隧道施工技術(shù)監(jiān)控量測技術(shù)TunnelConstructionTechnologyMonitoringandMeasurementTechnology

監(jiān)控量測技術(shù)目錄MonitoringandMeasurementTechnologyTableofContents監(jiān)控量測的目的和項目1PurposeandItemsofMonitoringandMeasurement監(jiān)控量測方法2MonitoringandMeasurementMethods量測數(shù)據(jù)分析與反饋3AnalysisandFeedbackofMeasurementData課程小結(jié)4Summary

監(jiān)控量測的目的和項目PurposeandItemsofMonitoringandMeasurement01掌握圍巖再施工中的動態(tài),控制圍巖的變形。監(jiān)控量測技術(shù)監(jiān)控量測的目的和項目MonitoringandMeasurementTechnologyPurposeandItemsofMonitoringandMeasurement

Inordertoensureconstructionsafety,weshouldobservethegeologyandsupportconditions,measurethecrownsettlement,peripheraldisplacementandsurfacesubsidence.

為保證施工安全,我們需要對地質(zhì)和支護狀態(tài)進(jìn)行觀察、拱頂下沉、周邊位移、地表下沉進(jìn)行量測。監(jiān)控量測的目的PurposeofMonitoringandMeasurementGraspthedynamicconditionsofsurroundingrocksinconstructionandcontrolthedeformationofsurroundingrocks.了解支護結(jié)構(gòu)的效果,及時采取措施,以保證安全施工。監(jiān)控量測技術(shù)監(jiān)控量測的目的和項目MonitoringandMeasurementTechnologyPurposeandItemsofMonitoringandMeasurement監(jiān)控量測的目的PurposeofMonitoringandMeasurementUnderstandtheeffectofthesupportstructureandtaketimelymeasurestoensuresafeconstruction.修正設(shè)計,指導(dǎo)施工,保證隧道既安全又經(jīng)濟。監(jiān)控量測技術(shù)監(jiān)控量測的目的和項目MonitoringandMeasurementTechnologyPurposeandItemsofMonitoringandMeasurement監(jiān)控量測的目的PurposeofMonitoringandMeasurementRevisethedesign,guidetheconstruction,andensurethesafetyandeconomyofthetunnel.02

監(jiān)控量測的方法MonitoringandMeasurementMethods監(jiān)控量測技術(shù)監(jiān)控量測的方法MonitoringandMeasurementTechnologyMonitoringandMeasurementMethods地質(zhì)和支護狀態(tài)觀察Thegeologicalandsupportconditionobservation圍巖有代表性測試斷面的位置、形狀、尺寸。Thelocation,shapeanddimensionoftherepresentativetestsectionofsurroundingrock.巖石名稱、結(jié)構(gòu)、顏色。

Thename,structureandcoloroftherock.節(jié)理和圍巖結(jié)構(gòu)面情況。Conditionsofjointsandsurroundingrockstructuralplanes.軟硬程度及破碎程度情況。ConditionsofHardnessandcrushingdegree.巖脈穿插情況。Conditionofdykeinterspersion;巖體的風(fēng)化程度、特點、抗風(fēng)化能力。Weatheringdegree,characteristicsandweatheringresistanceofrockmass.地下水的類型、出露位置、水量大小。Type,exposurelocationandvolumeofgroundwater.溶洞等特殊地質(zhì)條件描述。Descriptionofspecialgeologicalconditionssuchaskarstcaves.噴層開裂起鼓、剝落情況描述。Thedescriptionofcracking,bulgingandpeeling-offoftheshotcretelayer.監(jiān)控量測技術(shù)監(jiān)控量測的方法MonitoringandMeasurementTechnologyMonitoringandMeasurementMethods拱頂下沉與周邊位移量測Measurementofcrownsettlementandperipheraldisplacement收斂量測Convergencemeasurement拱頂下沉Crownsettlement周邊位移Peripheraldisplacement我們在拱頂下沉量測的測點,原則上應(yīng)設(shè)在拱頂中心,受其他因素制約,則可將測點設(shè)于拱頂中心之外。監(jiān)控量測技術(shù)監(jiān)控量測的方法MonitoringandMeasurementTechnologyMonitoringandMeasurementMethods拱頂下沉量測

