Thestudyonthestageoftheprojectcostmanagement
(Jack(YanGenfeng);StudentID:11B310043;Administrationspecialty)
Abstract:Projectcostmanagementisthebasiccontentstodeterminereasonableandeffectivecontroloftheprojectcost.Describedthecurrentstageoftheprojectcostmanagementsituationonthestrengtheningofthevariousstagesofconstructioncostmanagementoftheimportanceofandraisedanumberofkeyinitiatives.
Keywords:costoftheconstructionproject;thestatusofconstructioncostmanagement;managementofinvestmentunderthemarketeconomyofdecision-makingstage;thedesignphase;theimplementationphase
Introduction
EvenundertheWTOandChina'saccessiontotheworldcommunity,China'sconstructionindustryhowtoeffectivelycontrolconstructioncostoftheconstructionandmanagementofanimportantcomponentpart.However,thecurrentbudgetfortheconstructionprojects-estimate,budget,Superbudgetaccountsforthe"superthree"isstillwidespreadandthateventuallyledtoaseriouslossofcontrolofprojectinvestment.Projectcostmanagementisthebasiccontentstodeterminereasonableandeffectivecontroloftheprojectcost.
Astheprojectcosttotheprojectrunsthroughtheentireprocess,stagebystagecanbedividedintoInvestmentDecisionstage,thedesignandimplementationphases.Theso-calledProjectCosteffectivecontrolistheoptimizationoftheconstructionplansanddesignprogramsonthebasisofinthebuildingprocessatallstages,useofcertainmethodsandmeasurestoreducethecostoftheprojectshaveareasonablecontrolonthescopeandcostoftheapprovedlimits.
Engineeringandcostmanagementworkofthecurrentstatusofprojectcost
Managementsystemwasformedinthe1950s,andperfecttogetherinthe1980s.
Itistheactivitiesthatthecountrydirectlyinvolvedinthemanagementofeconomic.Provisionsinthedesignstagetodifferentestimatesorbudgetpreparationaswellasgovernment;Nothingrelevantdepartmentstoformulateabudget,content,methodsandapproval,thebudgetwillprovidethefixedcostofequipmentandmaterialsandfixedpriceofthebudgetpreparation,approval,managementauthority,andsoon.
Withthehistoricalprocessofthereformanddevelopment,Itisformedarelativelycompletebudgetestimateofquotamanagementsystem.However,asthesocialistmarketeconomicdevelopment,thesystem'smanyproblemshavealsoexposed.Generallyspeaking,thebudgetestimateisbasedondirectparticipationinthemanagementofnationaleconomicactivityasaprecondition.Enterpriseisnottheactualeconomicentities.Duetothecharacteristicsoftheplannedeconomy,and,atthetimeundertheconditionsofproductivity,willinevitablybecomeashortageintheeconomy.
Insevereshortageofcommoditiesundertheconditions,aslongasacertainlevelofinvestment,willbecertainoutputs.Inthisenvironment,theprojectplanningandtechnicalargumentationtherecanbenoeconomicanalysis.Statecontroloftheprojectcost,thatconstituteskeyfactorsequipmentandmaterialsprices,wagesandtaxesofartificialdistribution.Inthisrelativelystableeconomicenvironment,thebudgetestimateforthesystemapprovedprojectcost,helpthegovernmenttocarryoutinvestmentplanstoplayamajorrole.
Asthesocialistmarketeconomicsystemestablished,requiresustopredictprojectinvestmentandcontrol.Inrecentyears,internationalinvestmentprojectdevelopedtotherequirementsofpriorpre-controlandinthemiddleofcontrol.China,thetraditionalpracticeinanobjectivelightonthecausedecision-making,implementationheavy,lighttheeconomyandtechnology,
First,theconsequencesofvictimization,Duetothetechnicalpersonneloftheprojecttechnicalandeconomicconceptsandaweakawarenessofcostcontrol,costmanagementmakesthequalitydifficulttoraise.ProjectCostcontrolisdifficulttoachievelong-termgoals.
