




版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、.wd.wd.wd.目 錄TOC o 1-3 h z uHYPERLINK l _Toc497245431第一章工程簡(jiǎn)介 PAGEREF _Toc497245431 h - 4 -HYPERLINK l _Toc497245432一、工程概況 PAGEREF _Toc497245432 h - 4 -HYPERLINK l _Toc497245433二、預(yù)制梁板工程概況 PAGEREF _Toc497245433 h - 4 -HYPERLINK l _Toc497245434第二章編制說明 PAGEREF _Toc497245434 h - 5 -HYPERLINK l _Toc497245
2、435一、編制依據(jù) PAGEREF _Toc497245435 h - 5 -HYPERLINK l _Toc497245436二、編制原那么 PAGEREF _Toc497245436 h - 5 -HYPERLINK l _Toc497245437三、編制目的 PAGEREF _Toc497245437 h - 6 -HYPERLINK l _Toc497245438四、編制范圍 PAGEREF _Toc497245438 h - 6 -HYPERLINK l _Toc497245439第三章預(yù)制箱梁預(yù)壓方案 PAGEREF _Toc497245439 h - 6 -HYPERLINK l
3、 _Toc497245440一、預(yù)壓說明 PAGEREF _Toc497245440 h - 6 -HYPERLINK l _Toc497245441二、預(yù)壓總體方案 PAGEREF _Toc497245441 h - 6 -HYPERLINK l _Toc497245442三、預(yù)壓必要性和起拱分析 PAGEREF _Toc497245442 h - 7 -HYPERLINK l _Toc497245443四、預(yù)制箱梁預(yù)拱度表 PAGEREF _Toc497245443 h - 7 -HYPERLINK l _Toc497245444五、預(yù)壓荷載計(jì)算 PAGEREF _Toc497245444
4、 h - 8 -HYPERLINK l _Toc4972454455.1、預(yù)壓要求 PAGEREF _Toc497245445 h - 8 -HYPERLINK l _Toc4972454465.2、荷載計(jì)算 PAGEREF _Toc497245446 h - 8 -HYPERLINK l _Toc497245447六、預(yù)壓施工方案 PAGEREF _Toc497245447 h - 12 -HYPERLINK l _Toc4972454486.1、預(yù)壓材料選用 PAGEREF _Toc497245448 h - 12 -HYPERLINK l _Toc4972454496.2、預(yù)壓方案 PA
5、GEREF _Toc497245449 h - 12 -HYPERLINK l _Toc4972454506.3、預(yù)壓圖示 PAGEREF _Toc497245450 h - 13 -HYPERLINK l _Toc497245451第四章施工組織機(jī)構(gòu)及勞動(dòng)力組合 PAGEREF _Toc497245451 h - 15 -HYPERLINK l _Toc497245452一、現(xiàn)場(chǎng)勞動(dòng)力組織 PAGEREF _Toc497245452 h - 16 -HYPERLINK l _Toc497245453二、材料及設(shè)備機(jī)械組織 PAGEREF _Toc497245453 h - 16 -HYPER
6、LINK l _Toc497245454第五章質(zhì)量保證措施 PAGEREF _Toc497245454 h - 17 -HYPERLINK l _Toc497245455一、施工質(zhì)量保證體系 PAGEREF _Toc497245455 h - 17 -HYPERLINK l _Toc4972454561.1、質(zhì)量方針與目標(biāo) PAGEREF _Toc497245456 h - 17 -HYPERLINK l _Toc4972454571.2、質(zhì)量控制機(jī)構(gòu) PAGEREF _Toc497245457 h - 18 -HYPERLINK l _Toc4972454581.3、質(zhì)量保證體系 PAGER
7、EF _Toc497245458 h - 18 -HYPERLINK l _Toc497245459二、質(zhì)量保證措施 PAGEREF _Toc497245459 h - 20 -HYPERLINK l _Toc4972454602.1、組織保證措施 PAGEREF _Toc497245460 h - 20 -HYPERLINK l _Toc4972454612.2、技術(shù)保證措施 PAGEREF _Toc497245461 h - 20 -HYPERLINK l _Toc4972454622.3、人員保障措施 PAGEREF _Toc497245462 h - 21 -HYPERLINK l _
8、Toc4972454632.4、設(shè)備保障措施 PAGEREF _Toc497245463 h - 21 -HYPERLINK l _Toc4972454642.5、資金保證措施 PAGEREF _Toc497245464 h - 21 -HYPERLINK l _Toc4972454652.6、管理制度保障措施 PAGEREF _Toc497245465 h - 21 -HYPERLINK l _Toc4972454662.7、質(zhì)量管理控制措施 PAGEREF _Toc497245466 h - 22 -HYPERLINK l _Toc4972454672.8、應(yīng)對(duì)大風(fēng)、高溫等惡劣天氣保證工期
9、措施 PAGEREF _Toc497245467 h - 22 -HYPERLINK l _Toc497245468第六章文明施工措施 PAGEREF _Toc497245468 h - 23 -HYPERLINK l _Toc497245469一、開展創(chuàng)立文明工地活動(dòng) PAGEREF _Toc497245469 h - 23 -HYPERLINK l _Toc497245470二、工地宣傳 PAGEREF _Toc497245470 h - 23 -HYPERLINK l _Toc497245471三、場(chǎng)容場(chǎng)貌 PAGEREF _Toc497245471 h - 23 -HYPERLINK
10、l _Toc497245472四、工地衛(wèi)生 PAGEREF _Toc497245472 h - 24 -HYPERLINK l _Toc497245473五、噪音控制 PAGEREF _Toc497245473 h - 24 -HYPERLINK l _Toc497245474六、治安綜合管理 PAGEREF _Toc497245474 h - 24 -HYPERLINK l _Toc497245475第七章施工環(huán)保、水土保持措施 PAGEREF _Toc497245475 h - 25 -HYPERLINK l _Toc497245476一、水污染的防治措施 PAGEREF _Toc4972
