空客專業(yè)詞匯_第1頁
空客專業(yè)詞匯_第2頁
空客專業(yè)詞匯_第3頁
空客專業(yè)詞匯_第4頁
空客專業(yè)詞匯_第5頁
已閱讀5頁,還剩14頁未讀, 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報或認(rèn)領(lǐng)

文檔簡介

1、空客專業(yè)詞匯l l l l l l l l architectural details 節(jié)點大樣圖 level 標(biāo)高 scale 比例 lot 專業(yè) indice 版本 HVAC 暖通系統(tǒng)Engine run-up 發(fā)動機(jī)試車場 External aprons 緩沖停機(jī)坪LR weighing hangar LR系列稱重機(jī)庫 l l l l l l learthworks 土方工程ground leveling 場地平整 pavement 路面 apron停機(jī)坪 taxiway 滑行道 fence 圍墻 signage 標(biāo)志drainage system (surface & foul wat

2、er)排水系統(tǒng)(地表水及污水) l New powerhouse 新動力站 l TJFTZ fence天津自貿(mào)區(qū)圍欄lAircraft with switched on engine flow - Airbus A320飛機(jī)發(fā)動機(jī)啟動 - 空客A320lAircraft with switched off engine flow 飛機(jī)發(fā)動機(jī)關(guān)閉lLimit of pedestrian area 步行區(qū)域界面lLimit of towed aircraft area 飛機(jī)牽引區(qū)域界面lOffice for administration 行政辦公樓l periport 銷售簽約中心lFinal P

3、hase Hangar/flight line hangar 最終裝配及飛行檢修機(jī)庫 l Gauging area 燃油測試區(qū) l Waste facility 廢品站l MCA handling hangar 大部件庫 l FAL 最終總裝配線機(jī)庫 l plumbing給排水管道工程l fire protection system 消防系統(tǒng) lelectricity medium, low & extra low voltage 中壓及低壓電力工程及弱電工程lexternal works & infrastructure室外工程及地下工程lIn case of a difference in

4、 the requirements outlined in the English and the Chinese documentation, the English documentation shall form the basis of the design and construction. 如果英文文件的要求說明和中文文件說明不符,請以英文文件為準(zhǔn)。l surface charts面積指標(biāo)表lexternal electrical networks 高/低壓電力工程lgeneral layout(high and low pressure)高壓與低壓水總平面圖 lMV & LV e

5、lectrical services 中壓及低壓電力工程l fuel station 加油站 l synopsis 概要l schema diagram 原理圖l layout & build-up 布局和建造 lunpotable water network 非飲用水管網(wǎng)l potable water network 飲用水管網(wǎng) lcompressed air network 壓縮空氣管網(wǎng)lchilled water network general layout 空調(diào)冷水管網(wǎng)總平面圖lheating water network general layout 采暖熱水管網(wǎng)總平面圖 l cove

6、r page 封面 lenvelope detail delivery centre 交付中心立面節(jié)點大樣圖 l existing site 原有廠址 l new site 新建廠址lfoundations details hangers 機(jī)庫建筑基礎(chǔ)節(jié)點大樣圖 lenvelope detail hangers機(jī)庫建筑立面節(jié)點大樣圖lsecurity post and shelter principles警衛(wèi)室及室外棚標(biāo)準(zhǔn) l connection road 連接道路 l limits and fences 邊界和圍欄 l aircraft flows 飛機(jī)流線 lflows on site

7、流線分析l l ll l linterventions 項目范圍 ground floors 一層平面sections & details 截面及詳圖 energy pits and below ground networks 能量井及地下管網(wǎng)structural engineering 結(jié)構(gòu)工程 extra low voltage 弱電工程ELV service IT, security & fire ll l l lroof void plan 天花板夾層管網(wǎng) dangerous goods building 危險品庫房proximity store物流倉庫 logisitic centr

