablish12townPier,8expansionjoint.Townpierfortheclosed-endstructureofgravity,placedonsoftrockbasesurface,pipeconcreteC20onapedestal.Pipetrenchexcavationslope1:0.75,aftertheinstallationofsteeltube,compactedgravel1-2數軸、相反數和絕對值1-2-1數軸1、什么是數軸,你能畫好一條數軸嗎,答:規(guī)定了原點、正方向、和單位長度的直線。(所有的有理數都可以用數軸上的點表示。但數軸上的點并不是都表示有理數)。2、數軸的三要素是什么,數軸的三要素有什么規(guī)定,答:原點(任意、標0)、正方向(向右、箭頭)和單位長度(合適)。3、觀察數軸,回答下列問題。(1)有沒有最大的正數,(沒有)。有沒有最小的正數,(沒有)。有沒有最小的正整數,(有,是1)。(2)有沒有最小的負數,(沒有)。有沒有最大的負數,(沒有)。有沒有最大的負整數,(有,是-1)。installationpartmainincludingYunnanprovincetengchongCountyyongxingRiverprimaryandsecondaryhydropowerstationintheofpressurepipeandthepowerstationmetalstructure,whichlevelpowerstationpressurepipetotalabout562t(containingannex);IIlevelpowerstationpressurepipeabout733t(containingannex);levelpowerstationmetalstructureabout52.5t,containingdischargeGate2hole,rushedsandGate1hole,watermouthworkdoorandthestoppeddirtgatethe1hole,Qianpoolworkdoorandthestoppeddirtgatethe1hole;Secondarypowerstationmetaljunctionatabout19.5t,containingsandGate1hole,waterinletwatergateandtrashthe1hole;theirauxiliaryhoistequipmentandelectricalequipment.Concretepressurepipe,gate,trashandhoistingdeviceprojectpropertylist1-1~1-3.Table1-1themaincharacteristicsofthepenstocknumberitemparametertypecontrollersizeheadalongpipediameterpipelength11hydropowerstationpenstockopen-airexposedpipe,singlepipejointwatersupply1.3M931m0.8M8.3*2m22hydropowerstationpenstockopen-airexposedpipe,singlepipejointwatersupply1.4m1063.506m0.8M10*2mtable1-2hydropowerstationMaincharacteristicsofhydraulicmetalstructurenumberprojectnamegate,trashrack,door(gate...Pressurepipeandthemetalstructureinstallation9.1mainengineeringprofileyongxingriverlevelhydropowerstationpressurepipepipelineplaneShangalongRidgeislinelayout,andslopesurfacecontourclosevertical,GuanPowithoriginalgroundlinechanges,usedopentypeMingtube,singletubejointwaterway,competentdiameter1.3M,long931.00m,tworootnon-symmetric"Bu"typesupporttube,diameter0.8M,singlerootlong8.3M.Competenttoestablish12townPier,107buttress,telescopicsection11.SupportPierspacing8M,side-slidingbearing.Townpierfortheclosed-endstructureofgravity,basesurfaceintobedrock,pipeexcavationslope1:0.75withM5groutedrubbleslopeprotection,0.3M,bottomsidesewer,0.25mwide,deep0.3m,M5groutedrubblemasonry,setmaintenancestepladderontheleftside,1.0Mwide.Yongxinghe-?hydropowerstationpenstockpipesarrangedalongtheridgelineontheplane,andnearlyverticalslopecontourlines,GuanPochangeswiththeoriginalgroundline,withshallowbackfill-pipe,single-pipewatersupply,thecompetent1.4m,long1063.506m,twoasymmetric"y"pipe,diameter0.8M,single10m.Competenttoestablish12townPier,8expansionjoint.Townpierfortheclosed-endstructureofgravity,placedonsoftrockbasesurface,pipeconcreteC20onapedestal.Pipetrenchexcavationslope1:0.75,aftertheinstallationofsteeltube,compactedgravel1-2-2相反數1、什么是相反數,答:只有符號不同的兩個數,我們說其中一個是另一個的相反數。這兩個數叫做互為相反數。規(guī)定:0的相反數是0。數a的相反數是-a。2、相反數的幾何意義是什么,答:在數軸上表示互為相反數的兩個點,位于原點的兩旁,且到原點的距離相等。3、什么數的相反數是它的本身,(是0)。什么數和它的相反數相等,(是0)。4、-a一定是負數嗎,為什么,答:不一定,因為:當a是正數時,-a是負數;當a是負數時,-a是正數;當a是0時,-a也是0。