1、CHEMTURA Project Acorn 管道系統(tǒng)吹掃(清洗)方案 江蘇啟安建設(shè)集團(tuán)有限公司Jiangsu QIAN Construction Group Co., Ltd.文件編號(hào)Doc. No.:22150-QI'AN-S-0021文件類型Type文件頁(yè)數(shù)Page附件頁(yè)數(shù)Attached Page版次Rev修訂說(shuō)明Edit spec.受控編號(hào)Charged No.S0版Rev. 0UpdatedQIAN-0021文件標(biāo)題:Document Title:CHEMTURA Project Acorn MEI Stage II Works (Ester and Fluids)科聚亞高
2、新材料(南通)有限公司18500噸聚氨酯彈性體預(yù)聚物、33200噸高性能表面活性油品項(xiàng)目一期工程II階段工程機(jī)電安裝(冷凍機(jī)潤(rùn)滑油和潤(rùn)滑油)管道系統(tǒng)吹掃(清洗)方案Piping System Blowing / Flushing ProcedureRev. 02013.12.20版次Rev完成日期Date編 制Issued by審 核Checked by批準(zhǔn)Approved by S- Scheme 方案;P- Plan 計(jì)劃;R Report 報(bào)告; L- letter 信件;目錄1、 目的Purpose2、 適用范圍Scope3、引用標(biāo)準(zhǔn)及編制依據(jù) Standard4、工作內(nèi)容及操作流程
3、Content & Procedure5、人力及工機(jī)具計(jì)劃Person and machine plan6、操作程序及技術(shù)要求Operating procedure and technology requirements7、質(zhì)量記錄Quality Record8、安全措施Safety Measures9、其他 others管道系統(tǒng)吹掃(清洗)方案Piping System Blowing / Flushing Procedure前言 Preface 根據(jù)業(yè)主/管理公司發(fā)放的圖紙、工程說(shuō)明及相關(guān)的規(guī)范、標(biāo)準(zhǔn),以及工程量清單,我司將負(fù)責(zé)科聚亞高新材料(南通)有限公司年產(chǎn)18500噸聚氨酯彈
4、性體預(yù)聚物、33200噸高性能表面活性油品項(xiàng)目一期工程II階段工程的機(jī)電安裝工作,包括所有設(shè)備機(jī)器及附件安裝、管道及其附件制作安裝、儀表工程安裝、電氣安裝、暖通工程安裝等。We will be responsible for whole MEI installation works in the CHEMTURA Project Acorn in accordance with the drawings, specifications and BOQ issued by CHEMTURA/WPC, and under the relevant code and standard. Includ
5、e all equipment and their accessories installation, pipe and fittings fabrication and installation works, the electrical installation works.1 目的Purpose 為消除隱患,避免不必要的損失,為工程項(xiàng)目的管道系統(tