檢驗(yàn)計(jì)劃空白模板(散貨船 Form ESP-BC Ver.4.0 202112)_第1頁
檢驗(yàn)計(jì)劃空白模板(散貨船 Form ESP-BC Ver.4.0 202112)_第2頁
檢驗(yàn)計(jì)劃空白模板(散貨船 Form ESP-BC Ver.4.0 202112)_第3頁
檢驗(yàn)計(jì)劃空白模板(散貨船 Form ESP-BC Ver.4.0 202112)_第4頁
檢驗(yàn)計(jì)劃空白模板(散貨船 Form ESP-BC Ver.4.0 202112)_第5頁
已閱讀5頁,還剩18頁未讀, 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

1、Symbols : X Applicable Not applicable Form ESP-BC Ver.4.0 202009 中 國(guó) 船 級(jí) 社CHINA CLASSIFICATION SOCIETYENHANCED SURVEY PROGRAMMEFOR fillin Enter Type d “BULK CARRIER / OBO CARRIER” BULK CARRIERSBasic information and particularsShips name:Kind of Survey: FORMCHECKBOX No. Special Survey FORMCHECKBOX In

2、termediate Survey in scope of No. Special Survey IMO number:Flag State:Port of registry:Gross tonnage:Deadweight (metric tonnes):Length between perpendiculars(m):Shipbuilder:Hull No.:Recognized organization (RO):China Classification SocietyClass No.:Class Character and Notations of Hull:Date of buil

3、d of the ship:Owner:Thickness measurement firm:CONTENTS TOC o 1-2 h z u HYPERLINK l _Toc26052905 1. Preamble PAGEREF _Toc26052905 h 3 HYPERLINK l _Toc26052906 2. Arrangement of cargo holds, tanks and spaces PAGEREF _Toc26052906 h 3 HYPERLINK l _Toc26052907 3. List of cargo holds, tanks and spaces wi

4、th information on their use, extent of coatings and corrosion protection system PAGEREF _Toc26052907 h 3 HYPERLINK l _Toc26052908 4. Conditions for survey PAGEREF _Toc26052908 h 3 HYPERLINK l _Toc26052909 5. Provisions and method of access to structures PAGEREF _Toc26052909 h 4 HYPERLINK l _Toc26052

5、910 6. List of equipment for survey PAGEREF _Toc26052910 h 7 HYPERLINK l _Toc26052911 7. Survey requirements PAGEREF _Toc26052911 h 7 HYPERLINK l _Toc26052912 8. Identifications of tanks for tank testing PAGEREF _Toc26052912 h 8 HYPERLINK l _Toc26052913 9. Identification of areas and sections for th

6、ickness measurements PAGEREF _Toc26052913 h 9 HYPERLINK l _Toc26052914 10. Minimum thickness of hull structures PAGEREF _Toc26052914 h 9 HYPERLINK l _Toc26052915 11. Thickness measurements firm PAGEREF _Toc26052915 h 9 HYPERLINK l _Toc26052916 12. Damage experience related to the ship PAGEREF _Toc26

7、052916 h 9 HYPERLINK l _Toc26052917 13. Areas identified with substantial corrosion from previous surveys PAGEREF _Toc26052917 h 10 HYPERLINK l _Toc26052918 14. Critical structural areas and suspect areas PAGEREF _Toc26052918 h 10 HYPERLINK l _Toc26052919 15. Other relevant comments and information

8、PAGEREF _Toc26052919 h 12 HYPERLINK l _Toc26052920 Appendices PAGEREF _Toc26052920 h 13 HYPERLINK l _Toc26052921 Appendix 1 - List of Plans PAGEREF _Toc26052921 h 14 HYPERLINK l _Toc26052922 Appendix 2 - Survey Planning Questionnaire to Survey Programme PAGEREF _Toc26052922 h 15 HYPERLINK l _Toc2605

9、2923 Appendix 3.1 - Corrosion And Wastage Allowance of Hull Structure PAGEREF _Toc26052923 h 20 HYPERLINK l _Toc26052924 Appendix 3.2 - Minimum Thickness Table of Hull Structure PAGEREF _Toc26052924 h 22Ships Name: Class No.: ESP-BC()Ships Name: Class No.: ESP-BC()1. Preamble1.1 Scope1.1.1 The prese

10、nt survey programme covers the minimum extent of overall surveys, close-up surveys, thickness measurements and pressure testing within the cargo length area, cargo holds, ballast tanks including fore and aft peak tanks, required by CCS Rules and 2011 ESP Code.1.1.2 The arrangements and safety aspect

