版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)
文檔簡介
1、第四篇漢英常用采礦工程詞匯(分類按漢語拼音順序排列 )(開采)地表沉陷(mining) surface subsidence高產(chǎn)高效 h i gh produc t ion an d hi g h e fficie n cy回風巷 vent i lati o n roadway煤柱尺寸p illa r dimens i on灰色關(guān)聯(lián)分析 gra y r ela t i on ship analysis地質(zhì)構(gòu)造 geol o gical t ectonic水文地質(zhì)h y dro g eo 1 o g y極不規(guī)貝1J煤層 extremel y anoma 1 isti c coal seam預(yù)緊力
2、、預(yù)應(yīng)力 pre -1 ighten i ng forc e , p r e -s t ress含水的hydr o us水力采煤 h y drau 1 ic c u tting coal主倡 1)井 m a in (auxil i ar y) s h a ft敏感性 sensit i v i t y國內(nèi)夕卜 at home and ab r o a d瓦斯抽放gas drainage機電一體化 mech anical elec t r ica 1 integration穩(wěn)定性 stab i 1 i t y微地震 m i c r o -se i sm動載 dyn a mic 1 oa d i n
3、 g流變特征 rh e o logic a l cha r a ct e ristic蠕變 cree p人工神經(jīng)網(wǎng)絡(luò)a rt i f i ci a 1 neu r al netw o r k定位 o r i e ntat i on保水開采minin g w i t h ou t de troy i n g wa t er reso u高壓注水water i njecti o n w i th high pres sure中硬煤層 medium hard coa 1 seam層次分析法 hier a r chy ana l 1 ysi s pro c eeding煤與瓦斯突出 co a l an
4、d gas bursti n g模糊綜合評判 f u zzy c omp r ehen sive evalua t i o n綜(放)采工作面 full-mecha n ized (c aving) m ining face炮采工作面 blasting minin g face機采工作面 mechanized mining face(急)傾斜煤層 (st eeply) i ncline d coal seam走向 strike傾向 dir e cti o n dip, di p , i n c linati o n礦山壓力 un d e r g round pr essure支承壓力 abu
5、t men t pre s sure上覆巖層 ov e rlying r ock strata薄、中厚、厚煤層 t hin,m e d i u m thick,th i ck coal seam(松散)含水層(l o ose ) aqu i f e r裂縫帶 c ra c k z one垮落帶 c avin g zo n e頂、底板 roof, f lo o r頂煤 top c o al(掩護式)液壓支架 (sh i e ld) pow e re d s u ppo r t割煤機 coal cutte r舌板機 scra pper膠帶輸送機be It conveyor片幫 co al sl i
6、 de冒頂 roof fa 1 l巖爆(礦震、沖積礦壓)r ock b urst自燃 s p o ntan e o u s combu s tion防水(砂)煤柱 wat e r ( s an d)-proof coa 1 pillar陷落柱 collapse colum n煤(巖)巷 coal (rock) roadway沿空巷道 roadway alo n g gob圍巖 surr o u nd i n g rock突水 water burst ing三軟soft roof,sof t coal, soft floor地應(yīng)力 g ro u n d stress運輸巷 transportat
7、ion ro a dway火成巖(巖漿巖)igne ous rock厚沖積層t hick a llu v ium條帶開采st r ip mining移動、變形 movement,dist o rtio n極限平衡區(qū)limit e qu i librium are a可靠性,可行性,合理性,適應(yīng)性rel 1 ab ility, f eas ibility, rat i ona1 it y ,ad aptab ility采出率、回收率 minin g rate, r e cov e ry rate 埋管注氮 nitrogen i njec t io n with b u rie d p i pe
8、復(fù)合頂板 combined roo f 斷層fau lt噴漿 g rou t ing動壓 dyn amic pre s sure地質(zhì)災(zāi)害 geo logical disas t erEH- 4 電導率成像系統(tǒng)EH-4 elec tro- c ondu c ibi 1 i ty i maging s ystem透氣性(滲透性)perm e ab i l i ty傾向性liabi 1 ity井下 underground設(shè)備配套 eq u ipm ent m atchrce 選型設(shè)計 lect otype design撤架 d i smantling suppor t s力口固 reinforc i