MeasurementoftheCrownSettlement

Ourmeasuringpointsforcrownsettlementmeasurement,shallbelocatedinthecenterofthecrowninprinciple.Restrictedbyotherfactors,themeasuringpointscanbesetoutsidethecenterofthecrown.監(jiān)控量測技術(shù)監(jiān)控量測的方法MonitoringandMeasurementTechnologyMonitoringandMeasurementMethods周邊位移量量測

MeasurementofPeripheralDisplacement數(shù)顯收斂計Digitaldisplayconvergencegauge量測范圍0.5~30m范圍

精度為0.1mmMeasurementrangeTherangeof0.5~30mTheaccuracyof0.1mm監(jiān)控量測技術(shù)監(jiān)控量測的方法MonitoringandMeasurementTechnologyMonitoringandMeasurementMethods周邊位移量量測

MeasurementofPeripheralDisplacement

測線一般取點在拱頂中心、起拱線起點、邊墻腳位置。OnemeasuringlineTwomeasuringlinesThreemeasuringlinesFivemeasuringlinesSixmeasuringlinesSevenmeasuringline

Themeasuringlineisgenerallytakenatthecrowncenter,thestartingpointofthespringinglineandthefootofthesidewall.Thatis,thebetterthesurroundingrockis,thefewerthemeasuringlineswillbe;施工分部越多,測線越多。Themoreconstructiondivisions,themoremeasuringlines.圍巖越好,測線越少;開挖后盡快埋設(shè)測點,并測取初讀數(shù),要求12h內(nèi)完成。監(jiān)控量測技術(shù)監(jiān)控量測的方法MonitoringandMeasurementTechnologyMonitoringandMeasurementMethods量測的采納及事項需注意AdoptionofMeasurementandItemstobeNoted

Themeasuringpointsshallbeembeddedassoonaspossibleafterexcavation,andtheinitialreadingsshallbetakenwithin12hours.Monitoringpoints測點(測試斷面)應(yīng)盡可能靠近開挖面,要求在2m以內(nèi)。監(jiān)控量測技術(shù)監(jiān)控量測的方法MonitoringandMeasurementTechnologyMonitoringandMeasurementMethods量測的采納及事項需注意AdoptionofMeasurementandItemstobeNoted

Themeasuringpoint(testsection)shallbeascloseaspossibletotheexcavationsurfaceandshallbewithin2m.讀數(shù)應(yīng)在重錘穩(wěn)定或張力調(diào)節(jié)器指針穩(wěn)定指示規(guī)定的張力值時讀取。監(jiān)控量測技術(shù)監(jiān)控量測的方法MonitoringandMeasurementTechnologyMonitoringandMeasurementMethods量測的采納及事項需注意AdoptionofMeasurementandItemstobeNoted

Thereadingsshallbetakenwhenthehammerisstabilizedorthepointerofthetensionregulatorstablypointsthespecifiedtensionvalue.監(jiān)控量測技術(shù)監(jiān)控量測的方法MonitoringandMeasurementTechnologyMonitoringandMeasurementMethods地表下沉量測SurfaceSubsidenceMeasurement在隧道施工遇到IV~VI級圍巖InthetunnelconstructionClassIV~VIsurroundingrocksareencountered通常是軟弱破碎地層,其穩(wěn)定性差,如果覆蓋層厚度較小,則開挖時地表下沉就大。

Itisusuallyaweakandfracturedstratawithpoorstability.Ifthethicknessoftheoverburdenissmall,thesurfacesubsidencewillbelargeduringexcavation.監(jiān)控量測技術(shù)監(jiān)控量測的方法MonitoringandMeasurementTechnologyMonitoringandMeasurementMethods地表下沉量測SurfaceSubsidenceMeasurement

