




版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報或認(rèn)領(lǐng)
文檔簡介
1、摘 要本設(shè)計為教學(xué)樓。設(shè)計依據(jù)為畢業(yè)設(shè)計任務(wù)書,以新規(guī)范為準(zhǔn)進(jìn)行設(shè)計。結(jié)構(gòu)設(shè)計順序?yàn)椋航Y(jié)構(gòu)布置、恒荷載、活荷載、風(fēng)荷載及地震荷載作用內(nèi)力計算,荷載組合效應(yīng),框架梁、柱的配筋,樓板計算,樓梯計算,基礎(chǔ)配筋的計算。本設(shè)計中,板采用彈性理論的計算方法,框架選取典型的一榀,恒荷載作用下的內(nèi)力計算采用力矩分配法,活荷載作用下的內(nèi)力計算采用分層法,風(fēng)荷載和地震荷載采用D值法。關(guān)鍵字:框架結(jié)構(gòu)ABSTRACTThis design is about a building for school. It is according to Graduation design specifications and t
2、he latest norms. The order of the structural design is :The layout of the structure ,dead loads、living loads、wind loads and earthquake functions calculation, load effect of making up, reinforcing bars disposition for the frame beam and post, the floors calculation, the stairs calculation, the founda
3、tions calculation for reinforcing bars disposition. In this design, the board adopts the computing technology of elastic theory, choose a typical Pin in the frame ,to calculate internal force caused by vertical loads, divide one layer of laws is adopted; to calculate the wind loads and earthquake fu
4、nction, the law of D value is adopted.Key word: portal frame construction緒論畢業(yè)設(shè)計是學(xué)生學(xué)完全部課程后的一個重要實(shí)踐性教學(xué)環(huán)節(jié),也是一次將已學(xué)知識應(yīng)用于工程實(shí)際的綜合訓(xùn)練。通過畢業(yè)設(shè)計使學(xué)生了解一般民用建筑設(shè)計方法,掌握建筑構(gòu)造的處理;掌握多層框架結(jié)構(gòu)房屋的結(jié)構(gòu)選型和布置,掌握多層框架及部分結(jié)構(gòu)構(gòu)件的計算;能繪制房屋施工圖,熟悉房屋設(shè)計的全過程;掌握多層框架結(jié)構(gòu)房屋單位工程施工組織設(shè)計的一般方法。通過畢業(yè)設(shè)計的訓(xùn)練,使學(xué)生初步具有處理工程問題的能力。進(jìn)行畢業(yè)設(shè)計時要求我們能理論聯(lián)系實(shí)際,注意培養(yǎng)獨(dú)立思考、分析問題與解決