11、45476 h - 25 -HYPERLINK l _Toc497245477二、固體廢棄物污染的防治措施 PAGEREF _Toc497245477 h - 25 -HYPERLINK l _Toc497245478三、土地資源及生態(tài)環(huán)境保護(hù)措施 PAGEREF _Toc497245478 h - 25 -HYPERLINK l _Toc497245479四、制度保證措施 PAGEREF _Toc497245479 h - 26 -HYPERLINK l _Toc497245480第八章安全生產(chǎn)管理目標(biāo)及安全保證措施 PAGEREF _Toc497245480 h - 26 -HYPERLI
12、NK l _Toc497245481一、安全管理方針和目標(biāo) PAGEREF _Toc497245481 h - 26 -HYPERLINK l _Toc4972454821.1、安全管理方針 PAGEREF _Toc497245482 h - 26 -HYPERLINK l _Toc4972454831.2、安全管理目標(biāo) PAGEREF _Toc497245483 h - 26 -HYPERLINK l _Toc497245484二、安全組織機(jī)構(gòu) PAGEREF _Toc497245484 h - 27 -HYPERLINK l _Toc497245485三、工程部主要管理人員崗位職責(zé) PAG
13、EREF _Toc497245485 h - 27 -HYPERLINK l _Toc497245486四、安全生產(chǎn)制度保證措施 PAGEREF _Toc497245486 h - 28 -HYPERLINK l _Toc4972454874.1、建設(shè)健全各項(xiàng)安全制度 PAGEREF _Toc497245487 h - 28 -HYPERLINK l _Toc4972454884.2、安全生產(chǎn)教育與培訓(xùn)制度 PAGEREF _Toc497245488 h - 28 -HYPERLINK l _Toc4972454894.3、安全生產(chǎn)檢查制度 PAGEREF _Toc497245489 h -
14、29 -HYPERLINK l _Toc4972454904.4、安全技術(shù)交底制度 PAGEREF _Toc497245490 h - 29 -HYPERLINK l _Toc4972454914.5、特種作業(yè)人員管理制度 PAGEREF _Toc497245491 h - 30 -HYPERLINK l _Toc4972454924.6、現(xiàn)場(chǎng)安全監(jiān)管制度 PAGEREF _Toc497245492 h - 30 -HYPERLINK l _Toc4972454934.7、不安全因素告知制度 PAGEREF _Toc497245493 h - 30 -HYPERLINK l _Toc49724
15、54944.8、高空作業(yè)管理制度 PAGEREF _Toc497245494 h - 31 -HYPERLINK l _Toc497245495五、安全管理措施 PAGEREF _Toc497245495 h - 31 -HYPERLINK l _Toc4972454965.1、機(jī)械設(shè)備安全管理 PAGEREF _Toc497245496 h - 31 -HYPERLINK l _Toc4972454975.2、施工現(xiàn)場(chǎng)安全防護(hù)措施 PAGEREF _Toc497245497 h - 32 -HYPERLINK l _Toc4972454985.3、安全消防措施 PAGEREF _Toc497
16、245498 h - 33 -HYPERLINK l _Toc4972454995.4、防汛措施 PAGEREF _Toc497245499 h - 33 -HYPERLINK l _Toc497245500六、不安全因素標(biāo)識(shí)及防范措施 PAGEREF _Toc497245500 h - 34 -HYPERLINK l _Toc4972455016.1、不安全因素標(biāo)識(shí) PAGEREF _Toc497245501 h - 34 -HYPERLINK l _Toc4972455026.2、防范措施 PAGEREF _Toc497245502 h - 34 -HYPERLINK l _Toc4972
17、45503七、起重機(jī)械安全操作規(guī)程 PAGEREF _Toc497245503 h - 37 -HYPERLINK l _Toc497245504八、現(xiàn)場(chǎng)處置應(yīng)急預(yù)案 PAGEREF _Toc497245504 h - 39 -HYPERLINK l _Toc4972455058.1、現(xiàn)場(chǎng)處置領(lǐng)導(dǎo)小組 PAGEREF _Toc497245505 h - 39 -HYPERLINK l _Toc4972455068.1.1、工程經(jīng)理部成立現(xiàn)場(chǎng)處置工作領(lǐng)導(dǎo)小組 PAGEREF _Toc497245506 h - 39 -HYPERLINK l _Toc4972455078.1.2、領(lǐng)導(dǎo)小組職責(zé) P
18、AGEREF _Toc497245507 h - 39 -HYPERLINK l _Toc4972455088.1.3、現(xiàn)場(chǎng)處置小組成員職責(zé)分工 PAGEREF _Toc497245508 h - 39 -HYPERLINK l _Toc4972455098.2、現(xiàn)場(chǎng)應(yīng)急處置資源 PAGEREF _Toc497245509 h - 41 -HYPERLINK l _Toc4972455108.2.1、情報(bào)、信息 PAGEREF _Toc497245510 h - 41 -HYPERLINK l _Toc4972455118.2.2、搶險(xiǎn)隊(duì)及培訓(xùn) PAGEREF _Toc497245511 h
19、- 41 -HYPERLINK l _Toc4972455128.2.3、互助協(xié)議 PAGEREF _Toc497245512 h - 41 -HYPERLINK l _Toc4972455138.3、現(xiàn)場(chǎng)處置響應(yīng) PAGEREF _Toc497245513 h - 41 -HYPERLINK l _Toc4972455148.3.1、現(xiàn)場(chǎng)應(yīng)急處置準(zhǔn)備與響應(yīng)流程 PAGEREF _Toc497245514 h - 41 -HYPERLINK l _Toc4972455158.3.2、值班人員及值班 PAGEREF _Toc497245515 h - 42 -HYPERLINK l _Toc49
20、72455168.3.3、現(xiàn)場(chǎng)處置原那么 PAGEREF _Toc497245516 h - 42 -HYPERLINK l _Toc4972455178.4、突發(fā)事件處置預(yù)案 PAGEREF _Toc497245517 h - 43 -HYPERLINK l _Toc4972455188.4.1、高出墜落事故現(xiàn)場(chǎng)處置預(yù)案 PAGEREF _Toc497245518 h - 43 -HYPERLINK l _Toc4972455198.4.2、物體打擊事故現(xiàn)場(chǎng)處置預(yù)案 PAGEREF _Toc497245519 h - 44 -HYPERLINK l _Toc4972455208.4.3、起重
