管井降水施工設(shè)計(jì)方案_第1頁(yè)
管井降水施工設(shè)計(jì)方案_第2頁(yè)
管井降水施工設(shè)計(jì)方案_第3頁(yè)
管井降水施工設(shè)計(jì)方案_第4頁(yè)
管井降水施工設(shè)計(jì)方案_第5頁(yè)
已閱讀5頁(yè),還剩17頁(yè)未讀, 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說(shuō)明:本文檔由用戶(hù)提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

管井降水施工案Theconstructionschemeoftubewelldewatering柬埔寨安達(dá)都會(huì)廣場(chǎng)工程VCLPPROJECTCAMBODIA編制單位:SinomaHanDanConstructionCo.,Ltd編制:piled:__________________審批:Verified:__________________批準(zhǔn):Approved:__________________日期:Date:__________________安達(dá)廣場(chǎng)基坑降水施工案ConstructionSchemeforFoundationPitDrawdownofVATTANACPark一、降水設(shè)計(jì)案I.Drawdowndesignscheme1.1、設(shè)計(jì)參數(shù)1.1.Designdata本工程降水井采用直徑300mm波紋管濾管,管井共20根井深22米,井口外露500mm。300mmcorrugatedfilterpipeisadoptedasthedrawdownwellandtherearetotal20wellsof22mdeepeach.Thewellheadexposesby500mm.1.2、降水井平面布置1.2.Layoutofdrawdownwell降水井布置詳見(jiàn)降水管井平面布置圖。Thearrangementofdrawdownwellisshownonthelayoutofdrawdownwell.二、施工準(zhǔn)備II.Constructionpreparation2.1、測(cè)量放線(xiàn)2.1.Surveyingandsettingout測(cè)量放線(xiàn)依據(jù)現(xiàn)場(chǎng)測(cè)量控制點(diǎn),標(biāo)高采用水準(zhǔn)儀,并根據(jù)井點(diǎn)布置圖采用全站儀放線(xiàn)定位。放線(xiàn)經(jīng)復(fù)核后報(bào)管理公司確認(rèn)可進(jìn)展施工。Thesurveyingandsettingoutshallbebasedonthefieldsurveycontrolpointsandopticallevelshallbeusedformeasuringtheelevation.Inaddition,thetotalstationinstrumentshallbeusedforthesettingoutandpositioningaccordingtothelayoutofwellpoints.Settingoutshallbeperformedafterre-recheckandbeingreportedtothemanagementpanyforconfirmation.2.2、施工用電、用水配置2.2Electricityandwaterforconstruction1、施工用電直接從配電房接入,50kVA能完全滿(mǎn)足降水用電負(fù)荷。1.Theelectricityforconstructionshallbedirectlyconnectedfromtheswitchgearroom,and50kVAcanfullymeetthedrawdownloadrequirements.2、依據(jù)用水設(shè)備和施工經(jīng)歷,需用水量10m3/h直徑50mm管,就能滿(mǎn)足施工用水。2.Dependingonthewaterequipmentandbasedontheconstructionexperience,thepipeofdiameter50mmwithawaterflowrateof10m3/hcanmeettheconstructionrequirements.2.3、打井機(jī)械及井點(diǎn)設(shè)備2.3.Welldrillingrigandwellpointequipment打井機(jī)械可根據(jù)工期要求變更。井點(diǎn)設(shè)備是由井點(diǎn)管、連接收、排水主管及抽水設(shè)備等組成。具體如下:Thewelldrillingrigmayveryaccordingtotheschedulerequirement.Thewellpointequipmentconsistsofwellpointpipe,connectingpipe,drainheaderandpumpingequipment.Thedetailsareasfollows:機(jī)械設(shè)備表Listofmechanicalequipment序號(hào)S/N設(shè)備名稱(chēng)EquipmentName規(guī)格Size單位Unit數(shù)量Qty1鉆機(jī)DrillingrigXY型XYModel臺(tái)Set12潛水泵Submergedpump1.1~1.5kw臺(tái)Set20〔備5〕20(5standby)3配電箱Powerdistributionbox個(gè)Piece124泥漿泵MudpumpDN15臺(tái)Set15挖機(jī)Excavator200Model臺(tái)Set12.4、抽水設(shè)備的型號(hào)2.4.Modelofpumpingequipment本工程抽水設(shè)備采用潛水泵,功率為1.1~1.5kw、流量為5~8m3/h。