1、CSPC Nanhai Petrochemicals ProjectSEPCO Electric Power Construction Corp. 目 錄 CONTENTS1.目的 purpose2.范圍 scope 3.職責 responsibility4.參考文件 references5.計量器具、工具、機械 measuring instrument, tools , machinery6.勞動力組織 labor force7.施工工序和施工方法 construction procedure and plans1.范圍 scope 本作業(yè)指導書適用于CSPC 南海石化項目Steam & P

2、ower生產區(qū)油罐基礎上部結構的施工。The work instruction applies to the upper structure of oil tank foundation in Steam & Power production area for CSPC NANHAI PETROCHEMICALS PROJECT.2.目的 purpose規(guī)定SEPCC1在CSPC南海石化項目生產區(qū)油罐基礎上部結構施工中的施工工藝及標準,以有效的控制施工質量及施工進度。It stipulates the construction process and standard of the upper

3、 structure of oil tank foundation in production area for CSPC NANHAI PETROCHEMICALS PROJECT to effectively control the construction quality and the progress.3.職責 responsibilities3.1技術負責人 Technique leaders 宋輝、陳群 全面負責油罐基礎施工的技術工作。Completely responsible for the technique for oil can foundation construct

4、ion3.2施工負責人 Construction leaders 許德利、李曉東、方瑞青 全面負責油罐基礎施工現(xiàn)場人員、機械等的協(xié)調安排工作。Completely responsible for the corresponding arrange work for the site members for oil can foundation construction and machinery 3.3技術員 Technicians 趙克、石青松 具體負責油罐基礎施工技術資料收集、整理。Responsible for collecting and cleaning up the technic

5、al document for oil can foundation construction.3.4施工員 Constructors 卜現(xiàn)剛、胡燕青、楊志猛、張立平 具體負責油罐基礎施工現(xiàn)場人員、機械等的協(xié)調安排工作。Completely responsible for the corresponding arrange work for the site members for oil can foundation construction and machinery3.5質檢員 Inspectors 高見、王福全 負責油罐基礎施工的質量檢查及各工序的組織驗收。Responsible fo

6、r the quality inspection for oilcan foundation construction and checkingAnd accepting all the process.3.6測量員 Surveyors 張勝利、鄭小豐、潘江濤 負責油罐基礎施工的測量控制。Responsible for the survey control for oilcan foundation construction.3.7安全員 HSE man 李新軍 負責油罐基礎施工的HSE工作。Responsible for HSE task for oilcan foundation cons

7、truction.4.參考Drawing4.1相關設計圖紙;4.1 Correlative designing drawing;4.1.1油罐基礎施工圖(43-8320-8650-0002)Rev.01 4.1.1 Oil tank foundation construction drawing (43-8320-8650-0002)Rev.014.1.2油罐基礎施工圖(43-8320-8660-0002)Rev.014.1.2 Oil tank foundation construction drawing (43-8320-8660-0002)Rev.014.1.3油罐基礎施工圖(43-8

8、320-8670-0002)Rev.014.1.3 Oil tank foundation construction drawing (43-8320-8670-0002)Rev.014.1.4油罐基礎施工圖(43-8320-8680-0002)Rev.014.1.4 Oil tank foundation construction drawing (43-8320-8680-0002)Rev.014.1.5油罐基礎施工圖(43-8320-8690-0002)Rev.014.1.5 Oil tank foundation construction drawing (43-8320-8690-0

9、002)Rev.014.2與施工圖紙相關的設計變更文件;4.2 Design change document is correlative to the construction drawing;4.3參考相關文件4.3 Reference to correlative document.4.3.1 WI-8710-8100-00054.3.2 油罐基礎施工 Foundation of oil tank construction(QC-8710-8100-0012)4.3.3 SP-8320-8100-00024.3.4 DEP-34.11.00.114.3.5 GB128-905.計量器具、