5、問題的能力。通過三個多月的獨(dú)立設(shè)計,我認(rèn)識到畢業(yè)設(shè)計的目的:1)鞏固、加深基礎(chǔ)和專業(yè)知識。 通過畢業(yè)設(shè)計對于已經(jīng)學(xué)過的基礎(chǔ)知識如數(shù)學(xué)、結(jié)構(gòu)力學(xué)、計算機(jī)等和專業(yè)知識如鋼結(jié)構(gòu)、混凝土結(jié)構(gòu)設(shè)計原理、混凝土結(jié)構(gòu)設(shè)計、建筑抗震、土木工程施工、房屋建筑學(xué)等專業(yè)知識進(jìn)一步系統(tǒng)鞏固、加深和拓展。2)提高綜合運(yùn)用基礎(chǔ)和專業(yè)知識和基本技能的能力。 過去所學(xué)的數(shù)學(xué)、力學(xué)基礎(chǔ)知識和結(jié)構(gòu)設(shè)計等知識在畢業(yè)設(shè)計中要綜合運(yùn)用。畢業(yè)設(shè)計具有綜合性,通過設(shè)計也就提高了綜合運(yùn)用這些知識的能力,并培養(yǎng)創(chuàng)新能力。在畢業(yè)設(shè)計所遇到的問題和需要解決的問題,是需要具有綜合運(yùn)用所學(xué)知識的能力,而不是過去所學(xué)單純某一門課的知識所能解決,這樣就鍛
6、煉了綜合運(yùn)用所學(xué)基礎(chǔ)知識、專業(yè)知識的能力。 3)熟悉土木工程專業(yè)設(shè)計的程序和方法,了解我國有關(guān)土木工程建筑的方針和政策。通過設(shè)計了解一個設(shè)計任務(wù)從任務(wù)書到政府建設(shè)部門批文,到委托設(shè)計和進(jìn)行施工的建設(shè)程序。熟悉如何使用專業(yè)的技術(shù)規(guī)范和規(guī)定,如建筑防火、抗震、鋼結(jié)構(gòu)、混凝土結(jié)構(gòu)、地基基礎(chǔ)、技術(shù)規(guī)范等。 4)針對要解決的問題,學(xué)習(xí)和熟悉如何搜集國內(nèi)外資料,了解國內(nèi)外的現(xiàn)狀和水平。搜集國內(nèi)外資料。 5)學(xué)習(xí)調(diào)查研究的方法,培養(yǎng)深入細(xì)致、聯(lián)系實(shí)際,從經(jīng)濟(jì),技術(shù)觀點(diǎn)全面分析和解決問題,獨(dú)立思考獨(dú)立工作的能力。調(diào)查研究,可以深入到實(shí)際了解已有的設(shè)計存在的問題,在設(shè)計中克服這些缺點(diǎn),改進(jìn)設(shè)計。 6)了解工程中
7、常用做法,增強(qiáng)工程意識提高工程實(shí)踐能力。每人獨(dú)立、系統(tǒng)完成一個工程設(shè)計以期掌握一個工程的全過程設(shè)計。 在接下來的設(shè)計中,我將會在老師的指導(dǎo)以及參閱各種資料、規(guī)范下,全面綜合的解決設(shè)計過程中所遇到的問題。從而達(dá)到設(shè)計的完整和合理。1.結(jié)構(gòu)選型1.1.結(jié)構(gòu)形式本工程為六層教學(xué)樓,首層層高4.2m,其余各層層高為3.9m ,按設(shè)計要求,采用鋼筋混凝土現(xiàn)澆框架體系.1.2.基礎(chǔ)一層墻下設(shè)基礎(chǔ)圈梁,截面尺寸為250mm×400mm,基礎(chǔ)圈梁下設(shè)條形基礎(chǔ),外柱下做獨(dú)立基礎(chǔ),內(nèi)柱做聯(lián)合基礎(chǔ),基礎(chǔ)底標(biāo)高統(tǒng)一取為2.000m.1.3.墻體材料外墻采用250mm加氣混凝土砌塊,內(nèi)墻采用200mm加氣混凝
8、土砌塊.1.4.樓梯結(jié)構(gòu)采用鋼筋混凝土板式樓梯1.5.變形縫設(shè)置(1)伸縮縫該工程長邊總長為50.4m,根據(jù)鋼筋混凝土規(guī)范,對于框架承重結(jié)構(gòu),現(xiàn)澆式超過78m,整體式超過62m需要設(shè)置變形縫,故該工程不需要設(shè)縫.(2)沉降縫本綜合辦公樓采用的是框架結(jié)構(gòu),考慮到各種荷載組合后不會很大,基礎(chǔ)承載力較好,故不必設(shè)置(3)抗震縫由于抗震等級小,結(jié)合建筑結(jié)構(gòu)形式不需要設(shè)置.2.構(gòu)件選型2.1.梁、板、柱截面尺寸確定2.1.1梁根據(jù)«混凝土結(jié)構(gòu)設(shè)計»,根據(jù)梁截面高度可按跨度的1/14-1/8估算,寬高比一般為1/3-1/2,主梁高度不小于200mm,梁截面高度與寬度的比值不宜大于4,以
