




下載本文檔
版權說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權,請進行舉報或認領
文檔簡介
1、Renovation contractClient (Party A):to undertake (Party B):A and B sides through friendly negotiation and consultation, decided to entrust Party B to room decor.To ensure that works smoothly, according to relevant state law, hereby enter into this contract (including the annex to the contract and al
2、l supplementary contract), so mutual respect.Articlei: Project OverviewProject Address:Room size: chamber layer (type) Room Hall Kitchenroom, total square meters;Hall, total square meters;kitchen, total square meters;bathrooms, total square meters;balcony, total square meters;aisle, total square met
3、ers;Other (specify site), total square meters.Total: square meters of construction area.Construction content: See budget book and working drawings.Commissioned by:Project start date: DateProject completion date: Day Month YearThe total number of days: daysArticle II: the contract priceThe contract p
4、rice (the amount of capital) element, is shown in Appendix (b) budget book.the material shall yuan; 2 per person labor charge;the design fee element; 4, the construction of freight per Qing;5, unloading fees yuan; 6, management fees yuan;other costs (specify content) dollars.Article: Quality require
5、mentsEngineering the main material used varieties, specifications, name, and by mutual recognition.Shown in Appendix (c) final list of engineering materials.Construction, special construction projects, if any party or special quality requirements, both sides should recognize the increased costs, sha
6、ll also sign a supplementary contract.Quality inspection and supervision departments: Foshan City, home decorating interior decoration trade association of professional committees.Where the Party their own procurement of materials, equipment, product quality by own party; by the party responsible fo
7、r construction quality.Party, such as self-employed project management, shall inform Party B before the start of the project in order to facilitate the work of convergence.Article IV: Material SupplyParty B shall strictly follow the state regulations on the price of materials used in this contract s
8、hall be implemented in the marked price.See budget book.Materials provided by Party A under this Contract are used in decorating projects, non-consent of Party A shall not be used for other purposes.If Party B for other purposes, diversion of the material should be double the price of compensation t
9、o the owner.B provides the materials, equipment do not meet quality requirements, or specifications are different, should be prohibited.Who has used the project is responsible for damage caused by B.Party is responsible for procurement and supply of materials, equipment, should be qualified products
10、 meet the design requirements and should be at the supply to the scene.Such as the extension to reach the construction be delayed, according to the delay period penalties.Materials provided by Party 10% of the total amount of management fees paid to the Party.Material after acceptance by Party B, Pa
11、rty B responsible for the custody, due to losses caused by improper storage by the Party responsible for compensation.Article V: PaymentContract has been signed by Party B, after entering 35% for projects that meet; when the duration of the progress of more than half (year, month day), the Party tha
12、t is second to pay 30% for projects.Workers Party on demand after the project Jun 30% for projects, hospitality projects 5% of the balance due on completion of the project acceptance Party within one week after settlement.(Note: Party A Party B within three days of acceptance notification) Party A s
13、hall be the date of payment is a breach of non-payment, B has the right to stop construction.Acceptance of the outstanding value of the project shall not be delivered.Engineering construction project change or need any changes in Appendix (b) home decoration works projects to change the table, the t
14、wo sides should sign a supplementary contract issued by the party responsible for construction change orders, construction noticeSite Leader.Increase and decrease the price, paid before the next payment period.Party fails to advance construction of the contract price of the prescribed time limit, fo
15、r each overdue day of unpaid work by the amount of 1% of the price paid to the party.Article VI: construction periodIf the reason for delay in completion of Party B, a daily fee of 1% working penalty fines will be paid until the labor costs deducted last.If the reason for delay in completion of Part
16、y A, for each delayed day to decoration works price of 1% in labor costs as the loss of working time paid to the B element.By a party of their choice in materials, equipment, due to inferior quality and impact of project quality and schedule, the rework cost borne by the Party, the party caused the
