版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
1、上 海 市建筑和裝飾工程程預(yù)算定額工程量計(jì)算規(guī)則則(2000)上海市建設(shè)工程程定額管理總總站目 錄TOC o 1-1 h z u HYPERLINK l _Toc195750441 總 則 PAGEREF _Toc195750441 h 3 HYPERLINK l _Toc195750442 建筑面積計(jì)算規(guī)規(guī)則 PAGEREF _Toc195750442 h 4 HYPERLINK l _Toc195750443 第一章 土方方 PAGEREF _Toc195750443 h 5 HYPERLINK l _Toc195750444 第二章 打樁樁 PAGEREF _Toc195750444 h
2、 7 HYPERLINK l _Toc195750445 第三章 砌 筑 PAGEREF _Toc195750445 h 9 HYPERLINK l _Toc195750446 第四章 砼及及鋼砼 PAGEREF _Toc195750446 h 12 HYPERLINK l _Toc195750447 第五章 鋼砼砼及金屬結(jié)構(gòu)構(gòu)件駁運(yùn)、安安裝 PAGEREF _Toc195750447 h 17 HYPERLINK l _Toc195750448 第六章 門窗窗及木結(jié)構(gòu) PAGEREF _Toc195750448 h 18 HYPERLINK l _Toc195750449 第七章 樓 地 面
3、 PAGEREF _Toc195750449 h 19 HYPERLINK l _Toc195750450 第八章 屋面面及防水 PAGEREF _Toc195750450 h 20 HYPERLINK l _Toc195750451 第九章 防腐腐、保溫、隔隔熱 PAGEREF _Toc195750451 h 22 HYPERLINK l _Toc195750452 第十章 裝 飾 PAGEREF _Toc195750452 h 22 HYPERLINK l _Toc195750453 第十一章 金金屬結(jié)構(gòu)制作作及附屬工程程 PAGEREF _Toc195750453 h 27 HYPERL
4、INK l _Toc195750454 第十二章 建建筑物超高降降效及建筑物物(構(gòu)筑物)垂垂直運(yùn)輸 PAGEREF _Toc195750454 h 27 HYPERLINK l _Toc195750455 第十三章 腳腳手架 PAGEREF _Toc195750455 h 28總 則一、本工程量計(jì)計(jì)算規(guī)則為本本市統(tǒng)一的建建筑和裝飾工工程預(yù)結(jié)算工工程量計(jì)算規(guī)規(guī)則。二、本規(guī)則適用用于本市行政政區(qū)域范圍內(nèi)內(nèi)的工業(yè)與民民用建筑及構(gòu)構(gòu)筑物施工圖圖設(shè)計(jì)階段編編制工程預(yù)算算及工程量清清單,也適用用于工程設(shè)計(jì)計(jì)變更后的工工程量計(jì)算。本規(guī)則則與上海市市建筑和裝飾飾工程預(yù)算定定額相配套套,作為確定定建筑和裝飾飾工
5、程造價(jià)及及其消耗量的的依據(jù)。三、工程量計(jì)算算除依據(jù)上上海市建筑和和裝飾工程預(yù)預(yù)算定額及及本規(guī)則各項(xiàng)項(xiàng)規(guī)定除外,尚尚應(yīng)依據(jù)以下下文件:1經(jīng)審定的施施工圖設(shè)計(jì)圖圖紙及其說明明;2經(jīng)審定的施施工組織設(shè)計(jì)計(jì)或施工技術(shù)術(shù)措施方案;3經(jīng)審定的其其他有關(guān)技術(shù)術(shù)經(jīng)濟(jì)文件。四、本規(guī)則的計(jì)計(jì)算尺寸,以以設(shè)計(jì)圖紙表表示的尺寸或或設(shè)計(jì)圖紙能能讀出的尺寸寸為準(zhǔn)。除另另有規(guī)定外,工工程量的計(jì)量量單位應(yīng)按以以下規(guī)定計(jì)算算:1以體積計(jì)算算的為立方米米(m3);2以面積計(jì)算算的為平方米米(m2);3以長度計(jì)算算的為米(mm);4以重量計(jì)算算的為噸或千千克(t或kkg);5以件(個(gè)或或組)計(jì)算的的為件(個(gè)或或組)。五、匯總工程量
6、量時(shí),其準(zhǔn)確確度取值:立方米、平方米米、米取兩位位;噸取三位位;千克、件件等取整數(shù)。建筑面積計(jì)算規(guī)規(guī)則計(jì)算建筑面積的的范圍 一、單層建筑筑物不論其高高度如何,均均按一層計(jì)算建筑筑面積。其建建筑面積按建建筑物外墻勒勒腳以上結(jié)構(gòu)構(gòu)的外圍水平平面積計(jì)算。單層建筑物內(nèi)設(shè)有部分樓層者,首層建筑面積已包括在單層建筑物內(nèi),二層及二層以上應(yīng)計(jì)算建筑面積。高低聯(lián)跨的單層建筑物,需分別計(jì)算建筑面積時(shí),應(yīng)以結(jié)構(gòu)外邊線為界分別計(jì)算。二、多層建筑物物建筑面積,按按各層建筑面面積之和計(jì)算算,其首層建筑面積積按外墻勒腳腳以上結(jié)構(gòu)的的外圍水平面面積計(jì)算,二層及二層以上按外墻結(jié)構(gòu)構(gòu)的外圍水平面面積計(jì)算。三、同一建筑物物如結(jié)構(gòu)、
7、層層數(shù)不同時(shí)、應(yīng)應(yīng)分別計(jì)算建建筑面積。四、地下室、半半地下室、地地下車間、倉倉庫、商店、車車站、地下指指揮部等及相應(yīng)的出入口建筑面面積,按其上上口外墻(不不包括采光井井、外墻防潮潮層及其保護(hù)護(hù)墻)外圍水水平面積計(jì)算算。五、建于坡地的的建筑物利用用吊腳空間設(shè)置置架空層和深基礎(chǔ)地下架空層設(shè)設(shè)計(jì)加以利用用時(shí),其層高超過2.200m,按圍護(hù)護(hù)結(jié)構(gòu)外圍水水平面積計(jì)算算建筑面積。六、穿過建筑物物的通道,建建筑物的門廳廳、大廳,不不論其高度如如何均按一層層計(jì)算建筑面面積。門廳、大大廳內(nèi)設(shè)有回回廊時(shí),按其其自然層的水平平投影面積計(jì)算算建筑面積。七、室內(nèi)樓梯間間、電梯井、提提物井、垃圾圾道、管道井井等均按建筑物
8、物的自然層的的水平投影面面積計(jì)算建筑筑面積。八、書庫、立體體倉庫設(shè)有結(jié)結(jié)構(gòu)層的,按按結(jié)構(gòu)層計(jì)算算建筑面積,沒有結(jié)結(jié)構(gòu)層的,按按承重書架層層或貨架層計(jì)計(jì)算建筑面積積。九、有圍護(hù)結(jié)構(gòu)構(gòu)的舞臺燈光光控制室,按按其圍護(hù)結(jié)構(gòu)構(gòu)外圍水平面面積乘以層數(shù)數(shù)計(jì)算建筑面積積。十、建筑物內(nèi)設(shè)設(shè)備管道層、儲儲藏室其層高高超過2.22米時(shí),應(yīng)計(jì)計(jì)算建筑面積積。十一、有柱的雨雨蓬、車棚、貨貨棚、站臺等等,按其外圍圍水平面積計(jì)計(jì)算建筑面積積;獨(dú)立柱的的雨蓬、單排排柱的車棚、貨貨棚、站臺等等,按其頂蓋蓋水平投影面面積的一半計(jì)計(jì)算建筑面積積。十二、屋面上部部有圍護(hù)結(jié)構(gòu)構(gòu)的樓梯間、水水箱間、電梯梯機(jī)房等,按按圍護(hù)結(jié)構(gòu)外外圍水平面
