




版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)
文檔簡介
1、relationship, established equivalent relationship 14, and subject: application problem (4)-scores and percentage application problem review content overview answers scores, and percentage application problem of key is: according to meaning, (1) determine standard volume (units "1") (2) fin
2、d associate "volume rate corresponds to" relationship, Then in-line solution. Category fraction multiplication word problem score Division applications engineering problem problem XV, a subject: review of the measurement of the amount of capacity, measurement and units of measurement of co
3、mmon units of measurement and their significance in rate 1, currency, length, area, volume, unit size, volume, weight and rate. (Omitted) 2, commonly used time units and their relationships. (Slightly) with a measurement units Zhijian of of poly 1, and of method 2, and poly method 3, and of method a
4、nd poly method of relationship measurement distance of method 1, and tool measurement 2, and estimates 16, and subject: geometry preliminary knowledge (1)-line and angle review content line, and segment, and Ray, and vertical, and parallel, and angle angle of classification (slightly) 17, and subjec
5、t: geometry preliminary knowledge (2)-plane graphics review content triangle, and edges shaped, and round, and fan axisymmetric graphics perimeter and area combination graphics of area subject : Preliminary knowledge (3)-review of solid content category 1-d shapes are divided into: cylinder and cone
6、 2, column is divided into: cuboid, square 3, cone cone of the features of cuboids and cubes relationship between characteristics of circular cone is slightly solid surface area and volume 1, size 2, table .和廣州大學(xué)城建設(shè)項目房建九標生活區(qū)宿舍通風(fēng)與空調(diào)工程施工方案批 準: 審 核: 編 制: 中鐵十二局集團建筑安裝工程有限公司廣州大學(xué)城項目部二00三年十一月三日目錄一、工程概況 .1 二