17、quality of the construction accident, Party B shall bear the cost of rework, time does notchange.In the construction, due to quality problems, caused by the two sides disagree suspension, are not punished by loss of working time or delay period, both sides should take the initiative to mediation or
18、arbitration requested the departments concerned sectoral coordination, processing, resolving disputes as soon as possible to continue with the work.Construction of the reasons, if requested by Party rework, or because of delays in the content of party change the construction schedule, the required v
19、isa, Party A shall bear all construction costs, such as rework caused by Party B, Party Bassume responsibility for the same period.Construction, Party B agrees not to privately inform the content of construction workers caused by unauthorized changes to the quality of the construction problems and d
20、elays in schedule, Party A self-responsibility. Article VII: Project AcceptanceProject quality inspection, in addition to concealed work to be sub-inspection, the be all projects after completion and acceptance, Party B organizations.The two sides settled for engineering and transfer procedures.Noti
21、ce to Party B and the final acceptance inspection process, the party should come to acceptance within three days overdue to give up rights as a Party and as acceptance, if the problem, the Party own responsibility.Party moved into their own to stay, as acceptance.If Party B can not come to acceptanc
22、e within the time specified, shall promptly notify the Party, set a date.However, the employer shall recognize the process or project completion date.Article VIII: Other MattersPartymust be provided by the property management department approved floor plan and water, electricity, gas line diagram, o
23、r by the Party plans to provide housing, water, electricity, gas and road map to the B-site disclosure.the second decoration, should be vacated or partly vacated all the houses, clear the impact of the construction of the barrier.Only some of the houses vacated by the retention of the furniture, fur
24、nishings, etc., shall take the necessary protective measures are required to complete the formalities with Party B, and bear the cost.if they really need to demolition, change of the original building structure or equipment, pipelines, local housing authorities should complete the formalities and be
25、ar the costs.For the construction of the temporary use of public position, lay the neighborhood should call.BAssign (name )the representative for the B site is responsible for contract performance, according to the construction contract requires the organization, quality and quantity on schedule to
26、complete the construction tasks.Responsible for the safety of the construction site to prevent fire, wear certificates for employment, civil construction, and to prevent blockage caused by construction of the pipeline, leakage of water, power outages, damage items such as accident and influence othe
27、rs.In case, must be responsible for repair or compensation as quickly as possible.Strictly perform the contract, the implementation of credit period.In the construction and decoration within the warranty assumes liability, warranty and acceptance into the Party since the completion date of complianc
28、e for 12 months.Article IX: breach of contractContract after the commencement of the contract period of performance, the unauthorized party to terminate the contract shall be 5% of the total contract amount as liquidated damages paid to each other.Due to unauthorized termination of the contract, the
29、 actual loss caused by the other party more than the damages, should be compensated.Article: Dispute Resolutionthe performance of the contract, the two sides, such as a dispute, without prejudice to the premise of progress, both sides should be resolved through consultation.Or by this contract and t
30、he receipt issued by Party B to the Association of Foshan City, home decorating interior decoration Committee of complaints for a solution.the parties do not want to through consultation, mediation, or negotiation, mediation can not be reached, in accordance with this contract to - the arbitration committee for arbitration; - the peoples court proceedings.Article XI: change and termination of contractsAfter the commencement of the contract signed by both parties, both parties must be strictly adhered t
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 合同終止訴訟書范例大全
- 承包合同補充協(xié)議范本
- 9《古代科技耀我中華》(教學設計)-部編版道德與法治五年級上冊
- 餐飲空間設計合同范本
- 寧波建設用地使用權出讓合同范本
- 涉外企業(yè)外匯借款合同范本
- 裝修工程合同家庭居室版
- 8《同學相伴》教學設計-2024-2025學年道德與法治三年級上冊統(tǒng)編版
- 6 將相和 第一課時 教學設計-2024-2025學年語文五年級上冊統(tǒng)編版
- 車輛借用合同書
- 2025年02月黃石市殘聯(lián)專門協(xié)會公開招聘工作人員5人筆試歷年典型考題(歷年真題考點)解題思路附帶答案詳解
- 2024-2025學年第二學期開學典禮-開學典禮校長致辭
- 網(wǎng)絡保險風險評估-洞察分析
- 2025-2030年中國旅居康養(yǎng)行業(yè)全國市場開拓戰(zhàn)略制定與實施研究報告
- 食品檢驗員聘用合同樣本
- 六年級信息技術下冊教學計劃
- 2025年九年級數(shù)學中考復習計劃
- 《汽車專業(yè)英語》2024年課程標準(含課程思政設計)
- 《物料擺放規(guī)范》課件
- 2024年資助政策主題班會課件
- 《煙花效果及制作》課件
評論
0/150
提交評論