版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
02-10
251010-
SECTION251010
ADVANCEDUTILITYMETERINGSYSTEM
SPECWRITERNOTES:
Deletebetween//____//ifnotapplicabletoproject.Alsodeleteanyotheritemorparagraphnotapplicableinthesectionandrenumbertheparagraphs.Thisspecificationsectionappliestoandshallbeincludedwithallworktobeperformedunderthe22,23,26,32,and33DivisionsoftheMasterConstructionSpecifications.TheSectionisgeneralinnature,andshouldbeeditedtofiteachproject.
Providescheduleforeachflowmeterlistingflowmetertype,fluidtypeandcharacteristics,temperatureandpressureoffluid,flowrange(maximumandminimumflows),maximumpressureloss,minimummeteraccuracy,Englishandmetricmeasurementunits.
TheVAhasinplaceaCorporate-WideAdvancedUtilityMeteringDatabase,whichallowstheVAtoautomaticallyquerysomeofitsfacilitiesfortheirenergyandwaterusage.Thisspecificationrolls-outAdvancedUtilityMeteringSystems(AUMS)toallofitsfacilities.EachfacilityshallincludeanAUMS,periodicallytransmittinginformationinaformatcompatiblewiththeexistingVACorporate-WideAdvancedUtilityMeteringDatabase.
Thisspecificationdefinesthestructurefortheroll-outoftheAUMSs:eachVISNorVAMCshallbeprovided(bythissection,ifnotalreadyin-place)aSiteDataAggregationDevice(aPCworkstationorserver);communicationsbetweenthisSiteDataAggregationDeviceandtheVA’sCorporate-WideAdvancedUtilityMeteringDatabaseshallbeviaperiodicTCP/IPcommunications;communicationsbetweentheSiteWideAggregationDeviceandthefacility’smetersshallbeviaEthernetcabling(separatefromtheITsystem’sandtheHVACcontrolsystem’scabling),andwireless;andmetersofthefacility’senergyflowsandwaterflows.
Communications(especiallyTCP/IP)shallcomplywithNIST-recommendedsecurityprotocols.
CommunicationsbetweenmetersandtheSiteDataAggregationDeviceshallallowforreal-timeandhigh-samplingfrequencyautomaticmonitoringofenergyflowsthroughoutandwithineachfacilityaswellasless-frequentintervalor“billing”metering.TheAUMSshallincludecapacityforfutureautomaticcontrol:dispatchofloadsdependingonthresholdsbeingreached,alarmnoticesauto-sentundervariousconditions,andthelike.TheAUMSshallincludevariouslevelsofoperatorinterfaceandaccess,andshallallowforcustomizableviewportsasrequiredbytheUser.
Thisspecificationincludesmetersandcommunicationssystemswhichmaynotberelevanttotheindividualproject.Thespecifyingengineershallsurveythesiteandexaminephysicalconditionsandconstraintsrelativethefacilitybeingdesigned.ThespecifyingengineershallcoordinatethemeteringandcommunicationsscopewiththefacilityengineerandtheResidentEngineer.ThespecifyingengineershallonlytheneditthisspecificationtoincludeonlythosefeaturesrelevanttoandrequiredbytheAUMS.
Separatecablingorradiotransmission(RF)fromthemeterstotheSiteDataAggregationDeviceisrequired.Thecommunicationstransmissionshallnotberunonthefacility’sITnetwork.Ifthemetersareexistingandpartofthefacility’sdirectdigitalcontrolsystem,andifthoseexistingmetersaresufficienttothisSection’smission,theinformationmaythenbetransmittedoverthefacility’sdirectdigitalcontrolsystemnetworktothefacility’sECC,andfromtheretotheAUMS.
Showondrawingsallcommunicationscablingrouting,meterandtriminstallationdetailsandlocations,aswellasdescribingmethodsandmeanslimitationsfortheimplementationoftheAUMS.