7、、施工計劃.2 三、施工方法.4 四、工期保證措施.8 五、工程施工技術(shù)措施.9 六、質(zhì)量保證措施.10 七、交工驗收.11 八、安全、文明生產(chǎn).12廣州大學(xué)學(xué)生食堂空調(diào)安裝施工方案一、工程概況1工程概況廣州大學(xué)生活區(qū)學(xué)生食堂由美國SBA設(shè)計集團公司、廣州城市規(guī)劃勘測設(shè)計研究院設(shè)計,位于廣州大學(xué)城第四組團廣州大學(xué)生活區(qū)內(nèi),建筑面積為6150M2,層數(shù)為四層,空調(diào)面積約為4900 M2;建筑采用鋼筋砼框架結(jié)構(gòu),一、二層層高為4.5米,三、四層層高為2.5米,建筑物高度為16.4米。2主要工作量:1)設(shè)備安裝:立式空氣處理機6臺;新風(fēng)處理機2臺;柜式排風(fēng)機8臺;風(fēng)機盤管38臺;天花式排氣扇42臺;
8、復(fù)合阻抗式消聲器16個; 2)鍍鋅鋼板風(fēng)管制作、安裝:2781m2;3)各種管徑冷凍、冷凝水管安裝:812m; 4)風(fēng)管保溫:1634m2;5)各種風(fēng)閥77個;6)各種管徑冷凍、冷凝水管保溫:812m;7)防火閥安裝:62個;8)送、回風(fēng)口安裝:312個;9)各種閥門安裝:189個。3編制依據(jù)1)空調(diào)系統(tǒng)施工圖。2)主要的施工驗收規(guī)范:通風(fēng)與空調(diào)工程施工質(zhì)量驗收規(guī)范(GB50243-2002)建筑給水排水及采暖工程施工質(zhì)量驗收規(guī)范(GB50242-2002)制冷設(shè)備安裝工程施工及驗收規(guī)范(GBJ66-84)通風(fēng)與空調(diào)工程質(zhì)量檢驗評定標準(GBJ304-88)建筑安裝工程質(zhì)量檢驗評定標準(TJ3
9、05-84)質(zhì)量安全體系(GB/T11000)二、施工計劃1工期進度計劃(詳見施工進度橫道圖)2施工作業(yè)班組:空調(diào)施工擬分為5個作業(yè)班組。即:(1) 設(shè)備安裝1個班組;(2) 風(fēng)管制作、安裝1個班組;(3) 油漆、保溫1個班組;(4) 管道安裝1個班組,(5) 調(diào)試1個班組。3主要施工機具(見下表)序號設(shè)備名稱型號、規(guī)格單位數(shù)量備注1切板機(電動)=4mm,l=2000mm臺12咬口機L-15,=1-1.5mm臺23咬口機L-10,=0.5-1mm臺24腳踏剪板機1×1300臺25電焊機(交流)BX3-300臺66電焊機(直流)AX-165臺3序號設(shè)備名稱型號、規(guī)格單位數(shù)量備注7管子
10、坡口機臺18管牙套絲機1/2”4”臺29液壓沖擊鉆PR-38E;DH20V臺各1010乙炔氣切割具套311電動試壓泵BYS-35臺212皮托管500mm/1000mm/1500mm支各213傾斜式微壓計0150mmH2O臺614U型壓力計0150mmH2O臺215補償式微壓計0150mmH2O臺2168mm橡膠管1015m根1217常用工器具批118液壓彎管機1/2”-3”臺219手提式焊機BX1-200臺220砂輪切割機400臺421手提砂輪機100臺1622臺式砂輪機250臺223臺鉆25臺324手動葫蘆1T,2T,5T臺各525千斤頂3T,2T臺各526行燈變壓器BJZ-1500VA,2
11、00V/36V臺8序號設(shè)備名稱型號、規(guī)格單位數(shù)量備注27焊條烘干箱臺128熱電風(fēng)速儀010m/s、030m/s、臺各229自記式葉輪風(fēng)速儀0.510m/s臺230干濕球溫度計支20三、施工方法1鍍鋅鋼板風(fēng)管的制作、安裝、保溫1)風(fēng)管制作、安裝保溫施工工藝流程圖: 現(xiàn)場放線®實測安裝、制作尺寸® 繪制制作、安裝草圖®原材料檢驗®a ®剪 板® 咬 口® 折方® 組合®a ®鉚法蘭® b ®風(fēng)管法蘭下料®電焊®鉆孔®砂平®防腐®b