9、 n g安全閥 safety va 1 v e積水 seeper柔性支架 fl exi b 1 e sup p o rt偽斜 app a r en t d i p絞車房 h o ist ro om(winder c h amber)暗立(余)井 b 1 ind (slope) shaft底曦 f 1 oor he a v e破碎頂板 c r ack e d roof解放層 p r o t e c tive coal seam 電阻應(yīng)變儀 resistance st rai n ins t umen t 坑口 電廠 pit h ead pow er p lant. 煤炭科學技術(shù)總論采礦系統(tǒng)工程m
10、 i ning s y st e m e ng i neer ing采礦系統(tǒng)優(yōu)化模型 ?model o f minin g sy s tem o ptimizat i o n采礦巖石學?min ing roc k mec hanic s采煤coal m i n i ng, coa l extr acti o n, coa l getting 采煤學c oal mining地下開采underground minin g肝石re f use,was t e , d irt , debris固體可燃礦產(chǎn)solid c ombustibl e min era l褐煤? 1 ignite, b r ow
11、n coal 化石燃料f oss i l fuel潔凈煤技術(shù)?clean co a 1 technol ogy礦?und e rg r ound mine礦床模型mod e l of mineral deposits礦井und e rground mine礦井通風學?min e ventilation, u n derg round v e ntilatio n礦區(qū)?m i n i ng areaement地表移動觀測站roun d movement地表移動盆地subsidence basin頂板測點 700f s t ati o n定向連接測量?con ne c ti o n ion定向連接
12、點礦山mine礦山測量釣?m 1 ne survey i ng礦山電氣工程 ?m i n e electric en g ine e ring, mine elect r o - t e chn i cs礦山機械工程m ine mechan ical engin e e r ing礦山建設(shè)?mine c o n st r uct i o n礦山提升學 ?m i n e hoi s t in g , windin g礦山運輸學mine transportation,mine h a u lage礦田?m i n e file d露天開采,露天開采學surface mining露天礦?sur f
13、ac e mine煤 ?coal煤當量?coal e quivale n t煤的綜合利用 允omp r eh e n s ive utiliz a tio n of coal, coal u t ilizatio n煤化學co a l chemi s tr y煤礦?coa l mine, co llier y煤礦安全?mine s a fety煤礦機械coal mine m a chinery煤轉(zhuǎn)化?coa l conver s i o n煤炭地下技術(shù)unde r ground co a 1 gas ification煤炭環(huán)境保護支 o al e n vironm e n tal c ontr
14、ol, e nvro n m e ntalp rotec t i on i n coalm in i ng煤炭技術(shù)c o al t echn o log y煤炭力口工 支oal pro cess ig煤炭科學co a l s cien c e煤田?coal field煤田地質(zhì)勘探紀oal exp 1 o rat io n ,coal p r 0spec ting煤田地質(zhì)學 允oal g eol o g y煤巖學?co a l petro logy石煤?s ton e like coa 1無煙煤a n t h racite選煤coal pr e pa r at i on, c oal c 1 e
15、an i n g煙煤bitumino u s coal硬煤?hard c oal2. 地質(zhì)測量 ?A級儲量grade A r eservesB 級儲量?grade B re servesC 級儲量grade C reservesD級儲量?g r ade D reser v es邊界角?limi t angl e采場驗收測量pit a c c ept a nce survey采出率?ra ti o r e covery采動系數(shù)?f actor of full ext r action采掘工程平面圖 ?mine map采煤工作面測量coal fa c e survey采區(qū)測量 ?mini n g