Thespecifyingengineershallhavecompleteknowledgeofthespaceandcablepathways(i.e.equipmentrooms,TCs,conduits,wireways,etc.)oftheFacility.ThespecifyingengineershallataminimumdesignandinstalltheSystemusingthePathwayDesignHandbookH-088C3,TIA/EIATelecommunicationsBuildingWiringStandards,andVA’sFacilityChiefofInformationTechnologies(IT)instructions,asapprovedinwritingbytheVA.
Designanewsystemconformingtocurrentandaccepteddigitalindustrial/commercialcableandRFdistributionstandards.ThedistributioncableinstallationshallbefullycoordinatedwiththeVApriortothestartofinstallation.
Specifycableinthissystem(i.e.backbone,outsideplant,insideplant,andstationcabling)toconformtothisSectionandtoacceptedindustryandOEMstandardswithregardstosize,colorcode,andinsulation.Thepairtwistsofanypairshallnotbeexactlythesameasanyotherpairwithinanyunitorsub-unitofcablesthatarebundledintwenty-five(25)pairsorless.
TheSystemcablesshallbeprotectedconduit.ThespecifyingengineershallincludeSection260533inthespecificationsforthework.SomeareasofthisFacilitymaybeconsidered“plenum”.Ifanyofwireandcableusedinsupportoftheinstallationinthoseareasisnotinconduit(thisguidancedoesnotgrantrelieffromtheprotection):thenthecablingmustcomplywithnationalandrelevantcodespertainingtoplenumenvironments.ReviewtheVA’scableandwirerequirementswiththeVApriortoinstallationtoconfirmthetypeofenvironmentpresentateachlocation.
Designoutside-andinside-plantcablesthatfurnishthenumberofcablepairsrequiredinaccordancewiththeSystemrequirementsdescribedherein.FullycoordinateandobtainapprovalofthedesignwiththeoriginalequipmentmanufacturerandtheVApriortoinstallation.
Additionofadvancedmetersshallinnowayaffectanyexistingutilitymeteroritscomponents.
Thismetershallbeusedassupplementalinformation.
Knowthatmetersinstalledadjacentotherutilitymeterswillnotreadexactlythesame.
Thisdifferenceisduetothedifferentturn-downratios,calibrationstodifferentCT’s,andalsoduetodifferingaccuraciesofthemeters.
ExistingmetersalreadyinplacemayservethemissionofthisSection,providedthattheycomplywiththecommunicationsandaccuracyrequirementsofthisSection.Confirmthisre-usewiththeVA’sFacilityEngineerandREO.
Unlesstheconstructionisonagreenfield,mostoftheutilitiesmeteredbythisSectionarefundamentaltotheoperationofthefacility.Chooseinsertion-typemetersandusehot-tapsintoactivepipingsystemsandothermeanstoallowformeterinsertionintotheutilitydistributionsystemswithoutforcingoutagesofthosesystems.
MetermaintenanceisanimportantconcernfortheVA:wherefeasible,specifymeterswithnomovingparts,sominimizingmaintenanceofmechanicalcomponentsoverthelifeofthemeter.
PART1-ENERAL
1.1 DESCRIPTION
A. ThisSectionincludesthefollowingfortheadvancedmeteringofthesystemsofthefacility.Themeteredsystemsincludetheelectricalpower,naturalgasdistribution,fuelgasandfueloil,steam,steamcondensate,chilledwater,heatingwater,domesticwater,recoveredwaterandmakeupwatersystems.ThemeteringsystemsineachfacilityarepartofaCorporate-Wideutilitymeteringsystem,renderingtheVAaccurateandautomatedmeteringofitsfacilities’energyandwaterflows.Meteringsystemsarecomprisedof:
1. PC-basedworkstation(s)orserver(s)andsoftware.
2. Communicationnetworkandinterfacemodulesfor//RS-232,RS-485,ModbusTCP/IP,IEEE
802.3//datatransmissionprotocols.
