1、電力工程施工安全操作規(guī)程天津市新津建設(shè)有限公司2015年9月1日1目 錄1、停電作業(yè)········································12、帶電作業(yè)··
2、;······································23、臨時用電··········
3、3;·····························24、伐樹、涉水、履冰···················
4、;···············35、裝卸、運(yùn)輸·································
5、83;····66、挖溝、挖坑·······································97、拉線安裝····
6、··································108、落地式變壓器··············
7、183;····················109、桿上設(shè)備····························
8、··········1310、現(xiàn)場灌注混凝土································1311、組立桿塔····
9、83;·································1312、放線、緊線···············
10、;······················1413、高空作業(yè)··························
11、183;··········1614、箱式變電所安裝································1715、電纜敷設(shè)····
12、;··································18電力工程施工安全操作規(guī)程1 停電作業(yè)1.1 在帶電的桿塔上或帶電設(shè)備附近作業(yè)時,作業(yè)人員的活動范圍及 其所攜帶的工具、材料等與帶電體的距離小于表 1.1 的規(guī)定時應(yīng)停電 作業(yè)。在帶電線路
13、桿塔上或帶電設(shè)備附近作業(yè)的安全距離電壓等級(kV)安全距離(m)電壓等級(w)安全距離(m)10 及以下07154202035L 0220306011015330401.2 停電作業(yè)線路與另一帶電線路相接近或交叉,工作時可能與帶電線路的帶電體接觸或接近至表 1.2 的安全距離以內(nèi),則此帶電線路亦 應(yīng)停電并予接地。接近或交叉其他電力線工作的安全距離電壓等級(w)安全距離(m)電壓等級(kV)安全距離(m)10 及以下10154220402035253305060110301.3 在交叉檔內(nèi)架設(shè)到縣、接地線,施工的線路應(yīng)在帶電線路下面,并應(yīng)符合表 2 安全距離的要求,還必須采取防止導(dǎo)、地線產(chǎn)生跳動
14、或 過牽引而減小安全距離的措施。1.4 在發(fā)電廠、變電所出入口處,或線路某一段有兩條及以上線路鄰 近施工時,應(yīng)在施工線路的各桿塔處作出標(biāo)志,并設(shè)專人監(jiān)護(hù)。1.5 停電作業(yè),施工負(fù)責(zé)人應(yīng)向停、送電的發(fā)電廠、變配電所提出停電計劃申請,其內(nèi)容應(yīng)包括:1.5.1 需停電的線路(設(shè)備)名稱,停電范圍、地點(diǎn)(起止桿號)。1.5.2 作業(yè)內(nèi)容。1.5.3 需停電的起止日期及每天停電的時間。1.5.4 施工負(fù)責(zé)人姓名及聯(lián)系方法。1.6 停電作業(yè)應(yīng)執(zhí)行工作票制度。工作票簽發(fā)人可由負(fù)責(zé)停、送電的 變、配電所的主管生產(chǎn)領(lǐng)導(dǎo)人、技術(shù)人員擔(dān)任。工作票簽發(fā)人不得兼 任該項工作的施工負(fù)責(zé)人。1.7 線路停電,發(fā)電廠、變配電
