版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
1、CSPC Nanhai Petrochemicals ProjectSEPCO Electric Power Construction Corp. 目 錄 CONTENTS1.目的 purpose2.范圍 scope 3.職責(zé) responsibility4.參考文件 references5.計(jì)量器具、工具、機(jī)械 measuring instrument, tools , machinery6.勞動(dòng)力組織 labor force7.施工工序和施工方法 construction procedure and plans1.范圍 scope 本作業(yè)指導(dǎo)書適用于CSPC 南海石化項(xiàng)目Steam & P
2、ower生產(chǎn)區(qū)油罐基礎(chǔ)上部結(jié)構(gòu)的施工。The work instruction applies to the upper structure of oil tank foundation in Steam & Power production area for CSPC NANHAI PETROCHEMICALS PROJECT.2.目的 purpose規(guī)定SEPCC1在CSPC南海石化項(xiàng)目生產(chǎn)區(qū)油罐基礎(chǔ)上部結(jié)構(gòu)施工中的施工工藝及標(biāo)準(zhǔn),以有效的控制施工質(zhì)量及施工進(jìn)度。It stipulates the construction process and standard of the upper
3、 structure of oil tank foundation in production area for CSPC NANHAI PETROCHEMICALS PROJECT to effectively control the construction quality and the progress.3.職責(zé) responsibilities3.1技術(shù)負(fù)責(zé)人 Technique leaders 宋輝、陳群 全面負(fù)責(zé)油罐基礎(chǔ)施工的技術(shù)工作。Completely responsible for the technique for oil can foundation construct
4、ion3.2施工負(fù)責(zé)人 Construction leaders 許德利、李曉東、方瑞青 全面負(fù)責(zé)油罐基礎(chǔ)施工現(xiàn)場人員、機(jī)械等的協(xié)調(diào)安排工作。Completely responsible for the corresponding arrange work for the site members for oil can foundation construction and machinery 3.3技術(shù)員 Technicians 趙克、石青松 具體負(fù)責(zé)油罐基礎(chǔ)施工技術(shù)資料收集、整理。Responsible for collecting and cleaning up the technic
5、al document for oil can foundation construction.3.4施工員 Constructors 卜現(xiàn)剛、胡燕青、楊志猛、張立平 具體負(fù)責(zé)油罐基礎(chǔ)施工現(xiàn)場人員、機(jī)械等的協(xié)調(diào)安排工作。Completely responsible for the corresponding arrange work for the site members for oil can foundation construction and machinery3.5質(zhì)檢員 Inspectors 高見、王福全 負(fù)責(zé)油罐基礎(chǔ)施工的質(zhì)量檢查及各工序的組織驗(yàn)收。Responsible fo
6、r the quality inspection for oilcan foundation construction and checkingAnd accepting all the process.3.6測量員 Surveyors 張勝利、鄭小豐、潘江濤 負(fù)責(zé)油罐基礎(chǔ)施工的測量控制。Responsible for the survey control for oilcan foundation construction.3.7安全員 HSE man 李新軍 負(fù)責(zé)油罐基礎(chǔ)施工的HSE工作。Responsible for HSE task for oilcan foundation cons
7、truction.4.參考Drawing4.1相關(guān)設(shè)計(jì)圖紙;4.1 Correlative designing drawing;4.1.1油罐基礎(chǔ)施工圖(43-8320-8650-0002)Rev.01 4.1.1 Oil tank foundation construction drawing (43-8320-8650-0002)Rev.014.1.2油罐基礎(chǔ)施工圖(43-8320-8660-0002)Rev.014.1.2 Oil tank foundation construction drawing (43-8320-8660-0002)Rev.014.1.3油罐基礎(chǔ)施工圖(43-8
8、320-8670-0002)Rev.014.1.3 Oil tank foundation construction drawing (43-8320-8670-0002)Rev.014.1.4油罐基礎(chǔ)施工圖(43-8320-8680-0002)Rev.014.1.4 Oil tank foundation construction drawing (43-8320-8680-0002)Rev.014.1.5油罐基礎(chǔ)施工圖(43-8320-8690-0002)Rev.014.1.5 Oil tank foundation construction drawing (43-8320-8690-0