21、傷害事故現(xiàn)場(chǎng)處置預(yù)案 PAGEREF _Toc497245520 h - 45 -HYPERLINK l _Toc4972455218.4.4、觸電事故現(xiàn)場(chǎng)處置預(yù)案 PAGEREF _Toc497245521 h - 46 -HYPERLINK l _Toc4972455228.4.5、機(jī)械傷害事故現(xiàn)場(chǎng)處置預(yù)案 PAGEREF _Toc497245522 h - 47 -HYPERLINK l _Toc4972455238.5、應(yīng)急物資與裝備保障 PAGEREF _Toc497245523 h - 50 -HYPERLINK l _Toc4972455248.6、應(yīng)急救援聯(lián)系方式及周邊可利用資
22、源 PAGEREF _Toc497245524 h - 51 -HYPERLINK l _Toc4972455258.6.1、公用聯(lián)系方式 PAGEREF _Toc497245525 h - 51 -HYPERLINK l _Toc4972455268.6.2、周邊可利用資源聯(lián)系方式 PAGEREF _Toc497245526 h - 51 -第一章 工程簡(jiǎn)介一、工程概況本工程位于新疆維吾爾自治區(qū)吐魯番地區(qū)境內(nèi),起點(diǎn)位于小草湖互通以南2km,終點(diǎn)位于別離式路基上行線SK3481+300、別離式下行線XK3481+000,本合同段整體式路基長(zhǎng)9.800km,別離式路基長(zhǎng)上行線長(zhǎng)4.320km,別
23、離式路基下行線長(zhǎng)4.000km,改移G312共計(jì)長(zhǎng)13.428km。河流主要為白楊河,附近還有小草湖一級(jí)水源保護(hù)區(qū),路線總體 基本呈南北走向。本合同段設(shè)置互通式立交2座、大橋3座、中橋5座、小橋4座、箱涵2道其中新建1道,拼接加寬1道、涵洞23道其中新建17道,拼接加寬2道,上部換板維修利用1道,加固利用原涵3道、圓管涵2道、收費(fèi)站1處、小草湖互通1處、小草湖服務(wù)區(qū)1處、G312治超站1處,本工程建設(shè)工期為4年,方案2016年11月開工,2020年8月建成通車,工程總造價(jià)6.269億元。二、預(yù)制梁板工程概況連霍高速G30新疆境內(nèi)小草湖至烏魯木齊段改擴(kuò)建工程XWGJ-1標(biāo)段共有大橋3座、互通式立
24、交2座上部構(gòu)造為現(xiàn)澆預(yù)應(yīng)力混凝土連續(xù)箱梁、中橋5座、小橋4座,預(yù)制梁共計(jì)409片,其中40m預(yù)制箱梁91片、30m 預(yù)制箱梁206片、20m預(yù)制箱梁21片、20m預(yù)制空心板梁18片、8m空心板梁73片。本工程預(yù)制梁板統(tǒng)計(jì)詳見下表:預(yù)制梁、板統(tǒng)計(jì)表序號(hào)類型樁號(hào)交角度構(gòu)造形式m孔數(shù)跨徑m總數(shù)量片設(shè)計(jì)方量m31大橋SK3480+367.590裝配式預(yù)應(yīng)力混凝土簡(jiǎn)支箱梁16301123834.882裝配式預(yù)應(yīng)力混凝土簡(jiǎn)支箱梁340211162.33SK3481+00290裝配式預(yù)應(yīng)力混凝土簡(jiǎn)支箱梁1030702404.44裝配式預(yù)應(yīng)力混凝土簡(jiǎn)支箱梁340211162.35XK3478+766130裝配
25、式預(yù)應(yīng)力混凝土簡(jiǎn)支箱梁740492713.36中橋k3468+620.650裝配式預(yù)應(yīng)力混凝土簡(jiǎn)支箱梁13010372.47k3472+222.590裝配式預(yù)應(yīng)力混凝土簡(jiǎn)支箱梁12021419.68SK3478+295.8130裝配式預(yù)應(yīng)力混凝土簡(jiǎn)支箱梁1307259.49SK3479+78550裝配式預(yù)應(yīng)力混凝土簡(jiǎn)支箱梁1307259.410XK3480+827.9690裝配式預(yù)應(yīng)力混凝土簡(jiǎn)支空心板12018233.1111小橋SK3477+86490鋼筋混凝土空心板182159.9812SK3478+544.5120鋼筋混凝土空心板182159.9813XK3477+864.790鋼筋混凝
26、土空心板182159.3414G312k3478+824.7290鋼筋混凝土空心板181029.1合計(jì)40913029.4940m-91片、30m-206片、20m箱梁-21片、20m空心板-18片、8m空心板梁73片第二章 編制說明一、編制依據(jù)1、?連霍高速G30新疆境內(nèi)小草湖至烏魯木齊段改擴(kuò)建工程WGJ-1標(biāo)段施工合同?2、?連霍高速G30新疆境內(nèi)小草湖至烏魯木齊段改擴(kuò)建工程WGJ-1標(biāo)段兩階段施工圖設(shè)計(jì)?3、?公路工程質(zhì)量檢驗(yàn)評(píng)定標(biāo)準(zhǔn)?JTG F80/1-20044、?公路橋涵施工技術(shù)標(biāo)準(zhǔn)?JTG/T F50-20115、?公路工程施工安全技術(shù)標(biāo)準(zhǔn)?JTG F90-20156、?起重機(jī)械
27、安全規(guī)程?GB 6067.5-20147、?公路鋼筋混凝土及預(yù)應(yīng)力橋涵設(shè)計(jì)標(biāo)準(zhǔn)?JTG D62-20048、?橋梁工程施工與質(zhì)量驗(yàn)收標(biāo)準(zhǔn)?CJJ2-20089、?新疆維吾爾自治區(qū)公路施工標(biāo)準(zhǔn)化手冊(cè)?10、?連霍高速G30新疆境內(nèi)小草湖至烏魯木齊改擴(kuò)建工程WGJ-1標(biāo)總體施工組織設(shè)計(jì)?11、國(guó)家及新疆維吾爾自治區(qū)相關(guān)法律、法規(guī)及條例等。12、本公司擁有的科技成果、工法成果、管理水平、現(xiàn)有的技術(shù)裝備力量和多年積累的同類工程的施工經(jīng)歷。二、編制原那么1、符合性原那么。滿足建設(shè)工期和工程質(zhì)量標(biāo)準(zhǔn),符合施工安全要求。2、遵循設(shè)計(jì)文件的原那么。在編制施工方案時(shí),認(rèn)真閱讀核對(duì)所獲得的技術(shù)設(shè)計(jì)文件資料,了解設(shè)
28、計(jì)意圖,掌握現(xiàn)場(chǎng)情況,嚴(yán)格按設(shè)計(jì)資料和設(shè)計(jì)原那么編制施組,滿足設(shè)計(jì)標(biāo)準(zhǔn)和要求。3、遵循“安全第一、預(yù)防為主、綜合治理的原那么。嚴(yán)格按照施工安全操作規(guī)程,從制度、管理、方案、資源方面編制切實(shí)可行的施工方案和措施,確保施工安全。4、堅(jiān)持“百年大計(jì),質(zhì)量第一的方針,制定完善的工程質(zhì)量管理制度,建設(shè)質(zhì)量保證組織體系,針對(duì)本標(biāo)段工程特點(diǎn),加強(qiáng)過程控制,從各個(gè)環(huán)節(jié)上確保工程質(zhì)量目標(biāo)的實(shí)現(xiàn)。三、編制目的為確保本工程工程施工質(zhì)量,加強(qiáng)本工程各分部、分項(xiàng)工程的施工的質(zhì)量及進(jìn)度管理工作,以實(shí)現(xiàn)工程質(zhì)量及合同工期為目的。根據(jù)國(guó)家相關(guān)的標(biāo)準(zhǔn)文件及法律法規(guī),特制定該施工方案切實(shí)做到指導(dǎo)現(xiàn)場(chǎng)施工管理的目的。四、編制范圍本