11、s of the survey shall be acceptable to the attending surveyor(s).1.2 DocumentationAll documents used in the development of the survey programme shall be available onboard during the survey as required by 5.1.6.5(2), Section 1, Chapter 5, PART ONE of CCS Rules.2. Arrangement of cargo holds, tanks and

12、 spacesThis section of the survey programme shall provide information (either in the form of plans or text) on the arrangement of cargo holds, tanks and spaces that fall within the scope of the survey. 3. List of cargo holds, tanks and spaces with information on their use, extent of coatings and cor

13、rosion prevention systemThis section of the survey programme should indicate any changes relating to (and should update) the information on the use of the cargo holds and ballast tanks of the ship, the extent of coatings and the corrosion prevention system provided in the Survey Planning Questionnai

14、re. Tank/ Hold No.Corrosion ProtectionCoating ExtentCoating ConditionHCSHSCANPUMLCGFPRCAbbreviation: HC-N: Hard coating not subject to PSPC and PSPC (Void Space)HC-B: Hard coating applied in dedicated seawater ballast tanks (PSPC)SH = Semi Hard Coating SC = Soft coating A = Anodes NP = No protection

15、 U=Upper part M=Middle part L=Lower part C=Complete G=Good F=Fair P=Poor RC=Recoated (during the last 3 years)Notes:(1) For sub-column marked with “HC”, type of hard coating is to be filled in, if applicable; (2) For all columns except the sub-column mark with “HC”, “X” is to be filled in as applica

16、ble;(3) For the definition of the coating condition, refer to CCS Rule.4. Conditions for survey4.1 The owner shall provide the necessary facilities for a safe execution of the survey. 4.1.1 In order to enable the attending surveyors to carry out the survey, provisions for proper and safe access shal

17、l be agreed between the owner and China Classification Society, based on IMO Resolution A.1050(27) - Revised recommendations for entering enclosed spaces aboard ships. 4.1.2 In cases where the provisions of safety and required access are judged by the attending surveyor(s) not to be adequate, the su

18、rvey of the spaces involved shall not proceed.4.2 Cargo holds, tanks and spaces shall be safe for access. Cargo holds, tanks and spaces shall be gas free and properly ventilated. Prior to entering a tank, void or enclosed space, it shall be verified that the atmosphere in that space is free from haz

19、ardous gas and contains sufficient oxygen.4.3 In preparation for survey and thickness measurements and to allow for a thorough examination, all spaces shall be cleaned including removal from surfaces of all loose accumulated corrosion scale. Spaces shall be sufficiently clean and free from water, sc

20、ale, dirt, oil residues etc. to reveal corrosion, deformation, fractures, damages, or other structural deterioration as well as the condition of the coating. However, those areas of structure whose renewal has already been decided by the owner need only be cleaned and descaled to the extent necessar

21、y to determine the limits of the areas to be renewed.4.4 Sufficient illumination shall be provided to reveal corrosion, deformation, fractures, damages or other structural deterioration as well as the condition of the coating.4.5 Where soft or semi-hard coatings have been applied, safe access shall

22、be provided for the surveyor to verify the effectiveness of the coating and to carry out an assessment of the conditions of internal structures which may include spot removal of the coating. When safe access cannot be provided, the soft or semi-hard coating shall be removed.4.6 The surveyor(s) shall

23、 always be accompanied by at least one responsible person, assigned by the owner, experienced in tank and enclosed space inspection.5. Provisions and method of access to structuresThis section of the survey programme shall indicate any changes relating to (and update) the information on the provisio

24、ns and methods of access to structures provided in the survey planning questionnaire.Hold/TankNo.StructurePermanent Means of AccessTemporary stagingHydraulic arm vehiclesRaftsLaddersDirect AccessOther means(please specify)F.P.Fore PeakA.P.Aft PeakCargo HoldsHatch side coamingsTopside sloping plateUp

25、per stool platingCross deckSide shell, frames and bracketsTransverse bulkheadHopper tank platingLower stoolTank topTopside TanksUnderdeck structureSide shell and structureSloping plate and structureWebs and bulkheadsHopper TanksHopper sloping plate and structureSide shell and structureBottom structu

26、reWebs and bulkheadsDouble sidetanksSide shell and structureInner skin and structureWebs and bulkheadsDouble bottom structureUpper stool internal structureLower stool internal structureWing tanks of ore carriersUnderdeck and structureSide shell and structureSide shell vertical web and structureLongi

27、tudinal bulkhead and structureLongitudinal bulkhead web and structureBottom plating and structureCross ties/stringersNote: For all columns except the column mark with “Other means (please specify)”, “X” is to be filled in as applicable.5.1 For overall surveys, means shall be provided to enable the s