installationpartmainincludingYunnanprovincetengchongCountyyongxingRiverprimaryandsecondaryhydropowerstationintheofpressurepipeandthepowerstationmetalstructure,whichlevelpowerstationpressurepipetotalabout562t(containingannex);IIlevelpowerstationpressurepipeabout733t(containingannex);levelpowerstationmetalstructureabout52.5t,containingdischargeGate2hole,rushedsandGate1hole,watermouthworkdoorandthestoppeddirtgatethe1hole,Qianpoolworkdoorandthestoppeddirtgatethe1hole;Secondarypowerstationmetaljunctionatabout19.5t,containingsandGate1hole,waterinletwatergateandtrashthe1hole;theirauxiliaryhoistequipmentandelectricalequipment.Concretepressurepipe,gate,trashandhoistingdeviceprojectpropertylist1-1~1-3.Table1-1themaincharacteristicsofthepenstocknumberitemparametertypecontrollersizeheadalongpipediameterpipelength11hydropowerstationpenstockopen-airexposedpipe,singlepipejointwatersupply1.3M931m0.8M8.3*2m22hydropowerstationpenstockopen-airexposedpipe,singlepipejointwatersupply1.4m1063.506m0.8M10*2mtable1-2hydropowerstationMaincharacteristicsofhydraulicmetalstructurenumberprojectnamegate,trashrack,door(gate...Pressurepipeandthemetalstructureinstallation9.1mainengineeringprofileyongxingriverlevelhydropowerstationpressurepipepipelineplaneShangalongRidgeislinelayout,andslopesurfacecontourclosevertical,GuanPowithoriginalgroundlinechanges,usedopentypeMingtube,singletubejointwaterway,competentdiameter1.3M,long931.00m,tworootnon-symmetric"Bu"typesupporttube,diameter0.8M,singlerootlong8.3M.Competenttoestablish12townPier,107buttress,telescopicsection11.SupportPierspacing8M,side-slidingbearing.Townpierfortheclosed-endstructureofgravity,basesurfaceintobedrock,pipeexcavationslope1:0.75withM5groutedrubbleslopeprotection,0.3M,bottomsidesewer,0.25mwide,deep0.3m,M5groutedrubblemasonry,setmaintenancestepladderontheleftside,1.0Mwide.Yongxinghe-?hydropowerstationpenstockpipesarrangedalongtheridgelineontheplane,andnearlyverticalslopecontourlines,GuanPochangeswiththeoriginalgroundline,withshallowbackfill-pipe,single-pipewatersupply,thecompetent1.4m,long1063.506m,twoasymmetric"y"pipe,diameter0.8M,single10m.Competenttoestablish12townPier,8expansionjoint.Townpierfortheclosed-endstructureofgravity,placedonsoftrockbasesurface,pipeconcreteC20onapedestal.Pipetrenchexcavationslope1:0.75,aftertheinstallationofsteeltube,compactedgravel5、3-5的相反數是什么,答:是-(3-5)或5-3。6、a-b的相反數是什么,答:是-(a-,)或,-,。7、a+b的相反數是什么,答:是-(a+b)。8、如果a、b是互為相反數,那么a+b=。1-2-3絕對值1、絕對值的定義是什么(即幾何意義),答:一個數a的絕對值,就是數軸上表示數a的點與原點的距離,記作|a|。根據絕對值的概念,可知絕對值是非負數(|a|?0)。互為相反數的兩個數的絕installationpartmainincludingYunnanprovincetengchongCountyyongxingRiverprimaryandsecondaryhydropowerstationintheofpressurepipeandthepowerstationmetalstructure,whichlevelpowerstationpressurepipetotalabout562t(containingannex);IIlevelpowerstationpressurepipeabout733t(containingannex);levelpowerstationmetalstructureabout52.5t,containingdischargeGate2hole,rushedsandGate1hole,watermouthworkdoorandthestoppeddirtgatethe1hole,Qianpoolworkdoorandthestoppeddirtgatethe1hole;Secondarypowerstationmetaljunctionatabout19.5t,containingsandGate1hole,waterinletwatergateandtrashthe1hole;theirauxiliaryhoistequipmentandelectricalequipment.Concretepressurepipe,gate,trashandhoistingdeviceprojectpropertylist1-1~1-3.Table1-1themaincharacteristicsofthepenstocknumberitemparametertypecontrollersizeheadalongpipediameterpipelength11hydropowerstationpenstockopen-airexposedpipe,singlepipejointwatersupply1.3M931m0.8M8.3*2m22hydropowerstationpenstockopen-airexposedpipe,singlepipejointwatersupply1.4m1063.506m0.8M10*2mtable1-2hydropowerstationMaincharacteristicsofhydraulicmetalstructurenumberprojectnamegate,trashrack,door(gate...Pressurepipeandthemetalstructureinstallation9.1mainengineeringprofileyongxingriverlevelhydropowerstationpressurepipepipelineplaneShangalongRidgeislinelayout,andslopesurfacecontourclosevertical,GuanPowithoriginalgroundlinechanges,usedopentypeMingtube,singletubejointwaterway,competentdiameter1.3M,long931.00m,tworootnon-symmetric"Bu"typesupporttube,diameter0.8M,singlerootlong8.3M.Competenttoestablish12townPier,107buttress,telescopicsection11.SupportPierspacing8M,side-slidingbearing.Townpierfortheclosed-endstructureofgravity,basesurfaceintobedrock,pipeexcavationslope1:0.75withM5groutedrubbleslopeprotection,0.3M,bottomsidesewer,0.25mwide,deep0.3m,M5groutedrubblemasonry,setmaintenancestepladderontheleftside,1.0Mwide.Yongxinghe-?hydropowerstationpenstockpipesarrangedalongtheridgelineontheplane,andnearlyverticalslopecontourlines,GuanPochangeswiththeoriginalgroundline,withshallowbackfill-pipe,single-pipewatersupply,thecompetent1.4m,long1063.506m,twoasymmetric"y"pipe,diameter0.8M,single10m.Competenttoestablish12townPier,8expansionjoint.Townpierfortheclosed-endstructureofgravity,placedonsoftrockbasesurface,pipeconcreteC20onapedestal.Pipetrenchexcavationslope1:0.75,aftertheinstallationofsteeltube,compactedgravel對值相等。(因為它們到原點的距離相等)2、絕對值的代數意義是什么,答:(1)一個正數的絕對值是它本身。(2)一個負數的絕對值是它的相反數。(3)0的絕對值是0。3、一個數a的絕對值如何表示,(1)如果a,0,那么|a|=a;(2)如果a,0,那么|a|=-a;(3)如果a=0,那么|a|=0。4、兩個負數,絕對值大的反而小。5、絕對值最小的數是什么,(是,)。什么數的絕對值是它的本身,(正數和0)。什么數的絕對值是它的相反數,(負數)。installationpartmainincludingYunnanprovincetengchongCountyyongxingRiverprimaryandsecondaryhydropowerstationintheofpressurepipeandthepowerstationmetalstructure,whichlevelpowerstationpressurepipetotalabout562t(containingannex);IIlevelpowerstationpressurepipeabout733t(containingannex);levelpowerstationmetalstructureabout52.5t,containingdischargeGate2hole,rushedsandGate1hole,watermouthworkdoorandthestoppeddirtgatethe1hole,Qianpoolworkdoorandthestoppeddirtgatethe1hole;Secondarypowerstationmetaljunctionatabout19.5t,containingsandGate1hole,waterinletwatergateandtrashthe1hole;theirauxiliaryhoistequipmentandelectricalequipment.Concretepressurepipe,gate,trashandhoistingdeviceprojectpropertylist1-1~1-3.Table1-1themaincharacteristicsofthepenstocknumberitemparametertypecontrollersizeheadalongpipediameterpipelength11hydropowerstationpenstockopen-airexposedpipe,singlepipejointwatersupply1.3M931m0.8M8.3*2m22hydropowerstationpenstockopen-airexposedpipe,singlepipejointwatersupply1.4m1063.506m0.8M10*2mtable1-2hydropowerstationMaincharacteristicsofhydraulicmetalstructurenumberprojectnamegate,trashrack,door(gate...Pressurepipeandthemetalstructureinstallation9.1mainengineeringprofileyongxingriverlevelhydropowerstationpressurepipepipelineplaneShangalongRidgeislinelayout,andslopesurfacecontourclosevertical,GuanPowithoriginalgroundlinechanges,usedopentypeMingtube,singletubejointwaterway,competentdiameter1.3M,long931.00m,tworootnon-symmetric"Bu"typesupporttube,diameter0.8M,singlerootlong8.3M.Competenttoestablish12townPier,107buttress,telescopicsection11.SupportPierspacing8M,side-slidingbearing.Townpierfortheclosed-endstructureofgravity,basesurfaceintobedrock,pipeexcavationslope1:0.75withM5groutedrubbleslopeprotection,0.3M,bottomsidesewer,0.25mwide,deep0.3m,M5groutedrubblemasonry,setmaintenancestepladderontheleftside,1.0Mwide.Yongxinghe-?hydropowerstationpenstockpipesarrangedalongtheridgelineontheplane,andnearlyverticalslopecontourlines,GuanPochangeswiththeoriginalgroundline,withshallowbackfill-pipe,single-pipewatersupply,thecompetent1.4m,long1063.506m,twoasymmetric"y"pipe,diameter0.8M,single10m.Competenttoestablish12townPier,8expansionjoint.Townpierfortheclosed-endstructureofgravity,placedonsoftrockbasesurface,pipeconcreteC20onapedestal.Pipetrenchexcavationslope1:0.75,aftertheinstallationofsteeltube,compactedgravel6、絕對值是,的數是,絕對值是,的數是。絕對值是-,的數有沒有,(沒有)。絕對值不大于,的數有多少,(無數個)。絕對值不大于,的整數有,正整數有,負整數有。根據上面的例子,我們可以看出:任意一個正數的絕對值,都有兩個——它們是互為相反數;沒有一個數的絕對值會等于負數。7、如果|,|,,.,,那么x=。|y-,|=6,y=。如果|-,|=|-5|,那么,=。滿足|,|?3的負整數有。8、如果|,-,|+|,-,|,,,那么,,,,,。1-3有理數的大小installationpartmainincludingYunnanprovincetengchongCountyyongxingRiverprimaryandsecondaryhydropowerstationintheofpressurepipeandthepowerstationmetalstructure,whichlevelpowerstationpressurepipetotalabout562t(containingannex);IIlevelpowerstationpressurepipeabout733t(containingannex);levelpowerstationmetalstructureabout52.5t,containingdischargeGate2hole,rushedsandGate1hole,watermouthworkdoorandthestoppeddirtgatethe1hole,Qianpoolworkdoorandthestoppeddirtgatethe1hole;Secondarypowerstationmetaljunctionatabout19.5t,containingsandGate1hole,waterinletwatergateandtrashthe1hole;theirauxiliaryhoistequipmentandelectricalequipment.Concretepressurepipe,gate,trashandhoistingdeviceprojectpropertylist1-1~1-3.Table1-1themaincharacteristicsofthepenstocknumberitemparametertypecontrollersizeheadalongpipediameterpipelength11hydropowerstationpenstockopen-airexposedpipe,singlepipejointwatersupply1.3M931m0.8M8.3*2m22hydropowerstationpenstockopen-airexposedpipe,singlepipejointwatersupply1.4m1063.506m0.8M10*2mtable1-2hydropowerstationMaincharacteristicsofhydraulicmetalstructurenumberprojectnamegate,trashrack,door(gate...Pressurepipeandthemetalstructureinstallation9.1mainengineeringprofileyongxingriverlevelhydropowerstationpressurepipepipelineplaneShangalongRidgeislinelayout,andslopesurfacecontourclosevertical,GuanPowithoriginalgroundlinechanges,usedopentypeMingtube,singletubejointwaterway,competentdiameter1.3M,long931.00m,tworootnon-symmetric"Bu"typesupporttube,diameter0.8M,singlerootlong8.3M.Competenttoestablish12townPier,107buttress,telescopicsection11.SupportPierspacing8M,side-slidingbearing.Townpierfortheclosed-endstructureofgravity,basesurfaceintobedrock,pipeexcavationslope1:0.75withM5groutedrubbleslopeprotection,0.3M,bottomsidesewer,0.25mwide,deep0.3m,M5groutedrubblemasonry,setmaintenancestepladderontheleftside,1.0Mwide.Yongxinghe-?hydropowerstationpenstockpipesarrangedalongtheridgelineontheplane,andnearlyverticalslopecontourlines,GuanPochangeswiththeoriginalgroundline,withshallowbackfill-pipe,single-pipewatersupply,thecompetent1.4m,long1063.506m,twoasymmetric"y"pipe,diameter0.8M,single10m.Competenttoestablish12townPier,8expansionjoint.Townpierfortheclosed-endstructureofgravity,placedonsoftrockbasesurface,pipeconcreteC20onapedestal.Pipetrenchexcavationslope1:0.75,aftertheinstallationofsteeltube,compactedgravel1、數軸上數的大小有什么位置關系,答:在數軸上表示的兩個數,右邊的數總比左邊的數大。根據這點,我們可以利用數軸比較數的大小。正數都大于0,負數都小于0,正數大于一切負數。2、兩個負數比較大小,絕對值大的反而小。1-4有理數的加減1-4-1有理數的加法1、有理數加法法則的內容是什么,(1)同號兩數相加,取相同的符號,并把絕對值相加。(2)絕對值不相等的異號兩數相加,取絕對值較大的加數的符號,并用較大的絕對值減去較小的絕對值?;橄喾磾档膬蓚€installationpartmainincludingYunnanprovincetengchongCountyyongxingRiverprimaryandsecondaryhydropowerstationintheofpressurepipeandthepowerstationmetalstructure,whichlevelpowerstationpressurepipetotalabout562t(containingannex);IIlevelpowerstationpressurepipeabout733t(containingannex);levelpowerstationmetalstructureabout52.5t,containingdischargeGate2hole,rushedsandGate1hole,watermouthworkdoorandthestoppeddirtgatethe1hole,Qianpoolworkdoorandthestoppeddirtgatethe1hole;Secondarypowerstationmetaljunctionatabout19.5t,containingsandGate1hole,waterinletwatergateandtrashthe1hole;theirauxiliaryhoistequipmentandelectricalequipment.Concretepressurepipe,gate,trashandhoistingdeviceprojectpropertylist1-1~1-3.Table1-1themaincharacteristicsofthepenstocknumberitemparametertypecontrollersizeheadalongpipediameterpipelength11hydropowerstationpenstockopen-airexposedpipe,singlepipejointwatersupply1.3M931m0.8M8.3*2m22hydropowerstationpenstockopen-airexposedpipe,singlepipejointwatersupply1.4m1063.506m0.8M10*2mtable1-2hydropowerstationMaincharacteristicsofhydraulicmetalstructurenumberprojectnamegate,trashrack,door(gate...Pressurepipeandthemetalstructureinstallation9.1mainengineeringprofileyongxingriverlevelhydropowerstationpressurepipepipelineplaneShangalongRidgeislinelayout,andslopesurfacecontourclosevertical,GuanPowithoriginalgroundlinechanges,usedopentypeMingtube,singletubejointwaterway,competentdiameter1.3M,long931.00m,tworootnon-symmetric"Bu"typesupporttube,diameter0.8M,singlerootlong8.3M.Competenttoestablish12townPier,107buttress,telescopicsection11.SupportPierspacing8M,side-slidingbearing.Townpierfortheclosed-endstructureofgravity,basesurfaceintobedrock,pipeexcavationslope1:0.75withM5groutedrubbleslopeprotection,0.3M,bottomsidesewer,0.25mwide,deep0.3m,M5groutedrubblemasonry,setmaintenancestepladderontheleftside,1.0Mwide.Yongxinghe-?hydropowerstationpenstockpipesarrangedalongtheridgelineontheplane,andnearlyverticalslopecontourlines,GuanPochangeswiththeoriginalgroundline,withshallowbackfill-pipe,single-pipewatersupply,thecompetent1.4m,long1063.506m,twoasymmetric"y"pipe,diameter0.8M,single10m.Competenttoestablish12townPier,8expansionjoint.Townpierfortheclosed-endstructureofgravity,placedonsoftrockbasesurface,pipeconcreteC20onapedestal.Pipetrenchexcavationslope1:0.75,aftertheinstallationofsteeltube,compactedgravel數相加得0。(3)一個數同0相加,仍得這個數。2、加法交換律:兩個數相加,交換加數的位置,和不變。字母表達式是:a+b=b+a。