9、積積計(jì)算建筑面面積。十三、建筑物外外有圍護(hù)結(jié)構(gòu)構(gòu)的門斗、眺眺望間、觀光光電梯間、陽陽臺、櫥窗、挑廊、走廊等,按其圍護(hù)結(jié)構(gòu)水平面積計(jì)算建筑面積。十四、建筑物外外有柱和頂蓋蓋的走廊、檐檐廊,按其外外圍水平面積積計(jì)算建筑面面積;有蓋無無柱的走廊、檐檐廊挑出墻外外寬度在1.5米以上時(shí)時(shí),按其頂蓋蓋投影面積一一半計(jì)算建筑筑面積。無圍圍護(hù)結(jié)構(gòu)的凹凹陽臺、挑陽陽臺,按其水水平面積一半半計(jì)算建筑面面積。建筑物物建有頂蓋的架架空走廊,按按其頂蓋水平平投影面積計(jì)計(jì)算建筑面積積。十五、室外樓梯梯按自然層投投影面積之和和計(jì)算建筑面面積。十六、建筑物內(nèi)內(nèi)變形縫、沉沉降縫等,凡凡縫寬在3000毫米以內(nèi)內(nèi)者,均按其其縫寬按
10、自然然層計(jì)算建筑筑面積,并入入建筑物建筑筑面積之內(nèi)計(jì)計(jì)算。不計(jì)算建筑面積積的范圍一、突出外墻的的構(gòu)件、配件件、附墻柱、垛垛、勒腳、臺臺階、懸挑雨雨蓬、墻面抹抹灰、鑲貼塊塊材、裝飾面面等。二、用于檢修、消消防等室外爬爬梯。三、層高2.22米以內(nèi)設(shè)備備管道層、儲儲藏室、設(shè)計(jì)計(jì)不利用的深深基礎(chǔ)架空層層及吊腳架空空層。四、建筑物內(nèi)操操作平臺、上上料平臺、安安裝箱或罐體體平臺;沒有有圍護(hù)結(jié)構(gòu)的的屋頂水箱、花花架、涼棚等等。五、獨(dú)立煙囪、煙煙道、地溝、油油(水)罐、氣氣柜、水塔、儲儲油(水)池池、儲倉、棧棧橋、地下人人防通道等構(gòu)構(gòu)筑物。六、單層建筑物物內(nèi)分隔單層層房間,舞臺臺及后臺懸掛掛的幕布、布布景天橋
11、、挑挑臺。七、建筑物內(nèi)寬寬度大于3000毫米的變變形縫、沉降降縫。其他一、建筑物與構(gòu)構(gòu)筑物連接成成一體的,屬屬建筑物部分分按本規(guī)則前前二部分之規(guī)規(guī)則計(jì)算。二、本規(guī)則適用用于地上、地地下建筑物的的建筑面積計(jì)計(jì)算,如遇有有上述未盡事事宜,可參照照上述規(guī)則辦辦理。第一章 土方方一、土方工程量量計(jì)算一般規(guī)規(guī)則:1.土方體積均均以挖掘前的的天然密實(shí)體體積為準(zhǔn)計(jì)算算。如需以天天然密實(shí)體積積折算時(shí),按按下表所列系系數(shù)換算。土方體積折算表表虛方體積天然密實(shí)體積夯實(shí)后體積松填體積1.001.301.501.200.771.001.150.920.670.871.000.800.831.081.251.002.挖
12、土以設(shè)計(jì)計(jì)室外地坪標(biāo)標(biāo)高為準(zhǔn)。挖挖土深度按圖圖示槽、坑底底至設(shè)計(jì)室外外地坪計(jì)算。二、挖地槽、地地坑、土方工工程量,按下下列規(guī)定計(jì)算算:1.地槽、地坑坑、土方的劃劃分:凡圖示槽底寬在在3米以內(nèi),且且槽長大于槽槽寬三倍以上上的為地槽。凡圖示坑底面積積在20平方方米以內(nèi)的為為地坑。凡圖示槽底寬在在3米以外,坑坑底面積在220平方米以以外,平整場場地挖土方厚厚度在3000毫米以外,均均按挖土方計(jì)計(jì)算。2.挖地槽長度度:外墻按圖圖示中心線長長度計(jì)算,內(nèi)內(nèi)墻按圖示基基礎(chǔ)底面間凈長(不是墊墊層邊)計(jì)算算,內(nèi)外突出出部分(垛、附附墻煙囪等)體體積并入地槽槽土方工程量量內(nèi)計(jì)算。3.挖地坑以圖圖示尺寸的體體積計(jì)算
13、。4.挖管道、溝溝槽長度按圖圖示尺寸(包包括檢查井)計(jì)計(jì)算,寬度按按設(shè)計(jì)規(guī)定計(jì)計(jì)算,如設(shè)計(jì)計(jì)無規(guī)定時(shí)可可按下表計(jì)算算。各種檢查查井和排水管管道接口等處處,因加寬而而增加的工程程量均不計(jì)算算,但鋪設(shè)鑄鑄鐵給水管道道時(shí),接口處處的土方工程程量應(yīng)按鑄鐵鐵管道溝槽全全部土方工程程量增加2.5%計(jì)算。管、溝底寬度尺尺寸表單位:米管徑(毫米)鑄鐵管、鋼管PPPVC-U管50750.6010020000.700.9025035000.801.0040045001.001.3050060001.3070080001.60900100001.801100122002.001300144002.20(人工挖土已包
14、包括濕土排水水,1米內(nèi)定額不不考慮排水)三、人工平整場場地為建筑場場地就地挖、填填土方厚度在在300毫米米以內(nèi)及找平平。平整場地地工程量按建建筑物或構(gòu)筑筑物底面積的的外邊線,每每邊各加2米米以平方米計(jì)計(jì)算。四、放坡及支擋擋土板,按下下列規(guī)定計(jì)算算:1.挖地槽、地地坑、土方需需放坡時(shí),按按下表計(jì)算放放坡系數(shù)(放放坡起點(diǎn)為基基坑底):名 稱挖土深度(米以以內(nèi))放坡系數(shù)挖 土1.5挖 土2.51:0.5挖 土3.51:0.7挖 土5.01:1.0采用井點(diǎn)降水不分深度1:0.52.計(jì)算放坡和和支擋土板挖挖土?xí)r,在交交接處所產(chǎn)生生的重復(fù)工程程量不予扣除除。3.擋土板工程程量按垂直投投影面積計(jì)算算。4.凡
15、放坡部分分不得計(jì)算擋擋土板工程量量。支擋土板板或打鋼板樁樁等各類圍護(hù)護(hù)措施部分不不得計(jì)算放坡坡工程量。五、基礎(chǔ)施工所所需工作面按按下表計(jì)算:名 稱每邊增加工作面面寬度(毫米米)磚 基 礎(chǔ)礎(chǔ)200漿砌毛石、條石石基礎(chǔ)150混凝土基礎(chǔ)、墊墊層支模300地下室底板800地下室埋深超33米以上1800注:挖溝槽、基基坑需支擋土土板時(shí),其寬寬度按圖示溝溝槽、基坑底底寬每邊增加加100毫米米計(jì)算。六、機(jī)械挖有樁樁基土方時(shí),分分別按1米(混凝土樁樁)、0.55米(鋼管樁樁)、3米(鉆孔灌灌注混凝土樁樁)乘以基坑坑底面積以立立方米計(jì)算(若有放坡按按放坡計(jì)算規(guī)規(guī)則)。七、回填土按夯夯填和松填分分別按下列規(guī)規(guī)定以
16、立方米米計(jì)算。1、回填土體積積=挖土體積積-設(shè)計(jì)室外外地坪以下埋埋設(shè)的實(shí)物體體積(包括地地下室所占的的外形體積)。2、管道溝槽的的回填土,管管徑500毫毫米以內(nèi)時(shí)不不扣除管道所所占體積。3、室內(nèi)回填土土按主墻間的的凈面積乘以以回填土厚度度以立方米計(jì)計(jì)算。、4、余土或取土土的工程量按按下列方法計(jì)計(jì)算:余土運(yùn)輸體積=挖土量-回回填土量式中計(jì)算結(jié)果正正值時(shí)為余土土外運(yùn)體積;負(fù)值時(shí)為需需取土體積。八、場地機(jī)械平平整、碾壓按按以下規(guī)定計(jì)計(jì)算:1、原土碾壓按按圖示尺寸以以平方米計(jì)算算。2、填土碾壓按按圖示尺寸以以立方米計(jì)算算。九、機(jī)械土方運(yùn)運(yùn)距按下列方方法計(jì)算:1、推土機(jī)運(yùn)距距:按挖方區(qū)區(qū)重心至填方方區(qū)重
17、心直線線距離計(jì)算。2、鏟運(yùn)機(jī)運(yùn)距距:按鏟土區(qū)區(qū)重心至卸土土區(qū)重心加轉(zhuǎn)轉(zhuǎn)向距離455米計(jì)算。3、自卸汽車運(yùn)運(yùn)土:按挖方方區(qū)重心至填填方區(qū)(堆放放地點(diǎn))重心心之間的最短短行駛距離計(jì)計(jì)算。十、基坑鋼管支支撐工程量按按鋼管重量以以噸計(jì)算。1、鋼管支撐中中的十字接頭頭、活絡(luò)接頭頭、鋼箱梁圍圍令、H型鋼鋼圍令及為加加強(qiáng)基坑鋼管管支撐穩(wěn)定性性而設(shè)置的八八字斜撐分別別按其重量并并入鋼管支撐撐。2、地下鋼管支支撐和鋼圍令令安裝時(shí)所需需的包箍鐵件件及擱置點(diǎn)所所用鐵件按其其重量套用零零星鐵件定額額。十二、余樁在00.5米以內(nèi)內(nèi)為鑿樁,00.5米以外外為截樁;截截(鑿)混凝凝土樁均按實(shí)實(shí)際截(鑿)的的根數(shù)計(jì)算。十三、