口徑為25mm。Submersiblepumpisusedaspumpingequipment,forwhichthepoweris1.1~1.5kw,theflowrateis5~8m3/h,andthediameteris25mm.主要材料用量表Listofmainmaterialconsumption序號(hào)S/N材料名稱(chēng)Materialname規(guī)格Size單位Unit數(shù)量Qty1波紋管CorrugatedpipeΦ300m4402濾料Filtermaterial3~5mmt803水管Waterpipem15004電纜Cable3*1.5m15002.5、人員的組織2.5.Organizationofpersonnel1、降水組織機(jī)構(gòu)1.Drawdownorganization工程經(jīng)理〔X慶科〕工程經(jīng)理〔X慶科〕:0884321871現(xiàn)場(chǎng)經(jīng)理〔田書(shū)峰〕現(xiàn)場(chǎng)經(jīng)理〔田書(shū)峰〕:0978761875技術(shù)負(fù)責(zé)〔王春陽(yáng)〕:0974768583降水班組鉆井班組水電團(tuán)隊(duì)現(xiàn)場(chǎng)平安測(cè)量班組降水班組鉆井班組水電團(tuán)隊(duì)現(xiàn)場(chǎng)平安測(cè)量班組ProjectmanagerProjectmanager〔LiuQingKe〕tel:0884321871Sitemanager〔TSitemanager〔TianShuFeng〕tel:0978761875Technicalrepresentative〔WangChunYang〕tel:0974768583Water&electricityteamDrawdownteamDrillingteamSitesafetySurveyteamWater&electricityteamDrawdownteamDrillingteamSitesafetySurveyteam三、施工工藝III.Constructiontechnology降水井施工工藝流程Theworkflowofdrawdownwellconstruction放線(xiàn)→定井位鉆機(jī)就位→鉆井→換漿→吊放井管→填濾料→粘土封井→洗井→安裝水泵、架設(shè)電纜→鋪設(shè)排水總管及沉砂池→抽降→水位觀(guān)測(cè)→封井Settingout→positioningofwelldrillingrig→welldrilling→mudfluiddisplacement→liftingofwellpipe→filtermaterialfilling→shut-inwellwithclay→wellflushing→installingwaterpumpandcable→laydrainheaderandsedimentationtank→drawdownbypumping→opticallevelobservation→wellshut-in1、測(cè)量定位1.Surveyandpositioning按施工圖放出井的中心點(diǎn)。井位應(yīng)設(shè)立顯著標(biāo)志,必要時(shí)用鋼纖打入地面以下300mm,并灌灰粉作標(biāo)記。Markoutthecenterpointofthewellaccordingtotheconstructiondrawing.Acleardistrictsignshallbeerectedatthewellpositionandasteelrodshallbedrivenby300mmunderthegroundifnecessary.Inaddition,limepowdershallbepouredasmarker.2、鉆定位2.Locationofdrillhole以定好的井位點(diǎn)為中心,500mm為直徑作圓,向下開(kāi)0.40m作為井口。深度以見(jiàn)原狀土為準(zhǔn),確認(rèn)無(wú)地下管線(xiàn)及地下構(gòu)筑物后放護(hù)筒,護(hù)筒外側(cè)填粘土封隔好表層雜填土,以防鉆井沖洗液漏失。Takingthewelllocationasthecenter,makeacircleofdiameter500mmandcuta0.4mopeningdownward.Thedepthshallbesuchthatreachingtheundisturbedsoil.Theretainingcylindershallbelaidafterconfirmingthereisnoundergroundpipelineandstructure.Theoutsideofretainingcylindershallbefilledwithclaytoisolatethemiscellaneousfillatthesurfacelayer,soastopreventtheleakageofdrillingfluid.3、樁機(jī)就位3.Piledriverpositioning樁機(jī)就位時(shí)需用水準(zhǔn)儀找平,做到穩(wěn)固、正、水平,以保證鉆進(jìn)過(guò)程中的鉆機(jī)穩(wěn)定。起落鉆塔必須平穩(wěn)、準(zhǔn)確。鉆機(jī)就位偏差應(yīng)小于10mm,鉆塔垂直度偏差應(yīng)小于1%。Forpositioningofpiledriver,opticallevelshallbeusedforleveling.Itshallbestable,regularandhorizontal,soastoensurethestabilityofthedrillingriginthedrillingprocess.Theliftingandloweringofdrillingtowermustbestableandaccurate.Thedeviationofdrillingrigpositioningshouldbelessthan10mmandtheverticalitydeviationofthedrillingtowershallbelessthan1%.4、造漿:4.Mudmaking:根據(jù)地層情況采用正循環(huán)鉆法成,一般采用地層自造漿護(hù)壁。