




版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
淺層軟土地基快速動力固結(jié)技術(shù)
Lowenergydynamicconsolidationcombinedwithlightwell-pointdewateringXX地基基礎(chǔ)研究所
2023/4/29概述IntroductionThismethodisapplicabletosandysoil,sandysilt,miscellaneousfill,etc.,thecoefficientofpermeabilityofwhichisrelativelyhigh(thecoefficientofpermeability,ko,islargerthan10-5).2023/4/292023/4/292023/4/29
低能量強(qiáng)夯法結(jié)合輕型井點(diǎn)降水施工方案
Lowenergydynamicconsolidationcombinedwithlightwell-pointdewatering1.加固效果和工期ReinforcingEffectandConstructionperiod
2.低能量強(qiáng)夯法的加固原理reinforcementmechanismoflowenergydynamicconsolidation3.施工方案constructionscheme1).施工降水dewatering2).夯擊工藝參數(shù)tampingparametersandtechnique3).低能量強(qiáng)夯設(shè)備equipmentforlowenergyDCM4).收錘參考標(biāo)準(zhǔn)tamping-stopstandard5).檢測和信息化施工monitorandinformationconstruction6).施工程序和步驟constructionproceduresandsteps4.已成功的大面積施工中應(yīng)用實(shí)例casehistory
2023/4/291.加固效果和工效
ReinforcingEffectandConstructionEfficiency
加固效果(ReinforcingEffect)Insandysoils,theSPTblowcount,N63.5,canreachto12~15;theCPTvaluecanreachto5~8MpaandthePLTbearingcapacityto150~200Kpa.加固深度(treatmentdepth)
4-6m工效ConstructionEfficiency
一個(gè)月大約能施工100,000m2,About100,000m2canbefinishedinonemonth.2023/4/292.低能量強(qiáng)夯法的加固原理Reinforcementmechanismoflowenergydynamicconsolidation2023/4/292023/4/293.施工方案
Constructionplan
2023/4/291).施工降水dewatering場地降水采用真空強(qiáng)排水(well-pointdewatering),在地下水位降至地面下2.5m(undergroundwaterdewateredto2.5mbelowgroundsurface)以下時(shí)開始進(jìn)行第一遍強(qiáng)夯(firstpass)。。每遍強(qiáng)夯后進(jìn)行強(qiáng)排水dewateringaftereachtampingpass2023/4/293).低能量強(qiáng)夯設(shè)備
equipmentforlowenergyDCM履帶式吊車(25tcapacitytrackcrane),夯錘質(zhì)量(tamperweight)10~12t,錘底直徑(diameterofthetamperbottom)2.5m~3m套輕型井點(diǎn)降水設(shè)備lightwell-pointdewateringequipment2023/4/294).夯擊工藝參數(shù)
tampingparametersandtechnique2023/4/295).收錘參考標(biāo)準(zhǔn)
tamping-stopstandard(1)夯坑周圍出現(xiàn)明顯隆起和側(cè)向位移generateapparentheaveorlateraldisplacement;(2)后一擊夯沉量大于前一夯沉量cratercausedbythelatterpoundingislargerthantheformerpounding(3)當(dāng)夯坑深度≥80cm時(shí)。Craterdepthismorethan(orequalto)80cm2023/4/296).檢測與信息化施工
monitorandinformationconstruction
(1)檢測內(nèi)容monitorcontenta.沉降觀測settlementmeasureb.靜力觸探試驗(yàn)CPTtestc.孔隙水壓力觀測waterpressuremonitord.地下水位觀測groundwatermonitor2023/4/29(2)信息化施工informationconstructiona.降水的信息化施工informationconstructionfordewateringi出水量控制dischargecontrolii地下水位監(jiān)控waterlevelmonitorandcontroliii靜力觸探檢測CPTtest根據(jù)以上項(xiàng)目的測試結(jié)果,動態(tài)調(diào)整抽水時(shí)間、井點(diǎn)管排距、每遍夯擊間隔時(shí)間等施工參數(shù)。Basedonthemonitoringresultoftheabove-mentioneditems,adjustthepumpingtime,rowspacingofthewellpipe,timeintervalofeachpass,etc.2023/4/29b.低能量強(qiáng)夯效果的信息化施工informationconstructionforimprovementeffect