3. Electricmeters.
4. Volumetricflowmeters,temperaturesensorsandpressuretransducers.
5. Massflowmeters.
1.2 RELATEDWORK
A. //Section130541,SEISMICRESTRAINTREQUIREMENTSFORNON-STRUCTURALCOMPONENTS:Requirementsforseismicrestraintofnonstructuralcomponents.//
B. Section220519MetersandGagesforPlumbingPiping:metersandgages.
C. Section223300ElectricDomesticWaterHeaters:referencesmeters.
D. Section223400Fuel-FiredDomesticWaterHeaters:referencesmeters.
E. Section223500DomesticWaterHeaterExchangers:referencesmeters.
F. Section230511,COMMONWORKRESULTSFORHVACANDSTEAMGENERATION:Generalmechanicalrequirements,commontomorethanonesectioninmechanical.
G. Section230911,INSTRUMENTATIONANDCONTROLFORBOILERPLANT:Flowmeters
H. Section230923,DIRECT-DIGITALCONTROLSYSTEMFORHVAC:Flowmetersandcommunications
I. Section260511,REQUIREMENTSFORELECTRICALINSTALLATIONS:GeneralelectricalrequirementsanditemsthatarecommontomorethanonesectionofDivision26.
J. Section260521,LOW-VOLTAGEELECTRICALPOWERCONDUCTORSANDCABLES(600VOLTSANDBELOW):Lowvoltagecable.
K. Section260526,GROUNDINGANDBONDINGFORELECTRICALSYSTEMS:Requirementsforpersonnelsafetyandtoprovidealowimpedancepathforpossiblegroundfaultcurrents.
L. Section260533,RACEWAYANDBOXESFORELECTRICALSYSTEMS:Conduits.
M. Section261116,SECONDARYUNITSUBSTATIONS:Unitsecondarysubstation.
N. Section261300,MEDIUM-VOLTAGESWITCHGEAR:Highvoltageswitchgear.
O. Section261841,MEDIUM-VOLTAGESWITCHES:Highvoltageswitches.
p. Section262300,LOW-VOLTAGESWITCHGEAR:Secondarydistributionswitchgear.
Q. Section262411,DISTRIBUTIONSWITCHBOARDS:Secondarydistributionswitchboards.
R. Section262419,MOTOR-CONTROLCENTERS:Motorcontrolassemblies.
S. Section328400PlantingIrrigation:referencesmeters.
T. Section331000WaterUtilities:referencesmeters.
U. Section335100NaturalGasDistribution:referencesmeters.
V. Section336300SteamEnergyDistribution:referencesmeters.
1.3 definitions
A. AMR:Automaticmeterreadingisthetechnologyofautomaticallycollectingconsumption,diagnostic,andstatusdatafromwaterandenergymeteringdevices(water,gas,electric,steam)andtransferringthatdatatoacentraldatabaseforbilling,troubleshooting,andanalyzing.
B. AUMS:AdvancedUtilityMeteringSystem:thesystemdescribedbythisSection.
C BACnet:BACnetisaDataCommunicationsProtocolforBuildingAutomationandControlNetworks.ItisdefinedbyASHRAE/ANSIStandard135(ISO16484-5)standardprotocol.
D. DataOverCableServiceInterfaceSpecification(DOCSIS):aninternationalstandarddefiningcommunicationsandoperationsupportinterfacerequirementsforadataovercablesystem,bytheCableTelevisionLaboratories,Inc.consortium
E. DataHead(onmeters):convertsanalogandpulsesignalstodigitalsignalsfortransmissiontotheSiteDataAggregationDevice.Alsoprovidesforlimitedstorageofthedigitalsignals.
F. DeviceAccuracy:accuracyinthissectionisbasedonactualflow,notfullscaleorfullrange.Deviceaccuracymeasurestheconversionofflowinformationtoanalogorpulsesignals.
G. Ethernet:Localareanetwork,basedonIEEE
802.3standards.
H. Firmware:Software(programsordata)thathasbeenwrittenontoread-onlymemory(ROM).Firmwareisacombinationofsoftwareandhardware.StoragemediawithROMsthathavedataorprogramsrecordedonthemarefirmware.