9、002)Rev.014.2與施工圖紙相關(guān)的設(shè)計(jì)變更文件;4.2 Design change document is correlative to the construction drawing;4.3參考相關(guān)文件4.3 Reference to correlative document.4.3.1 WI-8710-8100-00054.3.2 油罐基礎(chǔ)施工 Foundation of oil tank construction(QC-8710-8100-0012)4.3.3 SP-8320-8100-00024.3.4 DEP-34.11.00.114.3.5 GB128-905.計(jì)量器具、
10、工具及機(jī)械 Measuring instrument, tools and machinery計(jì)量器具:全站儀、水準(zhǔn)儀、鋼卷尺、溫度計(jì)Measuring instrument : total station, water level, steel tape, thermometer工具:鐵鍬、小推車、剪刀兩把、手鋸一把、Tool: shovel, small hand cart, 2 scissors, 1 handsaw機(jī)械: 400kg 壓路機(jī)2臺(tái)、自卸車3臺(tái)、允許搭接寬度15cm的HDPE膜焊機(jī)一臺(tái),瀝青拌和站一套(惠州市市政總公司),平板振動(dòng)器一臺(tái)。Machinery: 2 400kg
11、 rollers, 3 automatic unloaders, 1 HDPE film welding machine (the allowable overlapping width is 15cm ) ,1 bitumen mixing plant (Hui Yang city planning parent company),1 flat vibrator.6.勞動(dòng)力組織 laborforce技術(shù)員2人,施工員4人,測量員2名、質(zhì)檢員2名,安全員1名,壯工20名,熟練操作工3名,駕駛員5人,電工1人。 2 technician , 4 constructors, 2 surveyors
12、, 2 inspector, 1 safetyman, 20 laborer, 3 skillful operators, 5 drivers, 1 electrician.7.施工工序和施工方法 Construction procedure and plans7.1施工工序 construction procedure施工工序?yàn)椋荷笆A(chǔ)回填至標(biāo)高修坡HDPE集水坑及排水管施工閉水試驗(yàn)排水管溝中砂回填夯實(shí)砂石基礎(chǔ)上部鋪5cm等級(jí)良好天然砂HDPE及土工布層施工土工布礫石包及PVC排水管施工鋪5cm等級(jí)良好的天然砂回填砂石料至瀝青砂層底標(biāo)高清理砂石墊層表面測量放線 鋪墊第一層瀝青砂 壓實(shí) 邊角
13、細(xì)部處理 鋪墊第二層瀝青砂 壓實(shí) 邊角細(xì)部處理檢查驗(yàn)收修邊坡邊坡上鋪10cm等級(jí)良好天然砂延長HDPE層移交安裝水壓試驗(yàn)鋼筋砼護(hù)坡及地面鋼筋砼變形縫(聚硫密封膏及橡膠)施工Procedure: sand foundation backfill to elevation trimming slope HDPE sump and drainpipe construction closed water testing sand backfill tamp in the drainpipe channel paving the nicer grading natural sand upside the
14、 sand foundation HDPE and waterproof cloth construction waterproof gravel package and PVC drainpipe construction paving nicer grading natural sand (5cm)backfilling sand material to the bottom elevation of pitch sand layer cleaning up the surface of sand layer surveying mark paving the first layer pi
15、tch compact side corner disposal paving the second pitch compact side corner disposal check and acceptance trimming the side slope paving nicer grading natural sand(10cm) on the side slope extending the bed of HDPE handover and installation hydraulic pressure testing ground rebar concrete deformatio
16、n crack (polysulfide seal paste and rubber ) construction7.2施工方法construction plans7.2施工方法construction plans7.2.1HDPE集水坑及HDPE管施工 water header and HDPE tube construction7.2.1.1按照?qǐng)D紙?jiān)O(shè)計(jì)要求采用專門HDPE管材焊機(jī)焊接,采用套管內(nèi)嵌導(dǎo)線,通過電流加熱使HDPE材料溶化,達(dá)到管材與套管的緊密連接(此前取試件進(jìn)行管材試焊,切出斷面,檢查焊縫情況)。7.2.1.1 According to the drawing design