10、工具及機械 Measuring instrument, tools and machinery計量器具:全站儀、水準儀、鋼卷尺、溫度計Measuring instrument : total station, water level, steel tape, thermometer工具:鐵鍬、小推車、剪刀兩把、手鋸一把、Tool: shovel, small hand cart, 2 scissors, 1 handsaw機械: 400kg 壓路機2臺、自卸車3臺、允許搭接寬度15cm的HDPE膜焊機一臺,瀝青拌和站一套(惠州市市政總公司),平板振動器一臺。Machinery: 2 400kg

11、 rollers, 3 automatic unloaders, 1 HDPE film welding machine (the allowable overlapping width is 15cm ) ,1 bitumen mixing plant (Hui Yang city planning parent company),1 flat vibrator.6.勞動力組織 laborforce技術員2人,施工員4人,測量員2名、質檢員2名,安全員1名,壯工20名,熟練操作工3名,駕駛員5人,電工1人。 2 technician , 4 constructors, 2 surveyors

12、, 2 inspector, 1 safetyman, 20 laborer, 3 skillful operators, 5 drivers, 1 electrician.7.施工工序和施工方法 Construction procedure and plans7.1施工工序 construction procedure施工工序為:砂石基礎回填至標高修坡HDPE集水坑及排水管施工閉水試驗排水管溝中砂回填夯實砂石基礎上部鋪5cm等級良好天然砂HDPE及土工布層施工土工布礫石包及PVC排水管施工鋪5cm等級良好的天然砂回填砂石料至瀝青砂層底標高清理砂石墊層表面測量放線 鋪墊第一層瀝青砂 壓實 邊角

13、細部處理 鋪墊第二層瀝青砂 壓實 邊角細部處理檢查驗收修邊坡邊坡上鋪10cm等級良好天然砂延長HDPE層移交安裝水壓試驗鋼筋砼護坡及地面鋼筋砼變形縫(聚硫密封膏及橡膠)施工Procedure: sand foundation backfill to elevation trimming slope HDPE sump and drainpipe construction closed water testing sand backfill tamp in the drainpipe channel paving the nicer grading natural sand upside the

14、 sand foundation HDPE and waterproof cloth construction waterproof gravel package and PVC drainpipe construction paving nicer grading natural sand (5cm)backfilling sand material to the bottom elevation of pitch sand layer cleaning up the surface of sand layer surveying mark paving the first layer pi

15、tch compact side corner disposal paving the second pitch compact side corner disposal check and acceptance trimming the side slope paving nicer grading natural sand(10cm) on the side slope extending the bed of HDPE handover and installation hydraulic pressure testing ground rebar concrete deformatio

16、n crack (polysulfide seal paste and rubber ) construction7.2施工方法construction plans7.2施工方法construction plans7.2.1HDPE集水坑及HDPE管施工 water header and HDPE tube construction7.2.1.1按照圖紙設計要求采用專門HDPE管材焊機焊接,采用套管內嵌導線,通過電流加熱使HDPE材料溶化,達到管材與套管的緊密連接(此前取試件進行管材試焊,切出斷面,檢查焊縫情況)。7.2.1.1 According to the drawing design

17、requirement, to adopt special HDPE pipe welder to joint and internal embedding lead of thimble to unfreeze the HDPE through heating current, so as to connect tightly with thimble (before this , welding line should be inspected).7.2.1.2管材加工完畢后,由測量專工定出油罐中心點及管道平面角度,按照圖紙設計要求人工開挖至管道設計標高,并安裝好管道坡度。安裝完畢進行閉水

18、試驗,管道注水后,管道不滲不漏為合格,閉水試驗后將HDPE管溝用等級良好的天然砂回填夯實。7.2.1.2 Make certain the central point of oil tank and the pipeline plane angle by measuring engineering , and excavating by manual till the designing elevation as drawing design requested, then installing the piping gradient after processing pipe materia

19、l . The test of closing water is followed by the installation, it will be passed if the pipeline is neither seeping nor leaking. Backfilling and tamping HDPE channel with nicer grading natural sand when closing water completed. 7.2.2HDPE層施工 HDPE construction7.2.2.1鋪設HDPE膜前,應對鋪設基底進行全面檢查,鋪設基底應堅實、平整,25