I. Gateway:Bi-directionalprotocoltranslatorconnectingcontrolsystemsthatusedifferentcommunicationprotocols.
J. GB:gigabyte.Whenusedtodescribedatastorage,"GB"represents1024megabytes.
K. HTML:Hypertextmarkuplanguage.
L. I/O:Input/output.
M. KB:Shortforkilobyte.Whenusedtodescribedatastorage,"KB"represents1024bytes.
N. KYPulse:Atermusedbythemeteringindustrytodescribeamethodofmeasuringconsumptionofelectricitythatisbasedonarelaychangingstatusinresponsetotherotationofthediskinthemeter.
O. LAN:Localareanetwork.Sometimespluralas"LANs."
P. LCD:Liquidcrystaldisplay.
Q. LonMark:AnassociationcomprisingofsuppliersandinstallersofLonTalkproducts.TheAssociationprovidesguidelinesfortheimplementationoftheLonTalkprotocoltoensureinteroperabilitythroughStandardimplementation.
R. LonTalk:AnopenstandardprotocoldevelopedbytheEchelonCorporationthatusesa“NeuronChip”forcommunication.
S. LonWorks:NetworktechnologydevelopedbytheEchelonCorporation.
T. LowVoltage:AsdefinedinNFPA
70forcircuitsandequipmentoperatingatlessthat50
Vorremote-control,signalingandpower-limitedcircuits.
U. MB:megabyte.Whenusedtodescribedatastorage,"MB"represents1024kilobytes.
V. Mbps:Megabytespersecond,equalto8megabitspersecond
W. ModbusTCP/IP:Anopenprotocolforexchangeofprocessdata.
X. Monitoring:Acquisition,processing,communication,anddisplayofequipmentstatusdata,meteredelectricalparametervalues,powerqualityevaluationdata,eventandalarmsignals,tabulatedreports,andeventlogs.
Y. OTDR:OpticalTimeDomainReflectometer.Atestinstrumentthatanalyzesthelightlossinanopticalfiber.Usedtofindfaults,splicesandbendsintheline,itworksbysendingoutalightpulseandmeasuringitsreflection.Suchdevicescanmeasurefiberlinesthatarelongerthan150miles
Z. PC:Personalcomputer
AA.PICS,ProtocolImplementationConformanceStatement:AwrittendocumentthatidentifiestheparticularoptionsspecifiedbyBACnetthatareimplementedinadevice.
BB.REO:ResidentEngineerOffice:theVAofficeadministeringtheconstructioncontract.
CC.ReportingAccuracy:thisistheroot-mean-squaresumofallofthemeteringdevices’inaccuracies:measurementinaccuracy,mechanicalinaccuracy,analog-to-digitalorpulseintegrationinaccuracy,etc.,uptothemeter’sdatahead.
DD.rms:Root-mean-squarevalueofalternatingvoltage,whichisthesquarerootofthemeanvalueofthesquareofthevoltagevaluesduringacompletecycle.
EE.Router:Adevicethatconnectstwoormorenetworksatthenetworklayer.
FF.RS-232:ATelecommunicationsIndustryAssociationstandardforasynchronousserialdatacommunicationsbetweenterminaldevices.
GG.RS-485:ATelecommunicationsIndustryAssociationstandardformultipointcommunicationsusingtwotwisted-pairs.
HH.TB:terrabyte.Whenusedtodescribedatastorage,"TB"represents1024gigabytes.
II.TCP/IP:Transportcontrolprotocol/internetprotocol.
JJ.Turn-down:themaximumflowdividedbytheminimumflowthroughameter;usedalongwithaccuracyrequirements.Forexample,ametershallbeaccuratetowithin2%ofactualflowwiththroughouta20:1turndown
KK.THD:Totalharmonicdistortion.
LL.UPS:Uninterruptiblepowersupply;usedbothinsingularandpluralcontext.
