版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領
文檔簡介
1、景觀工程設計合同中英文Design Contract of Landscape Design 項目名稱:Project Name: 景觀設計 Landscape Design項目地點: Project Location:委托方(甲方):Clients (Party A):承接方(乙方):Contractor (Party B):簽訂日期:Date: 年 月 日 第一章 本合同依據列文件簽訂Chapter1. The Contract in according to following documents:1.1國家及地方有關建設工程勘察設計管理法規(guī)和規(guī)章。 National and local
2、 administrative Law and regulations of construction project design1.2建設工程批準文件。 The approval document of construction project1.3省市相關規(guī)定和本工程的實際情況。 Provincial and municipal regulations and the actual situation of the project.第二章 設計咨詢范圍及內容 Scope of design consultation and content乙方設計咨詢范圍 Scope of design
3、consultation for Party B本次設計景觀總面積約為 平方米。甲方同意委托乙方承擔其景觀設計咨詢工作。The total area of the landscape design is square meters. Party A agrees to entrust Party B for the consultative and design work.本合同包括的工作階段: 景觀的方案設計、擴初設計、施工圖設計。The work stage of this contract include: project design of landscape, preliminary
4、 design, construction drawing design第三章 甲方需向乙方提交的相關資料、文件及時間 The related data, document and time that Party A should submit to Party B甲方在規(guī)定的時間內向乙方提交基礎資料及文件,并對其完整性、正確性、及時性負責。Party A shall submit the basic data and document on time, and responsible for its integrity, correct and timeliness3.1 甲方應于方案設計開
5、始前提交的相關資料The related data that Party A shall submit before the design設計任務委托書 Letter of authorization 規(guī)劃總圖(彩色平面圖、1/500報批圖) General layout of planning (color floor plan, 1/500 drawing)建筑立面效果圖 Architectural effect drawing 規(guī)劃設計說明 Illustrations of design layout項目策劃方案 Scheme for project建筑首層平面 The first fl
6、oor layout of the building基地豎向條件圖 Vertical design drawing of the building3.2甲方應于初步設計開始前提交的相關資料The related data that Party A shall submit before the tentative design方案設計確認書 Scheme design confirmation letter建筑首層平面 The first floor layout of the building建筑立面剖面施工圖 Architectural facade profile constructio
7、n drawing3.2.4豎向設計圖 Vertical design drawing地下建筑平面豎向施工圖 Underground floor vertical construction drawing綜合管網施工圖 Comprehensive pipe network construction drawing3.3甲方應于施工圖設計開始前提交的相關資料 The related data that Party A shall submit before design初步設計確認書 Preliminary design confirmation letter水源控制方式、位置來源 Water
8、sources control method, source location電源控制位置、電源控制間位置 Power control location, power control room location地質勘測報告 Geological prospecting report第四章 本合同設計項目工作階段及成果 The contract design work phase of the project and results4.1第一階段:方案設計 First phase:Scheme design工作成果: Work Resultsa方案設計說明; Scheme design inst
9、ructionb景觀方案總平面圖; Floor plan of the overall landscape schemec分析圖(包含景區(qū)分布、功能布置、空間及場所分析、交通分析); Analysis (includes scenic layout, space distribution, function and place analysis, traffic analysis);d主要區(qū)域景觀方案放大設計圖; Enlarge chart of the main regional landscape plan designede主要景點效果圖; Impression drawing of m
10、ajor attractions;f園林小品示意圖; Gardens sketch diagramg景觀設計示意圖; Landscape design diagramh其他彩色圖片; Other color picturesI提交A3圖冊六份; Deliver six atlas of A3 sizej匯報方式為草案匯報和電腦匯報。 Report method shall be draft report and computer report此階段用時 工作日; This stage takes workdays4.2第二階段:擴初設計 The second phase: Preliminar
