




版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、IEEE PES General Meeting, Tampa FLJune 24-28, 2007Conferncia Brasileira de Qualidade de EnergiaSantos, So Paulo, Agosto 5-8, 2007Chapter 9Case Studies Contributors: J. Wikston, E. Gunther, and M. GradyTutorial on Harmonics Modeling and SimulationIEEE PES General Meeting, Tampa FLJune 24-28, 2007Conf
2、erncia Brasileira de Qualidade de EnergiaSantos, So Paulo, Agosto 5-8, 2007Case 1Simulation of the potential harmonic impacts caused by DC motor drives of ski lifts in a ski areaIEEE PES General Meeting, Tampa FLJune 24-28, 2007Conferncia Brasileira de Qualidade de EnergiaSantos, So Paulo, Agosto 5-
3、8, 2007Single Line DiagramIEEE PES General Meeting, Tampa FLJune 24-28, 2007Conferncia Brasileira de Qualidade de EnergiaSantos, So Paulo, Agosto 5-8, 2007ScenariosScenario SKIA. No Corrections.Scenario SKIB. 30 phase shifting transformers added at Apollo and BigBoss ASDs.Scenario SKIC. Case SKIB, p
4、lus 1800 kVAr of filters. IEEE PES General Meeting, Tampa FLJune 24-28, 2007Conferncia Brasileira de Qualidade de EnergiaSantos, So Paulo, Agosto 5-8, 2007SKIA, Voltage Waveform and Spectrum at Bus #1, Substation 12.5 kV (THDV = 12.2%) IEEE PES General Meeting, Tampa FLJune 24-28, 2007Conferncia Bra
5、sileira de Qualidade de EnergiaSantos, So Paulo, Agosto 5-8, 2007SKIB, Voltage Waveform and Spectrum at Bus #6, Base (THDV = 8.7%) IEEE PES General Meeting, Tampa FLJune 24-28, 2007Conferncia Brasileira de Qualidade de EnergiaSantos, So Paulo, Agosto 5-8, 2007SKIC, Voltage Waveform and Spectrum at B
6、us #6, Base (THDV = 2.7%) IEEE PES General Meeting, Tampa FLJune 24-28, 2007Conferncia Brasileira de Qualidade de EnergiaSantos, So Paulo, Agosto 5-8, 2007Case 2Harmonics and interharmonics, the filter design, and design verification measurements associated with an industrial load IEEE PES General M
7、eeting, Tampa FLJune 24-28, 2007Conferncia Brasileira de Qualidade de EnergiaSantos, So Paulo, Agosto 5-8, 2007IntroductionThe load and compensationMeasurementsFilter designPerformance measurementsIEEE PES General Meeting, Tampa FLJune 24-28, 2007Conferncia Brasileira de Qualidade de EnergiaSantos,
8、So Paulo, Agosto 5-8, 2007Load and Compensation6 pulse loadCharacteristic harmonic orders are n*p +/- 1Initial design 5th and 7th on MV busIEEE PES General Meeting, Tampa FLJune 24-28, 2007Conferncia Brasileira de Qualidade de EnergiaSantos, So Paulo, Agosto 5-8, 2007Measurements - Voltage Distortio
9、n IEEE PES General Meeting, Tampa FLJune 24-28, 2007Conferncia Brasileira de Qualidade de EnergiaSantos, So Paulo, Agosto 5-8, 2007Measurements 200 ms window IEEE PES General Meeting, Tampa FLJune 24-28, 2007Conferncia Brasileira de Qualidade de EnergiaSantos, So Paulo, Agosto 5-8, 2007Measurements