MM.UTP:Unshieldedtwistedpaircabling,usedtolimitcrosstalkandelectromagneticinterferencefromtheenvironment
NN.WAN:Wideareanetwork.
1.4 qualityassurance
A. InstallerQualifications:Manufacturer'sauthorizedrepresentativewhoistrainedandapprovedforinstallationofunitsrequiredforthisProject.
B. ManufacturerQualifications:AfirmexperiencedatleastthreeyearsinmanufacturingandinstallingpowermonitoringandcontrolequipmentsimilartothatindicatedforthisProjectandwitharecordofsuccessfulin-serviceperformance.
C. ElectricalComponents,Devices,andAccessories:ListedandlabeledasdefinedinNFPA
70,Article
100,byatestingagency,andmarkedforintendeduse.
D. SystemModifications:MakerecommendationsforsystemmodificationinwritingtotheVA.NosystemmodificationsshallbemadewithoutpriorwrittenapprovaloftheVA.AnymodificationsmadetothesystemshallbeincorporatedintotheOperationsandMaintenanceInstructions,andotherdocumentationaffected.ProvidetotheVAsoftwareupdatesforallsoftwarefurnishedunderthisspecificationduringthiscontract’sconstructionandverificationperiodsandforthefirsttwoyearsaftergovernmentacceptance.Allupdatedsoftwareshallbeverifiedaspartofthiscontract.
1.5 performance
A. Theadvancedutilitymeteringsystemshallconformtothefollowing:
1. SiteDataAggregationDeviceGraphicDisplay:Thesystemshalldisplayupto4graphicsonasinglescreenwithaminimumof(20)dynamicpointspergraphic.Allcurrentdatashallbedisplayedwithin(10)secondsoftherequest.
2. SiteDataAggregationDeviceGraphicRefresh:Thesystemshallupdatealldynamicpointswithcurrentdatawithintenseconds.Datarefreshshallbeautomatic,withoutoperatorintervention.
3. MeterScan:Allchangesofmeteredvaluesshallbetransmittedoverthehigh-speednetworksuchthatanydatausedordisplayedatacontrollerorSiteDataAggregationDevicewillbecurrent,withinthepriortenseconds.
4. AlarmResponseTime:Themaximumtimefromwhenmetergoesintoalarmtowhenitisannunciatedattheworkstationshallnotexceedtenseconds.
5. ReportingAccuracy:Listedbelowareminimumacceptablereportingaccuraciesforallvalueswithinthebelowminimumturn-downenvelopereportedbythemeters:
MeasuredVariable
UnitsMeasured
MinimumTurn-DownofMeter
ReportingAccuracy(Note1)
Electricity
V,A,W,etc.
n/a
±0.5%ofmeasuredvalue
NaturalGas
l/s(CFH)
10:1
±2%
LiquefiedPetroleumGas
l/s(CFH)
10:1
±2%
Steam
kW(MBH)
20:1
±2%
Condensate
kW(MBH)
20:1
±2%
DomesticWaterflow
l/s(GPH)
20:1
±2%
ReclaimedWaterflow
l/s(GPH)
20:1
±2%
Make-upWatertoBoilersflow
l/s(GPH)
10:1
±2%
Make-upWatertoCoolingTowersflow
l/s(GPH)
10:1
±2%
No.2HeatingOil
l/s(GPH)
10:1
±2%
No.6HeatingOil
l/s(GPH)
10:1
±2%
HeatingWater
kW(MBH)
20:1
±2%
ChilledWater
kW(MBH)
20:1
±2%
OutsideAirTemperature
°C(°F)
n/a
±2%
OutsideAirRelativeHumidity
%rh
n/a
±2.5%
Table1.5:MeterPerformanceCriteria
TableNotes:
Thistableshowsreportingaccuracy,notmerelythemeter’saccuracy.Reportingaccuracyincludesmeteraccuracyanddataconversionaccuracy.SeeArticle1.3inthisSectionfordefinition.Accuracyisshownagainstthemeasuredvalue,notagainstthefullrangeofthemeter.
l/s:literpersecond
CFH:cubicfeetperhour
kW:kilowatt
MBH:1000’sBritishThermalUnitsperhour
GPH:gallonsperhour
1.6 WARRANTY
A. LaborandmaterialsforadvancedutilitymeteringsystemsshallbewarrantedforaperiodasspecifiedunderWarrantyinFARclause52.246-21.