18、基坑降水水工程量按以以下規(guī)定計(jì)算算:1、基坑明排水水按每口井(指指集水井)計(jì)計(jì)算;集水井井抽水按每口口井*天計(jì)算算。(基坑開開挖之日起至至回土日)2、輕型井點(diǎn)、噴噴射井點(diǎn)分不不同深度,井井管的安裝、拆拆除以根計(jì)算算;井管的使使用以套、天天計(jì)算。3、真空深井泵泵降水分不同同深度,安裝裝、拆除以每每口井計(jì)算,使使用以每口井井*天計(jì)算。4、井點(diǎn)套組成成:輕型井點(diǎn)按500根以內(nèi)為一一套;噴射井井點(diǎn)按30根根以內(nèi)為一套套。井管間距距應(yīng)根據(jù)地質(zhì)質(zhì)條件和施工工降水要求,依依據(jù)施工組織織設(shè)計(jì)確定。無無規(guī)定時(shí)可按按輕型井點(diǎn)管管距0.81.6米,噴射射井點(diǎn)管距223米確定定。5、井點(diǎn)、井管管的使用應(yīng)以以每晝夜24
19、4小時(shí)為一天天,使用天數(shù)數(shù)按施工組織織設(shè)計(jì)規(guī)定的的天數(shù)計(jì)算。十四、逆作法施施工:1、人工暗挖、手手推車運(yùn)土、反反鏟暗挖、龍龍門架取土均均按土方體積積計(jì)算。高度:地下室墊墊層底至地下下室暗挖首層層板底;面積:地下室連連續(xù)墻內(nèi)側(cè)水水平面積。2、砼墊層鑿除除按設(shè)計(jì)圖紙紙以體積計(jì)算算。3、樁柱、復(fù)合合墻:砼:按施工方案案以體積計(jì)算算;模板:按設(shè)計(jì)圖圖砼接觸面計(jì)計(jì)算;鋼筋:按施工圖圖及操作規(guī)范范按噸計(jì)算。5、樁、柱、連連續(xù)墻表面鑿鑿除按實(shí)際鑿鑿除面積以平平方米計(jì)算。第二章 打樁樁一、打、壓預(yù)制制鋼筋混凝土土方樁、管樁樁、短樁均按按設(shè)計(jì)樁長(不扣除樁尖虛體積)乘以樁截面面積以立方米計(jì)算。應(yīng)扣除管樁的空心體
20、積。如管樁的空心部分按設(shè)計(jì)要求灌注混凝土或其他填充材料時(shí),應(yīng)另行計(jì)算。(預(yù)制樁吊運(yùn)距離大于1Km時(shí),按實(shí)際發(fā)生路線長度計(jì)算)二、接樁按設(shè)計(jì)計(jì)圖紙要求以以個(gè)計(jì)算。三、送樁按各類類預(yù)制樁截面面面積乘以送送樁長度(設(shè)設(shè)計(jì)樁頂面至至自然地坪面面加0.5米米)以立方米米計(jì)算。送樁樁如需填料時(shí)時(shí),按第七章章樓地面墊層層定額子目計(jì)計(jì)算。四、打、拔鋼板板樁按施工組組織設(shè)計(jì)長度度及鋼板樁單單位重量以噸噸計(jì)算。安、拆拆導(dǎo)向夾具按按水平延長米米計(jì)算。(鋼鋼板樁未包括括錨固費(fèi)用)五、鋼管樁按設(shè)設(shè)計(jì)長度(設(shè)設(shè)計(jì)樁頂至樁樁底標(biāo)高)、管管徑、壁厚以以噸計(jì)算。1、計(jì)算公式:W=(D-t)t0.02446L1000W(Dt)*
21、 t * 3.14415/100000 * LL * 7.85 /110002、D:鋼管樁樁直徑(毫米米)W:鋼管樁樁重量(噸)L:鋼管樁長度度(米)t:鋼管樁樁壁厚(毫米米)2、鋼管樁內(nèi)切切割按根計(jì)算算;精割蓋帽帽按只計(jì)算。3、接樁按只計(jì)計(jì)算。六、就地灌注混混凝土樁、砂砂樁按設(shè)計(jì)樁樁長(不扣除除樁虛體積)乘乘以設(shè)計(jì)截面面面積以立方方米計(jì)算。1、多次復(fù)打樁樁按單樁體積積乘以復(fù)打次次數(shù)計(jì)算工程程量。2、設(shè)計(jì)采用鋼鋼筋籠時(shí),按按設(shè)計(jì)圖示尺尺寸及施工規(guī)規(guī)范以噸計(jì)算算,套用混凝凝土鉆孔灌注注樁鋼筋籠定定額子目。七、鉆孔灌注混混凝土樁按下下列規(guī)定計(jì)算算:1、混凝土按設(shè)設(shè)計(jì)樁長(以以設(shè)計(jì)樁頂標(biāo)標(biāo)高至樁底標(biāo)
22、標(biāo)高加0.225米)乘以以設(shè)計(jì)截面面面積以立方米米計(jì)算。2、成孔按設(shè)計(jì)計(jì)室外地坪標(biāo)標(biāo)高至樁底標(biāo)標(biāo)高乘以設(shè)計(jì)計(jì)截面面積以以立方米計(jì)算算。3、泥漿外運(yùn)按按成孔部分的的體積以立方方米計(jì)算。4、鋼筋籠按圖圖示尺寸及施施工規(guī)范以噸噸計(jì)算。八、塑料排水板板按垂直設(shè)計(jì)計(jì)長度以米計(jì)計(jì)算。九、樹根樁按設(shè)設(shè)計(jì)截面乘以以設(shè)計(jì)長度以以立方米計(jì)算算。十、壓密注漿鉆鉆孔按設(shè)計(jì)圖圖示深度以米米計(jì)算,其注注漿按下列規(guī)規(guī)定以立方米米計(jì)算:1、設(shè)計(jì)圖紙明明確加固土體體體積的,按按設(shè)計(jì)圖紙注注明的體積計(jì)計(jì)算。2、設(shè)計(jì)圖紙以以布點(diǎn)形式圖圖示土體加固固范圍的,則則按兩孔間的的一半作為擴(kuò)擴(kuò)散半徑,以以節(jié)點(diǎn)邊線各各加擴(kuò)散半徑徑,形成計(jì)算算
23、平面計(jì)算注注漿體積。3、如設(shè)計(jì)圖紙紙注漿點(diǎn)在鉆鉆孔灌注混凝凝土樁之間,按按兩注漿孔距距作為每孔的的擴(kuò)散直徑,以以此圓柱體體體積計(jì)算注漿漿體積。十一、深層攪拌拌樁按樁設(shè)計(jì)計(jì)截面面積乘乘以樁長以立立方米計(jì)算。樁樁長按下列規(guī)規(guī)定計(jì)算:1、圍護(hù)樁樁長長按設(shè)計(jì)樁長長計(jì)算。2、承重樁樁長長按設(shè)計(jì)樁頂頂高度加4000毫米。3、空攪按設(shè)計(jì)計(jì)室外地坪至至樁頂長度計(jì)計(jì)算。十二、高壓旋噴噴樁按下列規(guī)規(guī)定計(jì)算:1、成孔按設(shè)計(jì)計(jì)室外地坪至至樁底垂直長長度以延長米米計(jì)算。2、噴漿按設(shè)計(jì)計(jì)加固樁截面面面積乘以設(shè)設(shè)計(jì)樁長以立立方米計(jì)算。十三、打樁工程程場地處理按按打樁部位的的上層建筑面面積乘以下表表系數(shù)以平方方米計(jì)算。打樁部
24、位上層建建筑面積增 加 系 數(shù)數(shù)1800m2以以內(nèi)1.674000m2以以內(nèi)1.378000m2以以內(nèi)1.2610000m22以內(nèi)1.21各類板樁按樁頂頂延長米乘以以6.7米以平平方米計(jì)算。十四、地下連續(xù)續(xù)墻工程量按按下列規(guī)定計(jì)計(jì)算:1、液壓成槽按按計(jì)算深度(設(shè)設(shè)計(jì)室外地坪坪至連續(xù)墻墻墻底加0.55米)乘以地地下連續(xù)墻設(shè)設(shè)計(jì)長度及墻墻厚以立方米米計(jì)算。2、鋼筋網(wǎng)片按按施工圖紙及及施工規(guī)范以以噸計(jì)算。3、鋼平臺按施施工組織設(shè)計(jì)計(jì)以噸計(jì)算。4、導(dǎo)墻拆除、清清底置換、接接頭管安、拔拔分別按槽段段以段計(jì)算。5、混凝土按設(shè)設(shè)計(jì)長度乘以以墻厚及墻深深加0.5米米以立方米計(jì)計(jì)算。第三章 砌 筑一、基礎(chǔ)與墻身
