![5.2.1.3 PRIMOFIT系列管件測(cè)試_第1頁(yè)](http://file4.renrendoc.com/view/90c20977e4771e62409a7b1a439f5ace/90c20977e4771e62409a7b1a439f5ace1.gif)
![5.2.1.3 PRIMOFIT系列管件測(cè)試_第2頁(yè)](http://file4.renrendoc.com/view/90c20977e4771e62409a7b1a439f5ace/90c20977e4771e62409a7b1a439f5ace2.gif)
![5.2.1.3 PRIMOFIT系列管件測(cè)試_第3頁(yè)](http://file4.renrendoc.com/view/90c20977e4771e62409a7b1a439f5ace/90c20977e4771e62409a7b1a439f5ace3.gif)
![5.2.1.3 PRIMOFIT系列管件測(cè)試_第4頁(yè)](http://file4.renrendoc.com/view/90c20977e4771e62409a7b1a439f5ace/90c20977e4771e62409a7b1a439f5ace4.gif)
![5.2.1.3 PRIMOFIT系列管件測(cè)試_第5頁(yè)](http://file4.renrendoc.com/view/90c20977e4771e62409a7b1a439f5ace/90c20977e4771e62409a7b1a439f5ace5.gif)
版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、PRIMOFITProduct testsOctober 2007Table of Contents Test done and documented by:Johannes Falkensteinerjohannes. October 2007Vibration test (1)Test Nr.: 002/2006Date: 16.02.2006Test items PRIMOFIT: 2 pcs. female adaptors 1”2 pcs. couplings 1” 2 pcs. elbows 1”5 pcs. steel pipes 1” EN 10255Conditions:el
2、ectric motor 1.200 rmptest duration 15 minuteswater pressure 70 barOctober 2007Vibration test (2)Results:After 15 minutes continuous vibration testing:no leakage at pipesno leakage at PRIMOFIT compression fittings test passed!October 2007Pressure and tensile test steel pipe (1)Test Nr.: 004/2005Date
3、: 24.10.2005Test items PRIMOFIT: 2 pcs. female adaptors 1”1 pcs. steel pipe 1” EN 10255Pressure test:slow pressure increase in 5bar steps up to 220barResult:first leakage at 200bar! test passed!October 2007Pressure and tensile test steel pipe (2)Tensile test:tested items are the same which were used
4、 in pressure testpull speed 0,416mm/sResult:the pipe was pulled out of the fitting in the length of 6mmat a tensile force of73,74kN ( 7 tons!) test passed!October 2007Pressure and tensile test PE-X pipe (1)Test Nr.: 020/2007Date: 13.03.2007Test items PRIMOFIT: 2 pcs. female adaptors 1 ” / 40mm1 pcs.
5、 PE-X pipe 40mmTensile test:pull speed 0,416mm/sResult:test was stopped at a tensile force of 8,97kN (900kg) because only the pipe moved and the fittings stayed in position test passed!October 2007Pressure and tensile test PE-X pipe (2)Pressure test:tested items are the same which were used in tensi
6、le testslow pressure increase up to 10, 25, 45 and 55 barResult:up to a pressure of 55bar the connections remained leak-tight but the PE-X pipe burstdismantling of the assembly shows the grooves in the PE-X pipe done by the locking ring test passed!October 2007Pressure and tensile test copper pipe,
7、locking ring for steel pipes (1)Pressure testTest Nr.: 023/2007Date: 16.07.2007Test items PRIMOFIT: 2 pcs. female adaptors” / 20mm with locking ring for steel2 pcs. inside stiffeners 19,6mm; trimmed at shoulder to 21mm1 pcs. copper pipe 22mm (wall thickness 1mm)Result:during test no axial movementsa
8、t a pressure of 234,6 bar! the copper pipe burst, no leakage around the Primofits test passed!October 2007Pressure and tensile test copper pipe, locking ring for steel pipes (2)Tensile testTest Nr. 024/2007, Date 17.07.2007Test items PRIMOFIT: 2 pcs. fem. adaptors ” / 20mm with locking ring for stee
9、l2 pcs. inside stiffeners 19,6mm; trimmed at shoulder to 21mm1 pcs. copper pipe 22mm (wall thickness 1mm)Result:at a tensile force of 6,9kN (700kg) the pipe started to move, test was stopped at 11,3kN (1.100kg)the huge tensile force caused damages onto the copper pipe Test passed!October 2007Assembl
10、y test copper pipe without inside stiffenerAssembly testTest Nr.: 029/2007Date: 23.07.2007Test items PRIMOFIT: 2 pcs. female adaptors” / 20mm, locking ring steel1 pcs. copper pipe 22mm (wall thickness 1mm)Result:assembling without an inside stiffener causes a damage onto the copper pipe Test failed!
11、With stiffener:October 2007Summary PRIMOFIT for use with copper pipesTests done with copper pipes received from VG NL15mm and 18mm copper pipesnot possible with existing parts (diameter too small)development would be necessary (quantities?)22mm copper pipes - test passed with following conditions:bo
12、dy and nut:for tests standard parts were usedfor daily use it could be difficult to insert the pipe due to narrow tolerances (inner diameter body and nut = 21,9+0,5mm, outer diameter pipe = 22mm) a modification of the body and nut will be necessarylocking ring for steel pipes, washer for steel pipes, seal:standard parts can be usedinside stiffenerstandard stiffener for PE 2
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 浙教版數(shù)學(xué)七年級(jí)下冊(cè)2.1《二元一次方程》(第2課時(shí))聽(tīng)評(píng)課記錄
- 五年級(jí)分?jǐn)?shù)乘法口算練習(xí)
- 湘教版數(shù)學(xué)七年級(jí)下冊(cè)2.1.2《冪的乘方與積的乘方》聽(tīng)評(píng)課記錄1
- 蘇教版小學(xué)四年級(jí)上冊(cè)數(shù)學(xué)口算題
- 人教版數(shù)學(xué)九年級(jí)下冊(cè)27.3《位似》聽(tīng)評(píng)課記錄(一)
- 營(yíng)業(yè)場(chǎng)所租賃合同范本
- 核心員工高層管理人員各崗位保密協(xié)議書(shū)范本
- 辦公樓加固改造工程施工合同范本
- 合作開(kāi)店合同范本
- 三人合伙合作協(xié)議書(shū)范本
- 期末 (試題) -2024-2025學(xué)年教科版(廣州)英語(yǔ)四年級(jí)上冊(cè)
- 解讀國(guó)有企業(yè)管理人員處分條例課件
- 湖南省長(zhǎng)沙市一中2024-2025學(xué)年高一生物上學(xué)期期末考試試題含解析
- 碳纖維增強(qiáng)復(fù)合材料在海洋工程中的應(yīng)用情況
- 小孩使用手機(jī)協(xié)議書(shū)范本
- 公司市場(chǎng)分析管理制度
- 焊接材料制造工-國(guó)家職業(yè)標(biāo)準(zhǔn)(2024版)
- 江西省2024年中考數(shù)學(xué)試卷(含答案)
- 榆神礦區(qū)郭家灘煤礦(700 萬(wàn)噸-年)項(xiàng)目環(huán)評(píng)
- 2024年200MW-400MWh電化學(xué)儲(chǔ)能電站設(shè)計(jì)方案
- 余土外運(yùn)施工方案
評(píng)論
0/150
提交評(píng)論