版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
1、.FAQ Mx 10Aug04.doc Aug 10, 2004Initial and Continued Airworthiness (Maintenance) FAQsDocument Organization. This document is organized into:Section 1: FAQs Applicable to All Operators Part 1: Determination of Initial Aircraft RVSM Compliance/Airworthinesspage 2Part 2: RVSM Maintenance Programs.page
2、 3Section 2: General Aviation Operator RVSM Maintenance Programs.page 7FAQ Organization. FAQs are listed alphabetically by subject. Changes/Additions. The following changes or additions have been made:8/10/04FAQ: Scale Error Tolerance: 14 CFR Part 43: answer re-worded.Section 1, Part 1: FAQs Applica
3、ble to All Operators,Determination of Initial Aircraft RVSM Compliance/AirworthinessFAQ: Conformity Inspections. Is an FAA conformity inspection required on an airframe prior to the issuance of RVSM authority (i.e., Operations Specifications or Letter of Authorization (LOA)?Answer: While it is the p
4、rerogative of the FAA to inspect any US registered aircraft, an inspection is not required if the airworthiness inspector is able to determine RVSM compliance from aircraft documentation. FAQ: Equipment List. Where should the RVSM required equipment list be published? ANS. The required equipment lis
5、t should be documented in the approved RVSM Data Package along with any associated drawings. This list should be published in documents readily available to the operator and approving inspector (i.e., Instructions for Initial and Continuing Airworthiness (IICA), approved Service Bulletins, Illustrat
6、ed Parts Catalog (IPC). The list should clearly show equipment required for RVSM operations.FAQ: Field Approvals. In lieu of an STC, can I obtain a field approval for RVSM airworthiness approval of my aircraft?No. An applicant for RVSM airworthiness approval for both group and non-group aircraft sha
7、ll submit an RVSM Data Package to the appropriate Aircraft Certification Office. The RVSM Data package must contain the items listed in 14 CFR Part 91 Appendix G, Section 2(b). IG 91-RVSM Section 9 provides detailed guidance on the development of RVSM Data Packages. RVSM Data Package approval is the
8、 responsibility of FAA Aircraft Certification Offices or in some cases an appropriately authorized designee. RVSM Data Package approval may not be accomplished using the field approval process.Section 1, Part 2: FAQs Applicable to All Operators,RVSM Continued Airworthiness/MaintenanceFAQ: BITE Testi
9、ng. Is BITE testing acceptable for returning an aircraft to RVSM service following maintenance on an RVSM required system? ANS. Unless the airframe manufacturer addresses the use of BITE testing in its instructions for RVSM continued airworthiness, BITE is not an acceptable method or means, by itsel
10、f, for returning an aircraft to RVSM service. BITE can be used for fault isolation and troubleshooting.FAQ: Contract Maintenance. When contract maintenance is used, does the operator still need an approved RVSM maintenance program? Ans. Yes.Can RVSM maintenance be contracted out to an FAA approved r
11、epair station? Ans. Yes. RVSM maintenance can be contract out to an FAA approved repair station. When RVSM maintenance is contracted out, the operators approved maintenance program will contain provisions for that and the operator will ensure that the repair station or maintenance contractor complie
12、s with the provisions of its approved maintenance program by· Documenting in its maintenance program that RVSM maintenance will be contracted only to FAA certificated repair stations that are appropriately rated to perform the required maintenance tasks.· Supplying the repair station with
13、aircraft maintenance requirements and· Reviewing completed work records.FAQ: Functional Flight Test. When are functional flight tests required?A functional flight test is an element of continued airworthiness programs. It is only performed by the operator after repairs or modifications that are
14、 deemed to warrant such testing to confirm that the maintenance action was effective. Functional flight tests generally do not require the installation of specialized flight test equipment.FAQ: Maintenance Program Elements. What are the required elements of an RVSM maintenance program?Answer. Airwor