25、身的劃分以設(shè)設(shè)計(jì)室內(nèi)地坪坪(0.0000)為界,設(shè)設(shè)計(jì)室內(nèi)地坪坪以下為基礎(chǔ)礎(chǔ),以上為墻墻身。磚砌圍圍墻以設(shè)計(jì)室室外地坪為界界。二、磚基礎(chǔ)以立立方米計(jì)算,大大放腳面積按按附表二計(jì)算算,磚砌地籠籠墻的體積,并并入磚基礎(chǔ)內(nèi)內(nèi)。1、磚基礎(chǔ)長度度,外墻墻基基按外墻中心心線,內(nèi)墻墻墻基按內(nèi)墻凈凈長計(jì)算。2、磚基礎(chǔ)的TT形接頭重疊疊部位、嵌入入磚基礎(chǔ)的鋼鋼筋、鐵件、管管子、基礎(chǔ)防防潮層及每個(gè)個(gè)面積在0.3平方米以以內(nèi)的孔洞所所占體積均不不扣除,靠墻墻設(shè)置暖氣溝溝的挑磚亦不不增加。3、磚基礎(chǔ)中應(yīng)應(yīng)扣除鋼筋混混凝土柱、過過梁、圈梁及及面積在0.3平方米以以上的孔洞做做占體積。三、磚砌墻體應(yīng)應(yīng)按砌體的不不同砌筑部
26、位位、用材及厚厚度按體積以以立方米計(jì)算算。墻體的計(jì)計(jì)算厚度詳見見附表一。1、磚砌墻體應(yīng)應(yīng)扣除門窗洞洞口、過人洞洞、空圈、每個(gè)面面積在0.33平方米以上上的孔洞、嵌嵌入墻體內(nèi)的的鋼筋混凝土土柱、梁、過過梁、圈梁、暖暖氣包、壁龕龕所占的體積積。2、磚砌墻體不不扣除梁頭、外墻板頭、木楞頭、沿椽木、木磚、門窗走頭、砌體內(nèi)的加固鋼筋、木筋、鐵件所占的體積。3、磚砌墻體不不增加突出墻墻面的磚砌窗窗臺、壓頂線線、山墻泛水水、煙囪根、門門窗套、三皮皮磚以下的腰腰線、挑檐等等體積。4、磚垛、三皮皮磚以上的挑挑檐、磚砌腰腰線的體積,并并入所依附的的墻身體積內(nèi)內(nèi)計(jì)算。5、附墻煙囪(包包括附墻通風(fēng)風(fēng)道、垃圾道道)、采
27、暖、鍋鍋爐煙囪按其其外形體積計(jì)計(jì)算,并入所所依附的墻身身體積內(nèi),不不扣除橫斷面面積在0.11平方米以內(nèi)內(nèi)的孔洞所占占體積,孔洞洞內(nèi)的抹灰工工料亦不增加加。四、墻身長度,外外墻按墻中心心線,內(nèi)墻按按墻間凈長計(jì)計(jì)算;嵌砌內(nèi)內(nèi)、外墻均按按凈長計(jì)算;山尖按設(shè)計(jì)計(jì)寬度計(jì)算。五、墻身高度按按下列規(guī)定計(jì)計(jì)算:1、平屋面外墻墻帶有挑檐口口者,高度算算至屋面結(jié)構(gòu)構(gòu)板面;帶有有女兒墻者,高高度算至女兒兒墻壓頂面。2、坡屋面外墻墻無檐口天棚棚者,高度算算至屋面板底底;有檐口天天棚者,高度度算至屋架下下弦底加2000毫米。3、山墻山尖按按平均高度計(jì)計(jì)算。4、內(nèi)墻位于屋屋架下面,高高度算至屋架架底;無屋架架者,高度算算
28、至天棚底加加100毫米米;有樓隔層層者,高度算算至樓板底;有框架梁時(shí)時(shí),高度算至至梁底。六、磚柱不分柱柱身和柱基,合合并按體積以以立方米計(jì)算算。柱基大放放腳按附表三三計(jì)算。七、空花墻按空空花部分外形形體積以立方方米計(jì)算,不不扣除空隙部部分體積。若若有實(shí)砌連接接,實(shí)體部分分套用相應(yīng)墻墻體定額子目目。八、高強(qiáng)石膏空空心板、砂加加氣混凝土砌砌塊、加氣混混凝土砌塊(已包括第一一皮磚的1:3水泥砂漿漿)、混凝土小小型空心砌塊塊墻,均按砌砌塊厚度以立立方米計(jì)算。(混凝土空心小小型砌塊:芯芯柱及孔洞灌灌砼均未包括括,芯柱按構(gòu)構(gòu)造柱子目執(zhí)執(zhí)行;零星孔孔灌砼按零星星構(gòu)件;作為為圈梁砌塊灌灌砼,按圈梁梁計(jì))九、G
29、RC輕質(zhì)質(zhì)墻板、ACC板(已包括括墻板底細(xì)石石砼座漿)、彩彩鋼夾芯板分分別按圖示尺尺寸,分不同同厚度以平方方米計(jì)算。(彩彩鋼夾芯板:已包括外墻墻門斗、雨蓬蓬不再重計(jì);門框鋁或窗窗框鋁已包括括)十、磚煙囪:1、磚基礎(chǔ)與磚磚筒身以磚基基礎(chǔ)大放腳的的擴(kuò)大頂面為為界。磚基礎(chǔ)礎(chǔ)以下的鋼筋筋混凝土及混混凝土底板,按按第四章相應(yīng)應(yīng)子目計(jì)算。2、煙囪筒身不不論圓形、方方形均按定額額以實(shí)體積計(jì)計(jì)算,磚煙囪囪應(yīng)扣除鋼筋筋混凝土圈梁梁、過梁等所所占體積。磚磚煙囪的鋼筋筋混凝土梁和和過梁,按第第四章的相應(yīng)子目計(jì)計(jì)算。3、煙囪筒身原原漿勾縫和煙煙囪帽抹灰,已已包括在定額額內(nèi)。如設(shè)計(jì)計(jì)規(guī)定加漿勾勾縫者,按第第十章的勾縫縫
30、定額計(jì)算,原原漿勾縫的工工料不予扣除除。4、煙囪內(nèi)襯按按不同材種以以實(shí)體積計(jì)算算,應(yīng)扣除孔孔洞所占的體體積。5、填料按煙囪囪筒身與內(nèi)襯襯之間的體積積計(jì)算,應(yīng)扣扣除空洞所占占的體積,但但不扣除連接接橫磚(防沉沉帶)的體積積,填料及內(nèi)內(nèi)襯伸入筒身身的連接橫磚磚所需的人工工,以包括在在內(nèi)襯定額內(nèi)內(nèi)。6、煙道磚砌煙道與爐體的劃劃分,以第一一道閘門為準(zhǔn)準(zhǔn),在爐體內(nèi)內(nèi)的煙道應(yīng)列列入爐體工程程量內(nèi)。7、煙道中的鋼鋼筋混凝土構(gòu)構(gòu)件,按第四四章的相應(yīng)子子目計(jì)算。8、磚煙囪、煙煙道及其磚內(nèi)內(nèi)襯,如設(shè)計(jì)計(jì)要求加工楔楔形磚時(shí),其其數(shù)量應(yīng)按施施工組織設(shè)計(jì)計(jì)規(guī)定的數(shù)量量,按磚加工工子目計(jì)算。十一、磚(石)貯水池按實(shí)體積計(jì)
31、算。十二、零星砌體體、毛石砌擋擋土墻按實(shí)砌砌體積以立方方米計(jì)算。(零零星砌體:磚磚砌廁所蹲臺臺、水槽腳、垃垃圾箱、燈箱箱、臺階、臺臺階擋墻或梯梯帶、花臺、花花池、屋面架架空隔熱層磚磚墩、屋面出出風(fēng)口等、砌砌塊或輕質(zhì)墻墻體下的三皮皮標(biāo)準(zhǔn)磚)十三、磚砌地溝溝不分壁厚均均以立方米計(jì)計(jì)算。十四、圍墻:基基礎(chǔ)、墻身、粉粉刷分別計(jì)算算,套相應(yīng)定定額。附表一磚砌墻體計(jì)算厚厚度 單單位:毫米墻體名稱1/41/2111/2221/23統(tǒng)一磚5311524036549061574020 孔多孔磚磚側(cè)砌90平砌11524036549061574017孔多孔磚90190290390490590三孔磚側(cè)砌115200附
32、表二磚墻基大放腳折折算高度及面面積表 單位平方米米大放腳層數(shù)各種墻基厚度的的折算高度(米米)大放腳面積(平方米)放腳形式0.1150.1800.2400.3650.4900.615一等高式0.1370.0870.0660.0430.0320.0260.015755間隔式0.1370.0870.0660.0430.0320.0260.015755二等高式0.4110.2620.1970.0130.0960.0770.047255間隔式0.3420.2190.1640.1080.0800.0640.039388三等高式0.8220.5250.3940.2690.1930.1540.094500間隔
33、式0.6850.4370.3280.2160.1610.1280.078755四等高式0.157間隔式0.126五等高式0.236間隔式0.189六等高式0.331間隔式0.260附表三磚柱基礎(chǔ)大放腳腳增加體積表表 單位位:立方米類型磚柱水平斷面放 腳 層層 數(shù)一層二層三層四層五層六層間隔式240*2400240*3655365*3655365*4900490*4900490*6155615*6155615*7400740*74000.0100.0120.0140.0150.0170.0190.0210.0230.0250.0280.0330.0380.0430.0480.0530.0570.
