1、Mixing(配料)Mix solve nt and bound separately with positive and n egative active materials. Make into positive and negative pasty materials after stirring at high speed till uniformity.Coati ng (涂布)Now, we are in coati ng line. We use back reverse coati ng. This is the slurry-mixi ng tank. The anode(

2、Cathode) slurry is introduced to the coating header by pneumaticity from the mixing tank. The slurry is coated uni formly on the copper foil, the n the solve nt is evaporated in this ove n.(下面的依據(jù)情況而定)There are four temperature zon es, they are in depe nden tly con trolled.Zone one sets at 55 degree

3、C, zone two sets at 65 degree C, zone three sets at 80 degree C, zone four sets at 60 degree C. The speed of coati ng is 4 meters per minu te.You see the slurry is dried. The electrode is wound to be a big roll and put into the oven. The time is more than 2 hours and temperature is set at 60 degree

4、C.Throughout the coati ng, we use micrometer to measure the electrode thick ness per about 15 minu tes. We do this in order to keep the best con siste ncy of the electrode.coati ng header 涂布機(jī)頭 temperature zones 溫區(qū) oven烘箱Vocabulary:coat ing line涂布車間back reverse coat ing 輥涂Al/copper foil 鋁 / 銅箔degree

5、C 攝氏度wind to be a ( big) roll 收卷 evenly/uniformly 均勻 evaporate 蒸發(fā)electrode 極片Cutti ngCut a roll of positive and negative sheet into smaller sheets according to battery specification and punching request.Press ingPress the above positive and n egative sheets till they become flat.PunchingPunching she

6、ets into electrodes accord ing to battery specificati on,ElectrodeAfter coati ng we compress the electrode with this cyli nderi ng mach ine at about 7meters per minu te. Before compress we clea n the electrode with vacuum and brush to elim in ate any particles. Then the compressed electrode is wound

7、 to a big roll. We use micrometer to measure the compressed electrode thickness every 10 minutes. After compressing we cut the web into large pieces. We tape the cathode edge to preve nt any possible internal short. The large electrode with edge taped is slit into smaller pieces. This is ultrasonic

8、process that aluminum tabs are welded on to cathodes using ultras onic weld mach ine. We tape the weld sect ion to preve nt any possible internal short. And fin ally, we clea n the fini shed electrodes with vacuum and brush.Vocabulary:cyli nderi ng柱形輥壓vacuum 真空particle 顆粒wound 旋緊卷繞micrometer千分尺inter

9、nal short內(nèi)部短路slit分切ultrasonic超聲波weld 焊接Anode mak ingIn anode making process, we cut the material into certain length strips. At the mean time, we put a small piece of in sulati on tape to the tab in order to preve nt any possible internal short. Then the prepared n ickel tab is riveted on anode and

10、pat pla in. We also tape the rivet sect ion to preve nt any possible internal short. And fin ally, we clea n the fini shed electrodes with vacuum and brush.Jelly rollThis is Jelly roll, a manual winding process. In the course of Jelly roll, firstly, we place the separator in betwee n cen tral pins,

11、press the foot switch to turn cen tral pins about 120 degrees. Secon dly, place the anode to the edge of cen tral pins, and turn cen tral pins about 180 degrees. Lastly, place the cathode to the edge of central pins. During the winding process, we apply tension by press ing the electrodes and the se

12、parator. We put the term in ati on tape at the end.After Jelly roll, we check the short circuit, the n form the Jelly roll by press ing, so that it is easier to in sert the Jelly roll into the can.Con trol poin ts:1. Whe n wi ndi ng to the end of the ano de, coveri ng the anode completely by the sep

13、arator.2. In the whole process, it is the most importa nt points to en sure the best alig nment amongVocabulary:Jelly roll 卷繞 cen tral pin 卷針 cathode 正極片 alig nment 整齊the cathode, the anode and the separator for the Jelly roll. The separator has to cover the anode and the cathode, and the anode has

14、to cover the cathode completely. These points are mainly checked before short check ing.Man ual手工的Separator隔膜紙foot switch腳踏開關(guān)an ode負(fù)極片termin ati on tape尾端膠紙short circuit 短路Taping & in sert ingPut the tape on the two side of J/R, To preve nt J/R being hurt in the in serti on process.Put a piece o

15、f tape betwee n cathode tab and J/R .Because anode electrode is wider tha n cathode electrode.Put the bottom tape.Insert the finished J/R into the can manually and then short circuit check by multi-meter.Spot weld ing Ni tab to cap.Ultras onic weldi ng the Al tab to cap using ultras onic weld.We hav