Second,thevariousstagesoftheprojectmanagementviewoftheabovecircumstances,Myfirstacademiainthe1980smadethewholeprocessofcostmanagementandcontrolconcept,buildingdepartmentswillstudythefeasibilityofprojectsandthebudgetsandfinalaccountstotwoextendedattherequestofthecorrespondingregulationsputourcostmanagementconceptsandmethodsreferredtoanewheight.
OurtasknowistobemodernandcostmanagementinlinewithChina'snationalconditionsofthemarketeconomysystemgoal,learnfromtheadvancedexperienceofthedevelopedcountries,andestablishsoundmarketeconomiclawsofprojectcostmanagementsystem,effortstoincreasetheprojectcostlevels.Aninvestmentdecision-makingphaseoftheprojectcostmanagementconstructionprojectinvestmentdecision-makingstageisproposedprojectproposals;conductafeasibilitystudytodetermineinvestmentestimationandthefinalpreparationofdesigntask.Atthisstage,theproject'stechnicalandeconomicdecision-making,oftheconstructionprojectcostoftheprojectafterthecompletionoftheeconomicbenefitshaveadecisiveinfluence,Theconstructioncostisanimportantstagecontrol.
China'scurrentstageoftheprojectcostfortheprojectmanagementforthepurposeofclearingprice,andfocusingonlyontheconstructionprocessofcostcontrol,neglectedbeforethestartoftheprojectinvestmentdecision-makingstageofcostcontrol.Investmentdecision-makingphaseofinvestmentprojectsisestimatedanimportantbasisfordecision-making.Ithasadirectimpactonnationaleconomicandfinancialanalysisoftheresultsofthereliabilityandaccuracy.Becauseofthisphaseisthepreliminaryworkofprojects,theinformationcannotbefully,comparableworksmoreorlessthatinformationaccumulatedrelativelysmall,estimatedinadequateandunscientific.Makesprojectcostmanagementandcostworkersisdifficultatthisstagedosomething.
Thevariousstagesoftheprojectcostcontrolinthedecision-makingphaseprojectcostcontrol.Rightprojectplanningphaseofthecost,manyownershavethewrongunderstandingthatthelowerthecostthebetter.Costcontrolisnotaunilateralissue,andshouldbeanumberoffactors,acombinationofpractical,comprehensiveconsideration.Theconstructionprojectinvestmentdecision-makingstage,theproject'stechnicalandeconomicdecision-making,Costoftheprojectafterthecompletionoftheprojectandtheeconomicbenefits,withadecisiveroleinprojectcostcontrolisanimportantstage,rationallydefineandcontrolthedirectionoftheprojectcostofaccuratepositioningandbuildingOptimizationguidingrole.
Inthedecision-makingphaseofthemostimportantistodoagoodjobfeasibilitystudy,theworkisdonewell,returnsoninvestmentandcanformagoodproportion.Otherwise,investmore,lesseffective,resultinginlossofcontrolandwasteofinvestment.
Atpresent,someoftheprojectsplannedtheownersofdeparturefromthesubjectivedesiresofafeasibilitystudyonthelackofscientificproof.FeasibilityStudyuntrue,falseorengineeringfunctionsobtainingtheapprovaloftheirsuperiors,actuallyputintothefeasibilitystudywillbeawardedinthestudyfortheprojectafterthesmoothfunctioningburiedalotofhiddenproblems,leadtoinsufficientfollow-upfundsfortheprojectandhadtoextendthetimelimitsothattheprojectcouldnothaveplannedtheuseofcost-effective,evenbecomehopelesscompletionofthebeardworks.
Therefore,inordertophaseintheinvestmentdecision-makingeffectivelycontrolconstructioncosts,wemustdothefollowingaspects:
Implementationoftheconstructionprojectandcorporateaccountability,Constructionoftheprojectfromplanningtoimplementationoftheentireprocessandtheuseofthefundstorepayresponsibilitiestothepeople.inadditiontoestablishingalegalsystemandtheprojectsupervisionmatchingmechanismbythedepartmentsinchargeoftheindustryandsupervisiondepartmentsforsettingupamonitoringgrouptooverseetheuseoffunds.