34、0620.0670.0620.0710.0810.0910.1010.1110.1210.1300.1400.1100.1260.1410.1570.1730.1890.2040.2200.2360.1790.2030.2270.2500.2740.2980.3210.3450.3680.2700.3020.3340.3670.4000.4320.4640.4970.529等高式240*2400240*3655365*3655365*4900490*4900490*6155615*6155615*7400740*74000.0100.0120.0140.0150.0170.0190.0210.
35、0230.0250.0330.0380.0440.0500.0560.0620.0680.0740.0800.0730.0850.0970.1080.1200.1320.1440.1560.1670.1350.1540.1740.1940.2130.2330.2530.2730.2920.2220.2510.2810.3100.3400.3690.3990.4290.4580.3380.3790.4210.4620.5030.5450.5860.6270.669第四章 砼及及鋼砼一、現(xiàn)澆混凝土土及鋼筋混凝凝土模板工程程量,除另有有規(guī)定者外,均均按混凝土與與模板接觸面面積以平方米米計(jì)算。1、杯芯
36、不分柱柱斷面大小均均按只計(jì)算。設(shè)設(shè)備基礎(chǔ)螺栓栓套按不同預(yù)預(yù)留深度按個(gè)個(gè)計(jì)算。2、現(xiàn)澆鋼筋混混凝土柱、墻墻支模高度(即即室外地坪至至板底或板面面至板底)為為3.6米以上上時(shí),另按超超過部分的工工程量計(jì)算。3、現(xiàn)澆鋼筋混混凝土墻、板板上單孔面積積在0.3平平方米以內(nèi)的的孔洞不予扣扣除,洞側(cè)壁壁模板亦不增增加;單孔面面積在0.33平方米以外外時(shí),應(yīng)予扣扣除,洞側(cè)壁壁模板面積并并入墻、板模模板工程量計(jì)計(jì)算。4、現(xiàn)澆鋼筋混混凝土框架分分別按現(xiàn)澆混混凝土柱、梁梁、板有關(guān)規(guī)規(guī)定計(jì)算。(框框架梁模板另另列;次梁模模板并入板內(nèi)內(nèi))(柱與墻墻、柱與梁、主主梁與次梁等等聯(lián)接的重疊部分以及及伸入墻內(nèi)的的梁頭、板頭頭部
37、分均不計(jì)計(jì)算的模板面積)5、附墻柱并入入混凝土墻體體工程量計(jì)算算。6、構(gòu)造柱外露露面積均按圖圖示外露部分分(包括馬牙牙楔)計(jì)算模模板面積,構(gòu)構(gòu)造柱與墻接接觸面不不計(jì)計(jì)算模板面積積。7、不同類型的的板連接時(shí),以以墻中心線為為界。8、弧形板不分分曲率大小,不不分有梁板、平平板,按圓弧弧部分的弓形形面積計(jì)算。如如為整圓、半半圓或橢圓形形時(shí)應(yīng)扣除內(nèi)內(nèi)接正方形或或矩形所占面面積。9、現(xiàn)澆鋼筋混混凝土懸挑板板(雨蓬、陽陽臺)按圖示示外挑部分的的水平投影面面積計(jì)算。挑挑出墻外的牛牛腿及板邊模模板不另計(jì)算算。10、現(xiàn)澆鋼筋筋混凝土欄板板按垂直投影影面積計(jì)算。(包括伸入墻面的)11、現(xiàn)澆鋼筋筋混凝土樓梯梯,以圖
38、示明明露面的水平平投影面積計(jì)計(jì)算,不扣除除小于5000毫米樓梯井井所占面積。樓樓梯的踏步、踏踏步板平臺梁梁等側(cè)面模板板不計(jì)算。12、現(xiàn)澆鋼筋筋混凝土臺階階不包括梯帶帶,按圖示尺尺寸的水平投投影面積計(jì)算算。臺階端頭頭兩側(cè)面不計(jì)計(jì)算模板面積積。13、暖氣電纜纜溝、門框、挑挑檐天溝、壓壓頂、零星構(gòu)構(gòu)件均按實(shí)體體積以立方米米計(jì)算。14、現(xiàn)澆鋼筋筋混凝土池槽槽按構(gòu)件外圍圍體積計(jì)算,池池槽內(nèi)、外側(cè)側(cè)及底部的模模板不另計(jì)算算。二、預(yù)制混凝土土模板工程量量,除另有規(guī)規(guī)定者外,均均按混凝土實(shí)實(shí)體積以平方方米計(jì)算。1、預(yù)制小型池池槽按外型體體積以立方米米計(jì)算。2、預(yù)制方樁樁樁尖按虛體積積(不扣除樁樁尖虛體積部部分
39、)計(jì)算。3、花飾漏窗、花花飾欄板按設(shè)設(shè)計(jì)外形面積積計(jì)算,不扣扣除空花部分分。4、地模按施工工組織設(shè)計(jì)以以平方米計(jì)算算。三、構(gòu)筑物工程程的模板工程程量,除另有有規(guī)定者外,分分別按現(xiàn)澆和和預(yù)制混凝土土模板的有關(guān)關(guān)規(guī)定計(jì)算。1、大型池槽、設(shè)設(shè)備基礎(chǔ)等分分別按基礎(chǔ)、墻墻、板、梁、柱柱等有關(guān)規(guī)定定計(jì)算。2、液壓滑升施施工的倒錐殼殼水塔塔身鋼鋼模板按混凝凝土體積以立立方米計(jì)算。3、預(yù)制倒錐殼殼水塔水箱模模板制作按不不同容積以立立方米計(jì)算;提升按不同同容積及其高高度以座計(jì)算算。4、化糞池及窨窨井分別按底底、壁、頂以以立方米計(jì)算算。四、鋼筋工程量量應(yīng)區(qū)別現(xiàn)澆澆、預(yù)制構(gòu)件件并根據(jù)構(gòu)件件的部位,分分別按設(shè)計(jì)圖圖紙
40、及施工規(guī)規(guī)范規(guī)定長度度乘以單位重重量以噸計(jì)算算。1、砌體內(nèi)的拉拉結(jié)鋼筋應(yīng)根根據(jù)設(shè)計(jì)規(guī)定定以噸計(jì)算。2、現(xiàn)澆鋼筋混混凝土構(gòu)件預(yù)預(yù)埋鐵件工程程量按設(shè)計(jì)圖圖示尺寸以噸噸計(jì)算。3、電焊接頭、錐錐螺紋鋼筋接接頭,冷壓套套管鋼筋接頭頭、電渣壓力力焊接頭按設(shè)設(shè)計(jì)圖紙或施施工規(guī)范規(guī)定定以個(gè)計(jì)算。4、后張法預(yù)應(yīng)應(yīng)力鋼絲束、鋼鋼絞線,按設(shè)設(shè)計(jì)規(guī)定的預(yù)預(yù)應(yīng)力鋼筋預(yù)預(yù)留孔道長度度,以噸計(jì)算算。預(yù)應(yīng)力鋼鋼筋預(yù)留孔道道長度在200米以內(nèi)時(shí),預(yù)預(yù)應(yīng)力鋼筋長長度增加1米米;孔道長度度在20米以上時(shí)時(shí),預(yù)應(yīng)力鋼鋼筋長度增加加1.8米計(jì)算算。5、地下室外墻墻板中的穿墻墻對拉螺栓需需增加止水鋼鋼片,按預(yù)埋埋鐵件計(jì)算。6、成型鋼筋制