20、mm內不得有樹根、瓦礫、石子、混凝土顆粒、鋼筋頭、玻璃屑等有可能損傷HDPE膜的雜物,HDPE膜下部鋪5cm等級良好的天然砂,且夯實整平。7.2.2.1 Inspecting completely the fundus before laying the HDPE film and make sure the fundus stability , level , no sundries to damage HDPE film. Spreading 5cm natural under the HDPE film.7.2.2.2鋪設面清理干凈,無滲水、淤泥、積水、有機物殘碴和有可能造成環(huán)境污染的有

21、害物質。7.2.2.2 Clean up the laying surface, no seepage , sullage, seeper, substance remnant and deleterious matter .7.2.2.3 HDPE膜裁切之前,準確丈量其相關尺寸,然后按實際裁切。 7.2.2.3 Before cutting HDPE film , to measure correlative size, and then to cut it according to the practice.7.2.2.4膜與膜之間接縫的搭接寬度為150毫米,且搭接方向為順水方向。7.2.

22、2.4 The joining width of joint between film is 150mm, even the overlap direction is downstream.7.2.2.5 HDPE膜在鋪設中,避免產生人為的折皺。7.2.2.5 Avoiding the artificial cockling during paving the HDPE film.7.2.2.6 HDPE膜鋪設完后,應盡量減少在膜面上行走、搬運工具等,凡能對HDPE膜造成危害的物件,均不應放在膜上或攜帶在膜上行走,以免對膜造成意外損傷。7.2.2.6 Dont walk and convey

23、tools on the film surface film after paving the HDPE film ; nothing can damage to the film should place or walk on it to stop the film from being damaged.7.2.2.6 HDPE膜施工現(xiàn)場的所有人員都不能抽煙,不得穿帶鐵釘?shù)男蚋吒驳仔侥っ嫔闲凶撸辉试S從事有可能破壞防滲膜的一切活動。7.2.2.6 All personnel in the HDPE film construction site are not allowed to sm

24、oke, wear shoes with iron nail or high-heel shoes with hard bottom walking on the film, dont go in for any activities is likely to destroy the anti-penetrant film.7.2.2.7HDPE膜鋪好后,應及時用沙袋將膜壓住。 7.2.2.7 Press the film with sandbag in time after paving the HDPE film.7.2.2.8手提焊槍焊接一般應按四道工序進行:搭接檢查、熱粘、打毛、焊接。

25、雙軌熱熔焊機焊接工序分為:調壓加熱、定速恒溫、搭接檢查、清潔打毛、啟動焊接四道工序。7.2.2.8 Using welding torch to joint following the four steps : overlapping inspection, heating adhesion, grind, jointing. Double railway heat fusion welding procedure: adjusting the voltage to heat up, speed fixed and constant temperature, joint inspection,

26、 cleanness and grinding ,startup jointing .7.2.2.9清理接縫處表面,HDPE膜的搭接段面不應夾有泥沙等雜物。 7.2.2.9 Clean up the surface of joint , sundries cant be included on the overlap surface.7.2.2.10打磨后的表面必須保持清潔,遇有污染或落有泥沙等物時,要用干凈的布或棉紗撣掉再焊,必要時應重新打磨,切忌用手擦拭。7.2.2.10 Keep the surface clean and whisk off the dirty matter with

27、clean cloth or cotton yarn .Burnishing again if necessary and dont wipe it off with your hand. 7.2.2.11當手提焊槍的溫度控制器所指示的焊機頭溫度低于200時,在任何情況下不得啟動焊機。7.2.2.11 Dont startup the welding machine when the temperature of welding head is below the 200.7.2.2.12焊條在焊接時,不得隨意接觸地面,不得用粘有油污的手套、棉紗、布塊擦試焊條,并應保持干凈,不被任何物質污染。

28、7.2.2.12 When jointing the welding rod ,dont touch the floor at random, dont wipe the welding rod with smeary glove, cotton yarn , cloth .Keep it from being polluted.7.2.2.13手提焊槍的中心指針在焊接時必須和接縫中心對正,以免影響焊接的質量。7.2.2.13 The central hand of welding torch must just the joint center to avoid the quality.7.