29、方案適用于新疆交通建設(shè)集團(tuán)股份承建的連霍高速小烏改擴(kuò)建一標(biāo)預(yù)制梁板預(yù)壓的施工與管理。第三章 預(yù)制箱梁預(yù)壓方案一、預(yù)壓說明根據(jù)施工設(shè)計(jì)圖紙第三冊(cè)第一分冊(cè)、第二分冊(cè)及第四冊(cè)第四分冊(cè)預(yù)制梁、板說明中指出:“為了防止預(yù)制板上拱過大,預(yù)制板與橋面現(xiàn)澆層由于齡期差異而產(chǎn)生過大收縮差,存梁期不超過90d,假設(shè)累計(jì)上拱值超過計(jì)算值10mm或8mm指20m預(yù)制梁,應(yīng)采取控制措施。為保證預(yù)制梁上拱值不超過設(shè)計(jì)要求,特編制本預(yù)壓方案。二、預(yù)壓總體方案根據(jù)預(yù)制梁預(yù)制及安裝的總體工期和橋梁下部完成情況,我工程下表預(yù)制完成的預(yù)制梁需進(jìn)展預(yù)壓施工,共計(jì)248片。預(yù)制箱梁統(tǒng)計(jì)表序號(hào)類型樁號(hào)交角度構(gòu)造形式孔數(shù)跨徑m預(yù)制數(shù)量片預(yù)
30、壓數(shù)量預(yù)壓場(chǎng)所1大橋SK3480+367.590后張法預(yù)應(yīng)力砼簡(jiǎn)支箱梁1630112中梁80片邊梁32片橋上、預(yù)制場(chǎng)34021中梁15片邊梁6片橋上、預(yù)制場(chǎng)2SK3481+00290后張法預(yù)應(yīng)力砼簡(jiǎn)支箱梁103070中梁50片邊梁20片橋上、預(yù)制場(chǎng)34021中梁15片邊梁6片橋上、預(yù)制場(chǎng)3中橋K3468+620.650后張法預(yù)應(yīng)力砼簡(jiǎn)支箱梁13010中梁6片邊梁4片橋上4SK3478+295.8130后張法預(yù)應(yīng)力砼簡(jiǎn)支箱梁1307中梁5片邊梁2片預(yù)制場(chǎng)5SK3479+78550后張法預(yù)應(yīng)力砼簡(jiǎn)支箱梁1307中梁5片邊梁2片橋上合計(jì)248片30m預(yù)制箱梁206片,40m預(yù)制箱梁42片。三、預(yù)壓必
31、要性和起拱分析1、如果預(yù)應(yīng)力梁預(yù)制完成后,不能及時(shí)吊裝,形成構(gòu)造最終體系,即預(yù)制梁存放期過長(zhǎng),特別是夏季高溫預(yù)制的梁板,存梁期要跨越冬季,必須采取預(yù)壓措施,來保證梁體的質(zhì)量。2、如果不采取預(yù)壓措施,預(yù)應(yīng)力梁體向上的拱度會(huì)增大,這樣第一橋面砼在中間部位厚度不夠甚至連橋面鋼筋的高度都不能保證;第二是如果預(yù)應(yīng)力梁體向上的拱度過大就會(huì)導(dǎo)致梁體頂面砼開裂,嚴(yán)重影響梁體的質(zhì)量,開裂的過大就會(huì)形成廢梁。3、由于梁體砼在預(yù)應(yīng)力鋼絞線的長(zhǎng)期作用下,砼的收縮和徐變是導(dǎo)致使梁的上拱度不斷增大的原因之一。4、由于溫差的變化作用使梁體縮短熱脹冷縮,是造成梁體砼上拱度增大的主要原因,由于夏季高溫預(yù)制的梁體存梁期又要跨越冬
32、季,所以溫差較大,使梁體收縮,是造成梁體上拱度不斷增大的主要原因。四、預(yù)制箱梁預(yù)拱度表根據(jù)施工設(shè)計(jì)圖紙第三冊(cè)第一分冊(cè)、第二分冊(cè)及第四冊(cè)第四分冊(cè)關(guān)于30m、40m預(yù)制箱梁通用圖集設(shè)計(jì)說明:新建橋梁預(yù)制梁在預(yù)應(yīng)力鋼筋放張完成后,各存梁期跨中上拱度計(jì)算值及二期恒載所產(chǎn)生的下?lián)现等缦隆?、大橋30m、40m預(yù)制箱梁預(yù)拱度值設(shè)置表30m預(yù)制箱梁預(yù)拱值設(shè)置表預(yù)制梁上拱值理論值反預(yù)拱度建議值梁位鋼束張拉時(shí)存梁30d存梁60d存梁90d(mm)mm(mm)(mm)mm邊梁邊跨20.737.439.741.7-21中跨14.425.627.028.4中梁邊跨21.538.841.243.3中跨15.026.62
33、8.129.540m預(yù)制箱梁預(yù)拱值設(shè)置表預(yù)制梁上拱值理論值二期恒載撓度反預(yù)拱度建議值梁位鋼束張拉時(shí)存梁30d存梁90d(mm)(mm)mm(mm)mm(mm)邊梁邊跨223738.640.422邊跨:-19中跨:-12中跨10.516.517.018.110.5中梁邊跨22.337.939.641.422.3中跨11.017.317.818.711.0表注:a、表中數(shù)值為計(jì)算值,施工時(shí),應(yīng)根據(jù)預(yù)制梁實(shí)測(cè)上拱值修正反預(yù)拱度;b、表中反預(yù)拱度建議值未考慮豎曲線的影響,設(shè)計(jì)時(shí)應(yīng)根據(jù)豎曲線半後調(diào)整反預(yù)拱度的設(shè)置值;c、反預(yù)拱度可釆用圓曲線或其它二次拋物線。2、中橋30m預(yù)制箱梁預(yù)拱度值設(shè)置表30m預(yù)制
34、箱梁預(yù)拱值設(shè)置表預(yù)制梁上拱值理論值二期恒載撓度反預(yù)拱度建議值梁位鋼束張拉時(shí)存梁30d存梁60d存梁90d(mm)(mm)(mm)(mm)mmmm邊梁34.350.954.556.5-12.3-30中梁34.951.655.357.1-14.6表注:a、表中數(shù)值為計(jì)算值,施工時(shí),應(yīng)根據(jù)預(yù)制梁實(shí)測(cè)上拱值修正反預(yù)拱度;b、表中反預(yù)拱度建議值未考慮豎曲線的影響,設(shè)計(jì)時(shí)應(yīng)根據(jù)豎曲線半後調(diào)整反預(yù)拱度的設(shè)置值;c、反預(yù)拱度可釆用圓曲線或其它二次拋物線。五、預(yù)壓荷載計(jì)算5.1、預(yù)壓要求1、冬休放假之前必須對(duì)已經(jīng)預(yù)制完成空心板、箱梁進(jìn)展加載預(yù)壓,預(yù)制空心板、箱梁起拱過大問題。2、根據(jù)預(yù)壓荷載應(yīng)與成橋后橋面鋪裝層
35、荷載等效的原理,可依據(jù)設(shè)計(jì)圖紙將預(yù)制梁頂面所承受橋面系的重量計(jì)算出來即為預(yù)制梁需預(yù)壓的荷載重量。5.2、荷載計(jì)算1、荷載計(jì)算公式根據(jù)簡(jiǎn)支梁跨中彎矩等效代換原那么,按公式計(jì)算需要增加的跨中預(yù)壓荷載:P= ql/2P需要增加的跨中預(yù)壓荷載tq線荷載每平方米橋面鋪裝層荷載梁寬l預(yù)制箱梁長(zhǎng)度m2、預(yù)壓荷載參數(shù)根據(jù)設(shè)計(jì)圖紙,預(yù)制箱梁上部橋面鋪裝層主要為8cm厚度的C50混凝土和11cm厚度的瀝青混凝土及混凝土鋪裝層中間的一層鋼筋網(wǎng),其橋面構(gòu)造見以以下列圖。結(jié)合目前我工程施工具體情況,主要完成了30m和40m的預(yù)應(yīng)力預(yù)制箱梁。橋面構(gòu)造示意圖根據(jù)設(shè)計(jì)圖紙可得到預(yù)壓荷載計(jì)算參數(shù)如下:C50混凝土重力密度:26