16、di s t r i ct survey采區(qū)聯(lián)系測量 2ran sf e r survey in minin g d i stric t超前影響角 ?adv a nce angle o f in f lu e nce沉井鑿井法施工測量 ?c 0ns truction su r vey fo r drop s h a ft s inking充分采動fu 1 l subs i dence, cr i t ical /su p e rcri t i cal ext r action充分采動角?ZH ANGCHIZZub s i d e nce儲量管理rese r ves manage m e nt導
17、入高程測量elev atio n tr a n s fer surve y導水斷裂帶w a te r conducted zo ne點下對中?cen t ering und e r ro o fsta t ion地表移動?su rface movement, gr oundm o vob s erva t ion s tation of g subsidenc e trou g h,survey for sh a f t orien tat connect ion point for shaft orien t a ti o n動用儲量?minin g -emp l o yed re s er
18、ves凍結(jié)鑿井法施工狽U量con s t r uctio n s urve y forsh a ft si n k i n g b y freezing me t h od斷層幾何制圖f a ult geom e t r isa t ion斷裂帶?frac t ure d z on e防水煤巖柱s a f e ty p i lla r u nd e rwater-bodies非充分采動?sub critical extract ion剛性結(jié)構(gòu)措施 ?s t r ucture r i g i d i ty-st r e n gthening m easure s工業(yè)場地平面圖?mi n e ya
19、rd plan貫通測量?holing-th r o ug h su r ve y光電測距導線?EDM trav e r se拐點偏移距% e v i at ion of i n fl e c tio n point滑動層?s liding layer緩沖溝bu f fer t r ench灰分等值線圖is o g ram of a s h co n tent回采煤量?worka b le reserves激光指向laser guide幾何定向orienta t i on b y shaft plu mbing近井點near sh aft c ontrol p o int井底車場平面圖?sha
20、f t b o ttom pl a n井上下又照圖?loc at i o n map , si t e p lan井田區(qū)域地形圖 ?topog r ap h i c map o f underground mine f i el d井筒煤柱開采shaft p i llar extra c t ion井筒延深測量shaft deepen i n g s u rvey井下測量?un derg r ound surv e y井下平面控制測量un d ergr o un d ho r izon t a lcontr o l s urvey開采沉陷?mining sub s i de nce開拓煤量 %
21、ev e lo p ed rese rve s抗變形建筑物 % e f orma t ion resis t a n t structure垮落帶cav i n g zone礦區(qū)控制測量c ontro 1 su rvey o f mi n in g area礦山工程測量?mine survey礦體幾何學 勾eo met r y o f ore deposi t s礦體幾彳制圖勾eometr i sat i o nofore deposits TOC o 1-5 h z 礦田區(qū)域地形圖to p og ra phic map ofmine field立井定向shaftor i ent ation立
22、井施工測量construc t ionsu rvey forshaft sinking立井十字中線標定?5e t t i n g out cros s line o f shaftcenter立井中心標定s ett i ng o ut shaft c en ter聯(lián)系測量連接三角形法?c on n e ct裂縫角臨界變形值s露天礦測量煤層等厚線圖sea m煤層等深線圖?s。b a t h煤層褶皺幾何制圖fo 1 dseam瞄直法逆轉(zhuǎn)點法柔性結(jié)構(gòu)措施s ure stra n s f er s u rv e yion tr i a ngle meth o da ngle o f brea kcri
23、tica 1 d e form a tionope n-pit su r v e y isothi c kne s s map ofmap of c oa 1geo m etr i satal i gnmen tseam on o f cm eth o dalueoalalr eversal po int m e thods t ructure yielding mea三量?T h r ee Class 設(shè)計損失 &ll o wable 實際損失儲量水平移動系數(shù)損失率?l o ss p e r c 投點of Re1 ossactual loss of reserv e s d i s p 1