11、y design4.2.1 按甲方同意的方案進行擴初設計。Designed according to Party A agreed scheme for preliminary design.此階段的設計成果有 This stage of design work result includea景觀初設總平面圖; Preliminary landscape set general layoutb局部放大平面圖、剖面圖; Local enlargement of the plan, section plan;c園林小品平、立、剖面圖; Gardens sketch layout, elevatio
12、n and section pland種植圖(主要樹種及載植方式); The planting layout (Main tree species and cultivated methods)e豎向圖; Vertical plan;f局部景觀立面圖及剖面圖; Partial landscape elevations and section plang燈具及欄桿式樣; Lamps and railing styleh提交A3圖冊三份。 Deliver three atlas of A3 size此階段用時 工作日。 This stage takes workdays4.3第三階段:施工圖設計
13、The third phase : Construction drawing design 在擴初設計經甲方認可后,乙方將進行施工圖的設計工作。 After the design of preliminary design approved by Party A, Party B will start the construction drawing design. 此階段設計成果有: This stage of design work result include:a總平面圖;. General layoutb局部放大平面圖; Local enlargement of the floor p
14、lan;c放線圖; Line figured種植圖;. Plant figuree鋪裝圖; Install figuref豎向圖; Vertical plan;g 環(huán)境配電圖; Surrounding power distribution chart ;h 環(huán)境給、排水圖; Surrounding water supply and drainagei設計說明、各種詳圖、植物名錄; Design instruction, the detailed map, plants listj提供8套施工圖紙。 Deliver eight sets design drawing此階段用時 工作日。 This
15、 stage takes workdays4.4現(xiàn)場服務階段 The site service stage在項目進入施工階段后,乙方提供現(xiàn)場服務。 After commencing the construction phase of the project, Party B provide on-site service.此階段成果有: This stage of design work result include:a與施工方現(xiàn)場交底; communicate with construction contractor for the design intention.b現(xiàn)場效果控制; Job
16、site construction controlc材料封樣; Sealed sample materialsd 植物主材選定。 Plants selected 此階段用時 工作日。 This stage takes workdays第五章 設計費及支付方式 Design fee and the payment method5.1 本合同項目的設計費,總額為人民幣 ,小寫 元整。(按景觀面積 平方米,單價 元/平方米),The total project design fee of this contract is, RMB, ¥ . ( square meters of total land
17、scape area, price: /square meter)5.2 乙方基本服務費用根據不同階段分列如下: Party B basic service fees according to the different stages are as follows: 方案設計階段:提交成果后 個工作日內,委托方應支付設計費人民幣: 元整,小寫 元(合同金額的 %)。:Preliminary design phase: the client shall pay RMB of design fee, ¥ : ( % of contract total amount) within business
18、 day after submitting the results: 方案擴初階段:提交成果后 個工作日內,委托方支付設計費人民幣 元整,小寫 元(合同金額的 %)。:Scheme design phase: the client shall pay RMB of design fee, ¥ : ( % of contract total amount) within business day after submitting the results: 施工圖階段:提交成果后 個工作日內,委托方支付設計費人民幣 元整,小寫 元(合同金額的 %)。:Construction drawing ph
19、ase: the client shall pay RMB of design fee, ¥ : ( % of contract total amount) within business day after submitting the results: 施工期間現(xiàn)場配合階段:景觀工程竣工驗收后 個工作日,委托方支付費用為人民幣 元整,小寫 元(合同金額的 %)。Jobsite cooperating phase: the client shall pay RMB of design fee, ¥ : ( % of contract total amount) within business
20、 day after the landscape construction completed and pass the acceptance examine: 5.3 其它:Others 甲方需委派一位人員,就此工程設計方向的事宜上,負責批復乙方的設計。如甲方要求乙方對已同意的設計提供重大修改,或進行合同之外的設計工作,應被視為額外服務項目,收費應由甲乙雙方共同協(xié)定。Party A shall appoint a staff to in charge of Party Bs engineering design approval. If Party A request Party B to
21、be make major adjustment on the design approved by Party A, or work on the design out of this contract scope, should be considered an additional service, fees should be design by mutual agreement of both parties.第六章 雙方責任Chapter6 Responsibilities of parties6.1 甲方責任 Responsibilities of Party A 甲方按本合同協(xié)