36、.0KN/m瀝青混凝土重力密度:24.0KN/mC50混凝土鋪裝厚度:8cm瀝青混凝土鋪裝厚度:11cm30m預(yù)制箱梁寬度:2.85m邊梁頂寬,2.4m(中梁頂寬)40m預(yù)制箱梁寬度:2.85m邊梁頂寬,2.4m(中梁頂寬)30m預(yù)制箱梁梁高:1.6m40m預(yù)制箱梁梁高:2.0m12綁扎鋼筋網(wǎng),間距1010cm布置。12鋼筋單位重量為0.888kg/m。大橋:30m預(yù)制箱梁長(zhǎng)度:邊跨29.75m均長(zhǎng),中跨29.65m (均長(zhǎng))40m預(yù)制箱梁長(zhǎng)度:邊跨39.74m均長(zhǎng),中跨39.64m (均長(zhǎng))中橋:30m預(yù)制箱梁長(zhǎng)度:邊跨29.84m30m預(yù)制箱梁斷面示意圖40m預(yù)制箱梁斷面示意圖3、荷載計(jì)算
37、1橋面鋪裝鋼筋網(wǎng)每平方米荷載經(jīng)歷算橋面鋪裝鋼筋網(wǎng)每平方米荷載為:q1=10+1010.888=17.76Kg/m2=0.1776KN/m22鋪裝層混凝土和瀝青每平方米荷載q2=10.0826+10.1124=4.72KN/m23每平方米總荷載q=q1+q2=0.1776+4.72=4.9KN/m24每片箱梁的預(yù)壓荷載 大橋30m邊跨邊梁:P1=4.92.8529.75/2=207.73KN=20.77t30m邊跨中梁:P2=4.92.4029.75/2=174.93KN=17.49t30m中跨邊梁:P3=4.92.8529.65/2=207.03KN=20.70t30m中跨中梁:P4=4.92
38、.4029.65/2=174.34KN=17.43t40m邊跨邊梁:P5=4.92.8539.74/2=277.48KN=27.75t40m邊跨中梁:P6=4.92.4039.74/2=233.67KN=23.37t40m中跨邊梁:P7=4.92.8539.64/2=276.77KN=27.68t40m中跨中梁:P8=4.92.4039.64/2=233.08KN=23.31t 中橋30m邊梁:P1=4.92.8529.84/2=208.36KN=20.84t30m中梁:P2=4.92.4029.84/2=175.46KN=17.55t4、荷載匯總按上述計(jì)算方式各橋預(yù)壓荷載重量匯總?cè)缦拢簶蛄汗?/p>
39、程預(yù)制箱梁預(yù)壓荷載匯總表序號(hào)類型樁號(hào)交角度構(gòu)造形式跨徑m梁位預(yù)壓重量t1大橋SK3480+367.590后張法預(yù)應(yīng)力砼簡(jiǎn)支箱梁30邊跨邊梁20.77邊跨中梁17.49中跨邊梁20.70中跨中梁17.4340邊跨邊梁27.75邊跨中梁23.37中跨邊梁27.68中跨中梁23.312SK3481+00290后張法預(yù)應(yīng)力砼簡(jiǎn)支箱梁30邊跨邊梁20.77邊跨中梁17.49中跨邊梁20.70中跨中梁17.4340邊跨邊梁27.75邊跨中梁23.37中跨邊梁27.68中跨中梁23.313中橋K3468+620.650后張法預(yù)應(yīng)力砼簡(jiǎn)支箱梁30邊梁20.84中梁17.554SK3478+295.8130后張
40、法預(yù)應(yīng)力砼簡(jiǎn)支箱梁30邊梁20.84中梁17.555SK3479+78550后張法預(yù)應(yīng)力砼簡(jiǎn)支箱梁30邊梁20.84中梁17.55六、預(yù)壓施工方案6.1、預(yù)壓材料選用預(yù)壓時(shí)可采用預(yù)制梁場(chǎng)內(nèi)庫(kù)存不用的成捆鋼材或者噸袋作為預(yù)壓材料。根據(jù)我工程目前橋梁下部的施工進(jìn)度及架梁速度,預(yù)制箱梁冬季預(yù)壓存在兩種方式,一種是在存梁區(qū)在存梁臺(tái)座上進(jìn)展預(yù)壓,另外一種是在橋上預(yù)壓。在預(yù)制場(chǎng)存梁區(qū)在存梁臺(tái)座可利用庫(kù)存不用的成捆鋼材或者噸袋作為預(yù)壓材料,橋上預(yù)壓采用噸袋作為預(yù)壓材料。6.2、預(yù)壓方案1、預(yù)制場(chǎng)存梁區(qū)梁體預(yù)壓預(yù)制梁場(chǎng)預(yù)制箱梁堆放采用單層存放,對(duì)于采用雙層疊放的預(yù)制梁在冬季預(yù)壓期內(nèi)利用龍門吊將其上層預(yù)制梁吊于
41、存梁臺(tái)座之上,保證預(yù)壓期內(nèi)所有預(yù)制箱梁都處于單層狀態(tài)。預(yù)制場(chǎng)存放的預(yù)制梁利用庫(kù)存不用的成捆鋼材或者噸袋作為預(yù)壓材料,在梁頂排放預(yù)壓材料時(shí)應(yīng)均勻分部,確保梁體受力均勻。1噸袋預(yù)壓采用噸袋作為預(yù)壓材料時(shí),噸袋采用大型編織袋,每袋裝戈壁料1000公斤,噸袋與噸袋之間堆放整齊,噸袋采用人工配合龍門吊進(jìn)展吊裝和安放,預(yù)壓前需在梁頂鋪上土工布或廢舊木板防止噸袋被鋼筋刮破。通過計(jì)算各類型預(yù)制梁所需噸袋見下表。預(yù)壓所需噸袋數(shù)量表工程梁長(zhǎng)m梁位預(yù)壓荷載G (t)每個(gè)噸袋重t所需噸袋數(shù)個(gè)大橋30m邊跨邊梁20.77121邊跨中梁17.49118中跨邊梁20.70121中跨中梁17.4311840m邊跨邊梁27.7
42、5128邊跨中梁23.37124中跨邊梁27.68128中跨中梁23.31124中橋20中板20.84121邊板17.551182成捆鋼材預(yù)壓采用成捆鋼材作為預(yù)壓材料時(shí),預(yù)壓前需對(duì)成捆鋼材的數(shù)量、重量進(jìn)展統(tǒng)計(jì),如果成捆鋼材的名牌重量喪失,需對(duì)其進(jìn)展標(biāo)重前方可使用。成捆鋼材采用人工配合龍門吊進(jìn)展吊裝和安放,布置時(shí)需均勻進(jìn)展排放,確保梁體荷載均勻分部。一般未經(jīng)使用過的成捆鋼材重量在3.54噸之間,計(jì)算預(yù)壓捆數(shù)時(shí)可取平均按3.75噸/困,也可按成捆的實(shí)際重量與理論計(jì)算預(yù)壓重量進(jìn)展等載預(yù)壓,這里為計(jì)算方便采用3.75噸/困的數(shù)據(jù)來計(jì)算鋼材用量。通過計(jì)算各類型預(yù)制梁所需鋼材捆數(shù)見下表。預(yù)壓所需鋼材捆數(shù)表
43、工程梁長(zhǎng)m梁位預(yù)壓荷載G (t)每捆鋼材重t所需鋼材捆數(shù)捆大橋30m邊跨邊梁20.773.756邊跨中梁17.493.755中跨邊梁20.703.756中跨中梁17.433.75540m邊跨邊梁27.753.758邊跨中梁23.373.756中跨邊梁27.683.758中跨中梁23.313.756中橋20中板20.843.756邊板17.553.7552、橋上梁體預(yù)壓橋上梁體預(yù)壓采用噸袋作為預(yù)壓材料,噸袋采用大型編織袋,每袋裝戈壁料1000公斤,噸袋與噸袋之間堆放整齊,噸袋采用人工配合25t吊車進(jìn)展吊裝和安放。在梁頂排放預(yù)壓噸袋料時(shí)應(yīng)均勻分布,確保梁體受力均勻。預(yù)壓前需在梁頂鋪上土工布或廢舊木