當(dāng)遇到砂層時(shí),采用膨潤(rùn)土〔保持泥漿比重為1.1-1.15g/cm3〕造漿護(hù)壁成。地層土質(zhì)松散時(shí),泥漿應(yīng)高于地面。Accordingtothestratumlayer,normalcirculationdrillingmethodshallbeusedforboreforming.Normally,thenativemudisusedforwallretaining.Whensandlayerisencountered,bentoniteshallbeusedformud(keepingthemudweightis1.10~1.15.)makingandboreforming.Whenthesoilisloose,themudinsidetheboreshallbehigherthantheground.5、鉆井5.Drilling鉆進(jìn)過(guò)程中要隨時(shí)觀(guān)察泥漿的流損變化,水的補(bǔ)充要泥漿的流損情況及時(shí)調(diào)整,一般應(yīng)保持泥漿液面不低于井口下1米,當(dāng)鉆遇砂層,泥漿大量流失時(shí),應(yīng)加大補(bǔ)水量,并投入適量的膨潤(rùn)土形成一定粘度的泥漿以控制沖洗液漏失,防止塌事故。在以粘土為主的地層中鉆井時(shí),由于鉆井自造漿較稠,鉆進(jìn)效率低,此時(shí)可排走一局部泥漿,補(bǔ)充清水,調(diào)整泥漿密度到適宜狀態(tài)。鉆進(jìn)中發(fā)現(xiàn)塌、斜時(shí)應(yīng)及時(shí)處理??s時(shí)應(yīng)經(jīng)常提動(dòng)鉆具修擴(kuò)壁,每次沖擊時(shí)間不宜過(guò)長(zhǎng),防止卡鉆。Intheprocessofdrilling,attentionshallbealwayspaidtotheflowinglossofmud.Thewatermakeupandmudflowinglossshallbetimelyadjusted.Ingeneral,themudshallbekeptatalevelnotlowerthanthewellheadby1m.Whensandlayerisencounteredandgreatamountofmudflowsoff,greatamountofwatershallbemadeupandproperamountofbentoniteshallbeputintoestablishthemudofacertainviscosity,controltheleakageofflushingfluidandpreventtheborecollapseaccident.Whendrillinginthestratumthatismainlyformedbyclay,becausenativeslurryofthewellisthickandtheefficiencyofdrillingislow,inthiscasesomemudcanbedischargedandcleanwatershallreplenishedtoadjustthemuddensitytoaproperstate.Borecollapseandinclinationduringdrillingshallbetimelytreated.Incaseofshrinkagecavity,thedrillingtoolshallbefrequentlyliftedupforrepairingandexpandingtheborewall.Thetimeofeachpercussionshallnotbetoolong,soastopreventjamming.6、換漿6.Mudfluiddisplacement鉆至設(shè)計(jì)深度后〔一般應(yīng)大于設(shè)計(jì)深度的0.5m~1.0m〕,將鉆頭提高0.5m左右并加清水稀釋?zhuān)钡侥酀{密度接近1.05g/cm3,粘度為18~20s?,F(xiàn)場(chǎng)觀(guān)察一般以換漿后泥漿不染手為準(zhǔn)。替漿過(guò)程中,應(yīng)按排泥漿的清運(yùn)或排放工作。Afterdrillingtothedesigndepth(normallydeeperthanthedesigndepthby0.5m~1.0m),thedrillingbitshallbeupliftedbyabout0.5mandcleanwatershallbeaddedfordilutiontillthedensityofmudreaches1.05g/cm3andtheviscosityis18~20s.Forfieldobservation,thecriteriaisthatthemuddoesnotadheretohandsafterdisplacement.Duringdisplacement,mudremovalordischargeshallbearranged.7、下管7.Pipeplacement①、檢查井管有無(wú)殘缺、斷裂及彎曲情況。①Checkwhetherthewellpipeisdamaged,brokenandbent.②、在波紋管外側(cè)鉆,徑不小于20mm并在波紋管外包60目濾網(wǎng)不少于2層。②Drillboresoutsidethecorrugatedpipe.Theborediametershallbenotlessthan20mm,andtheoutsideofthecorrugatedpipeshallbewrappedwith60-meshstrainerbynotlessthan2courses.