41、制作損耗1.5%,安裝裝綁扎損耗11%。五、現(xiàn)澆、預(yù)制制混凝土和鋼鋼筋混凝土除除另有規(guī)定者者外,均按圖圖示尺寸實(shí)體體體積以立方方米計(jì)算。不不扣除鋼筋、預(yù)預(yù)埋鐵件和螺螺栓所占體積積??招臉?gòu)件件均應(yīng)扣除空空心部分體積積,按實(shí)體體體積計(jì)算。1、設(shè)在樓層上上的設(shè)備基礎(chǔ)礎(chǔ),體積并入入所依附的樓樓板工程量計(jì)計(jì)算。2、柱按圖示斷斷面尺寸乘以以柱高以立方方米計(jì)算。1)柱高自柱基基上表面至板板底的高度計(jì)計(jì)算;無梁板板的柱高自柱柱基或樓板上上表面至柱帽帽下表面的高高度計(jì)算。2)依附于柱上上的牛腿與柱柱身體積一并并計(jì)算。3)地下室的獨(dú)獨(dú)立柱,按體體積計(jì)算,套套相應(yīng)柱定額額子目。突出出墻身的垛或或柱,并入地地下室墻體
42、內(nèi)內(nèi)計(jì)算。4)構(gòu)造柱按凈凈高計(jì)算,與與磚墻嵌砌部部分的體積并并入柱身體積積計(jì)算。3、梁按圖示斷斷面尺寸乘以以梁長以立方方米計(jì)算。1)梁長的計(jì)算算:梁與柱連接時(shí),梁梁長算至柱側(cè)側(cè)面;次梁與主梁連接接時(shí),次梁的的長度算至主主梁的側(cè)面;梁與墻連接時(shí),伸伸入磚墻內(nèi)的的梁頭應(yīng)計(jì)入入梁的長度內(nèi)內(nèi);圈梁與過梁連接接時(shí),過梁長長度按門、窗窗洞口寬度兩兩端共加5000毫米計(jì)算算。(過梁另另列項(xiàng))2)梁頭處加搗搗梁墊的體積積并入梁內(nèi)計(jì)計(jì)算。3)預(yù)制花籃梁梁的后澆部分分按體積計(jì)算算套現(xiàn)澆矩形形梁定額子目目。4)弧形梁不分分曲率大小,斷斷面不分形狀狀,按梁中心心部分的弧長長乘以斷面尺尺寸以立方米米計(jì)算。(弧弧長=半徑
43、弧度;弧度度=角度/180)4、墻1)地下室墻按按設(shè)計(jì)室內(nèi)地地坪(0.0000)為界;直直形墻、地下下室墻按墻身身實(shí)體積計(jì)算算,墻高按凈凈高計(jì)算,應(yīng)應(yīng)扣除門窗洞洞口及0.33平方米以上上孔洞所占體體積,突出部部分均并入墻墻體計(jì)算。2)弧形墻不分分曲率大小,按按墻中心的弧弧長乘以墻凈凈高及墻厚按實(shí)體積積計(jì)算。5、板按圖示面面積乘以板厚厚以立方米計(jì)計(jì)算。應(yīng)扣除除0.3平方方米以上孔洞洞所占的體積積。1)有梁板包括括主、次梁與與板,按梁、板板體積之和計(jì)計(jì)算。2)無梁板按板板與柱帽體積積之和計(jì)算。3)平板按板的的實(shí)體體積計(jì)計(jì)算。4)伸入磚墻內(nèi)內(nèi)的板頭體積積應(yīng)并入板內(nèi)內(nèi)計(jì)算。5)現(xiàn)澆鋼筋混混凝土挑檐天天
44、溝與現(xiàn)澆屋屋面板連接時(shí)時(shí),以外墻面面為界;與梁梁連接時(shí),以以梁外邊為界界。外墻邊線線或梁邊線以以外為挑檐天天溝。6、樓梯與樓板板以樓梯梁的的外側(cè)面為界界。整體樓梯梯及旋轉(zhuǎn)樓梯梯包括踏步、斜斜梁、休息平平臺、平臺梁梁、樓梯與樓樓板的連接梁梁,按實(shí)體積積計(jì)算。7、陽臺、雨蓬蓬均按伸出墻墻外部分的實(shí)實(shí)體體積計(jì)算算。由柱支撐撐的大雨蓬,應(yīng)應(yīng)按柱、板分分別以體積計(jì)計(jì)算。(雨蓬蓬梁套用圈、過過梁定額;陽陽臺板下的梁梁并入陽臺板板內(nèi))8、欄板(包括括伸入磚墻內(nèi)內(nèi)的部分)、樓樓梯欄板分別別按長、斜長長乘以其垂直直高度及厚度度以立方米計(jì)計(jì)算。欄桿按長或斜長長乘以其垂直直高度以平方方米計(jì)算。9、臺階按水平平投影面
45、積計(jì)計(jì)算。臺階與與平臺連接時(shí)時(shí),以最上層層踏步外沿加加300毫米米為界。(梯梯帶和擋墻另另計(jì))10、預(yù)制樁按按全長(包括括樁尖)乘以以樁斷面以立立方米計(jì)算。11、預(yù)制花飾飾漏窗、花飾飾欄板按投影影面積計(jì)算。12、水塔1)鋼筋混凝土土基礎(chǔ)(包括括基礎(chǔ)底板和和塔座)以實(shí)實(shí)體積計(jì)算。鋼鋼筋混凝土筒筒式塔身,以以塔座上表面面或基礎(chǔ)底板板上表面為界界;柱式塔身身以柱腳與基基礎(chǔ)底板或梁梁交接處為界界;與基礎(chǔ)底底板相接的梁梁,并入基礎(chǔ)礎(chǔ)內(nèi)計(jì)算。2)塔身與槽底底以與槽底相相連的圈梁為為界,以上為為槽底,以下下為塔身。鋼筋混凝土筒式式塔身以實(shí)體體積計(jì)算,應(yīng)應(yīng)扣除門窗洞洞口體積,依依附于塔身的的過梁、雨蓬蓬、挑檐
46、等工工程量并入筒筒壁體積內(nèi)計(jì)計(jì)算;柱式塔塔身不分柱、梁梁和直柱、斜斜柱均以實(shí)體體積合并計(jì)算算。3)鋼筋混凝土土塔頂及槽底底的工程量合合并計(jì)算。塔塔頂包括頂板板和圈梁;槽槽底包括底板板、挑出斜壁壁和圈梁。槽槽底不分平底底、拱底,塔塔頂不分錐形形、球形,均均按相應(yīng)子目目計(jì)算。塔頂上如鋪保溫溫材料,應(yīng)另另列項(xiàng)目計(jì)算算。4)槽壁分為內(nèi)內(nèi)外壁,保溫溫水槽外保護(hù)護(hù)壁為外壁,直直接承受水壓壓側(cè)壓力的水水槽壁為內(nèi)壁壁,非保溫水水塔的水槽壁壁按內(nèi)壁計(jì)算算。水槽內(nèi)外壁應(yīng)扣扣除門窗洞口口以實(shí)體積計(jì)計(jì)算。依附于于外壁的柱、梁梁等均并入外外壁體積中計(jì)計(jì)算。5)鋼筋混凝土土倒錐殼水塔塔不論塔頂、槽槽底、水槽內(nèi)內(nèi)壁,均按實(shí)
47、實(shí)體積合并以以立方米計(jì)算算。6)鐵件、鐵梯梯、圍欄等,應(yīng)應(yīng)按相應(yīng)項(xiàng)目目計(jì)算。13、貯水(油油)池1)平底池的池池底體積,應(yīng)應(yīng)包括池底下下部的擴(kuò)大部部分,池底如如帶有斜坡時(shí)時(shí),斜坡部分分應(yīng)按坡底定定額子目計(jì)算算。2)錐形底應(yīng)算算至壁基梁底底面,無壁基基梁時(shí),算至至錐底坡的上上口。3)壁基梁的高高度為梁底至至池壁下部的的底面,如與與錐形底連接接時(shí),應(yīng)算至至梁的底面。4)無梁池蓋柱柱的柱高,應(yīng)應(yīng)自池底表面面算至池蓋的的下表面,包包括柱座、柱柱帽的體積。5)池壁不分厚厚度。其高度度不包括池壁壁上下的擴(kuò)大大部分,無擴(kuò)擴(kuò)大部分時(shí),則則自池底上表表面算至池蓋蓋下表面。6)無梁蓋應(yīng)包包括與池壁相相連的擴(kuò)大部部
48、分的體積;肋形蓋應(yīng)包包括主、次梁梁及蓋部分的的體積;球形形蓋應(yīng)自池壁壁頂面以上,包包括邊側(cè)梁的的體積在內(nèi)。7)各類池蓋中中的進(jìn)入孔、透透氣管、水泥泥蓋以及與蓋蓋相連接的結(jié)結(jié)構(gòu),均已包包括在定額內(nèi)內(nèi),不另計(jì)算算。8)沉淀池水槽槽,系指池壁壁上的環(huán)形溢溢水槽及縱橫橫U形槽,但但不包括與水水槽相連接的的矩形梁,矩矩形梁按相應(yīng)應(yīng)定額子目計(jì)計(jì)算。9)磚石池的獨(dú)獨(dú)立柱,可按按相應(yīng)定額子子目計(jì)算。如如獨(dú)立柱帶有有混凝土或鋼鋼筋混凝土結(jié)結(jié)構(gòu)者,其體體積并入池蓋蓋計(jì)算。14、地溝定額額適用于內(nèi)徑徑深或?qū)捫∮谟?.2米的地地溝項(xiàng)目。地溝肋形頂板或或預(yù)制板,按按板的相應(yīng)定定額子目計(jì)算算。15、貯倉1)矩形倉分立立壁