28、urveyor to examine the hull structure in a safe and practical way.5.2 For close-up surveys, one or more of the following means for access, acceptable to the Surveyor, shall be provided:5.2.1 For close-up surveys of the hull structure, other than cargo hold shell frames, one or more of the following

29、means for access, acceptable to the surveyor, shall be provided:(a) Permanent staging and passages through structures;(b) Temporary staging and passages through structures;(c) Hydraulic arm vehicles such as conventional cherry pickers, lifts and moveable platforms;(d) Portable ladders;(e) Boats or r

30、afts; and/or(f) Other equivalent means.5.2.2 For close-up surveys of the cargo hold shell frames of single-side skin bulk carriers less than 100,000 dwt, one or more of the following means for access, acceptable to the surveyor, shall be provided:(a) Permanent staging and passages through structures

31、;(b) Temporary staging and passages through structures;(c) Portable ladder restricted to not more than 5m in length may be accepted for surveys of lower section of a shell frame including bracket;(d) Hydraulic arm vehicles such as conventional cherry pickers, lifts and movable platforms;(e) Boats or

32、 rafts provided the structural capacity of the hold is sufficient to withstand static loads at all levels of water; and/or(f) Other equivalent means.5.2.3 For close-up surveys of the cargo hold shell frames of single-side skin bulk carriers of 100,000 dwt and above, the use of portable ladders shall

33、 not be accepted and one or more of the following means for access, acceptable to the surveyor, shall be provided:(a) Annual surveys, intermediate survey under 10 years of age and first special survey:- Permanent staging and passages through structures;- Temporary staging and passages through struct

34、ures;- Hydraulic arm vehicles such as conventional cherry pickers, lifts and movable platforms;- Boats or rafts provided the structural capacity of the hold is sufficient to withstand static loads at all levels of water; and/or- Other equivalent means.(b) Subsequent intermediate surveys and special

35、surveys:- Either permanent or temporary staging and passages through structures for close-up survey of at least the upper part of hold frames;- Hydraulic arm vehicles such as conventional cherry pickers for surveys of lower and middle part of shell frames as alternative to staging;- Lifts and movabl

36、e platforms;- Boats or rafts provided the structural capacity of the hold is sufficient to withstand static loads at all levels of water; and/or- Other equivalent means.5.3 Notwithstanding the above requirements, the use of a portable ladder fitted with a mechanical device to secure the upper end of

37、 the ladder is acceptable for the “close-up examination of sufficient extent, minimum 25% of frames, to establish the condition of the lower region of the shell frames, including approximately lower one third length of side frame at side shell and side frame and attachment and the adjacent shell pla

38、ting of the forward cargo hold” at annual survey.5.4 The use of hydraulic arm vehicles or aerial lifts (“cherry pickers”) may be accepted by the attending surveyor for the close-up survey of the upper part of side shell frames or other structures in all cases where the maximum working height is not

39、more than 17 m.6. List of equipment for surveyThis section of the survey programme shall identify and list the equipment that will be made available for carrying out the survey and the required thickness measurements. (1) Thickness measurements shall normally be carried out by means of ultrasonic te

40、st equipment. The accuracy of the equipment shall be proven to the surveyor as required.(2) One or more of the following fracture detection procedures may be required if deemed necessary by the Surveyor:- Radiographic equipment- Ultrasonic equipment- Magnetic particle equipment- Dye penetrant (3) Ex

41、plosimeter, oxygen-meter, breathing apparatus, lifelines, riding belts with rope and hook and whistles together with instructions and guidance on their use shall be made available during the survey. A safety checklist shall be provided.(4) Adequate and safe lighting shall be provided for the safe an

42、d efficient conduct of the survey.(5) Adequate protective clothing shall be made available and used (e.g. safety helmet, gloves, safety shoes, etc.) during the survey.7. Survey requirements7.1 Overall surveyThis section of the survey programme shall identify and list the spaces that shall undergo an

43、 overall survey for this ship in accordance with CCS Rules and 2011 ESP Code.(1) Cargo Holds:(2) Ballast Tanks:(3) Fuel Oil Tanks:(4) Lube Oil Tanks:(5) Fresh Water Tanks:(6) Other Tanks/ Spaces:7.2 Close-up surveyThis section of the survey programme shall identify and list the hull structures that

44、shall undergo a close-up survey for this ship in accordance with CCS Rules and 2011 ESP Code.8. Identifications of tanks for tank testingThis section of the survey programme shall identify and list the cargo holds and tanks that shall undergo tank testing for this ship in accordance with CCS Rules a