B. Advanceutilitymeteringsystemfailuresduringthewarrantyperiodshallbeadjusted,repaired,orreplacedatnocostorreductioninservicetotheowner.Thesystemincludesallcomputerequipment,transmissionequipment,andallsensorsandmeteringdevices.
1.7 submittals
A. ProductData:foreachtypeofproductindicated,AttachcopiesofapprovedProductDatasubmittalsforproducts(suchasflowmeters,temperaturesensorsandpressuretransmitters,switchboardsandswitchgear)thatdescribeadvanceutilitymeteringfeaturestoillustratecoordinationamongrelatedequipmentandutilitymeteringandcontrol.
B. ShopDrawings:includeplans,elevations,sections,details,andattachmentstootherwork.
1. OutlineDrawings:Indicatearrangementofmeters,componentsandclearanceandaccessrequirements.Clearlyidentifysystemcomponents,internalconnections,andallfieldconnections.
2. BlockDiagram:ShowinterconnectionsbetweencomponentsspecifiedinthisSectionanddevicesfurnishedwithpowerdistributionsystemcomponents.Indicatedatacommunicationpathsandidentifynetworks,databuses,datagateways,concentrators,andotherdevicestobeused.Describecharacteristicsofnetworkandotherdatacommunicationlines.
3. Detailequipmentassembliesandindicatedimensions,weights,loads,requiredclearances,methodoffieldassembly,components,andlocationandsizeofeachfieldconnection.
4. WiringDiagrams:Power,signal,andcommunicationswiring.Coordinatenomenclatureandpresentationwithablockdiagram.Showallcommunicationsnetworkcomponentsandincludeacommunicationssingle-linediagramindicatingdeviceinterconnectionandaddressinginformationforallsystemdevices.Identifyterminalblocksusedforinterconnectionsandwiretypetobeused.
5. UPSsizingcalculationsforworkstation.
C. SoftwareandFirmwareOperationalDocumentation:
1. Self-studyguidedescribingtheprocessforsettingequipment'snetworkaddress;settingOwner'soptions;procedurestoensuredataaccessfromanyPConthenetwork,usingastandardWebbrowser;andrecommendedfirewallsetup.
2. Softwareoperatingandupgrademanuals.
3. SoftwareBackup:Onacompactdisc,completewithOwner-selectedoptions.
4. Deviceaddresslistandthesetpointofeachdeviceandoperatoroption,assetinapplicationssoftware.
5. Graphicfileandprintoutofgraphicscreensandrelatedicons,withlegend.
6. "Quick-Start"guidetodescribeasimple,three-stepcommissioningprocessforsettingtheequipment’sEthernetaddress,andensuringtrouble-freedataaccessfromanyPConthenetwork,usingastandardwebbrowser.
D. SoftwareUpgradeKit:ForOwnertouseinmodifyingsoftwaretosuitfutureutilitymeteringsystemrevisions.
E. FirmwareUpgradeKit:ForOwnertouseinmodifyingfirmwaretosuitfuturepowersystemrevisionsoradvancedutilitymeteringsystemrevisions.Firmwareupdates,andnecessarysoftwaretoolsforfirmwareupdates,shallbedownloadablefromtheinternet.VAshallbeabletoupdatefirmware,inequipment,withoutremovingdevicefromtheequipment.VAshallbecapableofupdatingfirmwareovertheutilitymeteringcommunicationnetworkorthroughlocalcommunicationportsonthedevice.