I地下水位和孔隙水壓力監(jiān)控waterlevelmonitorandcontrolaswellaswaterpressureii靜力觸探檢測CPTtestiii沉降觀測settlementmeasure根據(jù)以上項(xiàng)目的測試結(jié)果,動態(tài)調(diào)整夯擊能量、夯擊間距、每遍夯擊間隔時(shí)間等施工參數(shù)。Basedonthemonitoringresultoftheabove-mensioneditems,adjustthetampingenergy,spacingoftampingpoints,timeintervalofeachpass,etc2023/4/297).施工程序和步驟
constructionproceduresandsteps1.平整場區(qū),布設(shè)強(qiáng)排水管線,并在施工場地四周挖設(shè)明溝。Levelthesite,installwell-pointpipes,anddigwaterfurrowaroundtheconstructionsite2.預(yù)埋孔隙水壓力計(jì)和水位管。Embedpiezometersandwaterlevelpipes3.降水dewatering:夯擊前地下水位排至吹砂面下2.5m以下。Drainuntilthewaterlevellowersto2.5mbelowthegroundbeforetamping4.測定地面沉降、孔隙水壓力和地下水位的初始讀數(shù),采用信息化施工法,調(diào)整抽水參數(shù).measuretheoriginalsettlement,waterpressureandwaterlevel,adjusteddewateringparameter2023/4/295.夯擊tamping:按上述夯擊工藝進(jìn)行夯擊,每遍夯后,進(jìn)行地面沉降、孔隙水壓力、地下水位觀測和靜力觸探測試,必須采用信息化施工法,Mustconductinformationconstructionbasedontheabove-mentionedtampingparametersandtechnique.6.相鄰兩遍夯擊間歇時(shí)間暫定為7~14天,具體應(yīng)根據(jù)孔壓消散情況確定。Predeterminedtimeintervalofeachpassis7d~14d,whichcouldbeadjustedbasedonthedissipationofwaterpressure7.推平和適當(dāng)碾壓levelandroll8.強(qiáng)夯施工結(jié)束后15天和30天,進(jìn)行靜力觸探檢測conductCPTtestafter15dand30doftampingend2023/4/292023/4/294.僵已成功奏的大面燭積施工許中應(yīng)用仔實(shí)例(1)XX港外高橋衛(wèi)港區(qū)四期狗工程地基處蝕理XX港外四翅期C2區(qū)和B區(qū)(60多萬平方姜米,表層濱1-2m為吹填厭砂,以粒下為淤上泥質(zhì)土輕)軟基謠處理采科用低能濁量強(qiáng)夯殼施工方洽法,獲喪得成功脈,己通取過由XX市科委知組織的同專家組研通鑒定號,認(rèn)為梁達(dá)到國更際先進(jìn)彎水平,陸目前正乖在申報(bào)XX市科技成童果。Soft旺soi湊lim互prov殖emen娘tof汁C2錯area撒and葵Ba做rea事ofW喂aiga卸oqia駁o4’聽Proj尸ect變ofS信hang丘hai夢Term貌inal煉Con鼠tain啞er(m燒ore固than冶600杏tho屆usan侍dm2,hy制drau壇lic爛sand集1~2字m,v引ery罷soft辨cla擦yun減derl棉ying奇)is將con敬stru臣cted宣by糠appl襪ying褲the援low津ene們r(jià)gy幣Dyna浩mic甚cons搬olid輪atio怨nme幅thod場com賄bine珍dwi劫thw登ell-凍poin屯tde竊wate兆ring席.Th巷eim抗prov榆ede損ffec泊tis灑sig界nifi而cant淋and冶con耗stru側(cè)ctio旅nha災(zāi)sga漂ined苦suc言cess202道3/4同/242023鞠/4/2喂4202防3/4斬/242023菌/4/2高42023竟/4/2撐42023閉/4/2篩42023稼/4/2疑4202伍3/4求/242023掛/4/2誰4202筆3/4柜/24202氣3/4畏/242023嬸/4/2撕4(2)XX外高橋港雀區(qū)多用途液碼頭工程俘堆場地基瘦處理地基處理呀面積14蔑8.3萬嘉平方米,敬陸域吹填剪方630寬萬方,主標(biāo)要道路面熊積29萬勾平方米,蚊回填細(xì)砂厚度2-搞6米。地基處臂理方法塑:(1躲)不外趣加粗填浩料低水葛壓振沖機(jī);(2勤)低能枯量強(qiáng)夯諒結(jié)合強(qiáng)岡排水202至3/4啊/24(3)X
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 勞動合同范本半
- 醫(yī)療評估服務(wù)合同范本
- 品牌部合作合同范本
- 合伙合同范例相
- 熱工檢測技術(shù)題庫(含答案)
- 人教版部編版小學(xué)語文一年級上冊烏鴉喝水教學(xué)設(shè)計(jì)教案21
- 中醫(yī)適宜技術(shù)模擬習(xí)題含答案
- 有答案人教部編版二年級語文上冊第三單元知識必記
- 商業(yè)物業(yè)年終工作總結(jié)
- 肘骨骨折護(hù)理問題
- 2024全國各省高考詩歌鑒賞真題及解析
- 《臨床科研思維》課件
- GA/T 761-2024停車庫(場)安全管理系統(tǒng)技術(shù)要求
- 大學(xué)生創(chuàng)新創(chuàng)業(yè)基礎(chǔ)(創(chuàng)新創(chuàng)業(yè)課程)完整全套教學(xué)課件
- 人教版小學(xué)數(shù)學(xué)四年級下冊第一單元測試卷附答案(共9套)
- 廣西版三年級美術(shù)下冊全冊教案
- 油田科研單位有效發(fā)揮技術(shù)專家作用初探
- 席位卡A4紙打印模板(共3頁)
- 陽泉?dú)庀蟮刭|(zhì)資料
- 家用和類似用途空調(diào)器安裝規(guī)范
- 游船安全生產(chǎn)事故調(diào)查處理及責(zé)任追究制度
評論
0/150
提交評論