③、使井管居于井正中,防止傾斜,并固定。③Putthewellpipeatthecenterofthewellbore,avoidinclinationandfixit.④、下降第二節(jié)井管時(shí),注意連接的公母接口,動(dòng)作要輕緩,不能猛降猛放。④Whenplacingthesecondsectionofthewellpipe,attentionshouldbepaidtotheconnectionofthemaleandfemaleinterfaces.Whiledoingthejob,theactionshallbelightandslow,avoidingsuddenplacement.⑤、井管安放應(yīng)力求垂直并位于井中間;管頂部比自然地面高500mm左右。井管過(guò)濾局部應(yīng)放置在含水層適當(dāng)?shù)膰?。⑤Wellpipeplacementshouldbeverticalandlocatedinthemiddleofthewellasfaraspossible;thepipetopshallbehigherthanthenaturalgroundbyabout500mm.Thefiltersectionofthewellpipeshouldbeplacedintheproperrangeoftheaquifer.8、填料8.Fillingmaterial①、安裝完井管后,在無(wú)砂濾水井管外側(cè)與井壁之間填礫料。①Afterinstallingthewellpipe,gravelmaterialshallbefilledbetweentheouterwallofthefilter-freepipeandthewellwall.②、礫料應(yīng)緩慢填入,防止沖歪井管,一次不可填入過(guò)多。接近井口1.50m處,用粘土封,以防地面水、雨水流入。②Thegravelmaterialshouldbeslowlyfilledtopreventdeflectionofthewellpipeduetoflushing.Thefillingshouldnotbetoomushinonetime.Whenitisnearthewellhead,clayshallbeusedforshut-in,soastopreventthesurfacewaterandrainwaterfromin-flowing.③、井管下入后,及時(shí)在井管與土壁間填充砂礫填料。粒徑應(yīng)大于濾網(wǎng)的徑,一般為3~8mm的細(xì)礫。砂礫濾料必須符合級(jí)配要求,將設(shè)計(jì)砂礫上、下限以外的顆粒篩除,合格率要大于90%,雜質(zhì)含量不大于3%;填料要一次連續(xù)完成。③Afterplacingthewellpipe,timelyfillsandandgravelbetweenthewellpipeandthesoilwall.Theparticlesizeofgravelshouldbelargerthanthefiltermeshdiameter,anditisgenerally3to8mmfinegravel.Gravelfiltermaterialmustmeetthegradationrequirements.Theparticleslargerthantheupperlimitorsmallerthanthelowerlimitofthedesigngravelsizeshallbescreenedoff.Therateofconformityshallbehigherthan90%andtheinclusioncontentshallnotbemorethan3%.Fillingshallbepletedinonetimecontinuously.9、洗井9.Wellflushing成井后,用污水泵反復(fù)進(jìn)展恢復(fù)性抽洗。洗井應(yīng)在成井4小時(shí)進(jìn)展,以免時(shí)間過(guò)長(zhǎng),影響滲水效果。洗井后可進(jìn)展試驗(yàn)性抽水,確定單井出水量及水位降低能否滿(mǎn)足設(shè)計(jì)要求。Afterthewellisformed,thesewagepumpshallbeusedtorepeatedlyperformrestorativepumpingandflushing.Wellflushingshallbeperformedwithin4hafterthewellisformed,soastoavoidbeingleftasidetoolongandaffectingtheseepageeffect.Afterthewellflushing,testpumpingshallbeperformedtodeterminewhetherthedischargeofsinglewellandtheloweringofopticallevelcanmeetthedesignrequirements.10、安裝抽水控制線(xiàn)路10.Installationofpumpingcontrolpipeline潛水泵在安裝前,應(yīng)對(duì)水泵本身和控制系統(tǒng)作一次全面細(xì)致的檢查。檢驗(yàn)電動(dòng)機(jī)的旋轉(zhuǎn)向,各部位螺栓是否擰緊,潤(rùn)滑油是否加足,電纜接頭的封口有無(wú)松動(dòng),電纜線(xiàn)有無(wú)破壞折斷等情況,然后在地面上轉(zhuǎn)3~5min,如無(wú)問(wèn)題,始可放入井中使用。深井安設(shè)潛水電泵,可用繩索吊入濾水層部位,上部應(yīng)與井管口固定。潛水電動(dòng)機(jī)、電纜及接頭應(yīng)有可靠的絕緣,每臺(tái)泵應(yīng)配置一個(gè)控制開(kāi)關(guān)。