17、requirement, to adopt special HDPE pipe welder to joint and internal embedding lead of thimble to unfreeze the HDPE through heating current, so as to connect tightly with thimble (before this , welding line should be inspected).7.2.1.2管材加工完畢后,由測量專工定出油罐中心點(diǎn)及管道平面角度,按照?qǐng)D紙?jiān)O(shè)計(jì)要求人工開挖至管道設(shè)計(jì)標(biāo)高,并安裝好管道坡度。安裝完畢進(jìn)行閉水
18、試驗(yàn),管道注水后,管道不滲不漏為合格,閉水試驗(yàn)后將HDPE管溝用等級(jí)良好的天然砂回填夯實(shí)。7.2.1.2 Make certain the central point of oil tank and the pipeline plane angle by measuring engineering , and excavating by manual till the designing elevation as drawing design requested, then installing the piping gradient after processing pipe materia
19、l . The test of closing water is followed by the installation, it will be passed if the pipeline is neither seeping nor leaking. Backfilling and tamping HDPE channel with nicer grading natural sand when closing water completed. 7.2.2HDPE層施工 HDPE construction7.2.2.1鋪設(shè)HDPE膜前,應(yīng)對(duì)鋪設(shè)基底進(jìn)行全面檢查,鋪設(shè)基底應(yīng)堅(jiān)實(shí)、平整,25
20、mm內(nèi)不得有樹根、瓦礫、石子、混凝土顆粒、鋼筋頭、玻璃屑等有可能損傷HDPE膜的雜物,HDPE膜下部鋪5cm等級(jí)良好的天然砂,且夯實(shí)整平。7.2.2.1 Inspecting completely the fundus before laying the HDPE film and make sure the fundus stability , level , no sundries to damage HDPE film. Spreading 5cm natural under the HDPE film.7.2.2.2鋪設(shè)面清理干凈,無滲水、淤泥、積水、有機(jī)物殘碴和有可能造成環(huán)境污染的有
21、害物質(zhì)。7.2.2.2 Clean up the laying surface, no seepage , sullage, seeper, substance remnant and deleterious matter .7.2.2.3 HDPE膜裁切之前,準(zhǔn)確丈量其相關(guān)尺寸,然后按實(shí)際裁切。 7.2.2.3 Before cutting HDPE film , to measure correlative size, and then to cut it according to the practice.7.2.2.4膜與膜之間接縫的搭接寬度為150毫米,且搭接方向?yàn)轫標(biāo)较颉?.2.
22、2.4 The joining width of joint between film is 150mm, even the overlap direction is downstream.7.2.2.5 HDPE膜在鋪設(shè)中,避免產(chǎn)生人為的折皺。7.2.2.5 Avoiding the artificial cockling during paving the HDPE film.7.2.2.6 HDPE膜鋪設(shè)完后,應(yīng)盡量減少在膜面上行走、搬運(yùn)工具等,凡能對(duì)HDPE膜造成危害的物件,均不應(yīng)放在膜上或攜帶在膜上行走,以免對(duì)膜造成意外損傷。7.2.2.6 Dont walk and convey
23、tools on the film surface film after paving the HDPE film ; nothing can damage to the film should place or walk on it to stop the film from being damaged.7.2.2.6 HDPE膜施工現(xiàn)場的所有人員都不能抽煙,不得穿帶鐵釘?shù)男蚋吒驳仔侥っ嫔闲凶撸辉试S從事有可能破壞防滲膜的一切活動(dòng)。7.2.2.6 All personnel in the HDPE film construction site are not allowed to sm
24、oke, wear shoes with iron nail or high-heel shoes with hard bottom walking on the film, dont go in for any activities is likely to destroy the anti-penetrant film.7.2.2.7HDPE膜鋪好后,應(yīng)及時(shí)用沙袋將膜壓住。 7.2.2.7 Press the film with sandbag in time after paving the HDPE film.7.2.2.8手提焊槍焊接一般應(yīng)按四道工序進(jìn)行:搭接檢查、熱粘、打毛、焊接。