15、所的工作許可人(值班調(diào)度員)必須對 停電線路采取有效的安全措施后方可發(fā)出許可工作的命令。1.8 許可開始工作的命令,必須通知到施工負(fù)責(zé)人。雙方應(yīng)認(rèn)真記錄, 并應(yīng)復(fù)誦核對無誤。1.9 嚴(yán)禁雙方約時停、送電。1.10 施工中如遇雷雨、大風(fēng)或其他情況威脅到施工人員的安全時, 施工負(fù)責(zé)人可決定暫停施工。1.11 工作間斷時,施工地點(diǎn)的全部接地線應(yīng)保留。如工班須暫時離 開施工地點(diǎn),必須采取安全措施和派人看守?;謴?fù)工作前,施工負(fù)責(zé) 人應(yīng)檢查接地線等各項安全措施。1.12、工作結(jié)束后,施工負(fù)責(zé)人(包括小組負(fù)責(zé)人)必須檢查施工地段 和線路上有無遺留的工具、材料等,并查明全部施工人員已由桿塔上 撤下后,方可命令
16、拆除接地線。接地線拆除后,不得再登桿施工。1.13 工作結(jié)束后,施工負(fù)責(zé)人應(yīng)即向工作許可人報告以下內(nèi)容:1.13.1 施工負(fù)責(zé)人姓名。1.13.2 某線路上某處(說明起止桿塔號分支線名稱等)施工已經(jīng)結(jié) 束。1.13.3 設(shè)備改動情況。1.13.4 施工地點(diǎn)所裝設(shè)的接地線已全部拆除。1.13.5 可以送電。1.14 工作許可人在接到所有施工負(fù)責(zé)人的完工報告,并與記錄簿核 對無誤后,方可下令向線路恢復(fù)送電。1.15 線路(設(shè)備)停電作業(yè)前,應(yīng)完成下列停電措施:1.15.1 斷開需停電作業(yè)線路(設(shè)備)的各端開關(guān)。1.15.2 斷開危及該線路(設(shè)備)停電作業(yè),又不宜采取安全措施的 交叉跨越、平行或同桿
17、線路的開關(guān)。1.15.3 斷開由變壓器、電壓互感器等二次側(cè)倒送電的開關(guān)。1.15.4 檢查斷開后的開關(guān)是否在斷開位置,并應(yīng)有明顯的斷開點(diǎn)。 開關(guān)的操作機(jī)構(gòu)應(yīng)加鎖,并應(yīng)在上面懸掛“有人工作,禁止合閘!” 的標(biāo)示牌。1.16 施工負(fù)責(zé)人未接到已停電的通知前,嚴(yán)禁任何人接近帶電體。1.17 施工負(fù)責(zé)人接到已停電的通知后,應(yīng)進(jìn)行驗電。驗電時應(yīng)帶絕 緣手套,并有專人監(jiān)護(hù)。1.18 線路經(jīng)過驗電明確無電壓后,各班(組)應(yīng)即在施工地段兩端裝 設(shè)接地線。凡有可能送電到停電線路的分支線亦應(yīng)裝設(shè)接地線。在停 電線路上如有感應(yīng)電壓時,應(yīng)增加接線。1.19 接地線聯(lián)接應(yīng)可靠,不得纏繞。裝拆接地線時,操作人員必須帶絕緣
18、手套,并有專人監(jiān)護(hù)。1.20 接地線應(yīng)有接地極、接地線和絕緣棒構(gòu)成的成套接地線。接地 線必須用多股軟銅線組成,其截面不得小于 25mm2。1.21 新線路施工時應(yīng)設(shè)臨時接地線。臨時接地線必須在線路送電前 拆除。接地線拆除后,線路即認(rèn)為帶電。1.22 新線路完工后,在線路送電前,應(yīng)向有關(guān)單位發(fā)出正式送電的 通知。2 帶電作業(yè)2.1 在相對地電壓小于 250V 的電力設(shè)備上工作時宜停電。必須帶電 工作時,應(yīng)設(shè)監(jiān)護(hù)人,并應(yīng)符合下列規(guī)定:2.1.1 使用帶絕緣柄的工具,穿絕緣鞋或站在絕緣墊上。2.1.2 嚴(yán)禁同時接觸帶電體和接地體,以及同時接觸兩個帶電體。2.1.3 尚未脫離設(shè)備的帶電部分時,嚴(yán)禁與站