22、定提交的內容,在協(xié)定的時間內向乙方提交資料及文件,并對其完整性、正確性及時限負責。另外,甲方還應提供關于場地條件的數(shù)據,包括公用事業(yè)、地理條件、道路使用權、限制條件等。 Party A shall submit the data and documents content in according to this contract stipulated, in agreed time limit, and be responsible for its integrity, correctness and time limit. In addition, Party A shall also p
23、rovide the data about the conditions at the jobsite, including utilities, geographical conditions, road use right, constraints, etc. 甲方提交上述資料及文件超過規(guī)定期限15天以內,乙方按合同規(guī)定交付設計文件時間順延;期限超過15天以上時,乙方有權重新確定提交設計文件時間。 Party A delay to submitted the data and documents referred above in excess of the prescribed peri
24、od within 15 days, Party B postpone deliver the design documents in according to the contract stipulation time. If the delay time more than 15 days, Party B has the right to determine a new submitted time for the design documents 甲方變更委托設計項目、規(guī)模、條件或因提交的資料錯誤,或所提資料作較大修改,以致造成乙方設計需返工時,雙方除需另行協(xié)商簽訂補充合同(或另訂合同
25、)、重新明確有關條款外,甲方應按乙方所耗工作量向乙方支付返工費。 Party B design reworked causes by Party A change design projects, scale, conditions or because of the presented material mistakes, or mentioned material major revision. Both parties shall sign a supplementary agreement (or sign a new agreement) and redefine relevant
26、terms, Party A shall pay associated rework fee to Party B in according to the workload. 在合同履行期間,甲方要求終止或解除合同,乙方未開始設計工作的,不退還甲方已付的定金;已開始設計工作的,甲方根據乙方已進行的實際工作量,另行議定。 During the implement of the contract, Party A request to terminate or rescind the contract, Party B has not started design work, does not r
27、eturn prepaid deposit to Party a; design work has begun, Party A can negotiate with Party B for the fee in according to the actual workload. 甲方應按本合同第五章規(guī)定的金額和時間向乙方支付設計費用,每逾期一天,需承擔應支付金額千分之二的逾期違約金。逾期超過十四天以上時,乙方有權暫停履行下階段工作,并書面通知甲方。 Party pay the design fee in according to the clause fifth of this contra
28、ct, Late payment shall pay 0.2 % of the late payment amount penalty per day, if the late payment is overdue more than 14 days, Party B has the right to suspend its work for next stage, and notice in writing to Party A. 甲方要求乙方比合同規(guī)定時間提前提交設計文件時,甲方應支付趕工費。 Party A requests Party B to submit the design do
29、cuments before contract stipulated time, Party A shall pay the rush cost. 甲方應為乙方派駐現(xiàn)場的工作人員提供工作、生活交通等方面的便利條件,但費用由乙方自行承擔。Party A should provide Party Bs on-site staffs work, living and traffic conveniences, but the cost shall be bear by Party B. 甲方應保護乙方的設計版權,未經乙方同意,甲方對乙方交付的設計文件不得向第三方轉讓,否則,乙方有權索賠。Party
30、A shall protect Party Bs design copyright, Party A should not transfer the design documents to third party without the agreement of Party B, or else, Party B has the right to claim for compensation. 甲方有權在本項目對外宣傳時使用乙方標識。 Party A has the right to use the logo of Party B in advertising the project.6.2
31、乙方責任 乙方按本合同協(xié)定提交的內容、份數(shù)、在協(xié)定的時間內向甲方提交成果,并對其完整性、正確性、及時性負責。2.1 Party b shall submit the result content, number of copies stipulated in the agreement in time, and be responsibility of its completeness, correctness and timeliness. 乙方對設計文件出現(xiàn)的遺漏、錯誤或甲方不滿意之處負責修改或補充。由于乙方設計錯誤造成工程質量事故損失,乙方除負責采取補救措施外,應免收受損失部分的 設計費