8、e 物流中心 general specification 總說明書 paintshop specification 噴漆機(jī)庫說明書alarm system 弱電工程-信息技術(shù),安全及火警報警系統(tǒng)lFlight line & delivery centre extension 飛機(jī)檢修及交付中心擴(kuò)建工程l high level service高位管網(wǎng) l ancillary space 附屬場地lfirst floor plan (including pits) 一層平面圖(包括井) l pit 管井l electrical sheath 電纜護(hù)套lcross and longitudinal

9、section剖面圖,lndtudn()l l elevations立面圖 l power house 動力站 l air treatment 空氣處理lcabin furnishing No.1&No.2 1號及2號客艙裝飾l working party 作業(yè)區(qū)域lsouth elevation and X02 section 南立面圖-X02軸剖面圖ltop chord roof plan & detail屋面桁架上部平面圖及詳圖lbottom chord roof plan & detail屋面桁架下部平面圖及詳圖lunderground fixtures 基礎(chǔ)及地下設(shè)備lplenum

10、plan and handling plan 吊頂內(nèi)層和操作層平面圖l basement floor plan地下室平面圖 l basement plan地下室平面圖 l basement layer 基層lcross sections-west elevation 剖面圖 西立面圖llongitudinal section/ south elevation 剖面圖-南立面圖lpavement & miscellaneous networks人行道-室外道路管網(wǎng) lenergy & environmental performance 能源與環(huán)境性能lfire protection requir

11、ement summary 消防要求概要l A330 superposition 飛機(jī)停放位置 l raft slab承重地坪 l floor heating 地暖 l designated area 指定地l10 kilowatts electrical power 10千瓦電l screw nail 螺釘l the lifting point 吊點 l I- beam 工字鋼 l floor heating 地暖 l insulation 隔離層lplastic anchors to hold the insulation 隔離層固定lformwork cardboard (putresc

12、ible)紙質(zhì)模板l gravel adjusting layer 墊層 l gravel stone layer碎石層 l electrical sheath 電纜護(hù)套 l embankments 素土夯實 l natural soil 自然土層 l gutter 地溝l hangar door 機(jī)庫大門 l ground beam 地梁 l pile 柱lfoundation detail (type) 典型基礎(chǔ)節(jié)點大樣 l parapet女兒墻 l corniche 女兒墻l metal siding 保溫金屬面板材 ljet blast fence倒流格珊l llllcurtain w

13、all 幕墻antennas assumptions 可能天線位置 limit of height restrictions for working party level 施工機(jī)庫限高 limit of height restrictions for weighing hall level 稱重機(jī)庫限高 limit of height restrictions for aprons level 停機(jī)坪限高(-1.00 M/building completion lllpiece of land to keep fuel pipeline outside(2.00M from the axis

14、 of the pipeline) 建議用地界線:航油管軸線內(nèi)側(cè)2.00米cross section on new long range site LR系列場地剖面security distance to avoid risk from the outside與外側(cè)的安全距離 weighing hall minimum height levelcentre) 標(biāo)高低于總裝中心1.00米 lconnection with the existing連接現(xiàn)狀道路ladditional concrete slab 新增混凝土地坪lextension of taxiway to allow fuel t

15、ruck to only go ahead 滑行道局部擴(kuò)建保證油車只進(jìn)不退lno information about the gate on .缺原圖紙信息區(qū)域l aircraft axis 飛機(jī)中軸線lICAO rules code E國際民航組織規(guī)則Elnew antenna position to fit with long range (translation of 21.14M)現(xiàn)狀天線移位適應(yīng)LR系列(平移21.14米)l trajectory studies飛機(jī)軌跡研究 ldistance to check with a survey according to trajector

