1、treatment of geothermal waters for production ofindustrial, agricultural or drinking waterdarrell l. gallup chevron corporation, energy technology company, 3901 briarpark dr., houston, texas 77042, usareceived 14 march 2007; accepted 16 july 2007available online 12 september 2007abstracta conceptual

2、 study has been carried out to convert geothermal water and condensate into a valuable industrial, agricultural or drinking water resource. laboratory and field pilot test studies were used for the conceptual designs and preliminary cost estimates, referred to treatment facilities handling 750 kg/s

3、of geothermal water and 350 kg/s of steam condensate. the experiments demonstrated that industrial, agricultural and drinking water standards could probably be met by adopting certain operating conditions. six different treatments were examined. unit processes for geothermal water/condensate treatme

4、nt include desilication of the waters to produce marketable minerals, removal of dissolved solids by reverse osmosis or evaporation, removal of arsenic by oxidation/precipitation, and removal of boron by various methods including ion exchange. the total project cost estimates, with an accuracy of ap

5、proximately 25%, ranged from us$ 10 to 78 million in capital cost, with an operation and maintenance (or product) cost ranging from us$ 0.15 to 2.73m3 of treated water. 2007 cnr. published by elsevier ltd. all rights reserved.keywords: geothermal water treatment; water resources; desilication; arsen

6、ic; boron1. introductionwith the world entering an age of water shortages and arid farming land, it is increasingly important that we find ways of recycling wastewater. the oil, gas and geothermal industries, for example, extract massive amounts of brine and water from the subsurface, most of which

7、are injected back into underground formations. holistic approaches to water management are being adopted ever more frequently, and produced water is now being considered as a potential resource. in the oil and gas arena, attempts have been made to convert produced water for drinking supply or other

8、reuses (doran et al., 1998). turning oilfield-produced water into a valuable resource entails an understanding of the environmental and economic implications, and of the techniques required to remove dissolved organic and inorganic components from the waters. treatments of geothermal water and conde

9、nsate for beneficial use, on the other hand, involve the removal of inorganic components only.we have explored the technical and economic feasibility of reusing waters and steam condensates from existing and future geothermal power plants. produced geothermal fluids, especially in arid climates, sho

10、uld be viewed as valuable resources for industry and agriculture, as well as for drinking water supplies. this paper presents the results of laboratory and field pilot studies designed to convert geothermal-produced fluids into beneficially usable water. the preliminary economics of several water tr

11、eatment strategies are also provided.2. design layoutthe layout for the treatment strategies (units of operation) have been designed specifically for a nominal 50mwe geothermal power plant located in an arid climate of the western hemisphere, hereafter referred to as the test plant. the average conc

12、entration of constituents in the produced water is shown in table 1. the amount of spent water from the test flash plant is 750 kg/s. the potential amount of steam condensate that could be produced at the plant is 350 kg/s. table 1 includes the composition of the steam condensate derived from well t

13、ests. the six treatment cases considered in the study are given in table 2, together with product flows and unit operations of treatment. fig. 1 provides simplified schematic layouts of the unit operations for each case.3. evaluation of treatment optionsin this section the various operations conside

14、red for each case are described.3.1. arsenic removalthe techniques considered viable for removing traces of arsenic (as) from condensate or from water are ozone oxidation followed by iron co-precipitation or catalyzed photo-oxidation processes (khoe et al., 1997). other processes for extracting as f

15、rom geothermal waters (e.g. rothbaum and anderton, 1975; umeno and iwanaga, 1998; pascua et al., 2007) have not been considered in the present study. in the case of the test plant, ozone (o3) would be generated on-site using parasitic power, air and corona-discharge ultra-violet (uv) lamps, and iron

16、 in the form of ferric sulfate fe2(so4)3 or ferric chloride (fecl3) that would be delivered to the geothermal plant. the photo-oxidation processes consist of treating the condensate or water with fe2+ in the form of ferrous sulfate (feso4) or ferrous chloride (fecl2), or with so2 photo absorbers. th