24、ace ment factoren t ag esh aft plu m b i n g陀螺方位角?gyros c陀螺經(jīng)緯儀定向 ?gy彎曲帶圍護帶下沉系數(shù)巷道坡度線標定i e n t巷道碎部測量wo r ki n gs巷道驗收測量foo topic azim u thr o sc op ic orient a tion s urvey sag ging z ones afety be r m sub s idence fa c to r sitti n g out road way g raddet a il survey for m i n eage m e a s u rem e nt
25、of巷道中線標定 ?setti n g out巖層移動移動角ef o r mation移動盆地主斷面trough影響傳播角中天法?t r a n主要影響半徑s主要影響角正切c ente r lin e of r str a ta movement ang 1 e o f cr iroadw a y a d w a y?majo r c r os s -sec tion of s u bs i denpro p a g ation anglem e t h odm ajo r inf luen c e radtangent of m a j or influ注漿鑿井法施工測量r o ut i n
26、g sinkingc o ns t rcee nce angleu ction su r vey for g準備煤量?p r e pared reserve s鉆井鑿井法施工測量 ?c onstruct i o n survey for shaft b o r in g最大下沉角sid e n ceangle o f max imum su b最大下沉速度角 ?ang 1 e of maxi m um sub s iden c e v e l o c i ty3地下開采?安全平盤& a f e ty berm安全水頭a a fet y 暗井薄煤層?th in seam爆破采煤工藝爆破裝煤w a
27、 ter h e adb lind shaft, staple shaftb last-w i nni n g tec hnol o gy blasting load i n g變形壓力 才 o ck d eforma t io n press ure 閉路供水?c losed-circuit wa t e r su p p 1 y閉式落煤順序sequence不規(guī)則垮落帶部分開采側(cè)支撐壓力采場延伸?pit deepen i ng采動裂隙采動應(yīng)力?mining- i n d uced采垛?w inning- b 1 oc k采垛角采段?ex tract i ng z one采段流煤上山coal-
28、water ri s e采高采掘帶化ut采掘區(qū)采寬采礦站采空區(qū)采裝710ad i采煤方法mini n g采煤工作面close type w inningi r r eg u 1 arly caving z o ne par tial extractions i de abutm e nt press urem ini n g- i n duced fis s ure ressang 1 e of wi n n in g blockex t r a c ti n g bloc kmining heightbloc k cu t w ore st a ti goa f ,dthngob,was t
29、 engmethod化 o al fa c e ,采區(qū)%istric t , p采區(qū)車場 采區(qū)準備 采區(qū)設(shè)計 采區(qū)上山 采區(qū)石門 采區(qū)下山%is t ri c t?mining-distco a l w ining metho d , coalworkin g fa c eanel taic?d i st r ict r i%istr ict cro s%is tri ct dipion,p r design e s- c utepdistr ict i n set aration i n dis t r i ctpanel desi g n倉儲采煤法長壁放頂采煤法?longw a ll m
30、i長壁工作面超前巷道充采比?sto充填倍線充填步距充填沉縮率? 1 ongwal 1 facewing r atio?se tting ra t io充填法?stowi ng m e th 充填能力沖擊地壓? r o c k burst, 承壓含水層上采煤?coa 1初撐力強度S LD初次放頂初次來壓出氣孔?p roduct i on wel 出氣強度出入溝?main a c 儲量備用系數(shù)r e serve垂直切片大巷帶壓開采r essure of aqui 單側(cè)溝?nills i d e 單煤層大巷seam單體液壓支柱倒臺階采煤法底板cesserditchshrinkag en ing wi
31、t hadvan c estow i ngstow i n gsto p ingsuble v e 1 cavingheadin gg radie n tintervalst o wing c a p a city pr e ssu re bump min i ng above aqu i ferset t i ng 10ad d ein i tial cav i ng firs t weig h tingpro d uction w el 1re s erve factorsity,capacit yo f minet e rrac e c ut sl i cemai n m i nimai