F. Softwarelicensesandupgradesrequiredbyandinstalledforoperatingandprogrammingdigitalandanalogdevices.
G. QualificationData:Forinstallerandmanufacturer
H. OtherInformationalSubmittals:
1. Systeminstallationandsetupguides,withdataformstoplanandrecordoptionsandsetupdecisions.
I. ReviseandupdatetheContractDrawingstoincludedetailsofthesystemdesign.Drawingsshallbeon17by11inchessheets.DetailstobeshownontheDesignDrawinginclude:
1. Detailsonlogicalstructureofthenetwork.Thisincludeslogicallocationofallnetworkhardware.
2. Manufacturerandmodelnumberforeachpieceofcomputerandnetworkhardware.
3. Physicallocationforeachpieceofnetworkorcomputerhardware.
4. PhysicalroutingofLANcabling.
5. Physicalandqualitativedescriptionsofconnectivities.
1.8 CLOSEOUTSUBMITTALS
A. OperationandMaintenanceData:Foradvancedutilitymeteringsystemcomponentsandmeters,toincludeinemergency,operation,andmaintenancemanuals.Includethefollowing:
1. Operatingandapplicationssoftwaredocumentation.
2. Softwarelicenses.
3. Softwareserviceagreement.
4. PCinstallationandoperatingdocumentation,manuals,andsoftwareforthePCandallinstalledperipherals.Softwareshallincludesystemrestore,emergencybootcompactdisks,anddriversforallinstalledhardware.ProvideseparatelyforeachPC.
5. Hardcopiesofmanufacturer'sspecificationsheets,operatingspecifications,designguides,user'sguidesforsoftwareandhardware,andPDFfilesonCD-ROMofthehard-copysubmittal.
6. Inadditiontothecopiesrequiredby010000,provide5boundpapercopiesoftheOperationandMaintenanceDataandtwocompactdisks(CD),withallInstructionsasAcrobatPDFfiles.ThepdffilesshallidenticaltothepapercopiesandshallAcrobatnavigationtoolsincludingBookmarksforeachChapter.
7. TheadvancedutilitymeteringsystemOperationandMaintenanceInstructionsshallinclude:
a. ProceduresfortheAUMSsystemstart-up,operationandshut-down.
b. FinalAs-Builtdrawings,includingactualLANcablingroutingshownonarchitecturalbackgrounds.
1) IPaddress(es)asapplicableforeachpieceofnetworkhardware.
2) IPaddressforeachcomputerserver,workstationandnetworkedprinter.
3) Networkidentifier(name)foreachprinter,computerserverandcomputerworkstation.
4) CEA-709.1Baddress(domain,subnet,nodeaddress)foreachCEA-709.1BTP/FT-10toIPRouter.
c. Routinemaintenancechecklist,renderedinaMicrosoftExcelformat.Theroutinemaintenancechecklistshallbearrangedinacolumnarformat.Thefirstcolumnshalllistallinstalleddevices,thesecondcolumnshalllisteachdevice’snodeidentifier/address,thethirdcolumnshalldescribeeachdevice’sphysicallocation,thefourthcolumnshallstatethemaintenanceactivityorstatenomaintenancerequired,thefifthcolumnshallstatethefrequencyofthemaintenanceactivity,frequencyofcalibrationandthesixthcolumnforadditionalcommentsorreference.
d. Qualifiedserviceorganizationlist.
e. InadditiontotherequirementsinSection013323,thesubmittalshallincludemanufacturerInstallationRequirements.
f. Includecompleteinstructionsforcalibrationofeachmetertypeandmodel.
g. Start-UpandStart-UpTestingReport.
h. Performanceverificationtestproceduresandreports.
i. PreventiveMaintenanceWorkPlan.
j. Inadditiontofactorytrainedmanufacturers'representativesrequirementsin010000,providesignedletterbyfactorytrainedmanufacturers'representativesstatingthatthesystemandcomponentsareinstalledinstrictaccordancewiththemanufacturers’recommendations.
