版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)
文檔簡介
1、Review of Lecture 71. Partial Discharge in Power Capacitors2. Parameters and Standard3. Electrical Detection of PD in CapacitorContents: Parameters to estimate the PD of capacitor Apparent charge, qInception voltage, UiExtinction voltage, UeChange of q with voltage applying time1Power SourceCompensa
2、tion reactor is used in series or parallel with Cx so that to decrease the capacity of testing transformerReview of Lecture 7Currents through L and C while the two elements connected in parallelVoltages across L and C while the two elements connected in series2Review of Lecture 7Detection circuits S
3、traight detection circuitsBalanced detection circuit3Review of Lecture 7Some problems need to be noticedDetection impedances is required to withstand large current.Several detection impedances are needed to match the capacitor samplesConnection types of capacitor elements influence detection results
4、.4Lecture 8 PD Detection in Power Transformers電力變壓器的局部放電及測量5Contents1. Significance of PD detection in Transformer電力變壓器測量局放的重要性2. PD Propagation in Windings4. Detection Circuits for Transformers5. Calibration6. The Influence of Discharges in Bushing3. Test Procedure and Permissible Apparent Charge7.
5、 Electrical Location of PD in Transformers局部放電在繞組中的傳播測試程序和允許放電水平變壓器局部放電的測試回路校正套管放電的影響變壓器局部放電的電氣定位方法61. Significance of PD Detection in Transformerpower frequency withstand test impulse withstand test PD often affects the transformers properties in a long-term period. The withstand strength in a shor
6、t time does not change significantly. Withstand test is destructive, the voltage is so high that insulation is easy to be damaged.工頻耐壓試驗沖擊耐壓試驗局部放電通常影響變壓器的長期運行性能,而對短時的耐壓強度影響不大。耐壓試驗是有損試驗,容易對絕緣造成破壞The voltage of PD test is much lower, and the testing duration is longer (0.51h).局部放電試驗的試驗電壓相對較低,試驗持續(xù)時間也較長
7、72. PD Propagation in WindingsEquivalent circuit of a transformer windingC-ground capacitance per unit lengthL-inductance per unit length, parasitic inductance K-series capacitance per unit length, longitudinal capacitance O-neutral point A-high voltage end單位長度對地電容單位長度的串聯(lián)電容 單位長度的電感,即寄生電感 中性點高壓端8Equi
8、valent circuit of a winding with a cavity discharge source2. PD Propagation in Windings92. PD Propagation in WindingsVoltage response along the winding沿繞組的電壓響應(yīng)103. Test Procedure and Permissible Apparent ChargeU1:pre-applied Voltage 預加電壓U2:measuring voltage 測量電壓Um :the maximum line voltageDuring obs
9、ervation, some impulses occasionally occurring with high magnitude can be neglected.在整個試驗時間內(nèi)連續(xù)觀測,個別較高的脈沖可以忽略The noise level is required to be less than 50% magnitude of the highest detected impulse.外圍噪聲水平應(yīng)低于規(guī)定的視在放電量的50%When test voltage is raised to U2 and decreased from U2, the inception and extinc
10、tion voltages are recorded.在電壓升至U2及由U2降低的過程中,記錄起始可能的放電電壓和熄滅電壓113. Test Procedure and Permissible Apparent ChargeDuring the first step under the test voltage U2, the maximum apparent charge is recorded.During the second step under the test voltage U2, discharge impulses need to be observed continuous