32、 nroadw a yn g un d er safe water proadw ay for s ingleh y d r aul i c prop overha n d min i ng fl o oroorc onverge n cwor k in g se r at i osubject t o dyn aad co e ffici e ntncemini n g滑移頂梁支架還原帶緩溝?e asy access 緩慢下沉法 勾r adual sag 緩斜煤層?g ently i n cl i 回采巷道回柱基本頂?mai n roof機械充填pier, b r bre a ke cham
33、be reakr props ropsmin iroom an d pngi 1 la r min i ngcav i ng th eoofc a v idr a wdr a wopeng int e rvalngi n ginter n alwo r king slope t i c stow i ng sl i cs 1 ice dngr if t ,sli cgatemain incl i ne clined drif tdrifts ublev e l ery,ngis eparate transor tanddistri b ution stat ionev e lw aste pa
34、ck, m o nitor,s t rip p ack,w o rk i ng s lopework ing slope fac e w o rking resistancework ing fac ef ace endtailgate, retur n a ihe a dgat e,haul a gework i n g be r mfrontt ect o nic stress ing zone橫向前移?c ross re m ova 1集中大巷?gathe ring main r o 急斜煤層?s tee ply p i tch i ng 堅硬巖層?st r o n g str a t
35、a , 間斷開采工藝techno 1 ogy架后充填建筑物下開采底板載荷集度floo門o a d inte n sity底幫才o o t sl o p e底部境界線floor b o u n d a ry line底鼓? f l o o r hea v e地表境界線surfac e bou n dary lin e地下煤氣發(fā)生場un d er g r o und g a sifie r地下氣化工作面 ?jnd e rgr o und gas i f icati on fa c e地下氣化效率efficiency of underground g a si f ication疊力口應(yīng)力 aupe
36、rim p o s ed s tress頂板roo f頂板單位破碎度s pe c i f ic roof f lak i ngratio頂板回彈才o of rebou n d頂板垮落?r oof caving頂板垮落角 才o o f c a ving a n gle頂板冒落才oo f fall頂板破碎度roof flaking r a tio頂板弱化 才o o f we akenin g頂板臺階下沉roof step頂板穩(wěn)定性r oof st a bility頂板壓力?r oo f p ressure頂幫 ?top slope頂?shù)装逡平縭oof- t o-f 1 oor con ver ge
37、nce頂?shù)装逡平什舘of-to-f 1動壓巷道m(xù) ic pre s su r e動載系數(shù)?dyn a mic 1 o端幫?sn d s 1 o pe端面距?tip- t o-face di s t端面冒頂?r oof flakin g短壁采煤法shortwa 1 1斷壁工作面?shor t wal 1 face墩柱?h e avy duty房頂柱房式采煤法?room mining,房柱式采煤法封閉圈?closed level放采比?d r a wing ra t io放頂放頂距放煤步距放煤順序非工作幫 ?ion-w o r king非工作幫坡面?io n 風力充填?p neum a 分層開采
38、分層巷道w ay分帶?str i p分帶集中斜巷 ?strip分帶斜巷?5t r op i n 分段?sublev e l分段平巷 t udinal su b dri f t分級提運oistin g分流站分期開采?mi n ing by stages分區(qū)開采?mini ng by ar eas 分區(qū)域開拓?areas devel o pment輔助水平?s u b si d i ary 1矸石帶i n ter v a 1 of mov i n g ?unit advance of m on i to r高壓大射流?hi g h p ressui r e large dia m e ter je
39、t干儲一干燥帶distill a t i o n an d drying z o ne工作幫工作幫坡面工作阻力?yi e 1 d load ,工作面工作面頂板控制 ?roof control工作面端頭工作面回風巷?tai 1 en try,rway工作面運輸巷Theade n try,gateway工作平盤工作線構(gòu)造裂隙? t ectoni c fissure構(gòu)造應(yīng)力規(guī)則垮落帶Teg ularly cav固定路線?pe rmanen t haul age 1 ine 管道水力運輸?p i p eli n e hyd r ot r an s port恒阻支柱yi e 1 ding pr o p厚