25、雙軌熱熔焊機(jī)焊接工序分為:調(diào)壓加熱、定速恒溫、搭接檢查、清潔打毛、啟動(dòng)焊接四道工序。7.2.2.8 Using welding torch to joint following the four steps : overlapping inspection, heating adhesion, grind, jointing. Double railway heat fusion welding procedure: adjusting the voltage to heat up, speed fixed and constant temperature, joint inspection,
26、 cleanness and grinding ,startup jointing .7.2.2.9清理接縫處表面,HDPE膜的搭接段面不應(yīng)夾有泥沙等雜物。 7.2.2.9 Clean up the surface of joint , sundries cant be included on the overlap surface.7.2.2.10打磨后的表面必須保持清潔,遇有污染或落有泥沙等物時(shí),要用干凈的布或棉紗撣掉再焊,必要時(shí)應(yīng)重新打磨,切忌用手擦拭。7.2.2.10 Keep the surface clean and whisk off the dirty matter with
27、clean cloth or cotton yarn .Burnishing again if necessary and dont wipe it off with your hand. 7.2.2.11當(dāng)手提焊槍的溫度控制器所指示的焊機(jī)頭溫度低于200時(shí),在任何情況下不得啟動(dòng)焊機(jī)。7.2.2.11 Dont startup the welding machine when the temperature of welding head is below the 200.7.2.2.12焊條在焊接時(shí),不得隨意接觸地面,不得用粘有油污的手套、棉紗、布?jí)K擦試焊條,并應(yīng)保持干凈,不被任何物質(zhì)污染。
28、7.2.2.12 When jointing the welding rod ,dont touch the floor at random, dont wipe the welding rod with smeary glove, cotton yarn , cloth .Keep it from being polluted.7.2.2.13手提焊槍的中心指針在焊接時(shí)必須和接縫中心對(duì)正,以免影響焊接的質(zhì)量。7.2.2.13 The central hand of welding torch must just the joint center to avoid the quality.7.
29、2.2.14手提焊槍每次焊接開始時(shí),應(yīng)先啟動(dòng)焊機(jī)、將槍頭里面余留的焊條擠壓物除去,完成后立即焊接。7.2.2.14 Firstly should startup the weld machine and remove the welding rod extrusion remained in the torch, and then to joint at once. 7.2.2.15手提焊槍在焊接過程中,應(yīng)經(jīng)常檢查槍頭的滑塊,磨損較嚴(yán)重時(shí)應(yīng)及時(shí)更新滑塊,以免損傷膜面;雙軌熱熔焊機(jī)在焊接過程中,需隨時(shí)注意焊機(jī)的運(yùn)行情況,要根據(jù)現(xiàn)場的實(shí)際情況對(duì)速度和溫度進(jìn)行微調(diào)。7.2.15 Inspecting
30、 the slide block of torch head regularity and, update in time to avoid the damage to film surface during the course of welding torch jointing ; During the course of double heat fusion welder jointing, pay attention to the function of weld machine at any moment , to slight adjust the speed and temper
31、ature according to the site circumstance.7.2.2.16嚴(yán)禁將從手提擠壓焊槍槍頭摘下的焊料物直接丟棄在膜面上。7.2.2.16 Dont throw the welding waste on the film.7.2.2.17手提焊槍每天使用完畢,應(yīng)將槍頭內(nèi)余留的焊條拔出。.7.2.2.17 Pull out the welding rod remained in the torch head after using it.7.2.2.18每天結(jié)束工作時(shí),應(yīng)及時(shí)切斷電源。7.2.2.18 Shut off the electrical source i
32、n time when end your work every day.7.2.2.19 HDPE膜施工現(xiàn)場禁止吸煙,必要時(shí)還應(yīng)配備消防設(shè)施。7.2.2.19 No smoking in HDPE construction site, fire protection equipment should be prepared if necessary.7.2.3集水坑上部土工布施工7.2.3 The construction of waterproof cloth upper the water storage pond.7.2.3.1土工布裁切之前,準(zhǔn)確丈量其相關(guān)尺寸,然后按實(shí)際裁切。7.2.