Forshallowtunnelsatsoilsandandsoftrocksections,Thesurfacesubsidencemeasurementisrequired,andthespacingofmeasuringpointsarrangedalongthelongitudinaldirectionofthetunnelcanbedeterminedaccordingtothegeology,

overburdenthickness,constructionmethodandsurroundingbuildings.對于土砂、軟巖地段的淺埋隧道,我們要求進(jìn)行地表下沉量測,沿隧道縱向布置測點的間距可視地質(zhì)、覆蓋層厚度、施工方法和周圍建筑物的情況確定。表地表下沉測試斷面間距覆蓋層厚度H測點間距(m)H>2B2B>H>BH<B20~5010~205~10TableSpacingofSurfaceSubsidenceTestSectionOverburdenthicknessHSpacingbetweenmeasuringpoints(m)03

量測數(shù)據(jù)分析與反饋AnalysisandFeedbackofMeasurementData監(jiān)控量測技術(shù)量測數(shù)據(jù)分析與反饋MonitoringandMeasurementTechnologyAnalysisandFeedbackofMeasurementData周邊位移分析Analysisofperipheraldisplacement

Theclearancedisplacementismainlyusedastheindexofsurroundingrockstabilityevaluationandsurroundingrockstabilitystatusjudgmentinthefieldmeasurementoftunnelengineering.

OnlythelargecavernexistsRetentionandreinforcementoffillingmaterialsinthetunnelConstructionofthebaseslabandretainingwall

Constructionoflining

隧道工程現(xiàn)場量測主要以凈空位移作為圍巖穩(wěn)定性評價及圍巖穩(wěn)定狀態(tài)判斷的指標(biāo)。監(jiān)控量測技術(shù)量測數(shù)據(jù)分析與反饋MonitoringandMeasurementTechnologyAnalysisandFeedbackofMeasurementData周邊位移分析Analysisofperipheraldisplacement判斷標(biāo)準(zhǔn):JudgmentStandard:位移量Displacement位移速率Displacementrate位移加速度Displacementacceleration根據(jù)以上判斷標(biāo)準(zhǔn),如果圍巖位移速度不超過允許值,且不出現(xiàn)蠕變趨勢,我們則可以認(rèn)為圍巖是穩(wěn)定的,初期支護是成功的。若表現(xiàn)出穩(wěn)定性較好,則可以考慮適當(dāng)加大循環(huán)進(jìn)尺。監(jiān)控量測技術(shù)量測數(shù)據(jù)分析與反饋MonitoringandMeasurementTechnologyAnalysisandFeedbackofMeasurementData周邊位移分析Analysisofperipheraldisplacement

Accordingtotheabovejudgmentstandards,Ifthedisplacementvelocityofthesurroundingrockdoesnotexceedtheallowablevalue,andnocreeptendencyoccurs,Itcanbeconsideredthatthesurroundingrockisstable,andtheprimarysupportissuccessful.Ifthestabilityisgood,thecyclicfootagecanbeappropriatelyincreased.

Originalsupport

Nosupport

Displacement/m

StepofCalculation/104根據(jù)新奧法施工原則,需要在圍巖或圍巖加初期支護基本達(dá)成穩(wěn)定后,才可以施作二次襯砌。監(jiān)控量測技術(shù)量測數(shù)據(jù)分析與反饋MonitoringandMeasurementTechnologyAnalysisandFeedbackofMeasurementData周邊位移分析Analysisofperipheraldisplacement

AccordingtotheconstructionprincipleofNewAustrianTunnelingMethod(NATM),Thesecondaryliningcanbeconstructedonlyafterthesurroundingrockorsurroundingrockisaddedwithprimarysupporttoachievebasicstable.