9、保證平面外的穩(wěn)定.2.1.2板根據(jù)«混凝土結(jié)構(gòu)設(shè)計»A.雙向板:一般不做剛度驗(yàn)算時板的最小高度為h=(1/50-1/40)L(L為雙向板的短向跨度),且應(yīng)滿足h80mmB.單向板:一般不做感度驗(yàn)算時板的最小高度為h=( 1/40-1/30)L(L為單向板的標(biāo)志跨度),且應(yīng)滿足h60mm2.1.3柱框架柱的截面邊長不宜小于250mm,圓柱的截面直徑不宜小于350mm,剪跨比不宜小于2,截面的高度與寬度比不宜大于3。為了減少構(gòu)件的類型,以簡化施工,多層房屋中柱子截面沿房屋高度不宜改變。2.2.結(jié)構(gòu)布置及計算簡圖取6 軸上的一榀框架計算??蚣苤逃诨A(chǔ)頂面,框架梁與柱剛接,由于各
10、層柱的截面尺寸不變,故梁的跨度等于柱截面型心軸線之間的距離,底層柱高以基礎(chǔ)頂面算至二層樓面,基礎(chǔ)頂標(biāo)高根據(jù)地質(zhì)條件,室內(nèi)外高差,定為-0.60m,二層樓面標(biāo)高為4.200m,故底層柱高為4.800m,其余各層柱高從樓面算至上一層樓面(即層高),均為3.900m,由此可以給出框架的計算簡圖.2.3.框架梁柱的線剛度計算2.3.1梁對于中框架梁取I=2I0,選用C25混凝土, E=2.80×107KN/m2 2.3.2柱 令其余各層柱 i=1.0 ,則其余各桿件的相對線剛度為框架梁柱的相對線剛度如圖所示,作為計算各節(jié)點(diǎn)桿端彎矩分配系數(shù)的依據(jù).框架計算簡圖3.荷載計算3.1 恒荷載標(biāo)準(zhǔn)值計
11、算3.1.1屋面防水層(剛性)30厚C20細(xì)石混凝土防水 1.0防水層(柔性)三氈四油鋪小石子 0.420厚水泥砂漿找平層 0.02×20=0.40120厚焦渣找坡層 0.12×14=1.68100厚現(xiàn)澆砼板 0.1×25=2.520厚石灰抹底 0.02×17=0.34合計 6.323.1.2樓面110厚水磨石地面: 20厚1:3水泥砂漿找平 0.6510厚混和砂漿天棚抹灰 0.01×17=0.17100厚板自重 0.1×25=2.5合計 3.323.1.3 衛(wèi)生間樓面10厚水磨石地面三氈四油放水層20厚1:3水泥砂漿找平 1.051
12、00厚現(xiàn)澆鋼筋砼板自重 0.10×25=2.510厚混和砂漿天棚抹灰 0.01×17=0.17合計 3.723.1.4 梁自重 b×h=300×600梁自重 25×0.3m×(0.60-0.10)=3.7510厚混和砂漿抹灰層 0.01×(0.60-0.10+0.30)×2×17=0.27合計 3.72基礎(chǔ)梁b×h=250×400梁自重 25×0.25×0.40=2.503.1.5 柱自重b×h=400×500柱自重 25×0.40
13、215;0.50=5.00抹灰層:10厚混合砂漿 0.01×0.50×4×17=0.34合計 5.343.1.6 外縱墻自重 2-6層無窗處 縱墻 18×0.25×3.9=17.55水刷石外墻面 3.9m×0.5=1.95 水泥粉刷內(nèi)墻面 3.9×0.36=1.40合計 20.92-6層C-1,C-3窗處縱墻 18×0.25×0.9=6.65塑鋼窗 0.35×2.40=0.84外墻面做法 (3.9-2.4)×0.5=0.75內(nèi)墻面做法 (3.9-2.4)×0.36=0.54
14、合計 6.18底層有門處縱墻 18×0.25×(4.8-2.1-0.6-0.4)=7.65塑鋼門 0.35×2.10=0.74水刷石外墻面 (4.2-2.1)×0.5=1.05水泥粉刷內(nèi)墻面 (4.2-2.1)×0.36=0.76 合計 10.20底層C-1,C-3窗處縱墻 18×0.25×(4.8-2.4-0.6-0.4)=12.5塑鋼窗 0.35×2.40=0.84 水刷石外墻面 (4.2m-2.4m)×0.5=0.90 水泥粉刷內(nèi)墻面 (4.2m-2.4m)×0.36=0.65合計 8.6
15、93.1.7 內(nèi)墻自重2-6層無門處內(nèi)墻 18×0.20×3.9=14.04水泥粉刷內(nèi)墻面 2×3.9×0.36 =2.80 合計 16.84 2-6層有門處內(nèi)墻 18×0.20×(3.9m-2.1)=6.48塑鋼門 0.35×2.10=0.74水泥粉刷內(nèi)墻面 2×(3.9-2.1m)×0.36 =1.30 合計 8.52底層無門處內(nèi)墻 18×0.20×(4.8-0.4-0.6)=13.68水泥粉刷內(nèi)墻面 2×(4.8-0.6m-0.4m)×0.36 =2.74 合