33、3.1 Before cutting the waterproof cloth , its correlative size must be exactly measured .7.2.3.2土工布在鋪設(shè)中,避免產(chǎn)生人為的折皺。7.2.3.2 Avoid the artificial cockling when paving the waterproof cloth .7.2.3.3將150cm150cm土工布覆蓋在25HDPE管口上,用綁扎絲擰緊固定。7.2.3.3 To cover the 25HDPE nozzle with 150cm150cm waterproof cloth and
34、 , then fixed it with binding thread.7.2.3.4土工布鋪設(shè)完后,應(yīng)盡量減少在布面上行走、搬運(yùn)工具等,凡能對(duì)土工布造成危害的物件,均不應(yīng)放在布面上或攜帶在布面上行走,以免對(duì)布造成意外損傷。7.2.3.4 Dont walk and convey tools on the film surface film after paving the waterproof cloth ; nothing can damage to the film should place or walk on it to stop the film from being damag
35、ed.7.2.3.5不得穿帶鐵釘?shù)男蚋吒驳仔讲济嫔闲凶?,不允許從事有可能破壞土工布的一切活動(dòng)。土工布鋪好后,應(yīng)及時(shí)用沙袋將布?jí)鹤 ?.2.3.5 No wearing shoes with iron nail or high-heel shoes with hard bottom walking on the film, dont go in for any activities is likely to destroy the waterproof cloth. Press the waterproof cloth with sandbag in time after paving t
36、he HDPE film.7.2.4HDPE層上部回填Upper backfilling of HDPE砂石料回填前在HDPE層上部回填5cm等級(jí)良好天然砂,密實(shí)整平后進(jìn)行上部回填,回填施工方法參見油罐砂石基礎(chǔ)施工WI-8710-8100-0005。Backfilling 5cm nicer grading natural sand upper the HDPE before backfilling , and then start to upper backfill when it is compact, refer to the backfill construction plans Oi
37、lcan sand foundation constructionWI-8710-8100-0005。7.2.5瀝青砂層施工bitumen sand layer construction7.2.5.1準(zhǔn)備工作preparation 施工前,必須進(jìn)行試配,并提供砂級(jí)配試驗(yàn)報(bào)告。Carry out the mix design before construction and provide sand grading test report.將瀝青砂墊層外邊線準(zhǔn)確放出邊線,并明確瀝青砂絕緣層的表面允許偏差和檢驗(yàn)方法。砂石墊層、瀝青砂上表面允許偏差和檢驗(yàn)方法見下表:The side line of b
38、itumen sand layer shall be set up correctly, make certain the surface allowance difference of bitumen sand insulated layer and inspection method. See following list:編號(hào)NO.項(xiàng)目ITEMS允許偏差/mm allowance difference/mm墊層Layer瀝青砂絕緣層bitumen sand insulation layer砂石墊層sand layer 瀝青砂層分兩層施工,下層40cm,上層35cmdivide the b
39、itumen sand into two beds, the underlayer 40cm,the upper 35cm檢驗(yàn)方法checking method1表面平整度surface level degree 1525用2m靠尺和楔形塞尺檢查surveying with 2m leaning ruler and cuniform filling feeler.2標(biāo)高elevation106(罐壁一米內(nèi) tank shell plate within 1m)20(其他部分other part)用水準(zhǔn)儀檢查Inspecting with water level.3厚度depth7.5mm用鋼尺
40、檢查Inspection with steel rule記錄表Table:油罐編號(hào)Number日期Date油罐容積Dimension油罐直徑Diameter基礎(chǔ)中心標(biāo)高偏差(mm)Windage of foundation center elevation 同心圓編號(hào)Number of circularity測點(diǎn)編號(hào)Point Number計(jì)算標(biāo)高(mm)Design elevation測點(diǎn)標(biāo)高(mm)Point elevation 任意兩點(diǎn)最大高差(mm)Difference of any 2 points 測點(diǎn)標(biāo)高誤差(mm)Difference of point elevation1(0