16、e the sec ond spot weldi ng to en sure the best con tact betwee n the tab and cap.Apply top in sulator, to preve nt Ni tab con tact ing with can.Final J/R in serti on by the cen trifuge.Cap positi oning by hand. Then check the cap in the suitable positi on, or the defects is put into red bin ,Fi nal

17、ly , short circuit check aga in to en sure that there be no in ternal short J/R flow ing to next line.Vocabulary:J/R 極芯 tape 膠紙 electrode 極片 multi-meter 萬用表 Spot weldi ng 點(diǎn)焊 Ni tab 極耳Ultras on ic weld超焊In sulator 隔圈 cen trifuge machi ne甩殼機(jī)defect 次品 red bin 紅盒Laser weldi ngThis is the Laser welding r

18、oom! The first process is welding for the aluminum cap, specially connect the rivet with the weld plate to prevent the cell impedance excursion.The sec ond process is the Laser seam weldi ng. In the process, it must en sure the inten sity and airproof characters of the weld.After the cell is welded,

19、 we would perform the leak checking, the short circuit checking and the weigh ing check ing.Vocabulary:Laser weldi ng room激光焊接車間Cap蓋板 Rivet 鉚釘 Plate 鎳片impeda nce excurs ion內(nèi)阻漂移inten sity 強(qiáng)度leak check ing檢漏short circuit check ing測短路weighi ng check ing稱重Oven drying electrolyte filli ng and stori ngThi

20、s is the process of cells oven drying at 80 °C for more than 12 hours under vacuum. After oven drying, the cells are tran sferred to the process of electrolyte filli ng through this cha nn el. The electrolyte filling performs in dry room. The electrolyte is injected in two times so that it can

21、be filled easily and sufficiently. When filling, vacuum first, then inject electrolyte. After that, we repeat vacuum and vent to room pressure several times. Fin ally the cell is put off at room pressure, then weigh the cell in order to check the amount of electrolyte. After weighing, we seal with t

22、ape onto the filling port to prevent the cells absorbing water during storing.We store the filled cells for 24 hours at room temperature so that the electrolyte can be saturated sufficie ntly by the ano des and cathodes.Vocabulary:oven drying 烘烤 vacuum 真空 electrolyte filli ng 注液 electrolyte 電解液 room

23、 pressure 大氣壓filling port注液孑Lstoring陳化 saturated 浸潤anode 正極 cathode 負(fù)極Pre-charge and ball sealAt first, we place a piece of absorb cotton above the filling port to absorb the excess electrolyte. This is the first process.The sec ond process is perform ing a pre-charge at 0.1C rate for 390 minu tes.A

24、fter the pre-charge, we take a voltage checking to the cell at once. If the voltage is lower than the sta ndard, it n eeds to be re-charged.The fourth process is the ball seal. we must complete this process in 15 minu tes.First, put the steel ball in the right place. Then, give pressure to it so tha

25、t the steel ball can fill the filling port.In the whole process, we must make sure that the temperature and humidity are in the regular ran ge.Fin ally, the process is clea ning to elim in ate the electrolyte on the cell surface with acet one solve nt.Vocabulary:filli ng port注液孔 electrolyte 電解液 pre-

26、charge 預(yù)先充電ball seal圭寸口voltage check ing 量電壓 regular range 合格范圍 elim in ate 消除 aceto ne solve nt 丙酮溶劑Agi ng and Formati onThis is the aging room. We age cells at 3540 Degree C for 7 days. The temperature is con trolled by two heati ng in strume nts which are set at 38 Degree C. The n we tran sfer ce

27、lls to the testing workshop. First, we check the voltage of cells with multi-meters. According to voltage, we divide the cells into acceptables and defects. Formati on is done at 1.0 Capacity rate for 140 minu tes to 4.2 Voltage. After that, check thick ness and impeda nee. At last, we tran sfer the

28、 acceptables to the storehouse.Vocabulary:aging room 老化房heati ng in strume nt 力口熱器testi ng workshop 檢測車間acceptables 良品 defects 次品formation 化成 thickness 尺寸,厚度impeda nee 內(nèi)阻 storehouse 倉庫標(biāo)識(shí)牌內(nèi)容(中文)英文1 正極球磨 Cathode Ball Mill Mixi ng2 負(fù)極球磨 Anode Ball Mill Mixing3 正極混漿 Cathode Slurry Mixi ng4 負(fù)極混漿 An ode Slurry

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論