16、計 16.42底層有門處內(nèi)墻 18×0.20×(4.8-0.4-0.6-2.1)=6.12塑鋼門 0.35×2.10=0.74水泥粉刷內(nèi)墻面 2×(4.8-0.6m-0.4m-2.1m)×0.36 =1.22 合計 8.083.1.8 女兒墻自重女兒墻自重 25×0.25×1.2=7.5外墻面 20×0.02×1.2=0.4420厚M5混和砂漿內(nèi)墻面 17×0.02×1.2=0.37合計 8.393.2 活荷載標(biāo)準(zhǔn)值計算3.2.1 屋面和樓面活荷載標(biāo)準(zhǔn)值計算根據(jù)荷載規(guī)范查得:上人屋面:
17、 2.0 不上人屋面: 0.5 樓面:教室 2.0 走廊 2.5 3.2.2 雪荷載Sk=0.4 3.3 豎向荷載下框架受荷總圖3.3.1 A-C軸框架梁屋面板傳荷載:荷載傳遞示意圖見上恒載:活載:樓面板傳荷載:恒載:活載:梁自重:4.02A-C軸間框架梁均布荷載為:屋面梁:恒載=梁自重+板傳荷載 =4.02 +45.93=49.95 活載=板傳荷載=7.83樓面梁:恒載=梁自重+板傳荷載和墻自重=4.02 +11.55=15.57 活載=板傳荷載=6.963.3.2 C-D軸間框架梁屋面板傳荷載恒載:6.32 ×1.5××2=11.85 活載:2.0×
18、1.5××2=3.75 樓面板傳荷載恒載:3.32×1.5××2=6.23 活載:2.5 ×1.5××2=4.69梁自重:4.02C-D軸間框架梁均布荷載為:屋面梁:恒載=梁自重+板傳荷載 =4.02+11.85=15.87 活載=板傳荷載=3.75 KN/m樓面梁:恒載=梁自重+板傳荷載和墻自重 =4.02+6.23=10.25活載=板傳荷載=4.69 KN/m3.3.3 D-E軸間的框架梁屋面板傳荷載恒載:活載:樓面板傳荷載:恒載:活載:梁自重:4.02D-E軸間框架梁均布荷載為:屋面梁:恒載=梁自重+板傳荷載
19、 =4.02+21.98=26 活載=板傳荷載=6.96KN/m樓面梁:恒載=梁自重+板傳荷載和墻自重 =4.02+11.55 =15.57 活載=板傳荷載=6.963.3.4 A軸柱縱向集中荷載的計算頂層柱恒載=8.39×4.2+4.02×(4.2-0.4)+2.1m×6.32×4.2×5/8=85.35頂層柱活載=板傳活載 =2.0×2.1×4.2 ×5/8 =11.03標(biāo)準(zhǔn)層柱恒載=墻自重+梁自重+板傳荷載 =6.18×(4.2m-0.4m)+4.02×(4.2m-0.4m) +3.32&
20、#215;2.1m×4.2m×5/8=57.06標(biāo)準(zhǔn)層柱活載=板傳活載=2.0×5/8×4.2m×2.1 =11.03基礎(chǔ)頂面恒載=底層外縱墻自重+基礎(chǔ)梁自重 =8.69×(4.2-0.4m)+2.5×(4.2-0.4m) =42.523.3.5 C軸柱縱向集中荷載的計算頂層柱恒載=梁自重+板傳荷載=4.02KN/m×(4.2m-0.4m)+6.32KN/m2×2.1m×4.2m×5/8+6.32KN/m2×(1-2×0.32m2+0.32m3)×1.5m
21、×4.2m=83.11KN頂層柱活載=板傳活載=2.0KN/m2×2.1m×5/8×4.2m+2.0KN/m2×(1-2×0.322+0.323)×1.5m×4.2m=21.47KN標(biāo)準(zhǔn)層柱恒載=內(nèi)墻自重+梁自重+板傳荷載=4.02 KN/m×(4.2m-0.4m)+3.32 KN/m2×2.1m×5/8×4.2m+3.32 KN/m2×(1-2×0.322+0.323)×1.5m×4.2m+16.84 KN/m×(2.1m-
22、0.2m)=82.91KN標(biāo)準(zhǔn)層柱活載=板傳荷載 =2.0×2.1×5/8×4.2 +2.0×(1-2×0.32m2+0.32m3)×4.2×1.5 =21.47基礎(chǔ)頂面恒載=底層內(nèi)墻無門處自重+基礎(chǔ)梁自重=16.42×(2.1m-0.2m)+2.5×(2.1-0.2)=35.953.3.6 D軸柱縱向荷載計算頂層柱恒載=梁自重+板傳荷載=4.02KN/m×(4.2m-0.4m)+6.32KN/m2×2.1m×4.2m×5/8+6.32KN/m2×(1-2