16、y studies根據(jù)飛機(jī)軌跡要求實地測量距離lproposition of crossing with Bombardier 與龐巴迪協(xié)商區(qū)域lentrance on substation變電站入口 lentrance on no mensland 無人區(qū)域l need for real future pipeline position 要求提供將來航油管線位置l actual fuel pipeline to move現(xiàn)狀航油管線移位l possible extension可擴(kuò)建區(qū) l land banking 儲備用地lnew proposition of the limit of de

17、稱重機(jī)庫最小高度llevel of external taxiway外部滑行道標(biāo)高llevel of future runway level未建跑到標(biāo)高llevel of reference (sea level in Tianjin) 天津海平面標(biāo)高lOil separators characteristics油分離器的特征lcompletion centre minimum height level裝配中心最小高度lworker flow: cars, buses, shuttles, bicycles, tourists 工作人員流線:小汽車,大客車,擺渡車,自行車,參觀者lintern

18、al fuel truck and tractors flow 油車牽引車流線lmaintenance& security flow維修及保安流線l logistic flow 物流流線 l work on exteriors 室外工程lexisting building that need to be demolished現(xiàn)狀建筑拆除lalignement of axis of delivery aprons with new delivery centre新交付中心建筑物軸線與停機(jī)坪軸線對中l(wèi)alignement of the facades in order to preserve th

19、e existing networks與現(xiàn)狀建筑物齊平,保護(hù)現(xiàn)狀管線 lnew antenna position to fit with long range (translation of 21.14m)現(xiàn)狀天線移位適應(yīng)LR系列 l pedestrian barrier 步行門禁llimit of jet blasts fence due toheight limit TBC導(dǎo)流墻TBC限高 l telecom operator 電信運(yùn)營商 l anti-thunder 防雷 llight asphalt輕瀝青 lin line with 與一致l dotted line 虛線l expan

20、sion joint伸縮縫 l slope 坡度lA330/A350 superposition A330/A350停放位置l project risks 工程風(fēng)險 l mandatory 強(qiáng)制的lcompulsory course必修課 lelective course 選修課l deduct扣除l FOD (detritus)外來物品碎片 l Crossslope橫向坡度l Longitudinal slope縱向坡度 l concave and convex 凹面和凸面 l odd-shaped 非規(guī)則形狀的 l embedded steel 埋設(shè)鋼筋 l rectangular 矩形的

21、lNo cross-section is showing the particular treatment reserved for these odd-shaped slabs.沒有針對不規(guī)則地坪特殊對待的剖面圖 l drainage ditch 排水溝 l outlet 排水口/插座l FAA standard美國航空標(biāo)準(zhǔn) l Design Brief 設(shè)計綱要l Subgrade modulusmdjls地基模數(shù) l longitudinal slopes 縱向坡度 ltransversal slopes 橫向坡度 las for 關(guān)于 some remarks as for l lim

22、e stone石灰石lAs a basic principle adopted in the Concept Design : All the networks must be positionned beneath the landscape areas along the shoulders of taxiways and roads.作為概念設(shè)計中采用的基礎(chǔ)原理:所有的管網(wǎng)要沿著滑行道和道路的路肩放置在園景區(qū)的下方。l Settlement risks 結(jié)算危險 l as per 依據(jù) 按照l underground piping 地下管道lsub-surface water drain

23、age system 地下排水系統(tǒng) l infiltrate 滲入l common practive常見做法l wherever possible 只要有可能 l the opposite direction 相反方向 l protect against使免受lleveling for subgrade layer and rolling 路基及路面罩面 挖方loverall site plan 總體場地平面圖 lsite preparation and clearance TJFTZ前期土方工程-天津保稅區(qū) l proposed gradient 設(shè)計坡度lproposed new grou

24、nd level 項目標(biāo)高l flexible pavement柔性路面 l weak concrete素混凝土lcement stable crushed stone水泥穩(wěn)定碎石l lime flyash earth石灰粉煤灰土 l BBA 瀝青混合料 l GB 瀝青碎石l Uncrushed aggregate 未粉碎骨料 lFine particle asphalt concrete face coating細(xì)骨料瀝青混凝土面層 lPre-fabricated concrete surface混凝土預(yù)制塊面層lMedium sand leveling layer中沙找平層lM10 cem