41、.25D)2(0.5D)3(0.75D)4(D)對(duì)原有的工作面進(jìn)行清掃工作。在每一層施工前,應(yīng)對(duì)工作面進(jìn)行徹底的清理、保證下一層干凈、整潔,無雜物污染。To clean up the base, and each layer shall be cleaned before proceeding with the next layer.攤鋪瀝青砂前,在砂石墊層上插上標(biāo)有攤鋪標(biāo)高的鋼筋,以控制攤鋪標(biāo)高,并在攤鋪后取出,并修補(bǔ)鋼筋孔洞,在施工過程中嚴(yán)格控制標(biāo)高,每層施工結(jié)束,立即進(jìn)行標(biāo)高復(fù)測,超過標(biāo)準(zhǔn)立即進(jìn)行修補(bǔ)。插鋼筋過程鋼筋不得插得過深,防止損壞下部HDPE膜。施工人員必須經(jīng)過SEPCO的培訓(xùn),
42、明確SEPCO對(duì)HSE的要求,尤其是環(huán)保方面的要求。施工人員必須穿著專用防燙勞保鞋,佩戴防護(hù)口罩及專用防護(hù)手套,防止?fàn)C傷及中毒。在施工前對(duì)施工人員進(jìn)行滅火器使用培訓(xùn),并就近明顯擺放滅火器。保證施工JSA中的措施和控制方法,使人員不和熱瀝青的蒸汽接觸。現(xiàn)場設(shè)立燙傷應(yīng)急急救箱,專門存放治療燙傷的藥品,并準(zhǔn)備應(yīng)急備用水桶。廢棄不用的瀝青砂進(jìn)行標(biāo)識(shí)并儲(chǔ)存在密封的容器內(nèi),清理出現(xiàn)場。施工中嚴(yán)禁明火,任何有明火的作業(yè)均不允許施工。A rebar marked with elevation shall be set up to control the bitumen/sand layer thickness
43、 before construction, and it shall not inserted too deep to damage the HDPE film and the holes shall be repaired after construction. It is strict to control the elevation during construction. After every layer have resurvey of the elevation. If the elevation is more difference than the standard in t
44、he inspection table, it must be submitted right now.All involved persons shall be carried out HSE training, especially environmental requirement, and equipped with proper PPE. Firefighting training shall also be carried out and extinguishers equipped. To ensure the JSA measures to be implemented to
45、prevent personnel from contact with heat bitumen vapour. The first aid box shall be equipped for any emergency. The waste bitumen/ sand shall be kept in the closed container with clear identification and removed out. No work with fire is allowed during construction.7.2.5.2瀝青砂施工bitumen sand construct
46、ion瀝青技術(shù)指標(biāo)見下表:the technical data of bitumen as follows:標(biāo)準(zhǔn)及標(biāo)準(zhǔn)號(hào)碼standard標(biāo)號(hào)type針入度(25,100g)/(1/10mm)不小于penetration延度(25)/cm不小于elongation軟化點(diǎn)(環(huán)球法)/不低于soft point not less than溶解度(三氯甲烷、三氯化碳或苯)/不小于solubility not less than蒸發(fā)損失(160,5h)/不大于vopour loss not more than閃點(diǎn)(開口)/不低于flash point not less than水分/%不大于water
47、 not more than建筑石油瀝青building petro-bitumen(GB49475)10號(hào)520195991.0230痕跡water mark拌和:在攪拌站將10#建筑瀝青加熱至180190攝氏度,按設(shè)計(jì)中砂與瀝青配合比7:93與混合,中砂加熱溫度比瀝青高1020攝氏度,攪拌均勻,瀝青混合料出廠溫度控制在170185攝氏度。Mixing: To heat the bitumen 10# up to 180190 Celsius degrees ,and bitumen is mixed with sand at the mix ratio of 7 to 93, while