23、×0.32m2+0.32m3)×1.5m×4.2m=83.11KN頂層柱活載=板傳活載=2.0KN/m2×2.1m×5/8×4.2m+2.0KN/m2×(1-2×0.322+0.323)×1.5m×4.2m=21.47KN標(biāo)準(zhǔn)層柱恒載=內(nèi)墻自重+梁自重+板傳荷載=4.02 KN/m×(4.2m-0.4m)+3.32 KN/m2×2.1m×5/8×4.2m+3.32 KN/m2×(1-2×0.322+0.323)×1.5m
24、15;4.2m+16.84 KN/m×(4.2m-0.4m)=114.90KN標(biāo)準(zhǔn)層柱活載=板傳荷載 =2.0×2.1×5/8×4.2 +2.0×(1-2×0.32m2+0.32m3)×4.2×1.5 =21.47基礎(chǔ)頂面恒載=底層內(nèi)墻無門處自重+基礎(chǔ)梁自重=16.42×(2.1m-0.2m)+2.5×(4.2-0.4)=71.903.3.7 E軸柱縱向荷載計算同A軸豎向荷載見圖3.4 風(fēng)荷載3.4.1 風(fēng)荷載標(biāo)準(zhǔn)值計算作用在屋面梁和樓面梁節(jié)點(diǎn)處的集中風(fēng)荷載標(biāo)準(zhǔn)值:式中:基本風(fēng)壓 :風(fēng)壓高度系數(shù)
25、,地面粗糙度為B :風(fēng)荷載體型系數(shù),根據(jù)建筑物的體型查得 =1.3 :風(fēng)振系數(shù),建筑高度30。=1.0 :下層柱高 :上層柱高,對頂層為女兒墻高度的2倍 :迎風(fēng)面寬度,從安全考慮,取B迎=B背=4.2計算過程見表01表01.集中風(fēng)荷載標(biāo)準(zhǔn)值離地高度Z/m24.150.911.00 1.30 0.353.90 2.40 5.4820.250.841.00 1.30 0.353.90 3.90 6.2616.350.771.00 1.30 0.353.90 3.90 5.7412.450.741.00 1.30 0.353.90 3.90 5.528.550.741.00 1.30 0.353.9
26、0 3.90 5.524.650.741.00 1.30 0.354.65 3.90 6.05框架在風(fēng)荷載作用下受荷圖如圖09所示(圖中數(shù)值為標(biāo)準(zhǔn)值)3.4.2 風(fēng)荷載作用下的位移計算3.4.2.1 側(cè)移剛度見下表橫向2-6層D值的計算桿件名稱A軸柱0.2789848C軸柱0.55110519D軸柱0.55119519E軸柱0.2789848橫向底層D值的計算桿件名稱A軸柱0.4929353C軸柱0.70113326D軸柱0.70113326E軸柱0.49293533.4.2.2 風(fēng)荷載作用下框架側(cè)移計算 水平荷載作用下框架的層間位移計算式中: 第 層的總剪力 第層所有柱的抗側(cè)剛度之和 第層的
27、層間位移第一層的層間位移值求得以后,就可以計算各樓板標(biāo)高處的側(cè)移值的頂點(diǎn)側(cè)移值,各層樓板的標(biāo)高處的側(cè)移值是該層以下各層層間側(cè)移之和,頂點(diǎn)側(cè)移是所有各層層間位移之和。層側(cè)移 頂層位移 框架在風(fēng)荷載作用下側(cè)移的計算見表04風(fēng)荷載作用下框架側(cè)移計算層次65.485.48587340.00013.91/3900056.2611.74587340.00023.91/1950045.7417.48587340.00033.91/1300035.5223587340.00043.91/975025.5228.52587340.00053.91/780016.0534.57453580.00084.651/6
28、000 側(cè)移驗(yàn)算: 層間側(cè)移最大值 1/6000<1/550(滿足)3.5 地震荷載計算 分層荷載計算 (57.06×2+82.91+114.90)+20.83×4+15.57×6.6+10.25×3+15.57×6.6+0.5×11.03×2+21.47×2+(6.96×6.6+8.71 ×3+6.96 ×6.6)=311.93KN+83.32KN+236.27KN+32.5KN+59KN=723.02311.93KN+25.63KN/m×4+236.27KN+32.