17、e latter is generated from the oxidation of h2s in turbine vent gas (kitz and gallup, 1997).the photo-oxidation process consists of sparging air through the photo- adsorber-treated fluid, and then irradiating it with uv lamps or exposing it to sunlight to oxidize as3+ to as5+. in the fe photo-oxidat

18、ion mode, the fe2+ is oxidized to fe3+, which not only catalyzes the oxidation reaction, but also co-precipitates the as. in the so2 photo-oxidation mode, after oxidizing the as, fecl3 or fe2(so4)3 is added to the water to precipitate the as5+ as a scorodite-like mineraltable 1approximate geothermal

19、 water and steam condensate compositions assumed in the studya total dissolved solids.table 2summary of the six cases of geothermal fluid treatment to produce marketable watera on treatment of water, clays are produced at a rate of 7.4 ton/h.(feaso42h2o). in the laboratory and field pilot tests, the

20、 photo-absorber and uv dosages were varied to decrease the as concentration in geothermal fluids to below the detection limit of 2 ppb (simmons et al., 2002). residual as in the precipitate may be slurry-injected into a water disposal well or fixed/stabilized for land disposal to meet united states

21、environmental protection agency (usepa) toxicity characterization leach procedure (tclp) limits using special cement formulations (allen, 1996).3.2. ion exchangestrong-base anion exchange resins have been shown to remove traces of as in geothermal fluids provided that the amorphous silica is decreas

22、ed below its saturation point or the water stabilized against silica scaling by acidification. the ion exchange alternative to as removal by oxidation/precipitation has proven successful in reducing the concentrations of this element to below the limits set for drinking water standards. as part of t

23、he present study, laboratory and field columnar tests were successfully conducted with geothermal hot spring water containing 30 ppm as. pre-oxidation of as3+ is required to achieve acceptable as removal by ion exchange. in these columnar tests, naocl and h2o2 were used to pre-treat the hot spring w

24、ater to oxidize as3+ to as5+. chloride-rich water, which had been treated with lime (caoh2) and filtered to reduce amorphous silica to well below its saturation point, successfully regenerated the resin. in the field, and for simplicity of operation, we concluded that ozone/fe co-precipitation or ca

25、talyzed photo-oxidation would be preferred for water treatment over ion exchange as this would eliminate the need to purchase and transport additional chemicals. on the other hand, ion exchange is an attractive option for extracting as from condensate.special ion-exchange resins have proven successf

26、ul in removing boron (b) from geothermal fluids (recepoglu and beker, 1991; gallup, 1995). hot spring water from the geothermal field, containing 25 ppm b, had its b content decreased to 1 ppm in a laboratory columnar test. the resin was regenerated with sulfuric acid (h2so4). no deterioration in re

27、sin performance was observed up to 10 loading and regenerationcycles. fig. 1. flow chart of the basic unit operations involved in treatment cases 16.3.3. ph adjustmentthe majority of the cases considered in this study require adjustment to ph. adding soda ash (na2co3) can increase the buffering capa

28、city of the water and condensate. soda ash or lime treatment can also be used to enhance precipitation of certain species. purchased h2so4, on-site generated sulfurous acid (h2so3) or on-site generated hydrochloric acid (hcl) can be used to acidify waters to meet reuse requirements or to inhibit sil

29、ica scaling (hirowatari, 1996; kitz and gallup, 1997; gallup, 2002). a number of geothermal power plants around the world utilize water acidification to inhibit silica scaling. unocal corporation commenced this practice of ph adjustment of hot and cold geothermal fluids in commercial operations in t

30、he early 1980s (jost and gallup, 1985; gallup et al., 1993; gallup, 1996). in water acidification the ph is reduced slightly so as to slow down the silica polymerization reaction kinetics without significantly increasing corrosion rates.3.4. cooling pondsin this water processing option, the water is