29、2.2.14手提焊槍每次焊接開始時,應先啟動焊機、將槍頭里面余留的焊條擠壓物除去,完成后立即焊接。7.2.2.14 Firstly should startup the weld machine and remove the welding rod extrusion remained in the torch, and then to joint at once. 7.2.2.15手提焊槍在焊接過程中,應經常檢查槍頭的滑塊,磨損較嚴重時應及時更新滑塊,以免損傷膜面;雙軌熱熔焊機在焊接過程中,需隨時注意焊機的運行情況,要根據現(xiàn)場的實際情況對速度和溫度進行微調。7.2.15 Inspecting

30、 the slide block of torch head regularity and, update in time to avoid the damage to film surface during the course of welding torch jointing ; During the course of double heat fusion welder jointing, pay attention to the function of weld machine at any moment , to slight adjust the speed and temper

31、ature according to the site circumstance.7.2.2.16嚴禁將從手提擠壓焊槍槍頭摘下的焊料物直接丟棄在膜面上。7.2.2.16 Dont throw the welding waste on the film.7.2.2.17手提焊槍每天使用完畢,應將槍頭內余留的焊條拔出。.7.2.2.17 Pull out the welding rod remained in the torch head after using it.7.2.2.18每天結束工作時,應及時切斷電源。7.2.2.18 Shut off the electrical source i

32、n time when end your work every day.7.2.2.19 HDPE膜施工現(xiàn)場禁止吸煙,必要時還應配備消防設施。7.2.2.19 No smoking in HDPE construction site, fire protection equipment should be prepared if necessary.7.2.3集水坑上部土工布施工7.2.3 The construction of waterproof cloth upper the water storage pond.7.2.3.1土工布裁切之前,準確丈量其相關尺寸,然后按實際裁切。7.2.

33、3.1 Before cutting the waterproof cloth , its correlative size must be exactly measured .7.2.3.2土工布在鋪設中,避免產生人為的折皺。7.2.3.2 Avoid the artificial cockling when paving the waterproof cloth .7.2.3.3將150cm150cm土工布覆蓋在25HDPE管口上,用綁扎絲擰緊固定。7.2.3.3 To cover the 25HDPE nozzle with 150cm150cm waterproof cloth and

34、 , then fixed it with binding thread.7.2.3.4土工布鋪設完后,應盡量減少在布面上行走、搬運工具等,凡能對土工布造成危害的物件,均不應放在布面上或攜帶在布面上行走,以免對布造成意外損傷。7.2.3.4 Dont walk and convey tools on the film surface film after paving the waterproof cloth ; nothing can damage to the film should place or walk on it to stop the film from being damag

35、ed.7.2.3.5不得穿帶鐵釘?shù)男蚋吒驳仔讲济嫔闲凶?,不允許從事有可能破壞土工布的一切活動。土工布鋪好后,應及時用沙袋將布壓住。7.2.3.5 No wearing shoes with iron nail or high-heel shoes with hard bottom walking on the film, dont go in for any activities is likely to destroy the waterproof cloth. Press the waterproof cloth with sandbag in time after paving t

36、he HDPE film.7.2.4HDPE層上部回填Upper backfilling of HDPE砂石料回填前在HDPE層上部回填5cm等級良好天然砂,密實整平后進行上部回填,回填施工方法參見油罐砂石基礎施工WI-8710-8100-0005。Backfilling 5cm nicer grading natural sand upper the HDPE before backfilling , and then start to upper backfill when it is compact, refer to the backfill construction plans Oi

37、lcan sand foundation constructionWI-8710-8100-0005。7.2.5瀝青砂層施工bitumen sand layer construction7.2.5.1準備工作preparation 施工前,必須進行試配,并提供砂級配試驗報告。Carry out the mix design before construction and provide sand grading test report.將瀝青砂墊層外邊線準確放出邊線,并明確瀝青砂絕緣層的表面允許偏差和檢驗方法。砂石墊層、瀝青砂上表面允許偏差和檢驗方法見下表:The side line of b