11、ly and the maximum apparent charge is recorded.U1:pre-applied Voltage 預加電壓U2:measuring voltage 測量電壓Um :the maximum line voltage在電壓U2的第一階段應(yīng)讀數(shù)并記錄No record is required under test voltage U1.在U1階段無需觀測記錄在電壓U2第二階段整個時間內(nèi),應(yīng)連續(xù)地觀測和記錄局部放電水平12 If the following results are obtained, the PD experiment can be passe
12、d.3. Test Procedure and Permissible Apparent ChargeDuring the test procedure, the test voltage never suddenly decreases.During the last 30 minutes, the magnitudes of all observed impulses are smaller than the permissible apparent charge and do not increase towards the permissible apparent charge.如果滿
13、足兩個條件,則試驗合格試驗過程中,試驗電壓不產(chǎn)生突然下降在施加電壓U2的第二階段的30分鐘內(nèi),所有測量的視在放電量連續(xù)維持在低于規(guī)定的限值,并且不表現(xiàn)出明顯地、不斷地傾向允許最大限制值增長的趨勢134. Detection Circuits for TransformersTwo ways of the test:induced voltage test and applied voltage test.Principles of PD circuit selection 兩種試驗方法:感應(yīng)加壓方式,直接加壓方式 試驗回路選擇采用盡量短的引線在試驗中對主縱絕緣都能同時得到所應(yīng)施加的電壓To e
14、xecute the test with required voltage on both main insulation and longitudinal insulation.To use high voltage leads as short as possible.144.1 Detection circuits for single-phase transformers4. Detection Circuits for Transformers(a)(b)(c)(d)單相變壓器的測試回路applied voltageinduced voltage154.2 Detection Cir
15、cuits for Three-Phase Transformers4. Detection Circuits for TransformersUA=0.25U, UB=0.75U, UC=UUBC=1.75U,UAC=1.25UUA=0.5U, UB=U, UC=0.5UUAB=1.5U,UBC=1.5U三相變壓器的測試回路164. Detection Circuits for TransformersUA=0.5U, UB=0.5U, UC=UUAC=1.5U,UBC=1.5UUA=0.5U, UB=0.5U, UC=UUAC=1.5U,UBC=1.5U175. CalibrationCo
16、0.1CxCx: entrance capacitance 入口電容Co:50100pFCalibration impulse injected from the HV terminalCalibration impulse injected from the measuring terminal高壓端校正入口校正Ck: capacitance of bushing 套管電容185. CalibrationExecute calibration at the place close to the detection terminal.Requirements of calibration:Put calibration unit as close as possible to the HV terminal in order to avoid influences of parasitic capacitances.Record the detected apparent charges and the relevant detection and calibration places.在測量部位和
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 二零二五年度幕墻施工材料運輸與倉儲合同4篇
- 2025年度企業(yè)債券發(fā)行承銷服務(wù)合同規(guī)范文本3篇
- 二零二五年度出租車司機勞動合同及職業(yè)規(guī)劃合同4篇
- 二手車買賣合同:2024專用版版B版
- 二零二五年度體育賽事組織打字員賽事資料合同2篇
- 2025版專業(yè)技術(shù)人員培訓服務(wù)標準合同
- 二零二五年度虛擬現(xiàn)實年薪制合同2篇
- 二零二五版互聯(lián)網(wǎng)直播內(nèi)容審核及分成合同4篇
- 防火排煙系統(tǒng)的設(shè)計與應(yīng)用
- 二零二五版木工行業(yè)電子商務(wù)平臺建設(shè)與合作合同3篇
- 垃圾車駕駛員聘用合同
- 2024年大宗貿(mào)易合作共贏協(xié)議書模板
- 新聞記者證600道考試題-附標準答案
- 變壓器搬遷施工方案
- 單位轉(zhuǎn)賬個人合同模板
- 八年級語文下冊 成語故事 第十五課 諱疾忌醫(yī) 第六課時 口語交際教案 新教版(漢語)
- 中考語文二輪復習:記敘文閱讀物象的作用(含練習題及答案)
- 2024年1月高考適應(yīng)性測試“九省聯(lián)考”數(shù)學 試題(學生版+解析版)
- (正式版)JBT 11270-2024 立體倉庫組合式鋼結(jié)構(gòu)貨架技術(shù)規(guī)范
- EPC項目采購階段質(zhì)量保證措施
- T-NAHIEM 101-2023 急診科建設(shè)與設(shè)備配置標準
評論
0/150
提交評論