25、ent sand pulp layer M10混凝土lAsphalt road for logistics loading trucks 物流裝車瀝青混凝土道路 lAsphalt road not for logistics loading trucks 禁行物流卡車瀝青公路lPre-fabricated road surface of the connection and transition sectionl l l l l l l for the hangar 機(jī)庫前連接段水泥混凝土預(yù)制塊道面 Border T3 T3路緣 Slot gutter 排水溝Re-use concrete s

26、lab地板區(qū)域保留 Lifting boom gates道閘 Bund wall圍堤Anti-blast fence防爆墻Surface water network雨水管網(wǎng) l ll l l l l 存燈桿column light fitting路燈設(shè)計 jackings foundation 飛機(jī)千斤頂基礎(chǔ)ground beam 地梁 gate rails 門滑軌thermal insulation 熱絕緣/保溫 putrescible materials易腐爛材料 gravels 碎石lSlot gutter(surface water)雨水縫隙式排水溝lSlot drain (surfa

27、ce water)柵格雨水排水溝l Foul water network 廢水管網(wǎng) l Abandoned network 廢棄管網(wǎng)l surface water manhole雨水檢修井 l foul water manhole污水檢修井 l manhole =chamber檢修井 lpetrol interceptor with hydrobrake 液壓閉鎖 油水分離器l pit without outlet封閉式井 l drain head (widening) 管頭l LV infrastructure ducts 強(qiáng)電網(wǎng)絡(luò) lLV infrastructure access pit

28、s 強(qiáng)電室lELV infrastructure ducts弱電地下管道lELV infrastructure access pits弱電地下接入井l radio antenna 無線電天線l MV infrastructure ducts 高壓電網(wǎng) lMV infrastructure access pits 分支高壓電網(wǎng)ldata infrastructure ducts 通信網(wǎng)絡(luò) ldata infrastructure access pits 通訊井lnetwork access point (NAP)主信息分配器lnetwork equipment room (NER)二級信息分配器

29、 lexisting external lighting network 現(xiàn)存照明網(wǎng)絡(luò)lexisting column light fitting 現(xiàn)loff-centered foundation to allow future extension building偏心基礎(chǔ)以便將來擴(kuò)建建筑l pile and pile cap 樁及樁承臺 l sectional door 滑升門l emergency exit緊急疏散出口 l 6m clearance 6米凈高l1H fire rated sliding door 1小時滑動防火門lmandatory aircraft passage 70

30、LM強(qiáng)制性飛機(jī)通道寬度70米 ltractors exit拖車出口lpit energy 能量井PO 250A 3P+N+T 插頭 250A RJ 45以太網(wǎng)接口RJ45 l earth terminal 接地端子 l AC 空氣調(diào)節(jié)l extraction air 抽氣l ATEX 16A 400V ATEX認(rèn)證16A 400V l hatch 1 蓋子1l isolating valves 隔離閥 l blind flange盲板法蘭lcompressed air and potable water below ground pipework served from working par

31、ty hangar plantrooms位于飛機(jī)組裝廠區(qū)引出的地下管道下方的壓縮空氣以飲用水lmanhole containing compressed air and potable water branches/header in order to split services to serve each pit裝有壓縮空氣和飲用水分管/集流管以便分流到各個井的人孔 lair conditioning unit connected to aircraft with above ground flexible ducts以地面上的柔性管道l ll l l l l接連飛機(jī)的空調(diào)設(shè)備 spare

32、 ducts備用管道 underground cable draw-in-box地下電纜箱composite floor混凝土樓板 purlin 檁條bottom chord 下弦 top chord上弦all steel beams under composite ll lThe structural gird has been designed so that program constraints can be respected. It must not be modified.本圖紙中建筑的結(jié)構(gòu)軸線滿足飛機(jī)外形和任務(wù)書中的各項要求,不能改變。 restroom 洗手間2 access