38、itumen sand layer shall be set up correctly, make certain the surface allowance difference of bitumen sand insulated layer and inspection method. See following list:編號NO.項目ITEMS允許偏差/mm allowance difference/mm墊層Layer瀝青砂絕緣層bitumen sand insulation layer砂石墊層sand layer 瀝青砂層分兩層施工,下層40cm,上層35cmdivide the b

39、itumen sand into two beds, the underlayer 40cm,the upper 35cm檢驗方法checking method1表面平整度surface level degree 1525用2m靠尺和楔形塞尺檢查surveying with 2m leaning ruler and cuniform filling feeler.2標高elevation106(罐壁一米內 tank shell plate within 1m)20(其他部分other part)用水準儀檢查Inspecting with water level.3厚度depth7.5mm用鋼尺

40、檢查Inspection with steel rule記錄表Table:油罐編號Number日期Date油罐容積Dimension油罐直徑Diameter基礎中心標高偏差(mm)Windage of foundation center elevation 同心圓編號Number of circularity測點編號Point Number計算標高(mm)Design elevation測點標高(mm)Point elevation 任意兩點最大高差(mm)Difference of any 2 points 測點標高誤差(mm)Difference of point elevation1(0

41、.25D)2(0.5D)3(0.75D)4(D)對原有的工作面進行清掃工作。在每一層施工前,應對工作面進行徹底的清理、保證下一層干凈、整潔,無雜物污染。To clean up the base, and each layer shall be cleaned before proceeding with the next layer.攤鋪瀝青砂前,在砂石墊層上插上標有攤鋪標高的鋼筋,以控制攤鋪標高,并在攤鋪后取出,并修補鋼筋孔洞,在施工過程中嚴格控制標高,每層施工結束,立即進行標高復測,超過標準立即進行修補。插鋼筋過程鋼筋不得插得過深,防止損壞下部HDPE膜。施工人員必須經過SEPCO的培訓,

42、明確SEPCO對HSE的要求,尤其是環(huán)保方面的要求。施工人員必須穿著專用防燙勞保鞋,佩戴防護口罩及專用防護手套,防止燙傷及中毒。在施工前對施工人員進行滅火器使用培訓,并就近明顯擺放滅火器。保證施工JSA中的措施和控制方法,使人員不和熱瀝青的蒸汽接觸。現(xiàn)場設立燙傷應急急救箱,專門存放治療燙傷的藥品,并準備應急備用水桶。廢棄不用的瀝青砂進行標識并儲存在密封的容器內,清理出現(xiàn)場。施工中嚴禁明火,任何有明火的作業(yè)均不允許施工。A rebar marked with elevation shall be set up to control the bitumen/sand layer thickness

43、 before construction, and it shall not inserted too deep to damage the HDPE film and the holes shall be repaired after construction. It is strict to control the elevation during construction. After every layer have resurvey of the elevation. If the elevation is more difference than the standard in t

44、he inspection table, it must be submitted right now.All involved persons shall be carried out HSE training, especially environmental requirement, and equipped with proper PPE. Firefighting training shall also be carried out and extinguishers equipped. To ensure the JSA measures to be implemented to

45、prevent personnel from contact with heat bitumen vapour. The first aid box shall be equipped for any emergency. The waste bitumen/ sand shall be kept in the closed container with clear identification and removed out. No work with fire is allowed during construction.7.2.5.2瀝青砂施工bitumen sand construct

46、ion瀝青技術指標見下表:the technical data of bitumen as follows:標準及標準號碼standard標號type針入度(25,100g)/(1/10mm)不小于penetration延度(25)/cm不小于elongation軟化點(環(huán)球法)/不低于soft point not less than溶解度(三氯甲烷、三氯化碳或苯)/不小于solubility not less than蒸發(fā)損失(160,5h)/不大于vopour loss not more than閃點(開口)/不低于flash point not less than水分/%不大于water