29、5KN+59=742.22KN恒向框架自振周期需考慮頂部附加地震作用420.24+723.02×4+742.22=4054.540.85×4054.54=3446.36結(jié)構(gòu)水平總地震作用標(biāo)準(zhǔn)值,各層橫向地震作用及樓層地震剪力見表框架在地震作用下受荷圖如圖所示圖中數(shù)值均為標(biāo)準(zhǔn)值地震何荷載作用下位移的計算(1) 側(cè)移剛度見表(2) 地震荷載作用下框架側(cè)移計算見表各層橫向地震作用及樓層地震剪力層數(shù)63.924.3420.2410211.8328.1628.1653.920.4723.0214749.6140.6668.8243.916.5723.0211929.8332.8910
30、1.7133.912.6723.029110.0525.12126.8323.98.7723.026290.2717.34144.1714.654.65742.223451.329.53153.704054.5455742.91地震荷載作用下框架側(cè)移計算層數(shù)628.16587340.00053.91/7800568.82587340.00113.91/35454101.71587340.00173.91/22943126.83587340.00223.91/17732144.17587340.00253.91/15601153.70453580.00344.651/13684.荷載作用下框架內(nèi)
31、力計算4.1恒載作用下框架內(nèi)力計算4.1.1恒荷載作用下框架的彎矩計算由剛度比求得節(jié)點(diǎn)各桿端的彎矩分配系數(shù)各節(jié)點(diǎn)分配兩次即可,傳遞系數(shù)C=1/24.1.2恒荷載作用下框架的剪力計算 4.1.3恒荷載作用下軸力計算已知某節(jié)點(diǎn)上柱傳來的軸力Nu和左右梁傳來的剪力Vl、Vr時,其下柱的軸力恒載作用下的M圖、V圖、N圖如圖所示。4.2活荷載做用下框架的內(nèi)力計算活荷載作用下框架受荷簡圖如圖所示,由于內(nèi)力計算采用分層法,因而除底層柱外,其他各層柱的線剛度(或相對線剛度)均乘以0.9,并取相應(yīng)的傳遞系數(shù)1/3(底層的傳遞系數(shù)仍為1/2),分配系數(shù)和固端彎矩的計算方法同前,此處省略。4.2.1頂層計算單元(h
32、3.9m)因屋面活荷載較小,不考慮活荷載的最不利組合,將活荷載滿跨布置,計算簡圖如所示4.2.2. 25層計算單元(h3.9m)活荷載滿跨布置4.2.3底層計算單元底層滿跨布置活荷載時計算結(jié)果如圖所示:上柱下柱左梁右梁上柱下柱左梁右梁上柱下柱左梁右梁下柱上柱0.57 0.44 0.22 0.29 0.49 0.49 0.29 0.22 0.44 0.57 8.54 -217.20 216.38 -8.31 -11.90 11.90 8.31 -94.38 94.38 -8.54 -208.66 -208.66 -208.66 196.17 196.17 196.17 196.17 -74.17
33、 -74.17 -74.17 85.84 85.84 117.89 90.77 -43.75 -56.89 -95.53 36.12 21.51 16.54 -37.34 -48.50 15.65 -21.87 45.38 -8.50 18.06 -47.77 4.20 -18.67 8.27 -9.17 -6.23 -6.23 54.94 54.94 54.94 54.94 -62.24 -62.24 -62.24 -62.24 -0.90 -0.90 3.52 2.71 -12.25 -15.93 -26.76 30.31 18.05 13.88 0.39 0.51 137.06 -145