49、和漏斗,立立壁和漏斗的的分界線以相相互交點(diǎn)的水水平線為分界界線,壁上圈圈梁并入漏斗斗工程量內(nèi),基基礎(chǔ)、支撐漏漏斗的柱和柱柱間的聯(lián)系梁梁分別套用相相應(yīng)基礎(chǔ)、柱柱、梁的定額額子目計(jì)算。2)倉壁耐磨層層,可按耐酸酸、防腐相應(yīng)應(yīng)定額子目及及其規(guī)則計(jì)算算。16、預(yù)制支架架支架均以實(shí)體積積計(jì)算,包括括支架各組成成部分,應(yīng)將將柱、梁的體體積合并計(jì)算算,如支架帶帶操作平臺板板的亦合并計(jì)計(jì)算。1)支架基礎(chǔ)應(yīng)應(yīng)按相應(yīng)的基基礎(chǔ)定額子目目計(jì)算。2)支架安裝不不計(jì)算腳手架架。六、輸送泵、輸輸送泵管工程程量按以下規(guī)規(guī)定計(jì)算:1、垂直泵管安安拆按設(shè)計(jì)室室內(nèi)地坪0.0000至屋面檐口口板面加5000毫米以延延長米計(jì)算。2、水
50、平泵管安安拆按建筑物物標(biāo)準(zhǔn)層外墻墻周長的一半半以延長米計(jì)計(jì)算。3、泵管使用按按元/米*天天計(jì)算。使用用天數(shù)按施工工組織設(shè)計(jì)規(guī)規(guī)定的天數(shù)計(jì)計(jì)算。4、輸送泵車及及輸送泵按泵泵送混凝土相相應(yīng)定額子目目的混凝土消消耗量以立方方米計(jì)算。5、施工組織設(shè)設(shè)計(jì)采用二級級輸送泵時(shí),按按輸送泵工程程量乘以系數(shù)數(shù)2。七、構(gòu)件接頭灌灌縫1、構(gòu)件接頭灌灌縫包括構(gòu)件件座漿、灌縫縫、堵板孔、塞塞板梁縫等均均按預(yù)制構(gòu)件件實(shí)體積以立立方米計(jì)算。2、柱與柱基的的灌縫,按首首層柱體積計(jì)計(jì)算;首層以以上柱灌縫按按各層柱體積積計(jì)算。3、空心板堵孔孔的人工材料料、板縫鋼筋筋已包括在定定額內(nèi)。預(yù)制砼板間板縫縫下口寬度在在20毫米以內(nèi)內(nèi)套接
51、頭灌縫縫子目。寬度度在150毫毫米以內(nèi),套套平板定額子子目,其人工工、材料和機(jī)機(jī)械臺班乘以以0.6系數(shù)數(shù);寬度在1150毫米以以上者為平板板。每件體積在0.05立方米米以內(nèi)的構(gòu)件件、梁或墻上上砼裝飾線條條的突出部分分可按零星構(gòu)構(gòu)件計(jì)列。現(xiàn)澆混凝土池槽槽的混凝土及及模板按構(gòu)件件實(shí)體積計(jì)算算。第五章 鋼砼砼及金屬結(jié)構(gòu)構(gòu)件駁運(yùn)、安安裝一、預(yù)制混凝土土構(gòu)件駁運(yùn)、安安裝、安全護(hù)護(hù)欄君按構(gòu)件件設(shè)計(jì)圖示尺尺寸按實(shí)體積積以立方米計(jì)計(jì)算。二、金屬結(jié)構(gòu)駁駁運(yùn)及安裝。1、金屬結(jié)構(gòu)駁駁運(yùn)及安裝按按設(shè)計(jì)圖示重重量以噸計(jì)算算。采用焊接接法的另加11.5%重量量;采用螺栓栓安裝的另加加2%的重量量。2、依附于鋼柱柱上的牛腿
52、及及懸臂梁等,并并入柱身主材材重量計(jì)算。3、高層鋼結(jié)構(gòu)構(gòu)高強(qiáng)螺栓、剪剪力栓釘均按按套計(jì)算。三、小型構(gòu)件安安裝按設(shè)計(jì)外外形體積以立立方米計(jì)算,不不扣除空花部部分體積。駁運(yùn):施工現(xiàn)場場外的堆放點(diǎn)點(diǎn)至安裝位置置卸車就位;運(yùn)距:構(gòu)件的場場外堆放場地地至安裝施工工現(xiàn)場的距離離;定額運(yùn)距以一公公里為準(zhǔn),如如超過,每公公里汽車臺班班增加25%。第六章 門窗窗及木結(jié)構(gòu)一、各類有框門門窗除另有說說明外均按門門窗洞口面積積以平方米計(jì)計(jì)算。若為凸凸出墻面的圓圓形、弧形、異異形門窗,均均按展開面積積計(jì)算。二、實(shí)拼式、框框架式防火門門均按門扇凈凈面積計(jì)算。三、各類無亮木木門扇均按門門扇凈面積計(jì)算,有有亮木門扇按按門扇和
53、亮扇扇凈面積之和和計(jì)算。四、各類木門框框均按門框的的上框、邊框框及中豎框之之和以延長米米計(jì)算。(按按框外側(cè)長度度)五、門邊帶窗者者,應(yīng)分別計(jì)計(jì)算,門寬度度算至門框外外口。六、普通窗上部部帶有半圓窗窗時(shí),應(yīng)位普普通窗和半圓圓窗之間的橫橫框上裁口線線為界,分別別計(jì)算。七、全玻地彈門門按設(shè)計(jì)洞口口面積(包括括固定扇)以以平方米計(jì)算算。無框玻璃璃門應(yīng)按設(shè)計(jì)計(jì)門扇凈面積積以平方米計(jì)計(jì)算。無框固固定扇按設(shè)計(jì)計(jì)洞口面積套套側(cè)亮定額子子目計(jì)算。八、鋁合金卷簾簾門按卷簾門門的實(shí)際高度度乘實(shí)際寬度度以平方米計(jì)計(jì)算。電動裝裝置按套計(jì)算算。卷簾門有有小門以個(gè)計(jì)計(jì)算。九、鏡面不銹鋼鋼、銅皮等裝裝飾材料包門門框,均按門門
54、框外表展開開面積計(jì)算。十、鋼窗密閉框框按裝置范圍圍的磚口面積積以平方米計(jì)計(jì)算。十一、特種門扇扇安裝所用的的混凝土塊以以及支撐屋架架的混凝土塊塊,均按第四四章現(xiàn)澆零星星構(gòu)件計(jì)算。十二、五金安裝裝按設(shè)計(jì)要求求分別以把、個(gè)個(gè)、副、組等等計(jì)算;(五五金安裝含材材料、安裝人人工;五金配配件僅含材料料,人工在對對應(yīng)的門窗定定額中)五金金配件均按樘樘計(jì)算。十三、方木屋架架按竣工木料料以立方米計(jì)計(jì)算。附屬于于圓木屋架的的木夾板、墊墊木、風(fēng)撐和和挑檐木為方方木時(shí)應(yīng)乘以以系數(shù)1.55,折算為圓圓木并入相應(yīng)應(yīng)的屋架工程程量。十四、單獨(dú)的方方挑檐木按方方檁木體積以以立方米計(jì)算算。十五、屋架的馬馬尾、折角和和半屋架應(yīng)并
55、并入相應(yīng)的屋屋架。十六、檁木按竣竣工木料體積積以立方米計(jì)計(jì)算,檁墊木木和檁托木已已包括在定額額內(nèi)。簡支檁長度按設(shè)設(shè)計(jì)圖示計(jì)算算,如設(shè)計(jì)未未規(guī)定,按屋屋架或山墻中中距增加2000毫米接頭頭計(jì)算。兩端端檁米算至博博風(fēng)板。連續(xù)續(xù)檁長度按設(shè)設(shè)計(jì)圖示計(jì)算算,其接頭按按全部連續(xù)檁檁總長度增加加5%計(jì)算。十七、屋面板、椽椽子、掛瓦條條按屋面斜面面積以平方米米計(jì)算。天窗窗挑檐重疊部部分按設(shè)計(jì)規(guī)規(guī)定增加,不不扣除屋面煙煙囪及斜溝部部分所占面積積。十八、封檐板按按檐口外圍長長度計(jì)算,博博風(fēng)板按屋面面斜長計(jì)算,每每個(gè)端部(魚魚尾)接頭增增加500毫毫米并入相應(yīng)應(yīng)項(xiàng)目計(jì)算。十九、木樓梯按按水平投影面面積以平方米米計(jì)算