10、- InterharmonicsIEEE PES General Meeting, Tampa FLJune 24-28, 2007Conferncia Brasileira de Qualidade de EnergiaSantos, So Paulo, Agosto 5-8, 2007Filter DesignType of filterLocation of filterIEEE PES General Meeting, Tampa FLJune 24-28, 2007Conferncia Brasileira de Qualidade de EnergiaSantos, So Paul
11、o, Agosto 5-8, 2007Filter TypesIEEE PES General Meeting, Tampa FLJune 24-28, 2007Conferncia Brasileira de Qualidade de EnergiaSantos, So Paulo, Agosto 5-8, 2007Filter LocationUtility busSecondary of customers step-downFault level reduced to Utility bus impedance 100% variationSecondary of customer s
12、tep-down 50%IEEE PES General Meeting, Tampa FLJune 24-28, 2007Conferncia Brasileira de Qualidade de EnergiaSantos, So Paulo, Agosto 5-8, 2007Performance MeasurementsIEEE PES General Meeting, Tampa FLJune 24-28, 2007Conferncia Brasileira de Qualidade de EnergiaSantos, So Paulo, Agosto 5-8, 2007Case 3
13、Analysis of harmonic impacts of variable frequency drives to the system IEEE PES General Meeting, Tampa FLJune 24-28, 2007Conferncia Brasileira de Qualidade de EnergiaSantos, So Paulo, Agosto 5-8, 2007SuperHarm model one-line diagramHARSRCAA1BC1FDD1CEGD2HID38 mi 266300 A Reg8 mi 2665.8 Ohms0.1 mi 26
14、6300 A Reg0.1 mi 2662 mi 2664 mi 2661 mi 2661.5 MVA25kv/480vZ=4.5%3 MVA25kv/4160vZ=5.0%1200kvar2 x 1250hp, 1 400hp, 2 x 200kvar, 1 50kvar2 750hp, 2 75kvar3 MVA25kv/4160vZ=5.0%750 kVA4160v/480vZ=5.0%2 x 75hp, 2 x 25kvar, 2 x 60hp, 2 x 22.5kvar, 2 x 30hp asd, 2 x 10kvarProposed750hp ASD100kW30kvar 150hp 20kvar 100hp0.07 + j0.60 pu 25 kV 100 MVAIEEE PES General Meeting, Tampa FLJune 24-28, 2007Conferncia Brasileira de Qualidade de EnergiaSantos, So Paulo, Agosto 5-8, 2007Predicted voltage waveform distortion
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 英語(yǔ)促進(jìn)杯試題及答案大全
- 惠州高中語(yǔ)文試題及答案
- 新能源汽車行業(yè)的社會(huì)責(zé)任與影響評(píng)估試題及答案
- 查看動(dòng)態(tài)2025年建筑施工安全試題及答案
- 家具行業(yè)設(shè)計(jì)的功能性與時(shí)尚性的平衡探討試題及答案
- 施工現(xiàn)場(chǎng)安全事故案例的法律責(zé)任考題及答案
- 注冊(cè)土木工程師考試考點(diǎn)一覽試題及答案
- 教師教育教學(xué)反思與方法學(xué)習(xí)試題及答案
- 家具便利性與安全性的設(shè)計(jì)考量試題及答案
- 理解和聲和旋律對(duì)比的重要性2025年樂理考試試題及答案
- GB/T 45501-2025工業(yè)機(jī)器人三維視覺引導(dǎo)系統(tǒng)通用技術(shù)要求
- 財(cái)務(wù)英文詞匯大全
- GB/T 19582.2-2008基于Modbus協(xié)議的工業(yè)自動(dòng)化網(wǎng)絡(luò)規(guī)范第2部分:Modbus協(xié)議在串行鏈路上的實(shí)現(xiàn)指南
- 細(xì)胞的能量“貨幣”ATP說課課件-高一上學(xué)期生物人教版必修1
- 解剖學(xué)課件神經(jīng)系統(tǒng)課件
- 《基于繪本閱讀的幼兒語(yǔ)言能力發(fā)展研究(論文)》9300字
- 印巴戰(zhàn)爭(zhēng)(修改稿)
- 工程項(xiàng)目管理實(shí)施方案(5篇)
- 2021年全國(guó)質(zhì)量獎(jiǎng)現(xiàn)場(chǎng)匯報(bào)材料-基礎(chǔ)設(shè)施、設(shè)備及設(shè)施管理過程課件
- 防爆電氣失爆判別標(biāo)準(zhǔn)和常見失爆現(xiàn)象匯總
- 10kV高壓開關(guān)柜整定計(jì)算書
評(píng)論
0/150
提交評(píng)論