Arealisticapproachtomarketanalysis,toavoidtheblindnessoftheprojectdecision-making,reducesandreducesinvestmentrisk.Fullyconsiderbuildingprojectsinthefuturemarketcompetitiveness,designtaskmorescientificandreliability.
Capitalfinancingmusthaveaformalcommitmentdocument,thepartiesmustdoinvestmentfundsinplace,andfundsmusthavedocumentstoensurethattheprojectcanbeapprovedafterthescheduledimplementation.Tothevariousloanconditionsshouldbecarefullyanalyzedtominimizetheburdenofinterestandrepaymentpressure.
Tostrengthentheengineeringgeology,hydrology,geologyandland,water,electricity,transport,environmentalprojectssuchasexternalconditionsfortheworkofdepthtomaketheinvestmentestimatetherearesufficientgrounds.
Afterfulltechnicalappraisalandeconomicevaluation,andthefinaltechnologicallyadvanced,functionalandreliable,reasonableeconomicprojects,thuscalculateamoreaccurateandrealisticestimationoftheamountofinvestment,sothattheprojectcostfromthestartpositioninginamorereasonablelevel.
Designphaseoftheprojectcostcontrol
Thedesignphaseoftheprojectcostcontrolforalongtime,China'sbuildingcontrolveryeffective,-investmentprojectsisnotuncommon,thiswillaffectownersof
investmentreturns,itaddstotheownersandwithinbudget,aswellasdifficultiesinfundowners,theimpactonthefuturemanagementortheownersmakepaymentsinarrears,andsoon.Hence,thecontroloftheprojectcostisofgreatsignificance,howevertheprojectcostistheprimarymeansofcontroldesign,
Currentlymostofthepropertyownersinthedesignstageseldomworksoncostcontrol,andtheyfoundthatthecostofthedesignwillnothaveagreatimpact,itiswrong,onthecontrary,Designphaseoftheprojectcostcontrolisthemostimportantstep.Becauseitdeterminesengineeringdesign,constructionmethods,materialsandequipmenttypes,modelsoftheprojectcostisofcriticalsignificance,designoptimizationphaseoftheprogramorminorchanges,projectcostwillhaveasignificantimpact,Designphaseoftheprojectcostcontrolofthetotalprojectcostof70%.FollowingishowtocontroltheprojectfromdesigntocreatetheLaw:
3.1Astheownersmustdesign
Thedesignselectedonthequalitylevelisadirectimpactonthequalityofproductdesignlevel,andthedesignqualityproductsinthelevelofdirectinfluenceonthepricingoftheworks.Differentdesignunitsonthesameprojectdesignaredifferent.thesameitemofdifferentdesigninstituteworksbetweencertainaspectsoftheprojectcostontheexistenceofdifferencesbetween,Weassumethatwithadesignfromtwodifferentdesigninstitutetodesign,Constructionplansafterthecompletionofarequestedadvisoryunitcosttodothebudget,certainlydifferentdesigninstitutethetotalcostoftheprojectisabsolutelynotthesame,andmostofthedifferencebetweenthetwoover10%evenmorethan30%,andnotnecessarilyhighcostthanthedesignoflowcost,andgooddesignisoftenlowcost,Weallknowthatdifferentpeoplehavedifferentdesignstylesanddifferentlevels,thedesignworksnaturally,thereforechosentodesignunitsisthecontrolonthefirststep.Throughtendertoselectthedesignoftheunitsisagoodmethod,thetenderdocumentstoelaborateonthisparticularaspectoftherequirements,costcontroltargets,andsoon.
Otherwise,inthesubsequentdesignprocessdesignunitswillputanincreaseinthecostofthedesignrequirements;throughtenderingtheprojectdesignintothemarket,comparedtoselectthebestdesignunits.