19、在地面上的人員接觸和 互相傳遞料具和其他物品。2.1.4 穿干燥緊袖工作服、戴工作帽和干燥清潔的線手套。2.2 高低壓同桿架設(shè),在低壓帶電線路上工作時,應(yīng)檢查與高壓的帶 電距離,采取防止誤碰帶電高壓設(shè)備的措施。在低壓帶電導(dǎo)線未采取 絕緣措施時,工作人員不得穿越。在帶電的低壓配電裝置上工作時, 應(yīng)采取防止相間短路和單相接地的隔離措施。2.3 登桿前應(yīng)分清相、零線,選好工作位置。斷開導(dǎo)線時應(yīng)先斷相線, 后斷零線,接續(xù)導(dǎo)線時順序相反。2.4 在帶電的電度表和繼電器回路上工作時,電壓互感器和電流互感器的二次繞組應(yīng)可靠接地。斷開電流回路時,必須將電流互感器二次 的專用端子短路。2.5 低壓帶電作業(yè)時,不
20、得帶負(fù)荷接續(xù)導(dǎo)線。帶電更換電器具時,應(yīng) 先做好旁路線。在自動閉塞的低壓線路上,宜在不受張力的處所接續(xù) 導(dǎo)線,但必須設(shè)可靠的旁路線。3 臨時用電3.1 線路及設(shè)備的絕緣必須良好,布置整齊。裸露的帶電部分應(yīng)裝于 不易被觸及的處所3.2 架空線路的路徑應(yīng)選擇合理,避開易撞、易碰、潮濕場所及熱管 道等。3.3 采用絕緣線的低壓線路,其對地距離不得小于 25m,通行車輛 的地方不得小于 5m。3.4 直埋電纜的埋深應(yīng)為 0208m,車輛通行地區(qū)應(yīng)穿管保護(hù), 地面應(yīng)有明顯標(biāo)志。沿建筑物架空敷設(shè)的電纜,其高度不得小于 2m。3.5 變壓器安裝在地面上時,周圍必須設(shè)圍欄,其高度不應(yīng)小于 17m, 門應(yīng)加鎖。圍
21、欄與變壓器外緣的距離不得小于 1m。并掛“止步!高 壓危險”的標(biāo)示牌。3.6 露天使用的電氣設(shè)備及元件,均應(yīng)采取防雨措施。3.7 電動機(jī)具和照明設(shè)備必須通過開關(guān)或插座接電源。嚴(yán)禁將線頭直 接插入插銷底座或直接掛在燈頭上。露出機(jī)體的轉(zhuǎn)動部分應(yīng)設(shè)防護(hù) 罩。嚴(yán)禁一個開關(guān)接多臺電動設(shè)備。3.8 臨時用電設(shè)備選用的開關(guān)及熔絲的容量應(yīng)滿足被保護(hù)設(shè)備的要求。熔絲應(yīng)有保護(hù)罩。嚴(yán)禁用其他金屬線代替熔絲。3.9 施工用電配電箱的底邊距地面不得小于 15m,并加鎖。3.10 用電設(shè)備拆除后,相應(yīng)的供電線應(yīng)即拆除。如必須保留,應(yīng)將 裸露端部包絕緣膠布,妥善安放。3.11 使用螺口燈頭時,零線應(yīng)接在螺口上。照明開關(guān)應(yīng)控
22、制相線。3.12 電烙鐵和電爐在使用時應(yīng)放在非燃燒體上,用畢應(yīng)即斷開電源。 嚴(yán)禁將電烙鐵及電爐接通電源后離開。3.13 電動機(jī)端線及外露的旋轉(zhuǎn)部分,應(yīng)有可靠的防護(hù)罩。外殼(包括 起動設(shè)備的外殼)應(yīng)接地或接零。電動機(jī)運(yùn)轉(zhuǎn)時,嚴(yán)禁斷開地線。3.14 在運(yùn)行的電動機(jī)上工作時,應(yīng)穿緊口工作服。運(yùn)行中檢查炭刷、 滑環(huán)、整流子時,必須兩人進(jìn)行,應(yīng)穿絕緣鞋(靴)或站在絕緣臺上, 并戴護(hù)目鏡,嚴(yán)禁戴手套工作。3.15、檢修發(fā)電機(jī)時應(yīng)符合下列規(guī)定:3.15.1 斷開發(fā)電機(jī)的油開關(guān)和隔離開關(guān)。3.15.2 待發(fā)電機(jī)完全停止轉(zhuǎn)動后,在操作把手、機(jī)組的起動裝置、 并車裝置上懸掛“有人工作,禁止合閘!”的標(biāo)示牌。3.1