40、煤層t hick s e am后退式開采 才e t r e ating minin g后支撐壓力 才ear a butment p r essuresli p ping bar co m posite support r e duct i on zoneg i n g met ho dned s eamg ateway, entry, gatep r op dr a wingm e ch a nica 1 s t o winga d w ays e am ,steep seamh ard st r a t adiscontin u o u s mini n gbac kfillco al mi
41、ning und e r b u i 1 din g s階段hori z o n階段垂高?horiz o n int e rval階段流煤上山extr a cti n g b 1 ock coal -wate r roa d way階段流煤巷?main c o al-water r i se階段斜長in c lin e d 1 ength of h o ri zo n近距離煤層?contiguou s s eams近水平煤層flat se a m井田尺寸und e rg r ound min e fi e lds i ze井田境界underg round mine fieldbo u n d
42、ary井田開拓? u n d er groun d mine field d e velopme n t靜壓巷道wor k ings subjec t to st atic pres s ure掘進卒?d riv a ge ratio局部冒頂隼art i a 1 r o of f a ll開采水平mining 1 eve 1 , g a llerylevel開采水平垂高?i f t, l e vel int e rval開路供水?Dpe n ci rcu it wate r supply開切眼ope n-off cu t開式落煤順序 ?o pen-ty p e winning s e qu e
43、 n c e開拓巷道 dev e l o pm ent r o a d w a y抗壓入強度press-in st r ength垮采比caving -height ra t i o垮落法cav i ng m ethod跨采over - t he-roa d w ay ext ract i on礦井初步設(shè)計 ?Dre 1 iminary u n d e r g roun d mine d e sign礦井服務(wù)年限under ground mine life礦井井型?p r od u ction scal e o f un d ergroun d m i n e礦井開拓設(shè)計? u nde r g
44、ro u nd m ine d e ve 1 o p m e nt des i gn礦井可采儲量workable under g roundmine r eserves礦井可行性研究u n dergroun d mi n e feasi bil i ty study礦井設(shè)計 qu n derground mine desi g n礦井設(shè)計儲量designed underground minereserv es礦井設(shè)計能力designedunde r g r o undm i necapacit y礦井施工設(shè)計un d e r g r o u n d m in e construc t i on
45、 design礦井延深s h aft de e pen i ng礦區(qū)地面總體設(shè)計?gen eral su r f a celayou t of m i n inga rea礦區(qū)規(guī)模 mining a rea c apac ity礦區(qū)開發(fā)可行性研究 fe a s ibility stu dy forming area ex p l o it a tion礦區(qū)總體設(shè)計 ?g ene ra 1 design of minin g area礦山壓力 才oc k pre ssure i n mine礦山壓力顯現(xiàn) ?s trata behav iors控頂距f a ce widt h離層?b ed se
46、par a t i on離層帶注漿充填grout i ng in s ep a rated-bed立井開拓?/ert i cal sh a ft develo p ment聯(lián)絡(luò)巷?c r o s s he a din g連續(xù)開采工藝continu o us m i n i n gtechnology溜井?draw s h a ft溜煤石煤?c o al-w a ter c r o ss -cu t溜眼?ch u t e臨界滑面crit i cal s 1 i d in g su r f ace漏頂face roofcol 1apse withcavity錨梁網(wǎng)支護roof bo1 ting w