主電源線(xiàn)路沿深井排水管路設(shè)置。安裝完畢應(yīng)進(jìn)展試抽水,滿(mǎn)足要求后始轉(zhuǎn)入正常工作。Beforeinstallingthesubmersiblepump,thepumpitselfandthecontrolsystemshallbesubjecttoaprehensiveanddetailedinspection.Thefollowingchecksshallbemade,suchastherotationdirectionofmotor,whethertheboltsatvariousplacesaretightened,whetherlubricantisfullyadded,whetherthecableconnectionsealisloose,whetherthecablesaredamagedorbroken,etc.Afterthechecks,runthepumponthegroundfor3~5min.Itcanbeputintothewellonlyifitisingoodcondition.Forinstallingsubmersiblepumpinsideadeepwell,thepumpmaybeliftedtofiltrationbedlevelwithropesandthepumptopshallbefixedtothewellhead.Thesubmersiblemotor,cableandjointshallbeprovidedwithreliableinsulationandeachpumpshallbeequippedwithacontrolswitch.Themainpowersupplylineshallbearrangedalongthedrainagepipeline.Afterinstallation,trialpumpingshallbeperformedanditshallbetransferredtonormaloperationaftersatisfyingtherequirements.四、降水過(guò)程的控制IV.Controlofthedrawdownprocess1、在正式降水前應(yīng)作抽水試驗(yàn),以驗(yàn)證案的可行性,根據(jù)抽水試驗(yàn)結(jié)果選擇泵的揚(yáng)程流量,基坑開(kāi)挖前至停頓抽水時(shí)止,每天對(duì)地下水位進(jìn)展觀(guān)測(cè)記錄,調(diào)整抽水速度及抽水量。1.Pumpingtestshallbeperformedbeforedrawdowntovalidatethefeasibilityofthescheme.Selecttheheadandflowrateofthepumpaccordingtothepumpingtest.Monitorandrecordthegroundopticallevelbeforetheexcavationoffoundationpittillthestopofpumpingeveryday.Adjustthepumpingspeedandamountofwaterbeingpumpedout.2、在基坑開(kāi)挖過(guò)程中,應(yīng)隨時(shí)觀(guān)測(cè)基坑側(cè)壁、基坑底的滲水現(xiàn)象,并查明原因,及時(shí)采取施工措施,并檢查基坑外管網(wǎng)有無(wú)滲漏。2.Duringtheexcavationoffoundationpit,theseepageofthefoundationsidewallandfoundationbottomshallbealwaysmonitored,forwhichthecausesshallbeidentifiedandmeasuresshallbetaken.Thepipenetworkoutsidethefoundationpitshallbecheckedforseepage.3、在抽水維護(hù)期間,根據(jù)單井出水量確定開(kāi)、關(guān)水泵的時(shí)間間隔,委派專(zhuān)業(yè)人員24小時(shí)輪流值班,保證水泵正常運(yùn)轉(zhuǎn)及井水位?,F(xiàn)場(chǎng)準(zhǔn)備多臺(tái)備用水泵及零配件,以便及時(shí)更換或維修,注意保護(hù)井口,防止雜物掉入井。3.Duringthepumpingmaintenanceperiod,assignprofessionalworkersfor24hworkonshifts,soastodeterminethetimeforthestartupandshutdownofwaterpumpaccordingtothewateroutputofasinglewellandensurethenormaloperationofthepumpandtheopticallevelinthewell.Manysparepumpsandsparepartsshallbepreparedonsiteforatimelyreplacementorrepair.Payattentiontoprotectthewellheadandpreventdebrisfromfallingintothewell.4、發(fā)現(xiàn)基坑出水、涌砂,應(yīng)立即查明原因,組織處理。4.Ifwaterflowingoutorboilingofsandisfoundinthefoundationpit,thecausesshallbeimmediatelyidentifiedforsettlement.5、降水開(kāi)場(chǎng)時(shí)間為:基坑土開(kāi)挖前不少于10天。5.Thebeginningtimeofdrawdownis:nolessthan10daysbeforetheexcavationoffoundationpit.6、降水時(shí)間持續(xù):上部構(gòu)造的自重大于地下水產(chǎn)生的浮力后可停頓降水。