Systemanchorrod

Arch

Haunch

Sidewall

Invertedarch

SidewallInvertedarch

WaterprooflayerPrimarysupportShotcretingReinforcingmeshSteelribAnchorrod監(jiān)控量測技術(shù)量測數(shù)據(jù)分析與反饋MonitoringandMeasurementTechnologyAnalysisandFeedbackofMeasurementData圍巖壓力分析Analysisofsurroundingrockpressure圍巖壓力的大小與圍巖位移量及支護剛度密切相關(guān)。

Thepressurevalueofsurroundingrockiscloselyrelatedtothesurroundingrockdisplacementandthesupportrigidity.監(jiān)控量測技術(shù)量測數(shù)據(jù)分析與反饋MonitoringandMeasurementTechnologyAnalysisandFeedbackofMeasurementData噴層應(yīng)力分析Shotcretelayerstressanalysis噴層應(yīng)力是指切向應(yīng)力,噴層應(yīng)力與圍巖壓力及位移有密切關(guān)系。

Stressofshotcretelayerreferstothetangentialstress,Thestressofshotcretelayeriscloselyrelatedtothesurroundingrockpressureanddisplacement.噴層應(yīng)力大的兩個方面:Therearetworeasonsforthehighstressoftheshotcretelayer圍巖壓力和位移大Thepressureanddisplacementofsurroundingrockarelarge.支護不足Insufficientsupport課程小結(jié)04Summary.監(jiān)控量測技術(shù)課程小結(jié)MonitoringandMeasurementTechnologySummary加強隧道圍巖監(jiān)控量測過程控制Strengthenthemonitoringandmeasurementprocesscontroloftunnelsurroundingrock建立穩(wěn)固的隧道圍巖監(jiān)控量測工作基點Establishstableworkingreferencepointsformonitoringandmeasurementoftunnelsurroundingrock重視隧道圍巖監(jiān)控量測元件埋設(shè)和保護Attachimportancetotheembeddingandprotectionofmonitoringandmeasurementelementsoftunnelsurroundingrock重視監(jiān)測與分析,信息化反饋Attachimportancetothemonitoring,analysisandinformatizationfeedback加強現(xiàn)場施工安全,為信息化工作提供保障Strengthenon-siteconstructionsafetyandprovideguaranteeforinformatizationworkPrecautions注意事項.施工檢測管理流程,將監(jiān)測的結(jié)果必須盡快地反饋到施工和設(shè)計中去。

Constructioninspectionmanagementprocess:themonitoringresultsmustbefedbacktotheconstructionanddesignassoonaspossible.施工檢測采用的機械和電子儀器,必須確保具有良好的使用狀態(tài)。

Themechanicalandelectronicinstrumentsusedforconstructioninspectionmustbeingoodservicecondition.監(jiān)控量測技術(shù)課程小結(jié)MonitoringandMeasurementTechnologySummary施工檢測管理Constructioninspectionmanagement.①檢查儀表設(shè)備是否完好,如發(fā)現(xiàn)問題及時修理或更換。Checkwhethertheinstrumentsandequipmentareingoodcondition,andrepairorreplacethemintimeifanyproblemisfound.②檢查測點是否松動或人為損壞,確認(rèn)測點狀態(tài)良好時方可進(jìn)行測試工作。Checkwhetherthemeasuringpointsarelooseorartificiallydamaged,andcarryoutthetestonlyafterconfirmingthatthemeasuringpointsareingoodcondition.監(jiān)控量測技術(shù)課程小結(jié)MonitoringandMeasurementTechnologySummary施工檢測管理Constructioninspectionmanagement測試前做到:Beforethetest:.監(jiān)控量測技術(shù)課程小結(jié)MonitoringandMeasurementTechnologySummary施工檢測管理Constructioninspectionmanagement按各項量測的操作規(guī)程安裝好儀器儀表,每測點一般測讀三次,三次讀數(shù)相差不大時,取算術(shù)平均值作為觀測點,若讀數(shù)相差過大時應(yīng)檢查儀器、儀表安裝是否正確,測點是否松動,當(dāng)確認(rèn)無誤時再進(jìn)行測試。Installinstrumentsandmetersaccordingtothevariousmea

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

最新文檔

評論

0/150

提交評論