3.2Promotingthedesignbiddinganddesignoptimizationcampaignmode
DesignunitsassessedbyexpertsusingscientificgroupFrance,inaccordancewithapplicable,economic,aestheticprinciplesandadvancedtechnology,reasonablestructuretomeetbuildingenergyefficiencyandenvironmentalrequirements,comprehensiveassessmentofthemeritsoftheprogramdesign,selectionofthebestdeterminationofthesuccessfulprogram.
Successfulinvestmentprogramestimatedtobeclosetothegeneralconstructionprojectscopeofinvestment.Thismeanstwodesigncontractswillhelpdesigntheprogramofchoiceandcompetitiontoensurethattheselecteddesignadvancedtechnology,uniquenovelty,adaptability,aswellastocontrolthecostoftheproject.Designunitsshouldstrivetoimprovetheirqualityoftheprojectdesigncleveridea,contemporaryreducingtheprojectcostontoracktheirbrainstoimprovedesignquality,strivetoputthedesignphaseoftheprojectcostcontrolapprovaloftheinvestmentceiling.
3.3Strengtheningthedesignstage
ThedesignphasetostrengthensupervisionoftheCommissionertodetermineareasonabledesign,maturetechnology,reductionintheconstructionphasemajordesignchangesandchangesintheprogram,intheeffectivecontroloftheprojectcostwillplayarole.1tothedesignoftheprojectiftheprojectsupervisiontogetinvolved,excludingunfavorablefactorsmaygenerallyisexcludedfromthe80%errors.Intheentireprocessofbuildingcostcontrol,constructionbeganatbesttosaveandinvest20%,thekeyliesintheconstructionphaseoftheidentificationandcontrolcosts.Supervisionofthedesignphaseinclude:DesignInstituteunderthedesigndrawingsandnoteshelpownersdealwithdifferentdesignoptionsfortheeconomy,capitalexpendituretodevelopthepreliminaryestimates,toensurethattheinvestmentcanbemosteffectivelyutilized.WiththeownersoftheCommissionerinclude:
AccordingtotheDesignInstitutetoprovidedesigndrawingsandnotestohelpownersdealwithdifferentdesignoptionsfortheeconomy,capitalexpenditurestodevelopthepreliminaryplantoensurethatinvestmentcanbemosteffectivelyused;withtheownersofdifferentdesignoptions,theneedtocalculatetheirownmaterialsandequipmenttoconductacostanalysisandstudy,tothedesignstaffcosts,toassistthemintheinvestmentlimitwithinlimitsdesignedtosaveandinvest.Toseekaone-timesmallinvestmentandeconomicgooddesignprogrammadethemostrationaleconomicindicators.
3.4Designactivelypromotetheso-calledcaplimitdesign
Evenwiththeapprovalofthedesigntaskandinvestmentestimates,guaranteethefunctionalrequirementsofthepremise.Thepreliminarydesignandcontrolbudget,accordingtothepreliminaryapprovalofthetotalbudgetforthedesignandconstructiondesigncontrol.Limits,andeveryoneprofessional,eachofwhomhaveadesignthresholdofatarget.Inthedesignprocess,designersshouldprogresstomoreprograms,designoptimization,ensuringthatthedesignistechnicallyadvancedandreasonable,innovative,stylish,anddonotbreakthelimitinvestmentobjectives,thuseliminatingtheengineeringdesignraisethefactorofsafetyanddesignstandards,oronlyconsiderthetechnicalfeasibilityoftheprogram,ratherthaneconomicrationalityphenomenon,theprojectcosttoensureeffectivecontrol.
Alsoknownasthevalueofvalueengineeringanalysis,isamodernscientificmanagementtechnique,isanewtechno-economicanalysis,istheproductoffunctionalanalysistoconserveresourcesandreducethecostofthepurposeofaneffectivemethod.Itmadeupforthetraditionalcostmanagementsimplyfocusoncostreductionandqualitymanagementonlyemphasizesimprovingthequalitydeficiencies,constructionisconducivetoresolvingthelong-standinglongperiod,alotofwastage,poorquality,high-costproblems.ValueEngineeringlawsgenerallydividedintothreesteps:assessmentofthedesignofobjecttechnologyandeconomicScore;Calculationofthetargetgroupoftechnicalandeconomicindicators;calculatethegeometricdesignoftheobject,onaverage;fromcomparisonchoosethebestdesign.
