




已閱讀5頁(yè),還剩4頁(yè)未讀, 繼續(xù)免費(fèi)閱讀
版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
12020 2 8 Test Plan Project Prepared by Date Product Version TEMPLATE 22020 2 8 Table of Contents OVERVIEW 3 1 0 SCOPE 3 1 1ASSUMPTIONS 3 1 2 PREREQUISITES 3 1 3 SYSTEM REQUIREMENTS 3 1 4 TERMS AND DEFINITIONS 4 1 5 RELATED DOCUMENTS 4 SECTION 2 PRODUCT AREAS TO TEST 5 2 1CLIENT TESTING 7 2 1 1 Configuration Parameter 8 2 4 11Next section here 8 SECTION 3 ISSUES 9 SECTION 4 QA S PROJECT ESTIMATES 10 SECTION 5 SQA ROBOT SET UP FOR BOUNDARY TESTING 11 SECTION 6 CHANGE HISTORY 12 32020 2 8 Overview This document will be divided up into the following section Section 1Scope Section 2Product Areas to Test Section 3Issues Section 4Project Estimates Section 5 SQA Robot Instructions for testing Section 6 Change History 1 0 Scope This test plan lists how the QA department will test the Project The intended audience for the document includes management and employees of YOUR COMPANY and all parties directly involved with the project This test plan is a work in progress document that will modified and appended to during the testing process 1 1Assumptions It is assumed that the Oracle database will be set up and installed correctly 1 2 Prerequisites Client Application Database server on a single database The process to be loaded on the server and configured appropriately 1 3 System Requirements Client Windows 95 Server AIX NT 4 0 for initial testing 42020 2 8 1 4 Terms and Definitions QA Quality Assurance Department Also can be used as a term when referring to testing Positive Functionality Testing will verify that each modules basic functionality is working Boundary Stress Testing will verify the upper and lower limits set on any item within the module This will consist of using Min Values Min Values 1 Max Values 1 and Max Values Error Negative Testing will verify that the invalid entries command and actions in the module are handled correctly Integrated Testing will verify that if entries in the component under test cause changes in other areas and that those areas are correctly changed Unit Test This is a test that the development team will do before handing over the finished code to QA System Test The test phase where the product is test thoroughly 1 5 Related Documents The following files can be found on the machine NameType Section 2 Product Areas to Test In order to ensure that the entire interface is tested completely it will be broken down into the following components Client Testing Database Testing Executable Testing and File Testing Testing Summary This table is a list of all the tests in the test plan It also prioritizes the order in which the tests need to be executed in A number of the test cases can be done simultaneously It is also important that the tests run is the order they are listed in the table Test SectionNumber of tests PassFailedCompleted Date Issue Numbers Functional Testing 2 3 1 13 1 2 1 1 7 2 1 2 2 2 1 3 1 2 3 4 1 1 52020 2 8 2 1 4 14 2 2 1 9 2 2 2 2 Error Testing 2 1 4 Payment19 2 1 1 Configuration Parameters6 2 1 2 External Interface1 2 1 3 Data9 2 3 1 Executable running7 2 4 4 Detail Record File Format9 Boundary 2 1 1 Configuration Parameters2 2 1 4 Payment20 2 3 1 Executable running1 2 4 4 Detail Record File Format23 2 4 6 Batch Trailer File Format1 2 4 7 Trailer File Format2 Do this section last Functional 2 1 5 Sales Order10 2 3 5 PO2 2 4 11 Receipt3 