3、加法結合律:三個數相加,先把前兩個數相加,或者先把后兩個數相加,和不變。字母表達式是:(a+b)+c=a+(b+c)。思考題:4、兩個正數相加,和一定為(),兩個負數相加,和一定為()。而正數和負數相加,和可能是(正數、負數或0),為什么,5、如果a,0,b,0,那么a+b0。為什么,如果a,0,b,0,|a|,|b|,那么a+b0。如果a,0,b,0,|a|,|b|,那么a+b0。installationpartmainincludingYunnanprovincetengchongCountyyongxingRiverprimaryandsecondaryhydropowerstationintheofpressurepipeandthepowerstationmetalstructure,whichlevelpowerstationpressurepipetotalabout562t(containingannex);IIlevelpowerstationpressurepipeabout733t(containingannex);levelpowerstationmetalstructureabout52.5t,containingdischargeGate2hole,rushedsandGate1hole,watermouthworkdoorandthestoppeddirtgatethe1hole,Qianpoolworkdoorandthestoppeddirtgatethe1hole;Secondarypowerstationmetaljunctionatabout19.5t,containingsandGate1hole,waterinletwatergateandtrashthe1hole;theirauxiliaryhoistequipmentandelectricalequipment.Concretepressurepipe,gate,trashandhoistingdeviceprojectpropertylist1-1~1-3.Table1-1themaincharacteristicsofthepenstocknumberitemparametertypecontrollersizeheadalongpipediameterpipelength11hydropowerstationpenstockopen-airexposedpipe,singlepipejointwatersupply1.3M931m0.8M8.3*2m22hydropowerstationpenstockopen-airexposedpipe,singlepipejointwatersupply1.4m1063.506m0.8M10*2mtable1-2hydropowerstationMaincharacteristicsofhydraulicmetalstructurenumberprojectnamegate,trashrack,door(gate...Pressurepipeandthemetalstructureinstallation9.1mainengineeringprofileyongxingriverlevelhydropowerstationpressurepipepipelineplaneShangalongRidgeislinelayout,andslopesurfacecontourclosevertical,GuanPowithoriginalgroundlinechanges,usedopentypeMingtube,singletubejointwaterway,competentdiameter1.3M,long931.00m,tworootnon-symmetric"Bu"typesupporttube,diameter0.8M,singlerootlong8.3M.Competenttoestablish12townPier,107buttress,telescopicsection11.SupportPierspacing8M,side-slidingbearing.Townpierfortheclosed-endstructureofgravity,basesurfaceintobedrock,pipeexcavationslope1:0.75withM5groutedrubbleslopeprotection,0.3M,bottomsidesewer,0.25mwide,deep0.3m,M5groutedrubblemasonry,setmaintenancestepladderontheleftside,1.0Mwide.Yongxinghe-?hydropowerstationpenstockpipesarrangedalongtheridgelineontheplane,andnearlyverticalslopecontourlines,GuanPochangeswiththeoriginalgroundline,withshallowbackfill-pipe,single-pipewatersupply,thecompetent1.4m,long1063.506m,twoasymmetric"y"pipe,diameter0.8M,single10m.Competenttoestablish12townPier,8expansionjoint.Townpierfortheclosed-endstructureofgravity,placedonsoftrockbasesurface,pipeconcreteC20onapedestal.Pipetrenchexcavationslope1:0.7
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 二零二五年度綠色家居產品免責任協(xié)議書3篇
- 2025年度農村土地租賃與農業(yè)廢棄物資源化利用項目合作合同2篇
- 二零二五年度全新音樂節(jié)演出活動承辦服務合同3篇
- 2025年度年度合伙開設中式快餐連鎖店合同3篇
- 2025年度農村土地互換與農業(yè)綠色發(fā)展合作協(xié)議
- 二零二五年度建筑用石材采購與加工合作協(xié)議3篇
- 二零二五年度現(xiàn)代化工廠生產線整體轉讓協(xié)議3篇
- 2025年度養(yǎng)老院老人外出社區(qū)活動安全保障合同3篇
- 二零二五年度金融科技基金公司投資合作協(xié)議3篇
- 二零二五年度房地產開發(fā)企業(yè)借款合同3篇
- 2021年貴安新區(qū)產業(yè)發(fā)展控股集團有限公司招聘筆試試題及答案解析
- 安全文化培訓 (注冊安工再培訓)課件
- 色粉-MSDS物質安全技術資料
- 骨科學研究生復試真題匯總版
- 石油化工鋼結構工程施工及驗收規(guī)范
- 遼海版六年級音樂上冊第8單元《3. 演唱 姐妹們上場院》教學設計
- 形勢任務教育宣講材料第一講——講上情
- 物業(yè)安全員考核實施細則
- 中國地質大學(武漢)教育發(fā)展基金會籌備成立情況報告
- 第四章破產法(破產法)教學課件
- PE拖拉管施工方案標準版
評論
0/150
提交評論