Constructionphaseoftheprojectimplementationunitconstructioncostmanagement
Itisreasonabletocontrolthecostoftheprojectintheprojecttomeetqualitystandardspremise,intheinvestmentdecision-makingstage,thedesignphaseandconstructionphaseoftheprojectputtheprojectapprovaloccurredinthecontrollimits,striveinvariousconstructionprojectsrationaluseofhuman,materialandfinancialresourcestoachievegoodinvestmentreturnsandsocialbenefits.
Theprojectcostcontrolandmanagementisadynamicprocess.Thedynamicmarketeconomy,tomaketheinvestmentintheidentificationandcontrolbecomemorecomplex,thiswillrequiretheconstructionunitstothemanagementofprojectcosttotheprojectrunsthroughtheentireprocess,itisnecessarytohaveacomprehensivefocus.
Theimplementationphaseoftheprojectcostmanagementistheimplementationoftheentireprocessofprojectmanagement.Projectimplementationphaseoftheprojectcostmanagementcanbedividedintothreeparts:thetendermanagement,constructionmanagementandsettlementmanagement.
4.1Biddingfortheconstructionphaseoftheconstructionunits
Biddingsystemcontrolengineeringcosteffectivemeans,bidorganizationcanimprovethecost-effectivenessofconstructionprojectsandensurethequalityofconstructionprojects,shorteningtheconstructioncyclereturnontheinvestment,constructionunitscantakefulladvantageofbiddingfortheeffectivemeansofcostcontrol.
ConstructionNo.10onthe7thministerialdecreeissueda"contractwiththeConstructionContractPricingManagement."clearlypointedoutinbiddingforprojectsusinginventories.Thisrequiresthebuildingofunitsconductingthetenderexercise,inthetenderdocumenttoincludenotonlytheusualcontent,liketendernotesbeforeschedule,tendernotes,theconditionsofthecontract,thecontracttermsoftheagreement,contractformat,technicalspecifications,drawings,tenderdocumentsandotherreferenceformat,itisalsonecessarytoprovidetheengineeringinventory,Biddingasareferencedocumentoftheimportantcomponents.
Constructionunitsinthetenderdocumentfortheprojectinventory,inaccordancewithstateorlocalrulespromulgatedbythecalculationthatthereunificationofthedividedprojects,unifiedmeasurementunitsandthereunificationoftheengineeringcalculationrules,accordingtodesigndrawingstobecalculatedandstatisticalarranged,obtainthelist.Quantitiestobefollowedinthepreparationofanobjective,impartial,scientific,andrationalprinciple.Compilersmusthavestrongmanlybudget,andshouldhavecertainknowledgeoftheengineeringdesignandconstructionexperience,andthematerialandmechanicalconstructiontechnologyforcomprehensivescientificknowledge,inordertocalculatethevolumeoftheworkswithoutheavymissed.Thebasisofwhichmustbeinaccordancewithstateregulationsengineeringcalculationrules,andthesub-projectsdivisionengineeringunits,andinaccordancewithdesigndrawings,designessentialLovetenderdocumentationrequirementsarecalculated.
Quantitiesoftheprojectshouldhaveatestinggeneral,theentriesmustbesimple,whilenotappearLousingwrongitemsPricingshouldguaranteethecorrectnessoftheproject.Shouldtherequirementsofthedifferentgradesseparateengineeringdivision,thesituationwasdifferent;wemayhavedifferentpricesfortheitemsseparately.Thisrequiresthepreparationofthelistcompilers,seriouslystudydesigndrawings,Analysisofthetenderdocumentsincludetheelementsoftheworkandthedifferenttechnicalrequirements,allfamiliarwiththeprocess,andtothesceneofseriousinvestigation,isforecasttomakepossibletheconstructionofthecase,rightwillhaveanimpactonthePriceofprojectstobebrokendown.Inaddition,becausetheprojectinventoriestocalculatetheamountoftheprojectisnotcompleteengineeringandconsidertheinterestsoftheconstructionunits,clearlypayingthepriceforthesameoverallprice,thequantitylistbythenumberofactualconstructionisapracticalterms.
