




版權(quán)說(shuō)明:本文檔由用戶(hù)提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、Distributed and modular measurement system provides flexibility and cost efficiency for mechanical load measurements (IEC61400-13) on wind turbines,Gantner-Instruments 中國(guó)有限公司(北京) 北京市通州區(qū)云景東路1號(hào)時(shí)尚街區(qū)園景國(guó)際大廈A座1508室 Tel: +86 10-59781872 / 59781873Fax: +86 10-59781872 / 59781873 轉(zhuǎn)802 Email: salesGantner-I W
2、eb: www.gantner-,Whats to do?,Distributed measurement and synchronized recording of all relevant quantitiesdynamic and acuracymechanical quantities in correlition/dependency with position and meteorological quantities,Conditioning of the recorded measurement data minimum, maximum, average, standard
3、deviation, data compression, data filtering, special methods (vect. avaraging), recognition and elimination of non plausible values,Saving of datalocally in the system or in a PC according configurable parameter (memory medium, redundancy, file size, format),Transmisson of the dataNetwork, Internet,
4、 GSM, Server/Client,Securaty and Remote Controlalarm function at not elought values alarm function at memory overrun, Watchdog, system start without personnel,Measurements for Mechanical Load Analysis (samples),Signal to measurePrinciple strain at blade edges / hubstrain gauges torque on the shaftst
5、rain gauges tilt momentstrain gauge yaw momentstrain gauge yaw positioncounter speed rpmfrequency azimuth anglecounter torsion nacellestrain gauge torsion top of the towerstrain gauge bending top of the towerstrain gauge bending bottom of the towerstrain gauge vibrationpiezo / voltage generated powe
6、rvoltage, current wind directionpotentiometer or counter wind speedfrequency temperature bottom and topPt100 humidityvoltage barometric pressurevoltage,fiber optic,hub,shaft,nacelle,tower bottom,Conditioning based on Application,calculation of the statistical values in a 10 min framemaximumminimumav
7、eragestandard deviation saving conditions (kind, location, redundancy) vectorial averaging of wind speed calculation od wind turbulences based on wind speed and wind direction monitoring of key measurements alarm management remote communikation (E-Mail, FTP-Client),10010110 00111001 01100110 1010001
8、0 10110001 00011010 11011101 01100011 11110101 00100010,10010110 00111001 01100110 10100010 10110001 00011010 11011101 01100011 11110101 00100010,Setup without PC in the turbine Data will be stored in the Test Controller, when indicaded with USB extension Higher reliability and availability Robust s
9、ystem (temperature, dust, EMC) Lower costs,Setup with PC in the turbine More flexibility because of variable software design Higher conditioning power Data redundancy (Controller + PC) More communication possibilities,Saving of Data,Saving of Data,Setup without PC in the turbine Signal conditioning
10、and data memory raw data recorded with 100 Hz calculation of the statistical values definition of the memory sections dynamic data 10 ms meteorological data 1 sec statistical data 10 min Memory capacity with100 channels at 100 Hz internal flash 4 Gbyte: 27 hours external HDD 1000 Gbyte: 28 days inco
11、mming amount of data 40 kbyte/sec In case the external medium will be changed the internal memory will be used automatically and after availability the data will be transfered.,Saving of Data,Setup with PC in the turbine,Conditioning and saving of the data using the server software test.node Test Co
12、ntroller provide the raw data Server Software test.node records the data synchronizes from one or more device calculation of the statistical values saving the data on a PC or in a data base (SQL) Online convertion of the binary data e.g. into FAMOS or MATLAB Visualization of the online- or the saved
13、 Data The saving of the data device or PC could happen redundancy.,Saving of Data,test.node,Saving of Data,Secure the memory function also with failing PC,Remote Reboot,Remote Reboot,Not everywhere it is easy to reach the turbine complete system can be rebooted without personnel whole system starts
14、working within 10 sec server software starts with adequate PC-configuration (auto start),Alarm Management,In case of not acceptable situations speed to high wind turbulences, unexpeted material stress others alarm will be released and mail will be send (FTP client, e-Mail.),Synchronized Recording in
15、 a Wind Park,The Measurement system can be synchronized using different media time signal, z. B. DCF77, IRIG over RS485, accuracy approx. 100 ms GPS signal, NMEA over RS232,accuracy approx. 0,2 s - 1 s SNTP over Ethernet (time server), accuracy depends on network load in case it is possible to connect the controller via RS485 together, an accuracy of +/- 2 s is possible.,Partner a
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶(hù)所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶(hù)上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶(hù)上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶(hù)因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 工程公司財(cái)務(wù)制度
- 咸寧彩色混凝土施工方案
- 磚砌污水井施工方案
- 砼護(hù)欄施工方案
- 南山車(chē)庫(kù)防水施工方案
- 廣西噴泉維修施工方案
- 6mm 650nm 5mw 紅光點(diǎn)狀激光 pd腳作用
- 5年級(jí)下冊(cè)人教版英語(yǔ)詞語(yǔ)表
- 5年級(jí)白鷺第二自然段改寫(xiě)成一段說(shuō)明文
- 橋梁端頭封堵施工方案
- 少兒美術(shù)繪本教案課件-3-6歲 《100層巴士》
- 鋼筋原材質(zhì)量證明書(shū)
- WH/T 42-2011演出場(chǎng)所安全技術(shù)要求第2部分:臨時(shí)搭建演出場(chǎng)所舞臺(tái)、看臺(tái)安全技術(shù)要求
- GB/T 5023.5-2008額定電壓450/750 V及以下聚氯乙烯絕緣電纜第5部分:軟電纜(軟線(xiàn))
- GB/T 23445-2009聚合物水泥防水涂料
- 瓷貼面教學(xué)課件
- 尺骨冠突骨折課件
- 北師大版七年級(jí)下冊(cè)第一章整式的乘除計(jì)算題專(zhuān)項(xiàng)訓(xùn)練
- 2022年蘇州健雄職業(yè)技術(shù)學(xué)院?jiǎn)握锌荚嚸嬖囋囶}及答案解析
- 乳腺癌改良根治術(shù)
- 新版(七步法案例)PFMEA
評(píng)論
0/150
提交評(píng)論