44、板防止噸袋被鋼筋刮破。預(yù)壓噸袋數(shù)量可參見表“預(yù)壓所需噸袋數(shù)量表6.3、預(yù)壓圖示1、30m預(yù)制梁預(yù)壓圖示1噸袋預(yù)壓圖示這里只示意了一種21個(gè)噸袋情況下的布置方式圖,其他噸袋數(shù)量的布置方式可按此示意圖的做法進(jìn)展擺放,擺放原那么是:“對(duì)稱分布,間距均勻。30m預(yù)制梁噸袋預(yù)壓示意圖2成捆鋼材預(yù)壓圖示這里只示意了一種6捆鋼材預(yù)壓情況下的布置方式圖,其他成捆鋼材數(shù)量的布置方式可按此示意圖的做法進(jìn)展擺放,擺放原那么是:“對(duì)稱分布,間距均勻。30m預(yù)制梁成捆鋼材預(yù)壓示意圖2、40m預(yù)制梁預(yù)壓圖示1噸袋預(yù)壓圖示這里只示意了一種28個(gè)噸袋情況下的布置方式圖,其他噸袋數(shù)量的布置方式可按此示意圖的做法進(jìn)展擺放,擺放原
45、那么是:“對(duì)稱分布,間距均勻。40m預(yù)制梁噸袋預(yù)壓示意圖2成捆鋼材預(yù)壓圖示這里只示意了一種8捆鋼材預(yù)壓情況下的布置方式圖,其他成捆鋼材數(shù)量的布置方式可按此示意圖的做法進(jìn)展擺放,擺放原那么是:“對(duì)稱分布,間距均勻。40m預(yù)制梁成捆鋼材預(yù)壓示意圖第四章 施工組織機(jī)構(gòu)及勞動(dòng)力組合為了確保安全、優(yōu)質(zhì)、高速完成預(yù)壓任務(wù),施工管理人員選用技術(shù)素質(zhì)好、工作能力強(qiáng)的人員參加,對(duì)工種的全過程實(shí)施統(tǒng)一方案、統(tǒng)一管理、統(tǒng)一監(jiān)控、統(tǒng)一調(diào)度。組織技術(shù)素質(zhì)好、作風(fēng)過硬、敢打硬仗的施工人員參加施工。一、現(xiàn)場(chǎng)勞動(dòng)力組織勞動(dòng)力組織配備表工程經(jīng)理部職 務(wù)姓 名職 稱備 注工程經(jīng)理彭生明高級(jí)工程師總工程師辛 軍高級(jí)工程師常務(wù)副經(jīng)理
46、李天彬高級(jí)工程師生產(chǎn)副經(jīng)理馬 鑫工程師現(xiàn)場(chǎng)技術(shù)負(fù)責(zé)吳 輝高級(jí)工程師構(gòu)造工程師謝遠(yuǎn)虎工程師構(gòu)造工程師劉奇奇工程師構(gòu)造工程師馬 亮助理工程師測(cè)量工程師王 波工程師試驗(yàn)工程師王克文工程師機(jī)械工程師楊曉亮工程師安全工程師張 東工程師專職安全員王 晨助理工程師操作人員工 種數(shù)量進(jìn)場(chǎng)時(shí)間備 注隊(duì) 長(zhǎng)12017年12月負(fù)責(zé)預(yù)壓全面工作起重指揮22017年12月吊裝、就位等指揮工作吊車司機(jī)22017年12月吊裝工作龍門吊操作手22017年12月吊裝工作鏟車司機(jī)12017年12月負(fù)責(zé)裝噸袋運(yùn)輸車司機(jī)32017年12月負(fù)責(zé)預(yù)壓材料運(yùn)輸服務(wù)車司機(jī)12017年12月負(fù)責(zé)人員運(yùn)輸與協(xié)調(diào)雜工102017年12月裝噸袋、掛
47、鉤等二、材料及設(shè)備機(jī)械組織主要材料方案表序號(hào)名 稱數(shù) 量規(guī) 格說 明1噸袋3000個(gè)大號(hào)預(yù)壓裝戈壁料用2鐵絲200kg6號(hào)綁扎噸袋3鋼材300捆成捆未使用鋼材3.5-4噸梁場(chǎng)預(yù)壓使用所需主要機(jī)械方案表序號(hào)名 稱規(guī)格型號(hào)數(shù)量用 途已進(jìn)場(chǎng)時(shí)間1吊車25t2噸袋吊裝2017年12月2鏟車50型1裝噸袋2017年12月3服務(wù)車1人員運(yùn)輸、協(xié)調(diào)2017年12月4龍門吊25t2噸袋吊裝2017年12月5地磅120t1稱重2017年12月6平板車1運(yùn)輸預(yù)壓材料2017年12月7雙橋車202運(yùn)輸戈壁料2017年12月所需主要工索具方案表序號(hào)名 稱數(shù) 量規(guī) 格說 明1鋼絲繩4m長(zhǎng)6根25mm吊裝使用2卡 環(huán)4M
48、42型吊裝使用3白棕繩100m21.5mm4榔 頭2個(gè)16磅5木梯子1個(gè)6撬 棍2個(gè)7鋼筋嵌4把第五章 質(zhì)量保證措施一、施工質(zhì)量保證體系1.1、質(zhì)量方針與目標(biāo)質(zhì)量方針:科學(xué)管理、質(zhì)量第一、用戶滿意、持續(xù)改進(jìn)。質(zhì)量目標(biāo):全部工程質(zhì)量到達(dá)交通部?公路工程質(zhì)量檢驗(yàn)評(píng)定標(biāo)準(zhǔn)?第一冊(cè)土建工程TGF80/1-2004及?公路工程竣交工驗(yàn)收方法?的要求,工程交工驗(yàn)收的質(zhì)量評(píng)定為:合格。質(zhì)量管理:認(rèn)真貫徹ISO9000系列質(zhì)量體系標(biāo)準(zhǔn),以質(zhì)量為生命,以質(zhì)量為效益,全面實(shí)施工程經(jīng)理負(fù)責(zé)制,建設(shè)健全質(zhì)量管理體系,全面實(shí)現(xiàn)質(zhì)量目標(biāo),確保工程質(zhì)量合格,爭(zhēng)創(chuàng)樣板工程、品質(zhì)工程。1.2、質(zhì)量控制機(jī)構(gòu)1、質(zhì)量管理領(lǐng)導(dǎo)小組質(zhì)
49、量管理領(lǐng)導(dǎo)小組是本工程整個(gè)工程質(zhì)量管理的最高領(lǐng)導(dǎo)機(jī)構(gòu),由工程經(jīng)理、總工程師、工程副經(jīng)理、質(zhì)檢總監(jiān)、試驗(yàn)室主任、材料設(shè)備部長(zhǎng)、工程技術(shù)部長(zhǎng)以及各科室主要成員組成,制訂整個(gè)合同段工程質(zhì)量創(chuàng)優(yōu)規(guī)劃、方針、措施。制訂攻關(guān)課題,成立QC小組,積極開展工作。質(zhì)量管理領(lǐng)導(dǎo)小組組織機(jī)構(gòu)圖1.3、質(zhì)量保證體系1、質(zhì)保體系為全面落實(shí)高速公路建設(shè)“雙標(biāo)管理,依照交通廳?新疆維吾爾自治區(qū)公路施工標(biāo)準(zhǔn)化手冊(cè)?和廳、局下發(fā)的有關(guān)質(zhì)量管理規(guī)定的要求,結(jié)合本工程特點(diǎn),明確創(chuàng)優(yōu)目標(biāo),建設(shè)質(zhì)量管理獎(jiǎng)懲制度,狠抓落實(shí),促進(jìn)工程質(zhì)量水平明顯提升,努力打造優(yōu)質(zhì)工程。從組織保證、思想保證、制度保證、施工質(zhì)量保證、質(zhì)量檢查保證五方面建設(shè)完
50、善的質(zhì)量保證體系。質(zhì)量保證體框圖2、質(zhì)保體系的運(yùn)行工程施工過程中嚴(yán)格控制影響質(zhì)量的六大因素,影響質(zhì)量的六大因素是:人、機(jī)械設(shè)備、材料、施工方法、檢測(cè)技術(shù)、環(huán)境。因此工程經(jīng)理部應(yīng)做到以下幾點(diǎn)尤為關(guān)鍵。1、工程經(jīng)理部在工程施工,加工制作過程中,對(duì)工程各施工工程及成品由操作人員進(jìn)展自檢,由施工人員組織班組之間和上下工序之間進(jìn)展互檢,由專職質(zhì)檢人員對(duì)產(chǎn)品質(zhì)量進(jìn)展專檢。2、提高全體參戰(zhàn)人員的質(zhì)量意識(shí)、技術(shù)素質(zhì),加強(qiáng)培訓(xùn)教育與考核。3、加強(qiáng)機(jī)械設(shè)備管理,使設(shè)備總體保持在最正確運(yùn)行狀態(tài)。4、把好采購(gòu)關(guān),應(yīng)用新材料,著重原材料的管理。5、采用新工藝、新方法、使施工方法科學(xué)化、技術(shù)標(biāo)準(zhǔn)化。6、利用先進(jìn)設(shè)備和方法