33、ible toilets (M&W) are provided 無障礙廁所2個 floors have shear connectors承載組合樓板的鋼梁應(yīng)設(shè)置抗剪鍵 l lintel (li) 過梁 l cantilever懸臂梁 l brickwork 磚砌體lIPE: European I beam/column IPE:歐標(biāo)工字梁/柱l portal frame support門式鋼架 l bracing X(steel) X型鋼支撐l suspended crane beam 懸掛吊車梁 l wind-resistant beams抗風(fēng)梁 l embossed steel壓面鋼板 l

34、 flange thickness翼緣厚度 l web thickness腹板厚度l domestic hot water 生活熱水lsymphonic rainwater pipe虹吸式雨水管道lgravity rainwater pipe重力式雨水管道l rainwater piping雨水管 l roof outlet屋頂排水 l isolation valve 隔離閥l electric water heater電熱水器 l array of fittings分水器lcompressed air connecting to existing networks連接到已有管網(wǎng)的壓縮空氣lp

35、otable water/non potable water connecting to existing networks連接至已有管網(wǎng)的飲用水/非飲用水 l vent pipe通風(fēng)管lchilled water hydraulic room冰水間l caged ladder 籠梯lmaintenance access 檢修通道l schematic diagram 原理圖 lWhat will be put in place to protect fuels and tanks from mud and dusts?(no contamination is a pre-requisite!

36、)什么措施要實施以保護(hù)燃油及油罐以免受泥和灰塵的傷害?(無污染是首要要求) l civil work 土建工程 l wind sock 風(fēng)向袋 l vane 風(fēng)向標(biāo)l reinforced concrete 鋼筋混凝土 l photographs file 圖示文件 l author 作者,編制人l cubiclekjubk()l小臥室;小隔間 l wing docks 機(jī)翼平臺l lifeline(on red arrows)安全吊繩 lIP rating (Ingress Protection)防水等級l Amp rating 額定電流l load diversity 負(fù)荷不同率 l st

37、ructural load 結(jié)構(gòu)荷重 l earth connection 接地線l electrical connection 電源接口 l peak flow rate 高峰流量lconnection type & size 接口類型&尺寸lhook for aircraft (hanging ring)飛機(jī)掛鉤 (吊環(huán)、掛環(huán))l cantilever 懸臂 (懸臂倉儲) l sprinkler 噴頭、噴淋 l slotted fencel distribution list 分發(fā)清單 l engine stall發(fā)動機(jī)熄火 l fire rated wall 防火墻 lred dotte

38、d line 紅色虛線l l l l l lseparate the hangar to office區(qū)分機(jī)庫及辦公室evacuation ,vkje()n排泄,疏散 pedestrian pdstrn人行道 cloakroom 更衣間 restroom洗手間in compliance with 符合.both are accessible for disable lheating pipe地暖管Random inspection; random check; spot check抽查l l l l l remote control 遠(yuǎn)程遙控 jetway 登機(jī)道power plant發(fā)電廠d

39、edicated room 專用房間 scissor lift 剪式舉升機(jī) person 每個都有無障礙廁所 l locker 帶鎖的柜子/工具柜lcubicles for personal painting materials/equipment 油漆工工作箱 l equivalent kwv()l()nt相等的 lcladding n. 包層,電鍍 lfinish鍍一層l central gutter中央管溝 l contaminate 污染,弄臟 l miscellaneous其他lthis list is not exhaustive.本單子并不十分詳細(xì) gzstv l harness

40、es hrnsz吊帶 l catalog 目錄 l sink水槽l railing 扶手,護(hù)欄 l tap水龍頭l glazed partition 玻璃外立面 l curtain walls 幕墻 l sandwich panel 夾芯板l mezzanine mtsnin夾樓,夾層 lRAILINGS : every spaces giving on a vacuum, a hopper, a placeto secure (mezzanines, rochelle,.) must be equiped of securityrailings respecting labour code.