6.Drawdownduration:thedrawdownmaybestoppedonlywhenthedeadweightofthesuperstructureisgreaterthanthebuoyancygeneratedbygroundwater.五、降水管網(wǎng)布設(shè)V.Layingofdrawdownpipenetwork1、降水用電纜應(yīng)延基坑邊布設(shè),并在坑降水井相對(duì)應(yīng)的位置設(shè)置配電箱,電纜借助臨近的支撐架設(shè)到坑邊,并采用絕緣套管懸掛在坑邊的護(hù)欄上。電纜布設(shè)和電箱布置詳見(jiàn)降水電纜布置圖。1.Thecablefordrawdownshouldbelaidalongthefoundationpit,andthedistributionboxshallbesetupatthecorrespondinglocationofthedrawdownwellinthepit.Thecableusetheneareststruttingstructuretothesideofpitandthenitshouldbehungontheguardrailonthesideofthepitwiththeinsulatingsleeve.Thearrangementofcablesandelectricboxesaredetailedinthelayoutofdrawdowncables.2、降水用輸水管線(xiàn)采用PVC排水管和沉砂池相結(jié)合的方法。地下水通過(guò)井水泵經(jīng)排水管抽至沉砂池沉砂后〔沉砂池采用成品水箱埋設(shè)在靠近城市管網(wǎng)接入口的下水道〕排出場(chǎng)外。2.ThedrainagepipelinefordrawdownisintheformofPVCdrainagepipelineplussedimentationtank.Thegroundwaterispumpedtothesedimentationtank(thesedimentationtankisawatertankembeddedinthesewagenearthemunicipalpipelineconnectioninterface)bythewellpumpthroughthedrainagepipe,andthendischargedtotheoutside.六、降水工程質(zhì)量保證措施VI.Measuresforqualityassuranceofdrawdownworks6.1、降水管理6.1.Drawdownmanagement1、根據(jù)水位觀(guān)測(cè)情況,控制降水井排水時(shí)間和時(shí)間間隔。1.Accordingtotheobservationofopticallevel,controlthedrainagetimeandtimeintervalofdrawdownwelldrainage.2、安排兩班人員日夜值班,進(jìn)展排水降水控制操作、水位觀(guān)測(cè)和數(shù)據(jù)記錄。2.Arrangetwoshiftsondutydayandnighttoperformdrainageanddrawdowncontrolandoperation,opticallevelobservationanddatarecord.3、在基坑開(kāi)挖過(guò)程中,須密切注意降水效果,做好降水工作。3.Duringtheexcavationoffoundationpit,attentionmustbepaidtotheeffectofdrawdown.Thedrawdownworkshallbeproperlyperformed.4、假設(shè)因地下圍護(hù)構(gòu)造大量滲漏而引起坑外水位下降超過(guò)規(guī)定值時(shí),監(jiān)測(cè)人員及時(shí)發(fā)出警報(bào),并由值班人員控制抽水力度或停抽。4.Iftheopticalleveldropexceedsthespecifiedvalueduetogreatseepageandleakageoftheundergroundretainingstructure,Monitoringworkershouldgivethealarmandthenthepumpingstrengthshallbecontrolledorthepumpingshallbestoppedbydutystaff.5、暴露的降水井管四要及時(shí)回填粘土封密5.Thesurroundingareaoftheexposeddrawdownwellpipeshallbetimelybackfilledwithclayforshut-in.6.2、施工技術(shù)措施6.2.Constructiontechnicalmeasures1、根據(jù)基坑圍護(hù)圖、地質(zhì)資料和對(duì)基坑降水的設(shè)計(jì)要求,作好施工組織設(shè)計(jì),并按施工組織設(shè)計(jì)要求認(rèn)真準(zhǔn)備。1.Accordingtothepitretainingdrawing,geologicaldataanddesignrequirementsofthefoundationpitdrawdown,makeproperconstructionorganizationdesign,andcarefullyprepareaccordingtotheconstructionorganizationdesignrequirements.2、對(duì)施工人員進(jìn)展技術(shù)培訓(xùn)工作,充分了解關(guān)鍵部位的施工要求,精心施工,保證潛水泵的抽吸作用和水泵的降水作用。