34、.60 205.77 -81.33 -116.13 30.56 43.76 -82.63 65.70 -57.16 0.36 0.36 0.28 0.17 0.23 0.23 0.38 0.38 0.23 0.23 0.17 0.28 0.36 0.36 5.71 -92.40 91.58 -8.30 -7.69 7.69 11.49 -56.52 56.52 -5.71 -86.69 -86.69 -86.69 75.59 75.59 75.59 75.59 -37.34 -37.34 -37.34 -37.34 50.81 50.81 50.81 31.30 31.30 24.10 -13
35、.08 -17.01 -17.01 -28.57 14.11 8.40 8.40 6.46 -14.13 -18.34 -18.34 58.95 15.65 -6.54 12.05 -28.44 -8.50 7.06 -14.29 10.75 4.20 -7.06 3.23 -9.17 -24.25 68.06 68.06 68.06 -17.84 -17.84 -17.84 -17.84 -6.39 -6.39 -6.39 -6.39 -30.19 -30.19 -30.19 -24.57 -24.57 -18.92 3.09 4.01 4.01 6.74 2.42 1.44 1.44 1.
36、11 8.39 10.90 10.90 65.67 22.37 -93.76 93.64 -41.44 -21.50 -22.46 9.93 20.59 14.04 -56.02 54.02 -16.61 -31.69 0.36 0.36 0.28 0.17 0.23 0.23 0.38 0.38 0.23 0.23 0.17 0.28 0.36 0.36 5.71 -92.40 91.58 -8.30 -7.69 7.69 11.49 -56.52 56.52 -5.71 -86.69 -86.69 -86.69 75.59 75.59 75.59 75.59 -37.34 -37.34 -
37、37.34 -37.34 50.81 50.81 50.81 31.30 31.30 24.10 -13.08 -17.01 -17.01 -28.57 14.11 8.40 8.40 6.46 -14.13 -18.34 -18.34 15.65 15.65 -6.54 12.05 -8.50 -8.50 7.06 -14.29 4.20 4.20 -7.06 3.23 -9.17 -9.17 24.76 24.76 24.76 2.10 2.10 2.10 2.10 -12.95 -12.95 -12.95 -12.95 -15.11 -15.11 -15.11 -8.94 -8.94 -
38、6.88 -0.36 -0.47 -0.47 -0.79 4.89 2.91 2.91 2.24 4.20 5.46 5.46 38.01 38.01 -81.72 90.19 -25.98 -25.98 -30.00 12.41 15.52 15.52 -54.88 49.83 -22.06 -22.06 0.36 0.36 0.28 0.17 0.23 0.23 0.38 0.38 0.23 0.23 0.17 0.28 0.36 0.36 5.71 -92.40 91.58 -8.30 -7.69 7.69 11.49 -56.52 56.52 -5.71 -86.69 -86.69 -
39、86.69 75.59 75.59 75.59 75.59 -37.34 -37.34 -37.34 -37.34 50.81 50.81 50.81 31.30 31.30 24.10 -13.08 -17.01 -17.01 -28.57 14.11 8.40 8.40 6.46 -14.13 -18.34 -18.34 15.65 15.65 -6.54 12.05 -8.50 -8.50 7.06 -14.29 4.20 4.20 -7.06 3.23 -9.17 -9.17 24.76 24.76 24.76 2.10 2.10 2.10 2.10 -12.95 -12.95 -12
