



全文預(yù)覽已結(jié)束
下載本文檔
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報或認(rèn)領(lǐng)
文檔簡介
附件I 技術(shù)協(xié)議APPENDIX I Technical Agreement雙方通過商榷,對*有限公司的1000x2000榨機(jī)雙輥喂料器液壓馬達(dá)驅(qū)動系統(tǒng)在技術(shù)參數(shù),供貨范圍,檢驗,安裝,調(diào)試,培訓(xùn),操作達(dá)成如下協(xié)議。Both parties had discussed thoroughly the technical aspects regarding the supply of hydraulic drives equipment for Guangxi Laibin Yongxin Sugar Co., Ltd 1000x2000 sugar mills pressure feeder drive, and agreed to sign this agreement as the reference for technical specification, scope of supply, inspection, installation, commissioning, training and operation of the hydraulic drives equipment.1榨機(jī)參數(shù)a). 4座1000x2000榨機(jī)。榨機(jī)由直流電機(jī)經(jīng)減速器通過聯(lián)軸器驅(qū)動b). 現(xiàn)有裝機(jī)功率:700Kw; c). 實際轉(zhuǎn)速:0 6.5Rpm.d). 動力電:3相 380 Volt, 50 Hz.e). 控制電壓:220VACf). 冷卻水溫度;30g). 榨季環(huán)境溫度:030h). 榨季濕度:85%Sugar mill specificationa). 4 sets of 1000x2000 sugar mills. The mill is drive by DC motor, roll drive by gear box via tail bar.b). Installation power at present is: 700Kw;c). The actual speed is between: 0 6.5Rpmd). Electric grid: 3-ph 380 Volt, 50 Hz.e). Control voltage: 220VACf). Cooling water temperature: 30 C g). Ambient temperature in sugar season:0 30 Ch). Relative Humidity in sugar season:85%2. 雙輥喂料器驅(qū)動參數(shù)用赫格隆驅(qū)動系統(tǒng)驅(qū)動雙輥喂料器,且它的速度依附于主榨機(jī)速度的速度,并由PLC控制系統(tǒng)控制。a). 裝機(jī)功率:400Kwb). 運行速度:09.6Rpmc). 液壓馬達(dá):MB1600-CNd). 工作油壓:160200bare). 工作扭矩:29Tm f). 最大扭矩:39Tm Pressure feeder drive specificationUse Hagglunds Drives system to drive pressure feeder, and the pressure feeders relates to the mill, and controlled by PLC.a). Power installation is 400Kwb). The speed is 09.6rpmc). Hydraulic motor: MB1600-CNd). Normal work pressure:160200bare). Work torque:29Tmf). Max torque:39Tm3. 供貨范圍 序號名稱型號數(shù)量1液壓馬達(dá)MB1600-CN2臺2扭力臂TMA80-22臺3編碼器SPLL85D-10004臺4 編碼器安裝架SMMM-14臺5安裝工具 MTMM-11套6動力站PEC 603-355/355-200/2002臺7spider 控制器2臺8PLC 控制系統(tǒng)(包括通信總線,為2座榨機(jī)配置)1臺9加油泵1臺10濾芯備件9件11工具1套12控制電纜 2套13 現(xiàn)場調(diào)試 (人天)10 天14管路系統(tǒng)(國內(nèi)供應(yīng))2套 Scope of Supply: Itemdescriptionmodel no.quantity1hydraulic motorMB1600-CN2 pcs2torque armTMA80-22 pcs3speed encoderSPLL85D-10004 pcs4 mounting set for encoderSMMM-14pcs5mounting tools MTMM-11 pc6power unitPEC 603-355/355-200/2002 sets7spider control system2 pcs8PLC drive control system(with Profibus I/O for 2 sets mills control)1 sets9oil filling pump1 set10spare parts filter cartridge9 pcs11hands tool kit1 set12control cable set, form mill to PLC 2 sets13 supervision on site (man days)10 days14piping hardware (purchase in China)2 sets4. 技術(shù)服務(wù)1. 設(shè)備到糖廠后,供貨方免費派專業(yè)人員到現(xiàn)場調(diào)試:管路安裝,指導(dǎo)糖廠技術(shù)工安裝液壓馬達(dá)和動力站,安裝檢查,運行調(diào)試。