45、nd 2011 ESP Code.Ballast Tanks:Cargo Holds used for water ballast:Fuel Oil Tanks:Lube Oil Tanks:Fresh Water Tanks:Others: (if any)Notes: (1) Tank testing of fuel oil, lube oil and fresh water tanks may be specially considered based on a satisfactory external examination of the tank boundaries, and a

46、 confirmation from the Master stating that the pressure testing has been carried out according to the requirements with satisfactory results.(2) The testing of double bottom tanks and other spaces not designed for the carriage of liquid may be omitted, provided a satisfactory internal examination to

47、gether with an examination of the tank top is carried out.(3) Boundaries of ballast tanks are to be tested with a head of liquid to the top of air pipes.(4) Boundaries of ballast holds are to be tested with a head of liquid to near to the top of hatches.(5) Boundaries of fuel oil, lube oil and fresh

48、 water tanks are to be tested with a head of liquid to the highest point that liquid will rise under service conditions. 9. Identification of areas and sections for thickness measurements This section of the survey programme shall identify and list the areas and sections where thickness measurements

49、 shall be taken in accordance with CCS Rules and 2011 ESP Code.10. Minimum thickness of hull structuresThis section of the survey programme shall specify the minimum thickness for hull structures of this ship that are subject to survey, (indicate either (a) or preferably (b) if such information is a

50、vailable):(a) FORMCHECKBOX For non-CSR Bulk Carriers, determined from the Appendix 3.1 Corrosion And Wastage Allowance of Hull Structure and the original thickness according on the hull structure plans of the ship;(b) FORMCHECKBOX For non-CSR Bulk Carrier, given in the table(s) listed in Appendix 3.

51、2 Minimum Thickness Table of Hull Structure.(c) For vessels built under IACS Common Structural Rules, the renewal thickness of the hull structure elements shall be indicated in the appropriate drawings.11. Thickness measurements firmThis section of the survey programme shall identify changes, if any

52、, relating to the information on the thickness measurement firm provided in the survey planning questionnaire.12. Damage experience related to the ship This section of the survey programme shall provide details of the hull damages for at least the last three years in way of the cargo holds, ballast

53、tanks and void spaces within the cargo length area, using the tables provided below. These damages shall be subject to survey.Hull damages sorted by location for this shipCargo Hold, tank or space number or areaPossible cause,if knownDescription of the damagesLocationRepairDate of repairHull damages

54、 for sister or similar ships (if available) in the case of design related damageCargo Hold, tank or space number or areaPossible cause,if knownDescription of the damagesLocationRepairDate of repair13. Areas identified with substantial corrosion from previous surveysThis section of the survey program

55、me shall identify and list the areas of substantial corrosion from previous surveys.14. Critical structural areas and suspect areasThis section of the survey programme shall identify and list the critical structural areas and the suspect areas, when such information is available.List of Critical Are

56、as for Bulk CarriersBulk Carriers/ Ore CarriersTopside tanks/ Hopper tanks/ Double-bottom tanks/ Double-side tanksconnections of longitudinals to transverse web frames and transverse bulkheadsBulk CarriersTopside tankscorners of transverse web framesBulk Carriers (Single hull)Topside tanks/ Hopper t

57、anks/ Cargo holdsconnections of hold side frames to topside tanks and hopper tanks, including corresponding brackets in topside tanks and hopper tanksBulk CarriersCargo holdsconnections of hatch end beam to topside tank web frameCarriers (Single hull)Cargo holds/ Hopper tanks/ Double-bottom tankswel

58、ded or radiused knuckle between inner bottom and hopper sloping plating, particularly connected hopper tank web frames, double bottom side girders and floorsBulk Carriers/ Ore CarriersCargo holdsconnections of corrugated bulkhead, shelf and stool platingBulk Carriers/ Ore CarriersCargo holdsconnecti

59、ons of lower stool plating to the inner bottom Bulk Carriers/ Ore CarriersMain deckweb or deck at the toes of the longitudinal hatch coaming termination bracketBulk Carriers/ Ore CarriersMain deckhatch cornersBulk Carriers/ Ore CarriersTopside tanks/ Hopper tanks/ Double-bottom tanks/ Double-side ta

60、nkstransverse bulkhead adjacent to heated fuel oil tank (if fitted)Ore CarriersWing tanksconnections of deck transverse in way of sheer strake and longitudinal bulkhead top strakeOre CarriersWing tankscorners of cross ties and floorsOre CarriersWing tanksconnection of horizontal stringer on transver

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

最新文檔

評(píng)論

0/150

提交評(píng)論