31、 cooled in open, lined ponds prior to injection or treatment for beneficial use. the flashed water is allowed to flow into the pond where it “ages” for up to 3 days; this is a sufficient length of time to achieve amorphous silica saturation at ambient temperature, which is assumed to be below 20 c m

32、ost of the year. adjustment of the water ph to 8.00.5 with soda ash or lime enhances water desilication, resulting in undersaturation with respect to amorphous silica (gallup et al., 2003). at 15 c, the solubility of amorphous silica in the water in our test field is predicted to be about 90 ppm (fo

33、urnier and marshall, 1983). in a large bottle, field water was adjusted from ph 7.2 to 8.1 with soda ash and allowed to cool to 15 c over a period of 90 min. the resultant dissolved silica si(oh)4 concentration in the supernatant fluid was 54 ppm (undersaturated by about 40%).3.5. filtrationsand and

34、 plate/frame filters were adopted in this study to polish water and dewater sludges, respectively. this does not mean that other filters could not be used in the water treatment project. at the salton sea (california, usa) geothermal field, for example, flocculated secondary clarifiers and pressure

35、or vacuum filters have been adopted with success for many years as alternatives to media and plate/frame filters, respectively (featherstone et al., 1989).3.6. multi-stage vacuum-assisted evaporatorin this unit of operation, cool, ponded water is combined with cooled and re-circulated water (from th

36、e evaporator heat rejection stages), and pumped to the heat recovery portion of the evaporator system. the cool water provides the thermal sink for the vapors from the final stages of the evaporator concentrate. the inlet water and concentrate flow countercurrent in the evaporator. after flowing thr

37、ough the heat recovery stages, the water temperature has increased somewhat. most of this heated water is sent to a separate cooling pond before returning to the heat recovery stages. a portion of the heated water continues on through the heat recovery stages; the water also functions as the heat si

38、nk for this portion of the process.after the heat recovery stages, the water is heated with steam and returned to the heat recovery stages for flashing. the water proceeds through the heat recovery and rejection stages until it is fully concentrated. the concentrate is sent to an injection well, whi

39、le the distillate is collected and re-routed for ph adjustment, as required, before passing to other treatments discussed here. the evaporator has not yet been tested at the field; the present discussion is provided for conceptualization only.3.7. reverse osmosisthe reverse osmosis (ro) process remo

40、ves dissolved salts through fine filtration at the molecular level of water. the ro membrane allows water to pass through but blocks 98% of the salts. the typical ro operating pressure is 27603100 kpa, which is achieved by gravity flow from the power plant to the ro unit located 300m downhill. the r

41、o feed is pre-treated with a 2 _m cartridge filter. the rejected fluid is injected into a disposal well, while the permeate can be sent to other treatment units for polishing.the ro unit has not yet been tested at the field; the present discussion is again provided for conceptualization only. howeve

42、r, ro has been successfully tested at the mammoth lakes, california, usa, field to recover useable silica (bourcier et al., 2006).3.8. desilication and production of clayssilica can be eliminated from the water by holding the latter in cooling ponds for up to 3 days. soda ash or lime can be added to

43、 the water to enhance silica precipitation. laboratory and field jar test experiments showed that desilication of the water can also be achieved by treating with various metal cations at elevated ph to precipitate metal silicates. below 90 cand at elevated ph (typically 910) treatments with caustic

44、soda (naoh), magnesium hydroxide mg(oh)2, lime, strontium hydroxide sr(oh)2, barium hydroxide ba(oh)2, ferric hydroxide fe(oh)3, birnessite (na,ca)0.5(mn4+,mn3+)2o41.5h2o, copper hydroxide, cu(oh)2 and zinc hydroxide zn(oh)2 precipitated only amorphous or poorly crystalline metal-rich silicates of l

45、ittle commercial value. treatment of water with alkaline-earth metals below 90 c, except magnesium, tended to co-precipitate metal carbonates. laboratory reactions conducted at 130 c demonstrated that certain metal ions may react with the silica in the water to precipitate crystalline compounds of c