15、thiness Inspectors Handbook (FAA Order 8300.10), Volume 2, Chapter 5 is posted under “FAA Inspector Guidance” on this webpage. Section 1, paragraph 9D lists the required RVSM maintenance program elements. It is reproduced below.Paragraph 9D. Each RVSM maintenance program must include the following:(
16、1) Identification of components considered to be RVSM critical, and identification of structural areas noted as RVSM critical areas.(2) The name or title of the responsible person who will ensure that the aircraft is maintained in accordance with the approved program.(3) The method the operator will
17、 use to ensure that all personnel performing maintenance on the RVSM system are properly trained, qualified, and knowledgeable of that specific system.(4) The method the operator will use to notify the crew if the aircraft has been restricted from RVSM but is airworthy for an intended flight.(5) The
18、 method the operator will use to ensure conformance to the RVSM maintenance standards, including the use of calibrated and appropriate test equipment and a quality assurance program for ensuring continuing accuracy and reliability of test equipment, especially when outsourced.(6) The method the oper
19、ator will use to verify that components and parts are eligible for installation in the RVSM system, as well as to prevent ineligible components or parts from being installed.(7) The method the operator will use to return an aircraft to service after maintenance has been performed on an RVSM componen
20、t/system or after the aircraft was determined to be non-compliant.(8) Periodic inspections, functional flight tests, and maintenance and inspection procedures with acceptable maintenance practices for ensuring continued compliance with the RVSM aircraft requirements. These elements may be listed in
21、detail or described by reference to an acceptableprogram that is identified and controlled by revision or issue number The need for functional flight tests may be limited to only after repairs ormodifications that are deemed to warrant such testing and may be accomplishedthrough monitoring height-ke
22、eping performance(9) The maintenance requirements listed in Instructions for Continued Airworthiness (ICA) associated with any RVSM associated component or modification.(10) Any other maintenance requirement that needs to be incorporated to ensure continued compliance with RVSM requirements.FAQ: Man
23、uals. Is it a requirement to list all the RVSM components by part number in the FAA approved RVSM maintenance manual?Answer: It is recommended that the operator identify all RVSM critical components by part number and either include this list in their program or make reference to it. An operator tha
24、t does not develop a list must ensure that the Service Bulletins, STCs or other documents that identify RVSM critical components are made available to all maintenance providers.FAQ: Minimum Equipment Lists. What is the guidance for MEL development? ANS. Global Change (GC-59) provides guidance materi
25、al for development of MELs for RVSM. It is posted on the RVSM Documentation webpage under “Documents Applicable to All Approvals”.FAQ: Minimum Equipment Lists. Is it a requirement to have a MEL before being issued RVSM authorization?Answer:Operators are not required to adopt an MEL. If the operator
26、chooses, however, to adopt an MEL, then the MEL must be developed using the Global Change 59.FAQ: Mixed Fleets. Will there be additional procedures required for handling fleets where some aircraft are RVSM compliant and others are not?ANS. Procedures should be developed to ensure that only RVSM comp
27、liant aircraft are dispatched and filed into RVSM airspace.FAQ: Monitoring Related to Maintenance. Does an aircraft need to be re-monitored, if maintenance is performed on an RVSM component or system?Answer: No. It is imperative, however, that the ICA and any additional maintenance program elements