Error Testing 2 1 5 SALES17 Boundary Testing 2 1 5 Sales 13 Integration 2 1 4 Payment2 2 1 5 Order2 2 4 10 Verify data in reports2 TOTAL262 2 1Client Testing In the Client Testing section testing will focus on the areas of the product that are used to configure and create the necessary data for the executable More details here The areas of the client that will be tested are Configuration Parameters External Interface Data Window s Payment Section Payment Window to create the necessary data Sale Order Window to create the necessary data Setup requirements for Client Testing 62020 2 8 TaskDone 1 Determine if this needs to be tested on a single or distributed database 2 Set up area on system 3 Setup up a market on database 4 Set up Store Locations in the market add all set up data 2 1 1 Configuration Parameter Functional Testing test cases Note add any notes here Test Test ProcedureResults Pass Fail 2 1 1 1 2 1 1 2 2 1 1 3 2 1 1 4 2 1 1 5 2 1 1 6 2 1 1 7 Boundary and Stress Testing Test cases Test Test ProcedureResults Pass Fail 2 1 1 8 2 1 1 9 Error Negative Testing Testcases Test Test ProcedureResults Pass Fail 2 1 1 10 2 1 1 11 2 1 1 12 2 4 11 Next section here Integration Testing test cases Test Test ProcedureResults Pass Fail 2 4 11 1 2 4 11 2 2 4 11 3 72020 2 8 Section 3Issues List your issues here 1 2 3 Section 4QA s Project Estimates Test Planning Writing the test design document 1 day Writing the test plan document5 days Review by team day Finalized version of the documents day Set up environment and sqa robot scripts1 day Test Phase 1 System Test Execution of all the test cases in the test plan 4 days Work with developer1 day Test Phase 2 Final Test Execution of all the test cases in the test plan 4 days Total17 Days Note This figure represents pure testing time It is not actual work days 82020 2 8 Section 5 SQA Robot Set up For Boundary Testing A project has been created in the repository for the boundary testing Files used in Robot XXXXXXX sbh to be put in the sqbas32 directory on PC XXXXXX sbh to be put in the sqbas32 directory on PC Bound1 rec shell script for Payment topic testing Bound2 rec shell script for order topic testing Openconv the script that opens up application Opencsh the script that opens up a draw payment the script that does the payment Saleap the script that does the order Clapcsh the script the closes the draw Closecon the script that closes down application Steps to execute 1 Set workstation to the appropriate store location 2 Make sure there are no draws open in the store 3 Create a customer for that location in customer topic 4 Bring up XXXXXX sbh file to edit the following variables
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025年地理學(xué)專業(yè)研究生入學(xué)考試試卷及答案
- 2025年非全日制研究生入學(xué)考試試題及答案
- 建筑工程項(xiàng)目設(shè)計(jì)及施工合作協(xié)議
- 分析零售業(yè)的客戶細(xì)分市場(chǎng)及其營(yíng)銷策略
- 快遞代收代派管理協(xié)議書(shū)
- 農(nóng)業(yè)智能化種植管理技術(shù)服務(wù)協(xié)議
- 2025年木工鋸機(jī)項(xiàng)目提案報(bào)告模板
- 2025年輕小型起重設(shè)備項(xiàng)目申請(qǐng)報(bào)告
- 2025年德語(yǔ)TestDaF口語(yǔ)模擬試卷:歷年真題與模擬測(cè)試
- 2025年抗艾滋病用藥項(xiàng)目提案報(bào)告
- 候診廳衛(wèi)生管理制度
- 超市導(dǎo)購(gòu)人員管理制度
- 柱上斷路器培訓(xùn)
- 2024年4月自考00228環(huán)境與資源保護(hù)法學(xué)試題及答案
- 設(shè)備物資管理培訓(xùn)
- 汽車漆面保護(hù)膜維護(hù)考核試卷
- 2025年算力電力協(xié)同:思考與探索白皮書(shū)
- 公司事故隱患內(nèi)部報(bào)告獎(jiǎng)勵(lì)制度
- 2025年醫(yī)聯(lián)體合作協(xié)議標(biāo)準(zhǔn)范本
- 2025年中考英語(yǔ)作文預(yù)測(cè)及滿分范文11篇
- 員工接觸勞務(wù)合同范例
評(píng)論
0/150
提交評(píng)論