47、i th b ar and wi re m e sh煤壁wa 1 l煤層產(chǎn)出能力coal-s eamp roduc t i v ecap a city煤房r o om,ch a mb e r煤漿?coal s 1 urry煤門?i n seam c r oss-c u t 煤面?#掃?c leanin g煤水泵?s lurry pump煤水比?coal-wa t er r a t io煤水倉?c o a l- s lu r ry s ump煤水洞室coal sl u r ry pre p a ra t ion room煤炭地下氣化站 ?u n d erg r ound co a l gas i
48、 ficati o n s tation煤巖固化?co al/rock re i nfor c e ment煤柱coal pill ar煤柱支撐法pilla r s u pp o r t ing met h od明槽水力運輸?flume hydr o t r a nsport摩榛支柱? f rict i on al prop逆向沖采?c ontr a ry efflux片幫r i b sp al 1 ing, slo u ghing平盤be r m平碉開拓?dri f t d eve 1 o p ment平行推進?paralle 1 a d v a n ce破煤?c oa 1 bre a ki
49、 n g, c oal cut t i n g破碎頂板f r actur e d ro o f, f riab 1 e ro o f普氏系數(shù)?Protod yak onov coef f ici e n t普通機械化采煤工 ?con ven t io n a lly-m e chanize d c o al winning technol o gy氣化貫通1 in k age氣囊支架a ir-b a g suppo r t前進式開采?advan cing mining前支撐壓力 才r o n t ab u tm e n t pre s s ure強制放頂 才o r c ed c aving傾斜
50、長壁采煤法long wall mi n in gtothe傾倒topp 1 ing dip or to the ris e傾斜短壁水力采煤法 ?shortw a ll h y draulic m i nin g in th ed i p傾斜分層采煤法?inc 1 i n ed s lic i ng切口stable, n i che區(qū)段?districtsub 1 ev el區(qū)段集中平巷?distr i ct s u blevel gat h e r i ng en try, di s tri c t m ain en t ry區(qū)段平巷district sub 1 e ve 1 e n tr y
51、 , di s trict 1 ong t u d inal s u bdri f t 區(qū)域性切冒?e xten s i v e ro o f colla p se全柱開采柔性掩護支架人工頂板f ull p i 1 la r extractio nflex i b le shi e ld support arti f icia 1 r oo f入換?sp o tting,train exchange入換站?e xch a n g e s t a tion三下開采co a l m i ning under buildi n gs, r a i lwa y s and wa t er bod i
52、es掃清平盤?cl e ani n g berm山坡露天采場m o untai n su r fac e min e射流打擊力?|et i mp a ct fo r ce射流燭心動壓力?j et axis dynamic a 1 pressure扇型推進?f a n advanc e上覆巖層?ov erlying st r ata上裝?uppe r le v el lo a d i ng上山ris e , rai s e上挖?up diggi n g上行式開采a s cen ding m ining上行式開采 ?u p ward m i n in g十字定梁cros s ba r石門?C r
53、oss cut始采線?b eginni n g line, m in i ng st arting line雙工作面d ouble-un i t fac e , d o ubl efac e水采回采巷道 atoppi n g ent r y水力采煤?iy d ra u lic c o a l mining technology水平分層采煤法 ?! o r i z onta 1 slic i n g水平分段放頂采煤法top-s liming system o fsuble v el caving水平切片?dro p pi n g cut slice水槍moni tor水體下采煤coal m i
54、nin g under wat e r-b巖石碎月系數(shù)?bu 1 kin g fa c 巖石粘聚力 才o c k cohe s i o n 巖應(yīng)力降低區(qū)氧化帶?oxidation zon e沿空巷道 ?gob-side entry掩護支架采煤法移道步距移動坑線移動線路t or, swell fact orstre ss-r e lax e d areas h ie 1 d miningshift spa cingtem porary wo r k i ng ram pshift able hau 1 a ge line應(yīng)力增高區(qū)?str e ss-concentrated area迎山角?pr