28、are consulted. FAQ: RVSM Return To Service Checks. What steps should be required to return an aircraft to RVSM service following maintenance to required RVSM equipment?ANS. Part 91, Appendix G, section 3 (b) (i) requires that an operator develop and obtain approval of maintenance and inspection proc
29、edures for ensuring continued compliance to the RVSM requirements. The specific steps may vary for different operators but must be approved by the FAA and included in the approved RVSM maintenance program.FAQ: RVSM Return-to-Service Checks. Can any maintenance personnel or maintenance organization p
30、erform these checks?ANS. The approved maintenance program must include provisions for maintenance personnel to be properly trained, qualified, and authorized to perform RVSM return to service checks following maintenance to RVSM required systems. FAQ: Skin Waviness Checks. When are skin waviness che
31、cks required for RVSM initial and continued airworthiness? ANS. If skin waviness checks are required for initial and/or continued airworthiness, the requirement will be documented in the Instructions for Initial and Continued Airworthiness (IICA's) and incorporated into the operators approved RV
32、SM maintenance program.a. Who will be authorized to perform skin waviness checks besides the airframe manufacturer?ANS. Criteria for authorized inspection personnel are contained in the operators approved maintenance program. Generally, this criteria is limited to RVSM-specific inspection training.b
33、. What is CFD? CFD is the acronym for Computational Fluid Dynamics. CFD is a computer simulation used for analyzing the effects of skin waviness, static ports/plates, etc. and their contribution to static source error. CFD analysis is generally performed by the airplane manufacturer or design author
34、ity responsible for the RVSM airworthiness approval.FAQ (8/10/04): Scale Error Tolerances: 14 CFR Part 43. Can I use Part 43, Appendix E to maintain my altimetry systems to RVSM standards?#Ans. No. The specifications listed in Part 43, Appendix E are not adequate to ensure RVSM altitude keeping perf
35、ormance. Operator responsibilities are:1. An operator that is required to comply with part 91 Section 91.411 must ensure that the requirements of part 43, Appendix E are accomplished and 2. If that operator is authorized to operate in RVSM airspace, it must also ensure that the requirements and tole
36、rances stated in the approved RVSM maintenance program are met. In some instances procedures in an approved RVSM maintenance program may include all the requirements of Part 43 appendix E. The operator of an RVSM aircraft should ensure that work records indicate specifically which (or both) requirem
37、ents have been met.Section 2: GA Operator RVSM Maintenance ProgramsFAQ: Part 91 Letters of Authorization. Is it required to record the serial numbers of RVSM required components on the LOA? Answer: No. There is no requirement to record or list the serial numbers of the RVSM components on the LOA. If
38、 the components' serial numbers were recorded on the LOA, then the LOA would become invalid if a component were replaced.FAQ: Manuals. For part 91 operators, is an RVSM maintenance manual required to document policy and procedures for maintaining RVSM required aircraft systems?ANS. The developme
39、nt of an RVSM maintenance manual is a preferred method for a part 91 operator to document its RVSM maintenance program.FAQ: Minimum Equipment Lists. Is it a requirement to have a MEL before being issued RVSM Authorization?Answer:Operators are not required to operate under an MEL. However, if an oper
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 醫(yī)療健康合作協(xié)議
- 藝術(shù)表演臨建房施工合同
- 土地復(fù)墾保險(xiǎn)協(xié)議
- 舞蹈學(xué)校教務(wù)助理招聘協(xié)議
- 企事業(yè)單位專職司機(jī)招聘合同
- 分布式服務(wù)器租賃合同范本
- 哈爾濱住房公積金賬戶安全
- 渣土清運(yùn)行業(yè)規(guī)范發(fā)展
- 智能交通系統(tǒng)招標(biāo)文件
- 企業(yè)籃球活動(dòng)比賽場地布置
- 施工現(xiàn)場消防安全驗(yàn)收表(總平面布置)
- 小學(xué)數(shù)學(xué)教師家長會(huì)ppt
- 君子自強(qiáng)不息課件
- 2022人教版高二英語新教材選擇性必修全四冊(cè)課文原文及翻譯(英漢對(duì)照)
- WDZANYJY23低壓電力電纜技術(shù)規(guī)格書
- 抗高血壓藥物基因檢測課件
- 醫(yī)院管理醫(yī)院應(yīng)急調(diào)配機(jī)制
- (公開課)文言文斷句-完整版課件
- 小學(xué)生性教育調(diào)查問卷
- 醫(yī)院感染管理質(zhì)量持續(xù)改進(jìn)反饋表
- 旅游行政管理第二章旅游行政管理體制課件
評(píng)論
0/150
提交評(píng)論