23、5.3 若本機(jī)還可從其他電源獲得勵磁電流時,也必須將此電源 斷開,并懸掛“有人工作,禁止合閘!”的標(biāo)示牌。3.15.4 將電壓互感器從高低壓兩側(cè)斷開。3.15.5 驗明無電后,應(yīng)在發(fā)電機(jī)和開關(guān)之間裝設(shè)接地線。3.15.6 應(yīng)將與其它發(fā)電機(jī)中性點(diǎn)的連線斷開。3.15.7 嚴(yán)禁在轉(zhuǎn)動著的發(fā)電機(jī)上工作,即使未加勵磁,亦應(yīng)認(rèn)為有電壓。3.16 檢修高壓電動機(jī)和起動裝置時,應(yīng)符合下列規(guī)定;3.16.1 斷開斷路器、隔離開關(guān),驗明無電壓后,裝設(shè)接地線,斷 路器手車應(yīng)從成套配電裝置內(nèi)拉出,并關(guān)門上鎖。3.16.2 在斷路器、隔離開關(guān)操作把手上懸掛“有人工作,禁止合 閘!”的標(biāo)示牌。3.16.3 拆開后的電纜
24、頭須三相短路接地。3.16.4 防止被其帶動的機(jī)械(如水泵、空氣壓縮機(jī)、引風(fēng)機(jī)等)引 起電動機(jī)轉(zhuǎn)動的措施,并在閥門上懸掛“禁止操作”的標(biāo)示牌。3.17 電動機(jī)的引出線和電纜頭以及外露的旋轉(zhuǎn)部分,均應(yīng)裝設(shè)牢固 的遮欄或護(hù)罩。3.18 自備發(fā)電機(jī)組應(yīng)設(shè)與正常工作電源的閉鎖裝置。如用戶自發(fā)電 時,應(yīng)取得水電段調(diào)度或變配電所值班員的同意,并采取安全措施, 同時雙方作好記錄復(fù)誦無誤后執(zhí)行。3.19 臨時用電設(shè)施,應(yīng)設(shè)專人(班組)負(fù)責(zé)運(yùn)行與維護(hù)。用電設(shè)備必 須裝設(shè)良好的接地或接零。3.20 臨時用電設(shè)施的停電作業(yè),應(yīng)按本章第一節(jié)的有關(guān)規(guī)定執(zhí)行。3.21 在有易燃易爆氣體或大量蒸氣的場所,應(yīng)采用防爆燈具或投
25、光 燈。發(fā)生電器火災(zāi)時,應(yīng)先切斷電源。4 伐樹、涉水、履冰4.1 砍伐樹木時,應(yīng)采取正確的砍伐方法,在樹干 (枝)傾倒的范圍內(nèi),嚴(yán)禁有人進(jìn)入或停留。4.2 砍伐靠近帶電線路的樹木時,嚴(yán)禁攀登桿塔,不得使樹木和繩索 與帶電體接近至表 12 的安全距離以內(nèi)。4.3 上樹砍剪樹枝時,工作人員應(yīng)站在堅實的樹干上,系好安全帶, 并應(yīng)注意螞蜂、毒蛇。4.4 涉水工作時,應(yīng)調(diào)查水流、水深、河底情況,以及上游水庫放水 的規(guī)律,并應(yīng)設(shè)有防護(hù)及必要的救生設(shè)備和安全措施。嚴(yán)禁將工具材 料等物系在身上涉水。4.5 履冰過河時,冰層厚度應(yīng)大于 150mm 并有足夠的承載力且氣溫低 于一 5時方可通行。5 裝卸、運(yùn)輸5.
26、1 起吊、裝卸、搬運(yùn)工作必須由有經(jīng)驗的人統(tǒng)一指揮,有明確的信 號和分工,并應(yīng)有具體的安全措施。5.2 起重工作開始前,應(yīng)檢查起吊搬運(yùn)工具、機(jī)具及繩索質(zhì)量是否良 好,不符合要求者嚴(yán)禁使用。 鋼絲繩接頭處的卡子必須連接牢固??ㄗ佑薪z扣和壓板的一面應(yīng)置于 鋼絲繩長的一邊??ㄗ拥臄?shù)量和間距應(yīng)符合下表的規(guī)定。鋼絲繩卡子數(shù)量和間距的規(guī)定鋼絲繩直徑(mm)1315182l242832353742卡子個數(shù)3334445b56卡子間距(mm)1201201501502002302502803003305.3 吊車、扒桿及繩索嚴(yán)禁超負(fù)荷使用。起重用鋼絲繩的安全系數(shù),應(yīng)符合下列規(guī)定:5.3.1 用于固定起重設(shè)備的為