55、o p-s e tt i ng angl e有井式地下氣化法 ?sh aft gasi f icati o n有效支撐能力p r actical sup po rti n g cao d ies松動壓力roken-rockpressure松軟巖層w eak s t rata松軟巖層?o f t s trata塌落?fa 1 l臺階坡面線 ?benc! angle掏槽?510tt i n g挑頂才00fr o p p i ng特種支柱 ?5p ec i f i c pr o ps鐵路下開采 允oal mining under railways推垮型冒頂thru st r o of fall往復(fù)式
56、開采r eciprocating mi n i ng挖底f loor dint i n g挖掘系數(shù) ?excavation factor圍巖surro u ndin g rock圍巖穩(wěn)定性?stabili t y of surro u n din g rockp a city原巖vir g in rock, vi r gin r ockm as s原巖應(yīng)力i n i tia 1 s tre s s, stress in v ir g i n rock mass員生裂隙?initial fissur e運輸大巷?main h aula ge roadwa y, ma i n hau lagewa
57、y運輸平盤?haula g e b e rm增阻支柱?ate b eari ng pro p再倒退o vercast i ng再生頂板?mat, re g ener ate d roof整層開采fu 1 l-seam m inin g正臺階采煤法?hea d in g -and bench mining支撐效率support i n g efficienc y支撐壓力?ab u tment pre s sure支垛 ?crib偽頂偽傾斜柔性掩護支架采煤法the fal s e dip偽斜長壁采煤法?o b li q u喂煤機?co al feeder無井式地下氣化法無煤柱護巷o tect io
58、 n無特種柱放頂?c aving without ving with o u t bre a ke r 無支柱足巨 隼rop- free front di 下裝下山fa 1flelonse r o ofx ib 1 e sh ie 1 d minin g i ng wa ll miningshaft less gas if i ca t ion n o n-ch a in-p i lla r e ntry prspec ifi c pr o ps, p r op ss t a n c e1 ower l e ver load i ng d i p下挖down digging下行式開采?desc
59、ending m ining, d ownward m i n ing巷道斷面縮小率roadw ay redu c tio n ra t i o巷旁充填 才oadsi de pack i ng巷旁支護ro a d side su pport限厚開采?1 i mited thickne s s extrac t io n限制區(qū)間?i m i t secti o n協(xié)調(diào)開采?iarm o n i c ext r action斜井開拓?nc lined shaft d e ve 1 opment斜切分層采煤法ob 1 ique slic i ng旋轉(zhuǎn)式推進 ?r evolving min i ng,
60、t u rni n g l o ngwa 1 l循環(huán)wor k ing c y cle循環(huán)進度?a dva n ce of working cycl e循環(huán)平均阻力 ?time-weig h ted m ea n r e sis t an c e循環(huán)平均阻力m e an load pe r unit c ycle巖層控制?s t ra t a co nt r o l支護剛度 支護強度 支架可縮量?nom i nal y ie支柱密度?prop d e ns i ty 直接頂her roof直進坑線?st r ai g ht ramp中厚煤層中斜煤層?inc 1 ined seam, 終采線周期
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 安徽省合肥市蜀山區(qū)重點中學2025屆十校聯(lián)考最后生物試題含解析
- 2025屆甘肅省蘭州市七里河區(qū)中考生物考試模擬沖刺卷含解析
- 2025年度金融科技產(chǎn)品開發(fā)與應(yīng)用合同2篇
- 二零二五年度全國知名商標代理機構(gòu)商標轉(zhuǎn)讓及服務(wù)合同6篇
- 2025年度二手房買賣雙方權(quán)益保障及售后服務(wù)合同3篇
- 2025年度國際物流管理聘用人員勞動合同4篇
- 2025年教育科技信用反擔保合同3篇
- 二零二五年房地產(chǎn)面積測繪與基礎(chǔ)設(shè)施配套合同范本3篇
- 2025年度期貨交易手續(xù)費結(jié)算合同范本4篇
- 2025年企業(yè)人才資源外包合同
- 骨科手術(shù)后患者營養(yǎng)情況及營養(yǎng)不良的原因分析,骨傷科論文
- GB/T 24474.1-2020乘運質(zhì)量測量第1部分:電梯
- GB/T 12684-2006工業(yè)硼化物分析方法
- 定崗定編定員實施方案(一)
- 高血壓患者用藥的注意事項講義課件
- 特種作業(yè)安全監(jiān)護人員培訓課件
- (完整)第15章-合成生物學ppt
- 太平洋戰(zhàn)爭課件
- 封條模板A4打印版
- T∕CGCC 7-2017 焙烤食品用糖漿
- 貨代操作流程及規(guī)范
評論
0/150
提交評論