12、 ®支、吊架安裝®風(fēng)管安裝®風(fēng)管與設(shè)備接口®風(fēng)管保溫®交驗2) 鍍鋅鋼板風(fēng)管,厚度為0.51.5mm制作(1) 風(fēng)管縱向接口采用聯(lián)合咬口,橫向接口采用法蘭連接加墊片安裝;風(fēng)管長邊小于或等于630mm時,橫向接口采用插條連接;(2) 矩陣風(fēng)管長邊大于或等于630mm,保溫風(fēng)管長邊大于或等于800mm,風(fēng)管長度在1200mm以上的應(yīng)采取加固措施,插條連接風(fēng)管每1m間隔安裝1個加固角鋼框。加固框鉚在風(fēng)管外側(cè);(3) 加固框用材需符合:連長小于1000mm以內(nèi)用25×4的角鋼;邊長大于或等于1000mm用30×4的角鋼。2).風(fēng)管及
13、部件安裝(1) 風(fēng)管支、吊架制作、安裝必須按設(shè)計要求和施工規(guī)范的規(guī)定施工;(2) 在風(fēng)口、閥門、檢視口及檢試孔處不得設(shè)置支、吊、托架;(3) 支、吊、托架的預(yù)埋件右膨脹螺栓位置正確,牢固可靠;埋入部分不得油漆,開應(yīng)除去油污;(4) 風(fēng)管安裝必須牢固,位置、標高和方向符合設(shè)計要求,部件方向正確,操作方便;風(fēng)管風(fēng)量、溫度測試口的位置應(yīng)設(shè)置于便于操作的部位,風(fēng)管法蘭墊片采用橡膠墊片,厚度為3mm。3).風(fēng)口安裝(1)風(fēng)口安裝應(yīng)做到位置正確,排列整齊,外露部分平整美觀;(2)安裝于頂棚上的風(fēng)口,應(yīng)與頂棚單獨固定,不得固定在垂直風(fēng)管上。4).風(fēng)管保溫:(1)風(fēng)管保溫采用橡塑復(fù)合難燃B1級及復(fù)合不燃鋁箔保
14、溫,保溫厚度=19mm; (2)保溫材料應(yīng)緊貼風(fēng)管表面,拼縫均勻整齊,平整一致,縱向縫錯開。2.管道、管件安裝及管道試壓1).管道及管件安裝施工工藝流程圖 a®管材下料®坡口或套絲®除銹、噴漆®b 測、繪安裝草圖®管材、管件檢驗®a a®型鋼下料®鉆孔®焊接®b b®吊架安裝®管子吊裝®焊接®探傷®試壓®沖洗®保溫®交驗2).管道安裝(1) 管道安裝先預(yù)制,后吊裝,盡量減少空中作業(yè)的工作量;先主管,后支管的安裝原則。
15、(2) 管材下料:公稱直徑小于或等于80mm的管材采用切割機械的割管器下料;公稱直徑大于或等于100mm采用氧炔切割。(3) 坡口:焊接管坡口采用坡口機或手提角磨機坡口,管子單邊坡口角度為35度,并把坡口50mm以內(nèi)的鐵銹清理干凈。(4) 管子、管件檢查:管材檢查內(nèi)容:產(chǎn)品是否有合格證書;壁厚是否符合設(shè)計要求;管口有無變形;管子的平直度。管件的檢查內(nèi)容:有無合格證、生產(chǎn)廠家名稱;型號、規(guī)格是不符合要求;開關(guān)是否靈活;外表有無損傷。(5) 管材除銹、防腐:管材除銹采用機械鋼絲刷除銹,除腐采用壓縮空氣噴涂。(6) 管子焊接時,應(yīng)進行組對,小口徑管子使用組對工具組對,大口徑管子采用角鋼固定法組對,加
16、熱管子,加偏墊或多層墊付的方法來消除接口丫面的空隙、偏差、錯口或不同心的缺陷。(7) 管子焊接方法采用電焊;焊條選用結(jié)422,直徑為2.5mm或3.2mm。(8) 鍍鋅鋼管采用絲扣連接,管子套絲采用機械套絲。(9) 直徑大于100mm的管子安裝時,必須使用葫蘆吊裝到位,禁止使用人工肩抬到位。(10) 閥門安裝應(yīng)便于操作為原則,止回閥安裝必須符合設(shè)計要求。(11) 凝結(jié)水管安裝坡度應(yīng)符合設(shè)計要求。(12) 管道的支、吊、托架的設(shè)置應(yīng)符合設(shè)計要求和施工規(guī)范,嚴禁管子、管件等重物承壓在設(shè)備上。3).管道試壓(1) 冷水系統(tǒng)在試壓前,必須做好如下工作:a.對照施工圖及施工規(guī)范,確定無漏項;b.管道安裝