IntheevaluationandreviewofthetenderoffershoulddotheunitstotalindividualPricequotationsandthecomprehensiveassessment.PricedoesnotmeettherequirementsofindividualshowsPricemeetstherequirements,andthelowesttotalPricecouldnotexplainthesinglelowestbidder.Biddersoftenknowthetotalcosttomaintainthesamecircumstances;theprojectislikelytochangesmallerprojectstolowertheprice.
Changesmaybelargerprojectspriceincreasestoachievethecompletionofclearingworkswillbeaddedforthepurpose.Wewouldalsodopriceandthecorrespondingquantityofcomprehensiveengineeringassessmentofthelargevolumeofprojectstofocusonthepriceanalysis.Pricewilldowiththecontentsofthework,constructionprogram,acomprehensivetechnicalevaluationprocess,therebypreferredchoiceofaconstructionunit.Constructionoftheconstructionphaseofthecontractcostcontrolbasis.Signedtightconstructioncontract,whilestrengtheningtheconstructioncontractmanagementcanguaranteethatthecontractpriceisreasonable,legitimacyandreducetheperformanceofthecontractA,Bindisputesandsafeguardtheinterestsofboththecontract,effectivecontroloftheworksinvestmentcosts.
Afterthesigningofthecontract,todothemanagementcontractdocumentation,contractandthesupplementarycontractagreementuntiltheregularmeetingsiteinminutes.Workcontactssuchasasinglecontentofacontractextensionandexplainedthattheintegritymustbepreserved,inadditiontoestablishingatechnicalfiles,Implementationofthecontractfordynamicanalysis,resultsoftheanalysistotakeproactivemeasures.
4.2Constructionphase
IntheconstructionphaseconstructionplanisbasedonthebudgetorKenworkscontractpriceofthetarget,Kencontrolthecostoftheproject.Atthisstageofconservationhasroomforasmall,butthepossibilityofwasteisgreat.Therebytocontrolthecostoftheprojecttogivesufficientattention.
4.2.1Constructionprogram
Constructionprogramtostrengthenthecomparativetechnicalandeconomicconstructionprogramisconstructiondesignofare-tothecontentsofthework,areasonableconstructionplan,shortentheconstructionperiodandensurethequalityoftheproject,improvingeconomicefficiency,Constructionoftheprogramrightfromthetechnicalandeconomicevaluationwerecompared,throughqualitativeandquantitativeanalysis,thequality,time,Costthreetechnicalandeconomicindicators,berational,andeffectiveuseofmanpower,materialandfinancialresources,achievebettereconomicefficiency,goodconstructionmanagementrelations,acomprehensivecostmanagementisanimportantway.
4.2.2Strictlyrelatedchangestotheprojectbudgetcontrolintheproposedbudget.
Constructionofthechangescausedbymanyreasons,includingworkspoorlydesigned,sothattheengineeringcontractwiththedrawingsprovidedinconsistent;Thecurrentmarketsupplyofmaterialsdonotmeetthestandardspecificationsofthedesignrequirements.Theseissueshavetoleavebreadwinnerprojectcostfactors.Therefore,intheconstructionprocess,wemusttightencustomschange,throughnodesignchangestoexpandthescaleandimprovethedesignstandards;increasetheconstructionandcontents,thebestimplementationofthe"gradecontrol,visaquota"system.Righttochangethedesign,particularlyasitrelatestothecostofthedesignchangesmustbeapprovedbythedesignunits,constructionunitsscenerepresentatives,supervisionengineerscommonsignature,andshouldbeaheadofthistypeofchange,reducelosses,becauseithasbeencompletedorpartiallycompletedprojectwillentailthedemolitionofthecontents,itisboundtocausemajorchangestotheloss.Therefore,theconstructionunitsshouldbeassignedtotheprojectcostmanagementprofessionalsPermanentconstructionsite,tograspatanytime.Controlprojectcostofthechanges.