27、 35 倍。5.3.2 用于人力起重的為 45 倍。5.3.3 用于機(jī)動起重的為 56 倍。5.3.4 用于綁扎起重物的為 10 倍。5.3.5 用于供人升降的為 14 倍。5.4 起重機(jī)具應(yīng)有銘牌標(biāo)明工作荷重,不應(yīng)超銘牌使用。無銘牌或自 選的起重機(jī)具,必須經(jīng)試驗合格后方可使用。5.5 起重機(jī)具應(yīng)妥善保管、列冊登記、定期檢查試驗,其標(biāo)準(zhǔn)應(yīng)符合 下表的規(guī)定。起重機(jī)具試驗標(biāo)準(zhǔn)名 稱試驗靜力允 許工作倍 數(shù)試驗周 期外表檢 查周期試荷時 間 (min)注白棕繩2一年一月10鋼絲繩2一年一月10鐵鏈2一年一月10葫蘆及滑車125一年一月10扒桿2一年一月10尖頭及卡于2一年一月10吊鉤1. 25一年一
28、月10絞磨1. 25一年一月105.6 鋼絲繩應(yīng)定期浸油,損傷達(dá)下列情況之一時,應(yīng)予報廢;5.6.1 鋼絲繩在一個節(jié)距中斷絲根數(shù)大于下表規(guī)定者。 鋼絲繩斷絲根數(shù)最初的安全系數(shù)鋼絲繩斷絲根數(shù)6X19+16X37+16X61+l18X19+1逆捻順捻逆捻顧捻逆捻順捻逆捻順捻<612622113618361867147261338193819>71683015402040205.6.2 鋼絲繩斷股者。5.6.3 鋼絲繩的鋼絲磨損或腐蝕達(dá)到原來鋼絲直徑的 40%級以上,或 者鋼絲繩受過嚴(yán)重退火以及局部電弧燒傷者。5.6.4 鋼絲繩壓扁變形表面起毛刺嚴(yán)重者。5.7 繩環(huán)結(jié)合段的長度不應(yīng)小于鋼
29、絲繩直徑的 20 倍,但最短不應(yīng)小 于 300mm。5.8 通過滑輪或滾筒的鋼絲繩不應(yīng)有接頭。往滑輪上纏繞鋼絲繩時注 意松緊,不應(yīng)扭卷。纏繞鋼絲繩的滑輪或滾筒的最小直徑除另有規(guī)定 外,手動操作不應(yīng)小于鋼絲繩直徑的 16 倍。5.9 起重機(jī)械及絞車用的牽引鋼絲繩,必須在滾筒或絞車軸心上繞五 圈以上,不得重疊。拉尾鋼絲繩應(yīng)隨時拉緊,并由有經(jīng)驗的人員看管, 未經(jīng)許可不得離開。5.10 起重物件必須綁牢,吊鉤應(yīng)掛在物件的重心上。長大物件的起 吊,吊鉤應(yīng)掛在經(jīng)過計算的受力點(diǎn)上或物件上指定的起吊點(diǎn)上。5.11 易損件宜單獨(dú)起吊,起吊時不得承受外力,并應(yīng)以軟物墊好。 起吊有棱角或光滑的部件,在棱角或光滑面與
30、繩索相接觸處應(yīng)以軟物 包墊,防止繩索受傷或打滑。5.12 起吊 200kg 以上的笨重物件,離開地面 100200mm 時,必須稍 停,檢查各部受力情況,確認(rèn)安全后方可繼續(xù)起吊。5.13 在起吊、牽引過程中,受力鋼絲繩的周圍、上下方、內(nèi)角側(cè)和起吊物的下面,嚴(yán)禁有人逗留和通過。5.14 遇有暴雨和六級以上大風(fēng)時嚴(yán)禁室外吊裝作業(yè)。5.15 人力裝卸搬運(yùn)笨重器材時,應(yīng)由一人統(tǒng)一指揮。必須確認(rèn)物件 的重心位置,防止傾倒。對于上重下輕的設(shè)備必須綁扎牢固。5.16 搬運(yùn)設(shè)備同時使用的滾杠直徑應(yīng)相等。撥動滾杠時應(yīng)用大錘敲 打,嚴(yán)禁用手直接撥動。5.17 使用手搖卷揚(yáng)機(jī)提升物件時,必須有牢固的地錨。卷揚(yáng)機(jī)上的
31、 棘輪卡子應(yīng)卡在棘輪齒底。卷揚(yáng)機(jī)用完后必須取下?lián)u把。5.18 多人抬杠長大物件時應(yīng)同肩,步調(diào)一致,起落時應(yīng)互相呼應(yīng)。5.19 凡用繩索牽引電桿上山時,必須將電桿綁牢,電桿兩側(cè)和下方 不得有人。滾動電桿時前方嚴(yán)禁站人。5.20 裝卸用的跳板,應(yīng)使用厚度 50mm 以上的堅實木板。跳板的坡度 不應(yīng)大于 1 : 3。跳板搭在車上時,車輪應(yīng)墊平,跳板下面不得有人。5.21 裝卸電桿時應(yīng)防止散堆傷人。當(dāng)分散卸車時,每卸完一處必須 將車上剩余的電桿綁扎牢固,方可繼續(xù)運(yùn)送。5.22 油斷路器在運(yùn)輸過程中應(yīng)處于合閘位置,否則應(yīng)將提升桿綁扎 牢固,或?qū)⑻嵘龡U卸下單獨(dú)包裝運(yùn)輸。5.23 隔離開關(guān)在搬運(yùn)過程中應(yīng)處于