32、,并根據損失程度向甲方償付賠償金。經甲方或上級主管部門審查后,在原定任務書設計范圍內的必要修改,乙方負責承擔。 Party B shall modify or resupply the design document if there appeared omissions, false or unsatisfied by Party A. Due to the engineering quality accidents loss caused by Party Bs design error, party B shall reduce the relevant part design fee,
33、 in addition to take remedial measures and be liability for compensation according to the loss to Party As damages. After examination by Party A or superior departments in charge, amendments request within the scope the original specification design, Party B shall be liable. 由于乙方自身原因,延誤了設計文件交付時間,每延誤
34、一天,應減收該項目設計費的千分之二。Due to reason of Party B, if delivery time being delayed, Party B should reduce the project design fee of 2/1000 per delayed days. 乙方交付設計文件后,參加有關上級審查及根據審查結論負責不超出原定計劃任務書范圍內的必要調整補充。不再計取費用。 After delivering design documents, Party B shall participate in relevant superior examination,
35、and according to the review conclusion to add necessary adjustment. Supplement within the scope of original plan task, shall not charge for any additional fee. 乙方不得向第三方擴散、轉讓甲方提交的產品圖紙等技術經濟資料。如發(fā)生以上情況,甲方有權索賠。Party B shall not spread or transfer product drawings, other technical and economic data submit
36、ted by Party A to third party. If above circumstance happened, Party A has the right to claim for compensation. 乙方同意配合甲方按工程進度要求調整出圖順序,付款方式可另行協(xié)商。Party B agrees to coordinate Party A to adjust drawing deliver order according to the schedule require, payment method can be separately negotiate by both p
37、arties. 乙方必須根據設計標準、技術規(guī)范、設計任務說明等相關景觀設計標準進行設計,提交符合質量的設計文件。Party B must submit the quality design documents in accordance with design standards, technical specifications and design task of relevant landscape design standards. 乙方必須在滿足方案標準的前提下,選料用材時要注意到景觀效果和造價的關系,作到既滿足景觀效果的要求,又最大限度的降低造價。Party B shall cho
38、ose materials quality in accordance with landscape effect and price under the standards of scheme, in satisfies the requirements effect and maximum reduce cost.第七章 補充條款 Supplemental condition 7.1 合同終止 Termination of contract 甲方因自身原因不能履行本合同,應按照合同付清已完成階段設計任務對應的設計費, 并承擔合同總額的10%給乙方作為違約金,合同終止。Party A una
39、ble to perform the contract due to its own reason, should pay the design fee of completed phase in accordance with the contract, and bear the 10% of the total contract amount as liquidated penalty, terminate the contract. 乙方因自身原因無法履行合同,應退回全部設計費用,并承擔合同總額的10%給甲方作為違約金,合同終止。Party B unable to perform the contract due to its own reason, should pay 10% of the total contract amount as liquidated penalty, and terminate the contract.7 .1.3 由于不可抗力因素致使合同無法履行時,雙方應及時協(xié)商解決。When unable to fulfill the contract due to force majeure factors, both parties should be resolved through consultation
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 水壩拆除爆破服務協(xié)議
- 城市住宅區(qū)電梯施工合同
- 交通強弱電布線改造協(xié)議
- 體食堂炊事員勞動合同
- 燃油運輸貨車司機招聘合同
- 鐵路建設施工合同毛利計算
- 高鐵車站粉刷施工合同模板
- 設計合同法律責任
- 公路養(yǎng)護與維修勞務合同
- 水利工程轉讓協(xié)議書
- 冰銅主要性質都有哪些呢
- 光伏并網逆變器調試報告(正式版)
- BIM咨詢技術標
- 2022年安全管理落實“三項措施” 推進安全生產.doc
- 印染廢水現(xiàn)狀及處理方法(共60頁).ppt
- 生物工程工廠設計
- 項目成果交付清單
- 寶龍地產商管公司各級員工薪酬
- 兒童哮喘診療指南
- 房地產企業(yè)樓盤商業(yè)定位報告培訓講座PPT講座資料課件
- 空氣站質量控制措施之運行維護
評論
0/150
提交評論