2.Conducttechnicaltrainingforconstructionpersonnel,fullyunderstandtheconstructionrequirementsforkeyparts,andguaranteethesuctionofthesubmersiblepumpandtheroleofwaterpumpfordrawdown.3、做好降水井特殊構(gòu)造的圖樣設(shè)計(jì)和工藝設(shè)計(jì)。3.Properlymakedrawingdesignandprocessdesignofthespecialstructureoftubewell.4、精心選用和確定施工用的各種材料和設(shè)備。4.Carefullyselectanddeterminethevariousconstructionmaterialsandequipment.6.3、生產(chǎn)設(shè)備準(zhǔn)備6.3.Preparationofproductionequipment1、作好施工用的材料、設(shè)備和勞動(dòng)力進(jìn)場(chǎng)方案。1.Maketheplanformobilizationofmaterials,equipmentandlabortothesite.2、降水作業(yè)隊(duì)?wèi)?yīng)提前作好鋼材、黃砂、水表、真空表、水泵、水泵管路、管道閥門(mén)等材料采購(gòu)及單井制造工作。成井所用的構(gòu)件、機(jī)械設(shè)備、材料必須隔天到場(chǎng)。2.Thedrawdownoperationteamshallprocuresteel,sand,watermeter,vacuumgauge,waterpump,waterpumppipelineandpipelinevalveandmanufacturetheindividualwellinadvance.Theponents,machinery,equipmentandmaterialsusedforpletedwellmustbeavailableonsitethenextday.6.4、質(zhì)量措施6.4.Qualitymeasures1、根據(jù)降水要求,格按施工組織設(shè)計(jì)提出的施工法進(jìn)展施工,施工人員應(yīng)對(duì)工人作好技術(shù)交底工作,施工過(guò)程中必須落實(shí)各項(xiàng)技術(shù)措施;鉆時(shí)應(yīng)根據(jù)水文地質(zhì)條件和土層物理力學(xué)性質(zhì),合理選擇鉆井設(shè)備,正確制備泥漿,控制好沖洗液面的高度和鉆井進(jìn)度,以防塌。1.Accordingtothedrawdownrequirements,theconstructionshallbeperformedinstrictaccordancewiththeconstructionmethodproposedintheconstructionorganizationdesign.Theconstructionpersonnelshallmaketechnicalclarificationfortheworkersandvarioustechnicalmeasuresmustbeimplementedduringconstruction.Duringdrilling,thefollowingjobshallbeperformedaccordingtothehydrogeologicalconditionsandphysicalpropertyofsoillayertopreventborecollapse,suchasrationalselectionofdrillingequipment,properpreparationofmud,controloftheheightofflushingsurfaceanddrillingspeed.2、認(rèn)真作好降水記錄;坑外水位發(fā)生變化,應(yīng)及時(shí)調(diào)整降水作業(yè);2.Carefullyrecordthedrawdownoperation;whentheopticalleveloutsidethepitchanges,thedrawdownworkshallbetimelyadjusted;3、挖土施工中,安排專(zhuān)人注意看護(hù)電纜和管路不受破壞;3.Duringexcavation,arrangetheworkerpayattentiontoprotectthecableandpipelinefromdamage;4、挖土施工中,降水井邊設(shè)置戒備標(biāo)注同時(shí)加強(qiáng)人員培訓(xùn)安排專(zhuān)人看護(hù)。防施工機(jī)械碰撞降水井。井管應(yīng)具有足夠的抗壓、抗拉、抗彎強(qiáng)度,以保證井管能承收井壁地層和濾料的側(cè)向壓力及井管的全部重量。4.Everydayitshouldeducatetheworkerandarrangetheworkertomonitor.Itshallsetupthenoticeboardaroundtubewell.Duringexcavation,preventconstructionmachineryfromcolli

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶(hù)所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶(hù)上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶(hù)上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶(hù)因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

最新文檔

評(píng)論

0/150

提交評(píng)論