41、護(hù)欄:所有的臨空位置,井道周邊,夾層必須安裝安全護(hù)欄。 l sliding door圍欄出口l horizontal hrznt()l水平的 l acceptance test 驗收測試l substantial completion大致完成 l centrifuge 離心機(jī)l archival room kavl檔案室 lairlock氣閥;前室l cherry picker 車載式吊車 l air conditioning unit空調(diào) l protection means 保護(hù)措施 l be specific to 針對于 l extinguish a fire :滅火 l be sub

42、ject to 從屬于 支配于 l vibration cable震動電纜l24 hours surveillance svel()ns24小時監(jiān)控lNoise nuisances and vibration 噪音污染和振動fire engines accessibility 消防車的通行 l hydrant 消防栓l fire detection 火警探測 l hollow profile方鋼l working properly正常工作 l applicable可適用的,合適的lpp panel with honey combs PP蜂巢板l completion acceptance 竣工

43、驗收 l substantial completion 大致竣工 lcompetitive negotiation競爭性談判l(wèi) feasibility study可行性研究lfire hazardclassification火災(zāi)隱患分類lfire resistance performance test 防火評估測試lFire Protection Demonstration fee消防論證費(fèi)lCommercial General Liabilities Insurance and Professional Liability Insurance. 商業(yè)綜合險、單一項目職業(yè)責(zé)任險lthird p

44、arty liability insurance第三方責(zé)任險l lHygiene special articles documentation, pre-evaluation charges and acceptance check衛(wèi)生專篇編織、預(yù)評估價費(fèi)、驗收費(fèi) Custom Clearance貨物清關(guān) Air-condition specialized l lchange definition which is proposed. 變更審核委員會負(fù)責(zé)共同審核A330完成和交付中心項目提出的變更的定義。JV joint venture合資公司/合營 A specific template f

45、orm專門的表inspections空調(diào)專項檢測l VE(value engineering)價值工程 l excavation 挖掘,發(fā)掘 l welding works焊接工作 l fire brigade 消防隊 l landscaping 景觀美化 l crushed rock碎巖石 l pea gravel鵝卵石lCompacting a gravel base layer using a single-drum compactor 單輪壓土機(jī)壓實碎石基層 l cost breakdown 成本分析 l guard house警衛(wèi)室,門衛(wèi)室 lthe responsible pers

46、ons on the site現(xiàn)場負(fù)責(zé)人l load bearing area承重區(qū)域 learth excavation 土方工程 lburying work beforehand預(yù)埋工作 l EIS entry into service 投入使用 l SOP star of production 批量生產(chǎn) l i.e. 即l practical completion 實際竣工 l wrap-up 總結(jié)l isolated mechanism隔離機(jī)制 l florescent vest 反光背心 l barrier gate擋車桿lback-up plan / Contigency Plan

47、 應(yīng)急預(yù)案l back-up 支援 v.(support/soutien)l Governance Model管理模式 l be co-chaired by共同主席lJoint Infrastructure & Facilities Team members 聯(lián)合基礎(chǔ)設(shè)施&設(shè)備團(tuán)隊成員lThe CRB is in charge of jointly reviewing the A330 C&DC project格lcommon agreement is reached 達(dá)成共識lthe requested change is escalated CR要上報lThe CRB is to be s

48、et-up from early April 2016 and will run for the duration of the development of the A330 C&DC project.變更審核委員會將在2016年4月初成立,在A330完成和交付中心項目進(jìn)行期間始終運(yùn)行。 lmasterplan 總計劃=overall/general plan l road map詳細(xì)計劃l oxygen enrichment富有氧氣 l oxygen depletion 缺氧 l toxic gas 有毒氣體 l explosive gas 爆炸氣體lsee reverse for fur