同時對糖廠有關(guān)人員操作維護(hù)培訓(xùn)。2. *廠為調(diào)試人員提供當(dāng)?shù)亟煌?,膳食及住?在*區(qū))。3. *廠負(fù)責(zé)設(shè)備安裝,并提供技術(shù)工及所需普通工具設(shè)備等。4. 喂料器速度依附于主榨機(jī)的轉(zhuǎn)速自動調(diào)節(jié),也可根據(jù)高位槽料位的高低自動調(diào)速。Technical service1. After arrival of the equipment at sugar mill, the seller will send professional service personnel for on-site commissioning: installation piping, instruct sugar mills workers installation hydraulic motor and power unit, check, startup. And also provide training to the maintenance staff in order to have a smooth running operation.2. Sugar mill will provide local transport, meal and accommodation at commissioning site.3. Sugar mill to be responsible for the installation work and provide skilled labour, tools and equipment as required.4. The speed of pressure feeder automatic following the mills speed, and also has chute control function.5. 技術(shù)資料1. 合同簽定4周,買方提供設(shè)備所需接口圖紙給供貨方。2. 合同簽定6周,供貨方提供設(shè)備所需接口初期圖紙,電控初期圖紙給買方。3. 液壓馬達(dá)與榨輥的過度軸圖由雙方確認(rèn),并在圖紙上簽字。4. 液壓馬達(dá)安裝在榨機(jī)的哪一側(cè),由雙方確認(rèn)。Technical documents1 The buyer will supply interface drawing to the seller 4 weeks after signing contract.2 The seller will supply preliminary interface drawing, electric drawings to the buyer 6 weeks after signing contract.3 The adaptor between the roller and hydraulic motor will be approved by the buyer and the seller, and both parties shall sign on the drawing.4Hydraulic motor to be installed on which side of the mill will be approved by the buyer and the seller.6. 保修期及售后服務(wù)賣方保證所提供產(chǎn)品的質(zhì)量保證期為設(shè)備投入生產(chǎn)后12個月或到貨后18個月,以先到為準(zhǔn)。在質(zhì)量保證期內(nèi),由于設(shè)備本身所產(chǎn)生的問題,賣方負(fù)責(zé)免費解決。對買方的問題,賣方應(yīng)給于協(xié)助。出現(xiàn)重大故障,賣方48小時趕到現(xiàn)場。Garantee and after sales:The guarantee period shall be 18(eighteen) months counting from the date of arrival at China Port of Contract Equipment, or 12(twelve) months counting from the date on which the goods is installed and operation, whichever is earlier will count. In guarantee, if itself of the Sellers equipments problem, the Seller should be free in charge solve the problem, if the problem is come from the Buyer, the Seller should be h
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025年港鐵校招筆試題目及答案
- 定遠(yuǎn)公司團(tuán)建活動方案
- 宜昌超市活動策劃方案
- 小型公司員工入職培訓(xùn)
- 2025至2030兒童康復(fù)行業(yè)項目調(diào)研及市場前景預(yù)測評估報告
- 自我本我超我理論解析
- 2025年急救知識考試題及答案
- 女生禮儀培訓(xùn)
- 科技推動教育
- 遵義市匯川區(qū)“特崗計劃”教師招聘筆試真題2024
- H3CNE認(rèn)證考試題庫及答案詳解
- 景觀綠化工程監(jiān)理規(guī)劃范文
- 公路工程施工質(zhì)量控制培訓(xùn)
- 中國高血壓防治指南(2024年修訂版)
- 2025國家公務(wù)員政治理論應(yīng)知應(yīng)會知識考試題庫(含答案)
- 隸書-課件教學(xué)課件
- 蔬菜種植基地管理手冊
- 【MOOC】微處理器與嵌入式系統(tǒng)設(shè)計-電子科技大學(xué) 中國大學(xué)慕課MOOC答案
- epc項目勞務(wù)分包合同
- 《扭傷后怎么辦》課件
- 【MOOC】算法初步-北京大學(xué) 中國大學(xué)慕課MOOC答案
評論
0/150
提交評論