17、完全符合施工圖要求和規(guī)范要求;c.做好水壓試驗的方案,試驗壓力按系統(tǒng)頂點工作壓力加0.1Mpa采用,但不得小于0.3Mpa,在5min內(nèi)壓力降不大于20Kpa為合格;d.試驗方案必須經(jīng)駐地監(jiān)理工程師認可,方案才能執(zhí)行;e.預(yù)先通知駐地監(jiān)理工程師參加試壓,并填寫好試驗記錄,簽字確認;f.試壓合格后,應(yīng)對系統(tǒng)進行反復(fù)沖洗,直至排出的水中不夾帶泥沙、鐵屑等雜質(zhì),且水色不渾濁時為合格。進行沖洗前,應(yīng)先除去過濾網(wǎng),待沖洗工作結(jié)束后再行裝上,管路系統(tǒng)沖洗時,水不得流經(jīng)任何設(shè)備。g.沖洗用的進水管截面不小于被沖洗管截面的1/3,排水管截面不小于被排水管截面的2/3,沖洗時,被沖洗管內(nèi)流速不小于1.0m/s。
18、4).管道保溫:(1) 管道及管件經(jīng)試壓驗收合格后,方可進行保溫。(2) 保溫管殼的縱向縫,環(huán)縫之間不得有間隙,膠帶粘貼牢固,平整,不得有斷裂現(xiàn)象。4.設(shè)備安裝1).空調(diào)設(shè)備開箱檢查: 空調(diào)設(shè)備拆箱檢查應(yīng)自上而下順序進行,拆箱時應(yīng)認真清點、記錄隨機附件的數(shù)量及文件數(shù)量,經(jīng)確認后,辦理設(shè)備移交手續(xù)。2) 空氣處理柜機、風(fēng)機盤管安裝:根據(jù)設(shè)備廠家的安裝要求,嚴格按相關(guān)規(guī)定進行空調(diào)設(shè)備安裝。5空調(diào)系統(tǒng)的調(diào)試 1) 調(diào)試計劃:調(diào)試時間為25天。2) 調(diào)試前檢查:調(diào)試前,應(yīng)按照質(zhì)量評定標準、檢查方法對通風(fēng)、空調(diào)各系統(tǒng)的設(shè)備進行一次全面的檢查,其檢查項目如下:a風(fēng)管、水管及部件與設(shè)備的連接處有無明顯的漏風(fēng)
19、、漏水現(xiàn)象;b所有開關(guān)、示意標志是否符合設(shè)計要求;c風(fēng)管、水管保溫有無破損、脫落;d各種調(diào)節(jié)裝置(如:風(fēng)閥、管道閥門等)調(diào)節(jié)是否靈活,操作是否方便。3) 風(fēng)機盤管的調(diào)試a、 按照供貨商提供的技術(shù)文件中的調(diào)試說明進行調(diào)試;b、 作好調(diào)試的記錄,請駐地監(jiān)察院埋工程師簽字認可。4) 空氣處理柜機a、提供的技術(shù)文件中的調(diào)試說明進行調(diào)試;b、調(diào)試的記錄,請駐地監(jiān)察院埋工程師簽字認可。 5) 空調(diào)送風(fēng)系統(tǒng)調(diào)試a、 測定與調(diào)整單系統(tǒng)風(fēng)量、風(fēng)壓及風(fēng)機轉(zhuǎn)速,將實測風(fēng)量與設(shè)計值進行比較,其偏差不大于10%。b、 平衡風(fēng)口風(fēng)量:系統(tǒng)與風(fēng)口的風(fēng)量必須經(jīng)過調(diào)整達到平衡,各風(fēng)口風(fēng)量實測值與設(shè)計值偏差不大于10%。c、 風(fēng)