40、.95 -12.95 -15.11 -15.11 -15.11 -8.94 -8.94 -6.88 -0.36 -0.47 -0.47 -0.79 0.00 4.89 2.91 2.91 2.24 0.00 4.20 5.46 5.46 38.01 38.01 -81.72 90.19 -25.98 -25.98 -30.00 12.41 15.52 15.52 -54.88 49.83 -22.06 -22.06 0.36 0.36 0.28 0.17 0.23 0.23 0.38 0.38 0.23 0.23 0.17 0.28 0.36 0.36 5.71 -92.40 91.58 -8
41、.30 -7.69 7.69 11.49 -56.52 56.52 -5.71 -86.69 -86.69 -86.69 75.59 75.59 75.59 75.59 -37.34 -37.34 -37.34 -37.34 50.81 50.81 50.81 31.30 31.30 24.10 -13.08 -17.01 -17.01 -28.57 14.11 8.40 8.40 6.46 -14.13 -18.34 -18.34 15.65 16.82 -6.54 12.05 -8.50 -8.88 7.06 -14.29 4.20 3.55 -7.06 3.23 -7.95 -9.17
42、25.93 25.93 25.93 1.72 1.72 1.72 1.72 -13.60 -13.60 -13.60 -13.60 -13.89 -13.89 -13.89 -9.36 -9.36 -7.21 -0.30 -0.39 -0.39 -0.65 5.14 3.06 3.06 2.35 3.86 5.02 5.02 37.58 38.75 -82.05 90.26 -25.90 -26.28 -29.86 12.66 15.66 15.01 -54.77 49.49 -21.28 -22.50 0.39 0.31 0.30 0.18 0.24 0.19 0.39 0.39 0.19
43、0.24 0.18 0.30 0.31 0.39 5.71 -92.40 91.58 -8.30 -7.69 7.69 11.49 -56.52 56.52 -5.71 -86.69 -86.69 -86.69 75.59 75.59 75.59 75.59 -37.34 -37.34 -37.34 -37.34 50.81 50.81 50.81 33.64 27.13 25.83 -13.68 -17.76 -14.36 -29.78 14.71 7.09 8.77 6.76 -15.14 -15.90 -19.71 15.65 -6.84 12.92 -8.50 7.36 -14.89 4.20 -7.57 3.38 -9.17 8.81 8.81 11.77 11.77 11.77 11.77 -18.26 -18.26 -18.26 -18.26 -5.79 -5.78 -3.42 -2.62 -2.13 -2.77 -2.24 -4.64 7.19 3.47 4.29 3.31 1.73 2.24 45.87 27.13 -76.03 88.68 -29.03 -16.60 -34.75 11.34 14.
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 電工聘請合同范本
- 供熱ppp項目合同范本
- 分期出租手機(jī)合同范本
- 共享單車租賃合同范本
- 個體雇傭司機(jī)合同范本
- 公司買車抵押合同范本
- 沖壓模具采購合同范本
- 內(nèi)墻涂料維修合同范本
- 醫(yī)療材料采購合同范本
- 保險服務(wù)合同范本
- DB11-T 2324-2024腳手架鋼板立網(wǎng)防護(hù)應(yīng)用技術(shù)規(guī)程
- 供應(yīng)鏈資源開發(fā)年終總結(jié)
- 作業(yè)區(qū)鐵路專用線工程項目可行性研究報告
- 金礦探礦權(quán)合作協(xié)議書范文范本
- 七年級下學(xué)期生物蘇教版電子教材
- 小學(xué)五年級美術(shù)《青花瓷》
- 藝術(shù)學(xué)概論第一章-彭吉象
- 浙江水利專業(yè)高級工程師任職資格考試題及答案
- 2024年新課標(biāo)《義務(wù)教育數(shù)學(xué)課程標(biāo)準(zhǔn)》測試題(附含答案)
- 醇基燃料突發(fā)事故應(yīng)急預(yù)案
- 肺病科中醫(yī)特色護(hù)理
評論
0/150
提交評論