56、,應(yīng)扣扣除寬度在3300毫米以以上的樓梯井井面積。定額額內(nèi)已包括踢踢腳板、休息息平臺及伸入入墻內(nèi)部分的的工料,但未未包括樓梯及及休息平臺底底的釘天棚。二十、間壁按圖圖示凈長乘以以高度以平方方米計(jì)算。應(yīng)應(yīng)扣除0.33平方米以上上的洞口面積積。二十一、浴廁木木隔斷按凈長長乘以高度(自自下橫檔底面面至上橫檔頂頂面)以平方方米計(jì)算。浴浴廁隔斷的木木門扇按門扇扇面積計(jì)算。(6-9-17是指全玻璃隔斷;半截玻璃隔斷下部材料另計(jì))第七章 樓 地 面一、地面墊層按按室內(nèi)主墻間間凈面積乘以以設(shè)計(jì)厚度以以立方米計(jì)算算。應(yīng)扣除凸凸出地面的構(gòu)構(gòu)筑物、設(shè)備備基礎(chǔ)、地溝溝等所占體積積,不扣除柱柱、垛、間壁壁墻、附墻煙煙囪
57、及面積在在0.3平方方米以內(nèi)孔洞洞所占體積。(砼墊層強(qiáng)度及配合比不同可以換算)二、整體面層(各各類整體面層層已包括找平平層)、找平平層均按主墻墻間凈面積以以平方米計(jì)算算。應(yīng)扣除凸凸出地面的構(gòu)構(gòu)筑物、設(shè)備備基礎(chǔ)、地溝溝等所占面積積,不扣除柱柱、垛、間壁壁墻、附墻煙煙囪及面積在在0.3平方方米以內(nèi)孔洞洞所占面積,但但門洞、空圈圈、暖氣包槽槽、壁龕的開開口部分亦不不增加。三、塊料面層按按圖示尺寸實(shí)實(shí)鋪面積以平平方米計(jì)算,門門洞、空圈、暖暖氣包槽、壁壁龕的開口部部分的工程量量并入相應(yīng)的的面層內(nèi)計(jì)算算。(應(yīng)扣除除獨(dú)立柱、間間壁墻及0.3平方米以以上的孔洞面面積)四、樓梯面層(包包括、踏步、休休息平臺以及
58、及小于5000毫米寬的樓樓梯井)按水水平投影面積積計(jì)算。五、臺階面層(包括踏步及最上面一層踏步外沿加300毫米)按水平投影面積計(jì)算。六、木樓板基層層、地板及地地毯均按圖示示尺寸實(shí)鋪面面積以平方米米計(jì)算,應(yīng)扣扣除0.3平平方米以上孔孔洞所占面積積。地毯鋪貼貼踏步壓棍以以套計(jì)算,壓壓板以延長米米計(jì)算。七、其他:1、踢腳線按實(shí)實(shí)際長度以延延長米計(jì)算。2、散水、防滑滑坡道按(水水平投影面積積)圖示尺寸寸以平方米計(jì)計(jì)算。(散水水、防滑坡道道未包括挖土土和墊層)3、欄桿、扶手手包括彎頭長長度按延長米米計(jì)算,扶手手彎頭制作按按個(gè)計(jì)算。(彎彎頭長度不扣扣)4、金屬嵌條及及防滑條按設(shè)設(shè)計(jì)長度以延延長米計(jì)算。5、
59、明溝按圖示示尺寸以延長長米計(jì)算。(已已綜合全部施施工內(nèi)容)6、地面分倉縫縫按圖示尺寸寸以延長米計(jì)計(jì)算。明溝做伸縮縫另另套定額子目目;只有水泥砂漿面面層包括踢腳腳線;水磨石面層未包包括酸洗打蠟蠟;大理石、花崗巖巖拼花,其圖圖案周邊的異異形部分可以以按塊作方計(jì)計(jì)算;樓地面中點(diǎn)綴的的塊料按個(gè)計(jì)計(jì)算,單個(gè)點(diǎn)點(diǎn)綴小于0.1平方米的的,原面積不不口;廣場磚鋪環(huán)形或或菱形,人工工1.2;塊料面層拼色,拼拼色部分人工工1.2;塊料面層安裝損損耗2%,其其余費(fèi)用全部部計(jì)入制品單單價(jià)中;樓梯水泥砂漿打打包,其余分分開計(jì)算。第八章 屋面面及防水一、瓦屋面1、混凝土瓦、小小波玻璃鋼瓦瓦、紅泥PVVC彩色波形形板均按圖
60、示示尺寸的水平平投影面積乘乘以坡屋面延延尺系數(shù)(附附表)以平方方米計(jì)算。不不扣除房上煙煙囪、風(fēng)帽底底座、風(fēng)道、屋屋面小氣窗和和斜溝等所占占面積,屋面面小氣窗出檐檐與屋面重疊疊部分亦不增增加。天窗出出檐部分重疊疊的面積,并并入相應(yīng)我面面工程量計(jì)算算。2、混凝土脊瓦瓦(不分平脊脊瓦、斜脊瓦瓦)、斜溝戧戧角線均按圖圖示尺寸分別別延長米計(jì)算算。3、彩鋼夾芯屋屋面板按圖示示尺寸的水平平投影面積以以平方米計(jì)算算。檐口外板板高度為1米米以上時(shí),超超過部分面積積并入彩鋼夾夾芯屋面板計(jì)計(jì)算。4、彩鋼夾芯板板雨蓬按凸出出墻面水平投投影面積以平平方米計(jì)算。二、屋面防水分分平屋面及斜斜屋面兩種。1、平屋面防水水按水平
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 無人機(jī)測繪技術(shù)在建筑工程測量中的應(yīng)用
- 石河子大學(xué)《智能計(jì)算系統(tǒng)》2022-2023學(xué)年期末試卷
- 石河子大學(xué)《虛擬儀器》2021-2022學(xué)年第一學(xué)期期末試卷
- 婚外情檢討書(合集四篇)
- 石河子大學(xué)《外國刑法學(xué)原理》2022-2023學(xué)年期末試卷
- 石河子大學(xué)《入學(xué)教育與軍事技能》2023-2024學(xué)年第一學(xué)期期末試卷
- 石河子大學(xué)《化工原理實(shí)驗(yàn)二》2021-2022學(xué)年第一學(xué)期期末試卷
- 沈陽理工大學(xué)《現(xiàn)代控制理論》2021-2022學(xué)年期末試卷
- 沈陽理工大學(xué)《汽車設(shè)計(jì)》2021-2022學(xué)年第一學(xué)期期末試卷
- 沈陽理工大學(xué)《計(jì)算機(jī)控制系統(tǒng)》2021-2022學(xué)年期末試卷
- 第五節(jié) 錯覺課件
- 2024-2030年中國水煤漿行業(yè)發(fā)展規(guī)模及投資可行性分析報(bào)告
- 2024-2030年陜西省煤炭行業(yè)市場發(fā)展分析及發(fā)展前景預(yù)測研究報(bào)告
- 【課件】Unit+3+SectionB+1a-2b+課件人教版英語七年級上冊
- 干部人事檔案任前審核登記表范表
- 期中階段測試卷(六)-2024-2025學(xué)年語文三年級上冊統(tǒng)編版
- 北京市昌平區(qū)2023-2024學(xué)年高二上學(xué)期期末質(zhì)量抽測試題 政治 含答案
- 第7課《不甘屈辱奮勇抗?fàn)帯罚ǖ?課時(shí))(教學(xué)設(shè)計(jì))-部編版道德與法治五年級下冊
- 中國腦出血診治指南
- 高校實(shí)驗(yàn)室安全基礎(chǔ)學(xué)習(xí)通超星期末考試答案章節(jié)答案2024年
- 國開2024年《中國法律史》平時(shí)作業(yè)1-3答案
評論
0/150
提交評論