20、管系統(tǒng)的漏風(fēng)率應(yīng)符合設(shè)計要求,若設(shè)計無要求則不應(yīng)大于10%。 (2)調(diào)試的順序,措施:a、 系統(tǒng)調(diào)試前,應(yīng)將風(fēng)閥全開,三通閥開到適當(dāng)?shù)奈恢茫籦、 采用“流量等比分配法”或“基準風(fēng)口調(diào)整法”從系統(tǒng)最遠端,即最不利環(huán)路開始測定、調(diào)整;c、 開啟風(fēng)機,用皮托管、熱電風(fēng)速儀等儀器初測風(fēng)管、風(fēng)口的風(fēng)量,風(fēng)機的轉(zhuǎn)速和風(fēng)壓,并將初測數(shù)據(jù)與設(shè)計數(shù)據(jù)列表比較;d、 以各支管風(fēng)量最小的風(fēng)口為基準,使用兩套儀器同時測量基準風(fēng)口和另一風(fēng)口,借助風(fēng)口調(diào)節(jié)閥進行調(diào)整,使它們的實測風(fēng)量與設(shè)計風(fēng)量的比值百分數(shù)近似相等;用相同的辦法逐個向總管方向調(diào)整;當(dāng)每根支管上所有風(fēng)口風(fēng)量調(diào)整完后,然后進行支風(fēng)管之間的風(fēng)量調(diào)整,以調(diào)整風(fēng)口相
21、同的辦法,調(diào)整各支管的風(fēng)量,使之達到相等。最后測定總管風(fēng)量。由于各支管之間,風(fēng)口之間均已調(diào)整好,可任意選定一個風(fēng)口,測出其風(fēng)量,計算出實測總送風(fēng)量與設(shè)計總風(fēng)量進行比較,再調(diào)整總送風(fēng)閥,并使總管送風(fēng)量與總管設(shè)計送風(fēng)量的比值百分數(shù)接近100%。根據(jù)風(fēng)量平衡原理可知,這時笨個送風(fēng)口的送風(fēng)量也接近100%。e、 按設(shè)計要求調(diào)整風(fēng)機的風(fēng)量;f、 在系統(tǒng)風(fēng)量到達平衡后,即不平衡率小于10%,進一步調(diào)整風(fēng)機的風(fēng)量,以滿足空調(diào)節(jié)器系統(tǒng)要求。g、 經(jīng)調(diào)整各部分調(diào)節(jié)閥不變的情況下,重新測定各處的風(fēng)量作為最后的實測,并使用紅油漆在甩有風(fēng)閥的把柄處作上標記,并將風(fēng)閥位置固定。h、 測定各支管風(fēng)量時,測點應(yīng)取在氣流均勻
22、、穩(wěn)定的直段上,并有皮托管在測孔中抽出、推進的空間,嚴禁在有局部阻力的管段處取點測試。i、 在矩形風(fēng)管內(nèi)測定平均風(fēng)速和風(fēng)量時,應(yīng)將管段截面分成若干個面積為0.04M2的小截面,以提高測試的準確性 。 四、工期保證措施:1施工前,專業(yè)技術(shù)人員和各工種班組長,必須認真熟悉和審查施工圖紙,了解設(shè)計意圖;并使每個參加施工的人員,對自己所承擔(dān)任務(wù)中的技術(shù)要求、質(zhì)量要求、安裝位置做到心中有數(shù)。以便在實施中,做到下料準、安裝位置無誤、技術(shù)、質(zhì)量要求均一次合格,杜絕返工現(xiàn)象的出現(xiàn);2作出合理的原材料、設(shè)備、半成品的供應(yīng)計劃,保證施工進度的正常進行。3合理安排勞動力,是保證工期進度的重要一環(huán),施工中嚴格按定額工
23、時進行人員安排;4施工中若遇需修改設(shè)計時,做到及時通知駐地監(jiān)理工程師和設(shè)計有關(guān)人員進行現(xiàn)場確定方案,并繪制修改施工圖,得到確認后,方可施工;5嚴格執(zhí)行工作票,使每一項工作均落實到個人,施工質(zhì)量的好壞,用工時間均與其工資、資金進行掛鉤。杜絕“大家都負責(zé),最后都不負責(zé)”的現(xiàn)象出現(xiàn);6空調(diào)施工中,難免與其它專業(yè)施工發(fā)生碰撞,本專業(yè)的施工人員應(yīng)顧全大局,聽從駐地監(jiān)理工程師和項目經(jīng)理的統(tǒng)一指揮,合理解決發(fā)生的問題,杜絕互不相讓的情況發(fā)生;7空調(diào)的大部分工作量,均屬隱蔽工程,因而在施工中應(yīng)嚴格執(zhí)行中間驗收制度,未通過中間驗收的項目,不準進行下一道工序施工;8安排施工進度計劃中,應(yīng)充分考慮影響施工進度的因素