51、,提高施工質(zhì)量檢測(cè)水平。7、注意施工現(xiàn)場(chǎng)環(huán)境管理,排除環(huán)境干擾因素。二、質(zhì)量保證措施2.1、組織保證措施1、為確保工程質(zhì)量,成立由工程經(jīng)理領(lǐng)導(dǎo)的質(zhì)量保證領(lǐng)導(dǎo)小組,各部門主管擔(dān)任組員,各施工工段長(zhǎng)為責(zé)任人,以各施工工段為生產(chǎn)實(shí)施對(duì)象,明確各層責(zé)任人的質(zhì)量管理責(zé)任,加強(qiáng)施工現(xiàn)場(chǎng)的協(xié)調(diào)和指導(dǎo),形成一個(gè)從上而下的質(zhì)量管理組織體系見以以下列圖。2、建設(shè)以工程為核心的責(zé)權(quán)利體系,定崗、定人、授權(quán),各負(fù)其責(zé),各司其職。3、實(shí)行定期生產(chǎn)例會(huì)制,組織和協(xié)調(diào)各施工工段間的生產(chǎn)關(guān)系,有效地控制生產(chǎn)進(jìn)度。4、落實(shí)經(jīng)濟(jì)責(zé)任制,將質(zhì)量控制與個(gè)人經(jīng)濟(jì)利益掛鉤,切實(shí)落實(shí)質(zhì)量責(zé)任制度的相關(guān)規(guī)定。2.2、技術(shù)保證措施1、組織技術(shù)
52、人員熟悉圖紙,了解工程構(gòu)造,熟悉施工現(xiàn)場(chǎng),做好技術(shù)交底工作等。2、預(yù)壓必須按施工方案和設(shè)計(jì)要求進(jìn)展。3、吊具吊索滿足構(gòu)件吊裝要求,應(yīng)有技術(shù)參數(shù)保證。4、貫徹質(zhì)量責(zé)任制,工程部與施工管理人員、施工隊(duì),施工隊(duì)與施工班組,班組與每個(gè)操作者逐級(jí)簽訂質(zhì)量獎(jiǎng)罰合同,實(shí)現(xiàn)經(jīng)濟(jì)收入與質(zhì)量指標(biāo)掛鉤。5、根據(jù)?招標(biāo)文件?、?監(jiān)理實(shí)施細(xì)則?的要求及規(guī)定的質(zhì)量檢查程序,建設(shè)質(zhì)量保證自檢體系:嚴(yán)格按質(zhì)量保證自檢體系規(guī)定的自檢程序做到報(bào)檢及時(shí)、程序標(biāo)準(zhǔn)。嚴(yán)格以圖紙、標(biāo)準(zhǔn)、質(zhì)量驗(yàn)評(píng)標(biāo)準(zhǔn)、操作規(guī)程和施工方案進(jìn)展施工作業(yè),按照監(jiān)視上道工序、保證本道工序、服務(wù)下道工序的要求,實(shí)施工序跟蹤檢查,切實(shí)做到施工中的每一道工序處于受控狀
53、態(tài)。6、積極開展“小創(chuàng)造、小創(chuàng)造、小革新、小建議、小改進(jìn)的五小活動(dòng),對(duì)重點(diǎn)工程配合或邀請(qǐng)?jiān)O(shè)計(jì)、科研單位聯(lián)合攻關(guān)。積極推廣“新技術(shù)、新工藝、新設(shè)備、新材料的四新技術(shù)。2.3、人員保障措施1、勞動(dòng)力選拔模式:工程部對(duì)施工人員挑選將從集團(tuán)公司范圍內(nèi)選拔,確保人力資源合理配置。 2、標(biāo)準(zhǔn):組建高效精干、領(lǐng)導(dǎo)有力的制梁工程部組織機(jī)構(gòu),配備業(yè)務(wù)精干、技術(shù)好、施工經(jīng)歷豐富、身體安康、思想素質(zhì)好、業(yè)務(wù)水平強(qiáng)、年齡在2545歲左右的專業(yè)人員隊(duì)伍。3、所有人員進(jìn)場(chǎng)前做好全面身體檢查。4、工資保證:保證??顚S?,投入的流動(dòng)資金及所付款項(xiàng)不挪用、不外借。為保證人員隊(duì)伍穩(wěn)定,積極性高,做到按時(shí)發(fā)放工資且工資收入不低于當(dāng)
54、地平均水平。2.4、設(shè)備保障措施1、施工機(jī)械做到統(tǒng)籌安排、統(tǒng)一調(diào)配、合理使用。2、做好施工機(jī)械的維修、保養(yǎng)工作,保證施工機(jī)械的正常運(yùn)轉(zhuǎn)。3、制訂完善的設(shè)備使用、維護(hù)制度,做好交接班記錄,責(zé)任到人。4、對(duì)重要的、常用的機(jī)械和機(jī)具做好充裕配備,以防萬一。2.5、資金保證措施在施工期間對(duì)本工程的資金實(shí)行封閉管理,杜絕挪用、借用施工資金的現(xiàn)象。在施工過程中,擬準(zhǔn)備足夠的營(yíng)運(yùn)資金,以確保施工進(jìn)度的順利進(jìn)展。2.6、管理制度保障措施由工程經(jīng)理牽頭,各部室、施工作業(yè)班組配合,規(guī)劃、制訂一整套管理制度,對(duì)各部門的工作進(jìn)展指導(dǎo),做到有據(jù)可依。 2.7、質(zhì)量管理控制措施1、建設(shè)質(zhì)量保證體系成立質(zhì)量檢查機(jī)構(gòu),建設(shè)月
55、度質(zhì)量檢查、獎(jiǎng)懲制度。工程經(jīng)理部設(shè)專職質(zhì)量檢查工程師,對(duì)施工的全過程進(jìn)展質(zhì)量檢查、控制。及時(shí)發(fā)現(xiàn)問題,質(zhì)檢工程師對(duì)質(zhì)量薄弱環(huán)節(jié)制定出能夠保證質(zhì)量的各項(xiàng)的措施,并組織實(shí)施,抑制質(zhì)量通病。工程部每月定期對(duì)工程質(zhì)量進(jìn)展全面檢查,并對(duì)質(zhì)量通報(bào)情況實(shí)行獎(jiǎng)懲制度,獎(jiǎng)優(yōu)罰劣,促進(jìn)工程質(zhì)量的提高。2、施工前,施工技術(shù)負(fù)責(zé)人組織技術(shù)人員和施工管理人員仔細(xì)閱讀設(shè)計(jì)文件,了解設(shè)計(jì)意圖,明確施工技術(shù)重點(diǎn)、難點(diǎn),進(jìn)展技術(shù)交底。3、實(shí)行施工質(zhì)量責(zé)任掛牌制,注明管理者、操作者,誰施工誰負(fù)責(zé)。4、對(duì)于關(guān)鍵的預(yù)應(yīng)力工程實(shí)行專人負(fù)責(zé),專人管理。5、重復(fù)使用的模板應(yīng)保持其外表平整、形狀尺寸準(zhǔn)確,不漏漿,有足夠的剛度、強(qiáng)度等。澆筑混
56、凝土之前,模板應(yīng)涂刷脫模劑,外露面混凝土模板的脫模劑應(yīng)采用同一品種,不得使用易粘在混凝土上或使混凝土變色的油料。固定在模板上的預(yù)埋件和預(yù)留孔洞須安裝結(jié)實(shí),位置準(zhǔn)確。6、預(yù)制梁預(yù)制所用鋼絲、鋼絞線、錨具、夾片等進(jìn)場(chǎng)后必須在監(jiān)理工程師的見證下隨機(jī)取樣,進(jìn)展試驗(yàn),合格的產(chǎn)品才能使用。張拉的千斤頂與油泵及油泵壓力表應(yīng)配套校驗(yàn)。張拉機(jī)具應(yīng)由專人使用、管理,并應(yīng)經(jīng)常維護(hù),定期校驗(yàn)。7、澆筑混凝土前,并應(yīng)檢查混凝土的均勻性和坍落度,嚴(yán)格按照設(shè)計(jì)標(biāo)號(hào)配制攪拌混凝土;混凝土的振搗時(shí),應(yīng)防止碰撞模板、鋼筋及預(yù)埋件,澆筑混凝土期間,應(yīng)設(shè)專人檢查模板鋼筋、預(yù)埋件等穩(wěn)固情況,當(dāng)發(fā)現(xiàn)有松動(dòng)、變形、移位時(shí),應(yīng)及時(shí)處理。預(yù)制