32、合閘位置,隔離開關(guān)底部用螺栓 與箱底固定,各相之間用支撐隔開。5.24 配電盤(屏)及儀表在運(yùn)搬中應(yīng)有防震措施。帶油的電氣設(shè)備(變 壓器、電壓互感器、電流互感器等)在運(yùn)搬時其傾斜角不應(yīng)大于 15º。6 挖溝、挖坑6.1 在有地下設(shè)施的處所施工時,開工前應(yīng)與有關(guān)單位聯(lián)系,查明地 下設(shè)施的位置,并做好防護(hù)。如發(fā)現(xiàn)意外設(shè)施,應(yīng)采取妥善措施,并 報告領(lǐng)導(dǎo)及時處理。6.2 挖溝時施工人員須保持 35m 的距離。挖溝 (坑)不應(yīng)采取掏挖 的方法。在有地下電纜的地方挖溝(坑)時,施工負(fù)責(zé)人應(yīng)了解地下電 纜的用途、埋設(shè)位置,并向施工人員說明。當(dāng)開挖深度到 04m 后, 應(yīng)小心挖掘。6.3 挖溝(坑)
33、影響行人,妨礙交通時,必須在距施工地點(diǎn) 35m 處加 設(shè)防護(hù),并應(yīng)當(dāng)天填平不得過夜。如必須過夜時,應(yīng)采取防止人員墮 落的安全措施。6.4 在鐵路沿線或穿越鐵路挖溝(坑)時,挖出的土石和料具嚴(yán)禁侵入 基本建筑限界,并應(yīng)采取防止塌落的措施。穿越鐵路挖溝時,宜采用 頂管方法。6.5 挖溝需穿越有倒塌危險的墻壁時,應(yīng)將墻壁兩側(cè)支撐牢固后開挖。6.6 在斜坡地段挖溝(坑)時,應(yīng)清除斜坡上的浮土和石塊。挖出的土 石應(yīng)放在下坡側(cè)。溝(坑)內(nèi)有人工作時,上坡側(cè)嚴(yán)禁有人。6.7 挖坑深度大于 15m 時,坑內(nèi)人員應(yīng)戴安全帽??拥酌娣e不大于15m2 時,應(yīng)只準(zhǔn)一人在坑內(nèi)工作。6.8 挖溝(坑)時,溝(坑)邊不得放
34、置重物或工具。棄土距離應(yīng)在溝(坑) 邊 04m 以外。堆土高度不應(yīng)大于 15m。挖水溝坑)使用抽水機(jī)時, 抽水機(jī)應(yīng)距溝(坑)邊 2m 以外。6.9 在土質(zhì)松軟地帶挖溝(坑)時,應(yīng)放坡開挖,坡度的大小應(yīng)根據(jù)土壤的性質(zhì)、濕度及坑深確定,一般情況下應(yīng)符合下表的規(guī)定。 開挖溝(坑)時的坡度土 壤 性 質(zhì)坡 度砂土、淤泥1:075砂質(zhì)粘土1:05粘土及黃土1:03堅土l:015挖水溝(坑)、流砂溝(坑)時,應(yīng)采用防護(hù)板或沉箱等加固措施。6.10 挖溝(坑)使用防護(hù)板時,應(yīng)經(jīng)常檢查擋土板及支撐有無變形、 損壞或折斷。防護(hù)板的安裝或撤除應(yīng)由熟練工人操作外,還應(yīng)有人監(jiān) 護(hù)。撤除防護(hù)板時,應(yīng)由下而上的逐層撤除逐
35、層回填夯實,嚴(yán)禁將防 護(hù)板一次全部撤除。有倒塌危險的流沙地帶,如不撤除必須經(jīng)施工負(fù) 責(zé)人同意。7 拉線安裝7.1 拉線位于交通要道或人易觸及的地方,須套上涂有紅、白漆標(biāo)志 的竹管保護(hù),材料另備。7.2 當(dāng)一基電桿上安裝有多條拉線時,拉線不應(yīng)有過松、過緊、受力 不均勻等現(xiàn)象。7.3 下拉線盤時,工作人員應(yīng)站在馬道兩側(cè)雙手拉持拉線棒將拉線盤 徐徐放入坑內(nèi),不得丟入,且馬道對面嚴(yán)禁有人。7.4 拉線安裝時線夾舌板與拉線應(yīng)密貼,受力后無滑移現(xiàn)象,拉線回 頭與本線應(yīng)扎牢。8 落地式變壓器8.1 在既有帶電線路上進(jìn)行變臺安裝作業(yè),要按規(guī)定辦理停電作業(yè)手續(xù);停電時,必須履行驗電、接地程序。8.2 工具及材料