49、ther guidance lArea to bechecked/inspected for combustion 1 Hour after completion of worklAssistant to standby with fire extinguisher suitable for tasklFor all operation involving flame, welding and hot cutting l flame cut火焰切割lPerson entering work area進(jìn)入作業(yè)區(qū)的工作人員l corridor 走廊/連廊 l sky-bridge 天橋 l ker

50、b路邊石l large vehicle 大車l aspirator spret吸塵器lcustoms patrol inspector 海關(guān)巡視檢查員lreverse effect相反效果l aircraft stands 停機(jī)位 l permanent 永久的 l firefightinglinclusive of 包括lpunch list 竣工核查事項表 ;剩余工作清單l adjacentdes()nt相鄰的 l procure prkj獲取,獲得 l overlap n./v.重合lGalvenized Clustering Chimney in Paint Shop Procurem

51、ent Project is proposed to open thebid on May.19, 2016. 噴漆車間集束式鍍鋅鋼煙囪采購項目,計劃于2016年5月19日開標(biāo)lAttached are Tender Document and Tender Announcement. 附件為招標(biāo)文件和招標(biāo)公告l high pole lamp/high mast高桿燈 l high mast lighting高干桿照明 lponding積水lOvertime is the amount of time someone works beyondnormal working hours.加班 wor

52、k overtimelTopics collated centrally & tracked集中整理話題并更進(jìn) lcollate kletinformation, texts collationner核對 校對l serial mode l riveting 鉚接 l acoustic 音響的l acoustic absorption聲音的吸收 l flexible acoustic duct 伸縮隔音管l exterior slab戶外地坪 l cracks裂痕 l pull rod 拉桿 ldoweldal傳力桿lpowerhouseheat recovery chiller動力站熱回收冷

53、卻裝置 l condenser 冷凝器 l simultaneous 同時的 l broom 掃把l detergentdtd()nt清潔劑lrockwool sandwich panel with steel plat wall and ceiling 鋼板巖棉夾心板隔墻及吊頂linterlayer condesation夾層空間結(jié)露l thermal performance 熱力性能 l accessory building副樓 l compromise 妥協(xié) 讓步l monitoring camera 監(jiān)控攝像頭 l water leakage漏水l change log變更記錄/日志

54、l Hydraulic Actuator液壓執(zhí)行器 l in respect of關(guān)于涉及 l cone圓錐體lTo do a U-turn 來一個180度大轉(zhuǎn)彎在駕駛時,U-turn 就是來一個180度的大轉(zhuǎn)彎或調(diào)頭。在現(xiàn)實生活中,這個短語的意思是形容對某事的態(tài)度或觀點來了一個180度的大轉(zhuǎn)彎,徹底改變The university did a U-turn and decided not to expel the student.lat a crossroads 在交叉路口或十字路口”可以用來形容緊要關(guān)頭,需要做出關(guān)鍵決定的時刻。Theirmarriage was at a crossroa

55、ds. They could either try again to make it work or take the decision to split up. l disassemble拆開分解 l The degree Celsius (C) 攝氏度lThe government has agreed in principle 原則上同意 l container 集裝箱 l hammer v.錘打 n.錘子lformality手續(xù);禮節(jié)l甲方委托乙方負(fù)責(zé)完成土石方工程(包括挖土、填土、石方爆破鑿除、外運(yùn))。就施工中的有關(guān)事項,經(jīng)雙方友好協(xié)商,達(dá)成如下協(xié)議。Party A hereby c

56、ommissioned party l400Hz frequency converter 400Hz變頻器archive 檔案transformer room變壓器室 heating substation 采暖分站 fire control valves room消防控制l l l lB responsible for completion and accomplishment of earthwork including excavation, filling, chiseled rock blasting and conveying out. Parties hereto, through amicable negotiations, reach the agreement on the respected items of construction as fol

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論