57、梁混凝土試塊的制作由專人負(fù)責(zé),現(xiàn)場(chǎng)指派專人養(yǎng)護(hù)。8、嚴(yán)格材料采購(gòu),檢驗(yàn)制度,無檢驗(yàn)材料嚴(yán)禁進(jìn)入全體工程。9、堅(jiān)持施工過程的三檢制度,做到“檢查上道工序,做好未班工序,服務(wù)下道工序。10、工序間實(shí)行質(zhì)量否決制,確保每道工序100%合格。2.8、應(yīng)對(duì)大風(fēng)、高溫等惡劣天氣保證工期措施該地區(qū)夏季高溫天氣及大風(fēng)砂塵天氣較多,對(duì)不利因素應(yīng)進(jìn)展預(yù)測(cè)分析,同時(shí)加強(qiáng)對(duì)天氣預(yù)報(bào)的收聽工作,抑制高溫、大風(fēng)等客觀氣候因素對(duì)施工進(jìn)度的影響,做好充分準(zhǔn)備,和防范措施對(duì)策,變被動(dòng)為主動(dòng),確保施工任務(wù)不滯后,保階段方案得已實(shí)現(xiàn),且只能超前,不能滯后。具體措施如下:1、依靠科學(xué)技術(shù)進(jìn)步,運(yùn)用網(wǎng)絡(luò)方案理論,采用前峰線法,定期檢查
58、與分析進(jìn)度方案網(wǎng)絡(luò)中關(guān)鍵線路,是否超前還是滯后。2、如因氣候因素造成進(jìn)度滯后,采取加強(qiáng)資源優(yōu)化配置,縮短工藝時(shí)間,減少技術(shù)間歇期等趕工措施與對(duì)策,將滯后時(shí)間挽回,從而保證總工期不突破。3、除滿足上述施工條件外,用網(wǎng)絡(luò)法宏觀控制,定期和不定期進(jìn)展檢查,以開工程例會(huì)的形式分析原因并制定措施,調(diào)整資源,優(yōu)先考慮控制工程進(jìn)度的關(guān)鍵是人、財(cái)、物、設(shè)備。4、合理安排和組織施工,消除被控制和制約因素,把被控制時(shí)間壓縮到最短。在高溫天氣情況下需要加強(qiáng)機(jī)械維修保養(yǎng),提高機(jī)械完好率和生產(chǎn)率。5、搞好材料供應(yīng),疏通材料供應(yīng)渠道,確保材料供應(yīng)不影響施工。第六章 文明施工措施一、開展創(chuàng)立文明工地活動(dòng)建設(shè)創(chuàng)立“文明工地領(lǐng)
59、導(dǎo)小組,全面開展創(chuàng)立文明工地活動(dòng),做到“三無五必須,即:施工中無管線高放,施工現(xiàn)場(chǎng)排水暢通無積水,施工工地道路平整無坑塘;施分部域與非施分部域嚴(yán)格分隔,施工現(xiàn)場(chǎng)必須掛牌施工;工地現(xiàn)場(chǎng)施工材料必須堆放整齊,工地生活設(shè)施必須文明,工地現(xiàn)場(chǎng)必須開展以創(chuàng)文明工地為主要內(nèi)容的思想政治工作二、工地宣傳1、工點(diǎn)路口旁設(shè)置醒目、整潔的施工標(biāo)牌,寫明工程名稱、建設(shè)單位、施工單位、駐地監(jiān)理單位、設(shè)計(jì)單位、工地施工及監(jiān)理負(fù)責(zé)人名稱,此外還在適當(dāng)位置設(shè)置“一圖四板,一圖:即平面布置圖;四板,即質(zhì)量保證、安全生產(chǎn)、環(huán)境保護(hù)、文明施工管理板。2、施工臨時(shí)用地內(nèi)必須張貼宣傳標(biāo)語(yǔ),要設(shè)宣傳欄,內(nèi)容經(jīng)常更換;施工現(xiàn)場(chǎng)入口處應(yīng)懸
60、掛宣傳標(biāo)語(yǔ)橫幅。3、施工內(nèi)業(yè)資料齊全、整潔、數(shù)據(jù)可靠,辦公室內(nèi)按要求布置各類圖表,及時(shí)反映現(xiàn)場(chǎng)狀況及工程進(jìn)度狀況。三、場(chǎng)容場(chǎng)貌創(chuàng)立美好環(huán)境。在工地現(xiàn)場(chǎng)和生活區(qū)設(shè)置足夠的臨時(shí)衛(wèi)生設(shè)施,每天清掃處理,在生活區(qū)周圍種植花草、樹木、美化生活環(huán)境。生活垃圾集中堆放,統(tǒng)一搬運(yùn)至指定地點(diǎn)廢棄。四、工地衛(wèi)生1、施工現(xiàn)場(chǎng)場(chǎng)地管理是為文明施工創(chuàng)造良好的施工環(huán)境。施工現(xiàn)場(chǎng)內(nèi)所有物品,嚴(yán)格按施工現(xiàn)場(chǎng)平面布置圖的設(shè)計(jì)定位。同時(shí)根據(jù)工程進(jìn)展,適時(shí)對(duì)施工現(xiàn)場(chǎng)進(jìn)展整理和整頓,進(jìn)展必要的調(diào)整。根據(jù)施工現(xiàn)場(chǎng)實(shí)際需要和環(huán)境保護(hù)的要求,采取隔離網(wǎng)或隔離圍墻與外界隔離圍蔽施工。2、施工期間,經(jīng)常對(duì)施工機(jī)械車輛道路進(jìn)展維修,確保晴雨暢通
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 山東省威海乳山市2024-2025學(xué)年九年級(jí)上學(xué)期期末化學(xué)試題(含答案)
- 2025年消防設(shè)施操作員之消防設(shè)備基礎(chǔ)知識(shí)基礎(chǔ)試題庫(kù)和答案要點(diǎn)
- 景觀橋分析面試題及答案
- 2023-2024學(xué)年廣東省廣州市越秀區(qū)執(zhí)信中學(xué)七年級(jí)(下)期中數(shù)學(xué)試卷(含答案)
- 廣東省廣州市中大附中2023-2024學(xué)年八年級(jí)下學(xué)期期中物理試題(含答案)
- 采購(gòu)合同范本(2篇)
- 電器知識(shí)技能培訓(xùn)班課件
- 關(guān)于調(diào)整工作時(shí)間與資源配置的通知
- 租賃協(xié)議合同
- 山東省青島萊西市(五四制)2024-2025學(xué)年八年級(jí)上學(xué)期期末生物學(xué)試題(含答案)
- 計(jì)算機(jī)網(wǎng)絡(luò)知到智慧樹章節(jié)測(cè)試課后答案2024年秋貴州財(cái)經(jīng)大學(xué)
- 酒店2025年應(yīng)急疏散演練計(jì)劃
- 第一單元第2課《生活之美》課件-七年級(jí)美術(shù)下冊(cè)(人教版)
- 2025年高考作文備考之題目解析及4篇范文:“生活是否還需要游戲”
- 2025年中國(guó)秸稈發(fā)電行業(yè)市場(chǎng)前瞻與投資預(yù)測(cè)分析報(bào)告
- 2025年七下道德與法治教材習(xí)題答案
- 新教科版一年級(jí)科學(xué)下冊(cè)第二單元第5課《它們吃什么》課件
- 坡面土壤侵蝕過程模擬-深度研究
- 互聯(lián)網(wǎng)護(hù)理服務(wù)典型案例
- 礦泉水購(gòu)銷合同范本2025年
- PLC培訓(xùn)課件教學(xué)課件
評(píng)論
0/150
提交評(píng)論