36、的傳遞嚴(yán)禁采取拋投方式進(jìn)行。8.3 六級以上大風(fēng)天氣嚴(yán)禁登桿作業(yè)。9 桿上設(shè)備安裝9.1 在帶電線路附近進(jìn)行隔離開關(guān)安裝作業(yè)時,要按規(guī)定辦理停送電 手續(xù),停電后應(yīng)設(shè)專人進(jìn)行安全監(jiān)護(hù)。9.2 進(jìn)入施工現(xiàn)場必須戴安全帽,桿上作業(yè)人員必須系安全帶。9.3 橫擔(dān)安裝前,應(yīng)在地面進(jìn)行檢查,其彎曲度和扭曲度不能超過有 關(guān)規(guī)定。9.4 所有安裝用螺栓,擰緊后至少要露出兩扣螺紋。9.5 嚴(yán)禁拋投傳遞工具及材料,應(yīng)采用繩索提拉。9.6 六級以上大風(fēng)天氣嚴(yán)禁登桿作業(yè)。10 現(xiàn)場灌注混凝土10.1 鋼筋作業(yè)的現(xiàn)場地面應(yīng)平整,工作臺應(yīng)堅固,臺上的鐵銹應(yīng)用 刷子等清除干凈。距工作臺 2m 以內(nèi)的地面不得堆放料具。綁扎后
37、的 成品應(yīng)堆碼整齊。鋼筋作業(yè)時應(yīng)穿緊袖、緊腿工作服。除銹時應(yīng)戴口 罩和護(hù)目鏡。10.2 拉直鋼筋時,工作區(qū)內(nèi)不應(yīng)有人穿行和停留。采用絞磨、手扳 葫蘆或其他工具拉直鋼筋時,應(yīng)檢查地錨牢固程度。絞磨、手扳葫蘆 等應(yīng)有制動裝置。10.3 人工切斷鋼筋時,應(yīng)檢查工具是否良好。嚴(yán)禁站在一條直線上和戴手套工作。10.4 支撐模板前應(yīng)檢查溝、坑壁有無裂紋和塌方危險。溝、坑邊 1m 內(nèi)不得堆放料具。向坑內(nèi)傳遞料具應(yīng)用繩索傳遞,不得上下拋擲或隨 地亂放。10.5 攪拌機(jī)使用前,必須進(jìn)行全面檢查,經(jīng)試車合格后方可進(jìn)行工 作。人工拌合時,拌合臺架必須牢固平正,嚴(yán)禁站在模板和支梁上工 作。10.6 使用攪拌機(jī)時,必須
38、符合下列規(guī)定:10.6.1 裝料時,人不應(yīng)站在料斗上。10.6.2 升降料斗時,下方不應(yīng)有人。10.6.3 清理料斗時,必須與司機(jī)聯(lián)系,將料斗保險鏈扣牢。10.6.4 嚴(yán)禁用手或工具伸入攪拌筒內(nèi)加速卸出混凝土混合料。10.6.5 清除在攪拌筒內(nèi)的殘留攪拌物時,必須斷開電源,鎖上開 關(guān)箱。10.7 灌注混凝土?xí)r,溝、坑內(nèi)不得有人。振搗器的接地必須良好。 不得將電線掛在身上或浸入水中。移動振搗器時不得硬拉電線。發(fā)現(xiàn) 有漏電時必須及時處理。11 組立桿塔11.1 立桿時,必須使用滑板,叉桿、支桿必須支撐在地面上??觾?nèi) 有人時,嚴(yán)禁移動或轉(zhuǎn)動電桿。在六級及以上大風(fēng)、雷雨、濃霧時, 嚴(yán)禁組立桿塔。11.
39、2 組立桿塔時,各受力點(diǎn)必須綁扎牢固,側(cè)面應(yīng)用拉繩控制。當(dāng)桿塔未安裝牢固前,不應(yīng)登桿塔工作和解開繩索。拉線裝設(shè)不齊全不能登桿作業(yè),永久性拉線未裝設(shè)完畢前,臨時性拉 線不得卸載或撤除。11.3 地面組裝桿塔時,不得將手指插入螺孔內(nèi)找正。在市區(qū)、地面 狹窄或路肩、高崗、斜坡等地區(qū)組立桿塔時,應(yīng)采取安全措施。11.4 組立桿塔的指揮者,應(yīng)由技術(shù)熟練、有經(jīng)驗的人員擔(dān)任。指揮 信號應(yīng)先統(tǒng)一,并做到準(zhǔn)確、宏亮和清楚。11.5 組立桿塔使用的絞車、滑車、繩索、抱桿等機(jī)具應(yīng)檢查合格后 方可使用。使用的卡環(huán)應(yīng)使長度方向受力,抽銷卡環(huán)應(yīng)防止銷子滑脫。 在市區(qū)、地面狹窄或路塹、高崗、斜坡等地區(qū)組立桿塔時,應(yīng)采 取