46、ommercial value. for example, kerolite1 clay was precipitated upon treating synthetic and field waters with magnesium at 130 c, whereas, under similar conditions, sodalite (na4al3 si3o12cl) and zeolite p2 were precipitated upon treatment with aluminum hydroxide or sodium aluminate (gallup et al., 20

47、03; gallup and glanzman, 2004). treatment of waters with a combination of magnesium and iron precipitated hectorite (i.e. a lithium-rich clay mineral of the montmorillonite group).the desilication process designed for the field consists of a crystallizer-clarifier similar to those used at the salton

48、 sea field (newell et al., 1989). for kerolite production, magnesium chloride (mgcl2) is added at slightly above stoichiometric proportions (3mg:4si) and the ph is increased to 10.0 with caustic soda or lime. the crystallizer and clarifier include sludge recirculation to maximize the “seed crystal”

49、effect, thus providing a high surface area for precipitation. after precipitation, the water is clarified, possibly treated further to meet industrial water specifications, cooled to pipeline specifications, and finally sent to a pipeline for transport to the industrial site. the kerolite sludge is

50、dewatered using a filter, as discussed earlier. the dewatered sludge can be dried in a steam-heated kiln or in an arid, but cool environment at the power plant. dried kerolite is transported off-site for commercial refining and use. in zeolite manufacture, sodium aluminate (naalo2) is used both as t

51、he al and base source. hectorite or saponite (i.e. a magnesium-rich clay mineral of the montmorillonite group) are made1 kerolite is a disordered form of talc.2 zeolite p refers to various forms of gismodine.table 3quality of the water end-product estimated from actual testing and from vendor treatm

52、ent specifications for the six treatment cases described in table 2a tds: total dissolved solids.in a similar fashion by treating water with mg2+ and fe2+ salts and a base (gallup et al., 2003). adding a little brucite mg(oh)2 or mgcl2 will also produce a nearly pure silica by-product for industrial

53、 uses (lin et al., 2001). desilication of water with precipitation of valuable minerals is a preferred option as opposed to simply allowing the silica to deposit in cooling ponds as it adds value to the geothermal power project by simultaneously controlling scale deposition and producing marketable

54、products. once the water is treated for desilication, any metals of commercial value can be extracted by means of well-documented processes (maimoni, 1982; featherstone, 1988; duyvesteyn, 1992; featherstone and furmanski, 2004). this approach is particularly important if ion exchange or solvent extr

55、action techniques have been used to concentrate and recover lithium, base and precious metals.4. quality of the water end-producttable 3 gives details on the estimated quality of the water produced after each of the six treatment cases (see table 2 for initial concentrations). the water qualities me

56、et or exceed perceived drinking, agriculture and industrial standards at the location of the test plant.5. preliminary cost estimatestable 4 is a summary of the estimated capital and operating (product water) costs, based on construction of the geothermal power plant for the six treatment processes.

57、 local market prices for chemicals such as h2so4, cao, flocculents, nacl, na2co3, feso4, mgcl2, naalo2, etc., were used in the calculations. the product cost does not include a productstorage reservoir at the end of the pipeline where the treated water can be made available for industrial, agricultu

58、ral or drinking uses. the anticipated selling price for finished minerals, such as kerolite, saponite, sepiolite (a magnesium-rich clay mineral), etc. was set at us$ 0.45 kg1. for comparison, the cost of injecting all of the waste geothermal fluids back into the field (using wells with gravity feed)

59、 is us$ 10,000,000. the latter is the estimated capital cost of drilling sufficient injection wells for water disposal, but does not include poten-table 4preliminary cost estimates (us$) for the six treatment cases described in table 2 a water treatment cost offset by 7.5 ton/h of clay sales.tially high maintenance costs for acidification treatment and/or for re-drilling these injectionwells.6. conclusionsa prelim

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論