24、,如:停水、停電等;并利用這段時間組織職工進行業(yè)務(wù)、安全等方面知識的學(xué)習(xí)和總結(jié)工程施工的經(jīng)驗、教訓(xùn),為以后的工作打下良好的基礎(chǔ)。五、工程施工技術(shù)措施1.風(fēng)管穿墻體、樓板時,嚴格按消防的有關(guān)規(guī)定執(zhí)行,安裝技術(shù)措施:1).各種尺寸的風(fēng)管應(yīng)作出下料樣板,以保證下料的準確性;2).板材下料均采用機械剪板,嚴禁人工剪板下料,圓弧線除外;3).風(fēng)管咬口壓實時,嚴禁使用鐵錘頭敲邊;4).所用各種量具必須準確,以保證下料的準確無誤;5).風(fēng)管法蘭根據(jù)不同的規(guī)格統(tǒng)一制作,幾規(guī)格的法蘭應(yīng)具備互換性;6).風(fēng)管穿越墻、樓板時,可拆卸處嚴禁安裝在墻體、樓板中間。2.管道穿墻、樓板安裝技術(shù)措施:1).穿墻及樓板的管道,
25、應(yīng)加套管,其保溫不能間斷,中間填入麻絲等松軟類緩沖物。管道焊縫不得設(shè)置于套管內(nèi)。2).空調(diào)系統(tǒng)焊接施工的焊工,必須具備焊接資格證,持證上崗,無證者不準上崗操作。3.施工中,作好一切施工原始記錄,嚴禁搞回憶錄。4.空調(diào)系統(tǒng)的大部份工程量均屬隱蔽工程,在工程施工過程中,嚴格按照隱蔽工程的有關(guān)規(guī)定執(zhí)行,嚴禁未經(jīng)駐地監(jiān)理工程師的認可簽字就進行隱蔽,在項目隱蔽前48小時應(yīng)書面通知駐地監(jiān)理工程師,經(jīng)驗收合格后,方可進行隱蔽工作。5.嚴格執(zhí)行“自檢、互檢、專檢”的“三檢”制度。六、質(zhì)量保證措施:1. 空調(diào)系統(tǒng)質(zhì)量控制框圖 項目經(jīng)理空調(diào)項目負責(zé)人 空調(diào)技術(shù)負責(zé)人 質(zhì)量檢查技術(shù)員 施工員 安全員 材料員設(shè)備安裝組 管道安裝組 風(fēng)管安裝組 油漆保溫組2.空調(diào)工程施工中嚴格執(zhí)行如下標準:通風(fēng)與空調(diào)工程施工質(zhì)量驗收規(guī)范(GB50243-2002)建筑給水排水及采暖工程施工質(zhì)量驗收規(guī)范(GB50242-2
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2019-2025年軍隊文職人員招聘之軍隊文職管理學(xué)全真模擬考試試卷A卷含答案
- 高等教育自學(xué)考試《00065國民經(jīng)濟統(tǒng)計概論》模擬試卷二
- 2024年新疆公務(wù)員《行政職業(yè)能力測驗》試題真題及答案
- 裝貨柜安全知識培訓(xùn)課件
- 年度工作計劃與執(zhí)行情況總結(jié)
- 指定地軟件開發(fā)項目合作協(xié)議
- 兒童藝術(shù)啟蒙故事征文
- 濃香白酒知識培訓(xùn)課件
- 法律民法實務(wù)考試要點梳理
- 比較兩地的端午節(jié)風(fēng)俗差異:初三語文生活應(yīng)用課文教案
- 北京服裝學(xué)院招聘考試題庫2024
- 2024年江蘇省南京市中考數(shù)學(xué)試卷真題(含答案解析)
- 物資裝卸培訓(xùn)課件
- DB5101-T 71-2020 成都市電動汽車充電設(shè)施 安全管理規(guī)范
- 2025年北京電子科技職業(yè)學(xué)院高職單招職業(yè)技能測試近5年??及鎱⒖碱}庫含答案解析
- 高教版2023年中職教科書《語文》(基礎(chǔ)模塊)下冊教案全冊
- 《社群運營》全套教學(xué)課件
- 2024入團知識題庫(含答案)
- 寧氏譜系條目匯總表2016318支系名稱家譜世系字輩-簡明
- GB/T 7129-2001橡膠或塑料軟管容積膨脹的測定
- 第五單元群文閱讀(共28張PPT) 部編版語文八年級下冊
評論
0/150
提交評論