B. Fieldquality-controltestreports.
1.9 LICENSINGAGREEMENT
A. Licensesprocuredaspartofthisworkbecomethepropertyofthegovernmentuponacceptanceofthework.Licensesshallhavenoexpiration.
B. TechnicalSupport:BeginningwithGovernmentAcceptance,providesoftwaresupportfor//one//two////Insertnumber//years.
C. UpgradeService:UpdatesoftwaretolatestversionatProjectcompletion.InstallandprogramsoftwareupgradesthatbecomeavailablewithintwoyearsfromdateofGovernmentAcceptance.Upgradingsoftwareshallincludetheoperatingsystems.Upgradeshallincludeneworrevisedlicensesforuseofsoftware.
1. Provide30-daynoticetoOwnertoallowschedulingandaccesstosystemandtoallowOwnertoupgradecomputerequipmentifnecessary.
1.10 MAINTENANCEANDSERVICE
A. PreventiveMaintenanceRequirements:provideapreventativemaintenanceplanwithattachedproceduresindicatedbymeterandcomponentmanufacturers.Performmaintenanceproceduresforaperiodof1yearaftergovernmentacceptance,atfrequenciesandusingproceduresrequiredbythemeterandcomponentmanufacturers.Ataminimumandifthemanufacturerissilentonitspreventativemaintenancerequirements,frequencies,deliverablesandactivitiesshallcomplywiththefollowing:
1. PreventiveMaintenanceWorkPlan:prepareaPreventiveMaintenanceWorkPlantoscheduleallrequiredpreventivemaintenance.VAapprovaloftheWorkPlanshallbeobtained.AdheretotheapprovedworkplantofacilitateVAverificationofwork.IftheContractorfindsitnecessarytoreschedulemaintenance,awrittenrequestshallbemadetotheVAdetailingthereasonsfortheproposedchangeatleastfivedayspriortotheoriginallys
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 新形勢下Mini LED行業(yè)快速做大市場規(guī)模戰(zhàn)略制定與實(shí)施研究報(bào)告
- 2025-2030年中國超聲熱量表行業(yè)資本規(guī)劃與股權(quán)融資戰(zhàn)略制定與實(shí)施研究報(bào)告
- 新形勢下北斗衛(wèi)星應(yīng)用行業(yè)可持續(xù)發(fā)展戰(zhàn)略制定與實(shí)施研究報(bào)告
- 2025-2030年中國廚房料理小家電行業(yè)并購重組擴(kuò)張戰(zhàn)略制定與實(shí)施研究報(bào)告
- 市政道路竣工驗(yàn)收質(zhì)量評估報(bào)告-定稿
- 自動(dòng)變速器維修試題及答案2
- 微懸浮法糊樹脂新建項(xiàng)目可行性研究報(bào)告建議書申請格式范文
- 中國改善睡眠保健品行業(yè)全景評估及投資規(guī)劃建議報(bào)告
- 2024-2030年航空運(yùn)輸行業(yè)投資機(jī)會及風(fēng)險(xiǎn)投資運(yùn)作模式研究報(bào)告
- 四年級數(shù)學(xué)(四則混合運(yùn)算)計(jì)算題專項(xiàng)練習(xí)與答案匯編
- 高速服務(wù)區(qū)經(jīng)營分析報(bào)告
- 浙江省湖州市2022-2023學(xué)年四年級上學(xué)期數(shù)學(xué)期末試卷(含答案)
- 現(xiàn)場工藝紀(jì)律檢查表
- 建井施工方案
- YMO青少年數(shù)學(xué)思維28屆五年級全國總決賽試卷
- 烘干廠股東合作協(xié)議書
- 個(gè)人業(yè)績相關(guān)信息采集表
- 過敏性紫癜課件PPT
- 大學(xué)生暑期社會實(shí)踐證明模板(20篇)
- 自來水維修員年度工作總結(jié)
- ASTMB117-2023年鹽霧試驗(yàn)標(biāo)準(zhǔn)中文
評論
0/150
提交評論