40、安全措施和適當(dāng)增加人員。11.6 立桿塔時地錨應(yīng)牢固。主牽引地錨、桿塔中心、抱桿頂及制動 地錨四點(diǎn)必須在同一垂直面上。11.7 桿塔起立頭部離地面 0。51m 的高度時,應(yīng)暫停牽引進(jìn)行檢查, 確認(rèn)無異狀后方可繼續(xù)起立,中途不應(yīng)停下,起立到 70º 時應(yīng)減慢牽 引速度。與立桿無關(guān)人員均應(yīng)距起立桿塔高度的 1,2 倍以外,指揮 者除外。11.8 吊車組立桿塔時應(yīng)加三方拉繩,立正回填夯實后方可撤去拉繩。11.9、立無叉梁的 H 型桿時應(yīng)加裝臨時叉梁,保證在起吊過程中有足 夠的穩(wěn)定性。11.20 參加立桿的施工人員應(yīng)戴安全帽。11.22 吊車組立桿塔時,應(yīng)加三方拉繩,立正回填夯實后方可撤去拉
41、繩。起吊物件應(yīng)使用交互捻制的鋼絲繩套。12 放線、緊線12.1 放線時,線盤支架應(yīng)放穩(wěn),兩個支架受力均勻,線盤軸杠應(yīng)保 持水平,防止線盤傾斜。放線過程中應(yīng)設(shè)專人指揮。12.2 電線盤的防護(hù)板,應(yīng)集中存放在不妨礙交通和施工的地點(diǎn)。線 盤應(yīng)有制動裝置。12.3 放線信號必須明確、暢通、并便于了望和傳遞,如發(fā)現(xiàn)異狀應(yīng) 即停止放線。在山區(qū)放線時應(yīng)選好路徑。在市內(nèi)、住宅區(qū)或跨越公路 時,應(yīng)設(shè)專人防護(hù)??缭酵ㄐ拧㈦娏€路時,應(yīng)搭設(shè)越線架。12.4 越線架必須堅固可靠,立柱埋深不應(yīng)小于 05m。簡易架的埋 深應(yīng)適當(dāng)加大,并應(yīng)設(shè)撐桿或拉線。越線架的型式應(yīng)根據(jù)被跨越物的 大小和重要性確定,寬度必須超出兩邊線各 15m。越線架的中心應(yīng) 在線路中心線上。12.5 在通航的河流上跨河架線時,必須與航運(yùn)部門取得聯(lián)系,并設(shè) 專人防護(hù)。放線時應(yīng)放一條緊一條并綁扎牢固。12.6 當(dāng)耐張線夾上的 U 型螺栓將導(dǎo)線緊固后,方可松開緊線器。12.7 不得在緊線的一側(cè)、角桿內(nèi)側(cè)或利用拉線上下電桿。12.8 緊線時應(yīng)根據(jù)導(dǎo)線截面及地形情況選擇緊線工具及方法。耐張、 轉(zhuǎn)角桿塔應(yīng)根據(jù)緊線張力和設(shè)計要求,調(diào)整永久拉線或設(shè)臨時拉
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- PEP人教版小學(xué)四年級上冊Unit 1 My classroom PartC Story time課件
- 農(nóng)村個人房屋買賣合同協(xié)議書范本
- (立項備案方案)椰雕項目立項申請報告
- 古代建筑行業(yè)中的追蹤和定位- 王姣27課件講解
- 山東省菏澤市鄆城縣第一中學(xué)2023-2024學(xué)年七年級上學(xué)期第一次月考生物試題(解析版)-A4
- 湖南省婁底市新化縣2024-2025學(xué)年八年級上學(xué)期12月月考道德與法治試題-A4
- 獸醫(yī)寄生蟲題庫與參考答案
- 養(yǎng)老院老人心理關(guān)愛制度
- 養(yǎng)老院老人緊急救援人員職業(yè)道德制度
- 房屋建筑項目工程總承包合同(2篇)
- 走近湖湘紅色人物知到章節(jié)答案智慧樹2023年湖南工商大學(xué)
- 普通化學(xué)習(xí)題庫
- 穿孔機(jī)操作規(guī)程
- 危機(jī)公關(guān)處理技巧
- 10、特種作業(yè)人員管理臺賬
- 機(jī)械基礎(chǔ)考試題庫及參考答案
- GB/T 70.1-2008內(nèi)六角圓柱頭螺釘
- 第一章數(shù)學(xué)的萌芽
- GB/T 24628-2009醫(yī)療保健產(chǎn)品滅菌生物與化學(xué)指示物測試設(shè)備
- GB/T 24176-2009金屬材料疲勞試驗數(shù)據(jù)統(tǒng)計方案與分析方法
- 多發(fā)性骨髓瘤的療效評估