48、the sand temperature shall be 1020 Celsius degrees higher than that of bitumen. The mixture temperature shall be controlled at 170185 Celsius degrees.運(yùn)輸:拌和的混合料,裝車后應(yīng)控制行車時(shí)間,及時(shí)運(yùn)往工地。在運(yùn)輸中,不論天氣如何,必須加蓋保溫蓬布,以保證到場混合料溫度在160170攝氏度。運(yùn)輸時(shí)應(yīng)控制裝車量,并將蓬布加蓋密實(shí),且車輛選用自卸車,防止瀝青漏出。運(yùn)輸?shù)綀龊笙攘繙y溫度,對(duì)低于100攝氏度的廢棄不用,并查找原因,分清是運(yùn)輸延誤時(shí)間降溫,還
49、是拌和站拌和原因,如是后者,及時(shí)通知拌和站調(diào)整溫度。由于瀝青粘性比普通瀝青大,運(yùn)料車運(yùn)料前車廂底部應(yīng)涂刷適量的油混合料,避免粘車,并注意使油料不能混入瀝青砂墊層中。瀝青砂中混入油料的部分不能用到瀝青砂墊層中去,廢棄部分及時(shí)清理出場。Transportation: the mixture shall be delivered to the field promptly and insulate during transportation to ensure the temperature to be kept at 160170 Celsius degrees. If its lower tha
50、n 160 which is transported to the jobsite, the mixture shall be rejected and the root cause shall be investigated and necessary correction be taken.攤鋪:采用人工作業(yè)鋪筑的施工方法。攤鋪前檢查攤鋪溫度,溫度低于100的瀝青砂禁止施工,清除出現(xiàn)場,保證攤鋪過程中均勻前進(jìn),對(duì)邊角或弧形地帶,采用局部加工調(diào)整處理。攤鋪時(shí)在已攤鋪的瀝青砂墊層上鋪鋼板,工人用斗車經(jīng)過鋼板將瀝青砂運(yùn)至未鋪設(shè)區(qū)域,攤鋪工人站在未鋪設(shè)區(qū)域,邊攤鋪邊后退。在攤鋪后,應(yīng)及時(shí)檢測攤鋪厚
51、度,若不合要求,及時(shí)調(diào)整。Laying: to lay manually and the mixture temperature shall be higher than 100 to ensure the laying to be done evenly. The edges or arc area shall be trimmed properly. After laying, the layer thickness shall be checked and make any adjustment if necessary.碾壓:瀝青混合料的碾壓,壓實(shí)采用400kg壓路機(jī),在終壓溫度前消除
52、人為全部軌跡,達(dá)到設(shè)計(jì)要求的厚度即停止作業(yè),以免過壓。先攤鋪第一層瀝青砂,厚度大約40mm,并在模板上做出標(biāo)記。攤鋪均勻后,用400kg壓路機(jī)壓實(shí),壓路機(jī)無法壓實(shí)的區(qū)域采用人工夯實(shí)。第一層施工完畢,經(jīng)SEPCO、PMC、BSC驗(yàn)收后方可進(jìn)行第二層施工。然后按第一層瀝青砂鋪設(shè)厚度與壓實(shí)厚度之比攤鋪第二層瀝青砂,使壓實(shí)后標(biāo)高達(dá)到設(shè)計(jì)標(biāo)高。中心點(diǎn)半球型將使用球形鐵板壓實(shí)成型。對(duì)于接茬處應(yīng)將瀝青砂層鏟成斜面,使接茬相互搭接,上層接茬縫與下層接茬縫必須錯(cuò)開,防止裂縫。上下層間接茬前也應(yīng)噴灑一層熱瀝青。最后人工平整使碾壓達(dá)到7.5.2.1中質(zhì)量標(biāo)準(zhǔn)的要求。施工中每隔30分鐘進(jìn)行一次測溫,并進(jìn)行詳細(xì)測溫記錄。每車瀝青砂測溫點(diǎn)5個(gè),中心一個(gè),每個(gè)邊角一個(gè),共5個(gè)。修補(bǔ)瀝青砂溫度必須大于100攝氏度,施工
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 礦業(yè)成本控制培訓(xùn)
- 高中化學(xué)學(xué)案【電解的原理】
- 高中化學(xué) 化學(xué)常識(shí)測試題
- 17端午節(jié)公司福利通知
- 成本削減實(shí)踐訓(xùn)練培訓(xùn)
- 碼頭起重機(jī)制造承包合同三篇
- 漫步自然的山間小屋三篇
- 社會(huì)實(shí)踐與志愿服務(wù)活動(dòng)計(jì)劃
- 高考化學(xué)二輪復(fù)習(xí)-化學(xué)與材料的發(fā)展(必刷卷)
- 班級(jí)文明禮儀教育方案計(jì)劃
- 煤炭行業(yè)2025年行業(yè)回歸合理盈利估值仍有提升空間
- 期中測試卷(1-4單元)(試題)-2024-2025學(xué)年四年級(jí)上冊(cè)數(shù)學(xué)北師大版
- 5.2 珍惜師生情誼同步課件-2024-2025學(xué)年統(tǒng)編版道德與法治七年級(jí)上冊(cè)
- 專題25 圓的基本性質(zhì)(分層精練)(解析版)
- 2024-2030年中國電視訪談節(jié)目行業(yè)市場前瞻與未來投資戰(zhàn)略研究報(bào)告
- 5.2 珍惜師生情誼 課件-2024-2025學(xué)年統(tǒng)編版道德與法治七年 上冊(cè)
- 在初中數(shù)學(xué)教學(xué)中有效開展項(xiàng)目式學(xué)習(xí)的策略
- 行政或后勤崗位招聘筆試題及解答(某大型國企)2025年
- 醫(yī)療廢物管理工作計(jì)劃范文(4篇)
- 小學(xué)道德與法治研修活動(dòng)方案
- 五下音樂《瑤族舞曲(簡譜、五線譜)》課件
評(píng)論
0/150
提交評(píng)論