4.2.3Worksonthescenevisaformalities
Throughstrictcontroloftheconstructionprojectsupervisionsystem,theestablishmentofspecializeddepartments,Professionaluseoftheprofessionalmanagementofprojectsandtoavoidprojectmanagementpersonneljustvisas,noteconomicaccountofthephenomenon.Investmentoutofcontrolcausedseriousconsequences.Toseriouschangevisaprocedurestobetakentothebuilding,Supervisor,theconstructionsitetogetherrepresentativessignedthewaytoensurethatchange,visaauthenticity,legitimacy,economicandavoidfraudandtheresultingphenomenaarisingfromthedispute.
Inthecourseofconstruction,theconstructionunitstoenhanceon-siteconstructionmanagement,supervisionandconstructionsideaccordingtothedrawings,andstrictlycontrolthechangeofthenegotiations,materialssubstitution,thescenevisas,andvariousadditionalextrabudgetarylaborcostsforthenecessarychangesshouldbedonefirstafterwards,aftermoney,Changeeventonthetimelychangeinthecalculationoftheworkloadandthecostofchangeoccurredtograspatanytimecostoftheprojectlevel,thingstoavoidabacklogofworkthatthetruecostoftheproject.
Constructionunitrepresentativestothescenetosupervisedoingagoodjobrecord,particularlyconcealedrecordsandvisas,reduceclearingthepassingphenomenon.Manyworksvisasceneisnotasserious,workstobringaverylargesettlementofthetrouble,leadtoconsiderableeconomiclosses,thescenestrictvisamanagementoftheconstructionphaseoftheprojectcostcontrolkey.
Ofprojectlistrigorousreviewoftheprojectonthereviewofinventories
Engineers’monitorlistofmeasurestocontroltheproject.BOQtoprovidethelistofmeasuresistocompleteconstructionprojects,occurredinthepre-constructionengineeringandconstructionprocesstechnology,lifeandsafetyaspectsofnon-engineeringprojectsentities.Atthisstagebecausemanyprojectsareinconstructionplansandtheconstructionsiteoftheimperfectionsonthetenderwaituntiltheconstructiontenderoftheprojectdesignandactualscenehavebetteraccess.ManagementEngineeraddressesthegatheringfirst-handinformationontheoriginal,itemizedcheckingidentification,inconsistentmakerevisions.
Controlmaterialconsumption,rationallyd
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 母親節(jié)一分鐘演講稿400字10篇
- 事業(yè)單位工作總結(jié)范文
- 會計實習報告范文集錦七篇
- 2022新線上學習心得體會10篇
- 財務(wù)人員工作總結(jié)(15篇)
- 女生節(jié)活動策劃書(合集15篇)
- 初中學生自我介紹15篇
- 幼兒教育工作計劃模板集錦七篇
- 廣告公司的個人實習報告(6篇)
- 怎么下載多媒體知識課件
- 2023年新疆中考物理試卷(附答案)
- 中國當前的民族問題
- 陜西省建筑防火設(shè)計、審查、驗收疑難問題技術(shù)指南-ppt
- 海警法智慧樹知到答案章節(jié)測試2023年大連海洋大學
- 手機號碼段歸屬地數(shù)據(jù)庫(2016年3月)
- 《借貸記賬法》教學設(shè)計
- 【試題】人教版二年級下數(shù)學暑假每日一練
- 衛(wèi)生院關(guān)于開展?jié)M意度調(diào)查工作的實施方案
- 紡織材料學選擇題
- YY/T 0916.1-2021醫(yī)用液體和氣體用小孔徑連接件第1部分:通用要求
- 醫(yī)務(wù)科工作思路(計劃)6篇
評論
0/150
提交評論