1、1.編制目的1 2 ,爆破工程概述1.爆破器材(blasting equipment)管理 1爆破器材的儲存132爆破器材的運輸2Taking and return of the blasting materialExplosive Receipt3Explosive Returned to the Explosive Store3.爆破實施期間的平安管理4爆破作業(yè)的設計、審批、交底442裝藥管理4爆破警戒5警戒范圍5爆破警報5盲炮處理6.編制目的為了使爆破工程施工處于受控狀態(tài),使其符合技術規(guī)范及合同要求,特制定 本平安專項施工方案。.爆破工程概述Keyal爆破工程施工為石方明挖及石方洞挖,石

2、方明挖主要在大壩,keyal 山谷道路,帕坦-調(diào)壓井道路,明挖工程量約為384988m3,石方洞挖主要是沉砂 池,引水隧道,壓力管道系統(tǒng),廠房系統(tǒng),尾水系統(tǒng),洞挖工程量約為248440m 3,預計總共需要約600噸炸藥以及相應的雷管,導爆索等材料。.爆破器材(blasting equipment)管理爆破器材的儲存 在炸藥庫建立之前,所有爆破器材都將存放在DuberKhwarHPP炸藥庫,承 包商計劃于帕坦-調(diào)壓井道路中部棄渣場附近建立一個面積約為90 nV的炸藥 庫,存放用于該工程的爆破器材,炸藥庫的具體位置,承包商將另行告知。Respect the import, storage and

3、usage regulations of Pakistan blasting equipment. Prevent any loses and fire accident happening.The special and allowed guard shall be arranged to be on the duty for 24 hours.The storage should dry and ventilate well.Explosion and detonator should store separately, and two store house distance no le

4、ss than 20m. Make up 0.1m level by wood lumps. The width of the explosion less than 2m, the height of that less than 1.6m. Access between the lumps should be 0.7-0.8m.Storage area is managed by authorized people and has guard. No electric and fire in the store house, during the night time use the la

5、mp.Strict system is established around storehouse. No shoes with nail, no match and other combustibles and no smoking in storage area.Storage area equipped with 4 fire extinguishers.A Establish account system in storehouse, checking the quantity and quality every month.The out of date explosive equi

6、pment should clear out of the storehouse. The related department submit the method statement and after approved by top management, it will be melt down.The people who employed as blasting control worker should be trained. Including escort in transportation, transport people and keeping people.爆破器材的運

7、輸The special and allowed trucks that must be sealed type shall be used fortransport the explosive and the detonator.Explosive material and detonator shall not be transported in the same trucks. Prior to the transport, the route for transport shall be planned and informed to relative department in ad

8、vance and shall avoid to the maximum any areas of much population and with special guards for escort purpose.For level road, the speed of truck must be less than 40km/h, while at the incline road not more than 10km. Dangerous marking shall be set both in the front of and behind of the truck.When tra

9、nsported by manpower, every time only one box (25kg) with shoulder. Transport of explosive material and detonator by manpower shall only be within Contractors site boundary,and the distance thereof shall be kept to a minimum,When explosive and initiation material must be transported at the same time

10、, total weight of them not more than 10kg.Blasting material belongs to combustible and explosive material. Smoking and carried with combustible material are prohibited in the loading and unloading, transportation and storage periods. This is to prevent kinds of energy caused the blasting accident. D

11、o the loading and unloading lightly and collision, dragging and throwing are prohibited.There should install bumper and change the discharge pipe in front of the truck, and lean to the ground. No over speeding, breaking rule, no parking, repairing and adding oil during the transportation.33 Taking a

12、nd return of the blasting materialExplosive ReceiptThe explosive shall be received by a designated and allowed person of the operation team. First the operation team shall fill in a Bill of Receipt according to the actual need based on the number of holes and then checked and signed by the blastingt

13、echnicians and the storekeeper of the explosive store shall deliver correspondingly the certified quantity. The operation team shall establish a registration book and check the quantity on monthly basis with the explosive store.Explosive Returned to the Explosive StoreThe blasting materials shall be

14、 strictly accounted after charging every time. Any blasting materials remaining shall be returned to the explosive store and none of the same shall be kept by any individuals.4.爆破實施期間的4.爆破實施期間的平安管理爆破作業(yè)的設計、審批、交底 爆破設計由承包商完成,報工程師批準(爆破設計表見附件)。根據(jù)爆破作業(yè)的技術要求及控制重點,爆破作業(yè)前由爆破隊技術負責人對全體作業(yè)人員進行技術交底裝藥管理 爆破作業(yè)時,由爆破隊現(xiàn)場

15、負責人,在場指揮裝藥作業(yè)裝藥期間,所有設備退出爆破區(qū)域,同時周邊設置警戒線(使用警示帶), 禁止無關人員進入爆破區(qū)域,嚴禁邊打孔邊裝藥;裝藥期間,爆破器材堆放 在平安位置,并且必須有專人進行看守;裝藥應使用木質或竹制炮棍,不得使用堅硬的鋼管及鋼筋等深孔裝藥出現(xiàn)卡塞時,在未裝入雷管、起爆藥柱等敏感爆破器材前,應采用 非金屬長桿處理在裝藥過程中,不得拔出或硬拉起爆藥包中的導爆管、導爆索和電雷管腳線。嚴格按照爆破設計裝藥,如孔距、孔深、最小抵抗線等有無變化,立即告知工程師,征得工程師同意后對裝藥量進行調(diào)整嚴格按照爆破設計聯(lián)網(wǎng),控制單響藥量,認真檢查聯(lián)網(wǎng)情況,防止露聯(lián)、錯聯(lián)造成盲炮裝藥,聯(lián)網(wǎng),并檢查完

16、成后,應排專人對爆破區(qū)域進行看護,防止人員踩踏 破壞爆破網(wǎng)絡。爆破警戒警戒范圍明挖爆破時,爆破平安距離至少300米,隧道爆破時,爆破平安距離至少500 米。機械設備距爆破點應該至少撤離150米,爆破警戒示意圖如下:爆破警報Blasting time: follow application of blastingBlasting warning sign:Preliminary sign: 3 times of long sound discontinuance (every time 30s),30s -(stop)- 30s - (stop) - 30s , warning the site

17、 people to stop working and leaving the site immediately.Preparing sign: After 20min of preliminary sign, 3 times of long sound and short sound alternately. (long sound20s short sound 10s),20s -lOs-(stop) - 20s - 10s-(stop)- 20s - 10s ,meaning there is nobody in the warning region, it can collect th

18、e blasting cap.Blasting sign : After 5min of preparing sign, 3 times of short sound discontinuance (every time 10s), 10s- (stop) -10s (stop)- 10s , meaning set fire and ready to blasting.Relieving sign: 20min after the cannon sound and finish the safety inspection, be sure about the safety, the blasting man in charge can inform them send the relieving sign. One time long sound. - 60s , people can enter the warning region.In particular situation, if the preparing work is not finish, after the blasting people in charge inform and perform can send the bl

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
  • 4. 未經(jīng)權益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
  • 6. 下載文件中如有侵權或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論