47、 not more than建筑石油瀝青building petro-bitumen(GB49475)10號520195991.0230痕跡water mark拌和:在攪拌站將10#建筑瀝青加熱至180190攝氏度,按設計中砂與瀝青配合比7:93與混合,中砂加熱溫度比瀝青高1020攝氏度,攪拌均勻,瀝青混合料出廠溫度控制在170185攝氏度。Mixing: To heat the bitumen 10# up to 180190 Celsius degrees ,and bitumen is mixed with sand at the mix ratio of 7 to 93, while

48、the sand temperature shall be 1020 Celsius degrees higher than that of bitumen. The mixture temperature shall be controlled at 170185 Celsius degrees.運輸:拌和的混合料,裝車后應控制行車時間,及時運往工地。在運輸中,不論天氣如何,必須加蓋保溫蓬布,以保證到場混合料溫度在160170攝氏度。運輸時應控制裝車量,并將蓬布加蓋密實,且車輛選用自卸車,防止瀝青漏出。運輸?shù)綀龊笙攘繙y溫度,對低于100攝氏度的廢棄不用,并查找原因,分清是運輸延誤時間降溫,還

49、是拌和站拌和原因,如是后者,及時通知拌和站調整溫度。由于瀝青粘性比普通瀝青大,運料車運料前車廂底部應涂刷適量的油混合料,避免粘車,并注意使油料不能混入瀝青砂墊層中。瀝青砂中混入油料的部分不能用到瀝青砂墊層中去,廢棄部分及時清理出場。Transportation: the mixture shall be delivered to the field promptly and insulate during transportation to ensure the temperature to be kept at 160170 Celsius degrees. If its lower tha

50、n 160 which is transported to the jobsite, the mixture shall be rejected and the root cause shall be investigated and necessary correction be taken.攤鋪:采用人工作業(yè)鋪筑的施工方法。攤鋪前檢查攤鋪溫度,溫度低于100的瀝青砂禁止施工,清除出現(xiàn)場,保證攤鋪過程中均勻前進,對邊角或弧形地帶,采用局部加工調整處理。攤鋪時在已攤鋪的瀝青砂墊層上鋪鋼板,工人用斗車經過鋼板將瀝青砂運至未鋪設區(qū)域,攤鋪工人站在未鋪設區(qū)域,邊攤鋪邊后退。在攤鋪后,應及時檢測攤鋪厚

51、度,若不合要求,及時調整。Laying: to lay manually and the mixture temperature shall be higher than 100 to ensure the laying to be done evenly. The edges or arc area shall be trimmed properly. After laying, the layer thickness shall be checked and make any adjustment if necessary.碾壓:瀝青混合料的碾壓,壓實采用400kg壓路機,在終壓溫度前消除

52、人為全部軌跡,達到設計要求的厚度即停止作業(yè),以免過壓。先攤鋪第一層瀝青砂,厚度大約40mm,并在模板上做出標記。攤鋪均勻后,用400kg壓路機壓實,壓路機無法壓實的區(qū)域采用人工夯實。第一層施工完畢,經SEPCO、PMC、BSC驗收后方可進行第二層施工。然后按第一層瀝青砂鋪設厚度與壓實厚度之比攤鋪第二層瀝青砂,使壓實后標高達到設計標高。中心點半球型將使用球形鐵板壓實成型。對于接茬處應將瀝青砂層鏟成斜面,使接茬相互搭接,上層接茬縫與下層接茬縫必須錯開,防止裂縫。上下層間接茬前也應噴灑一層熱瀝青。最后人工平整使碾壓達到7.5.2.1中質量標準的要求。施工中每隔30分鐘進行一次測溫,并進行詳細測溫記錄。每車瀝青砂測溫點5個,中心一個,每個邊角一個,共5個。修補瀝青砂溫度必須大于100攝氏度,施工

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
  • 4. 未經權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
  • 6. 下載文件中如有侵權或不適當內容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論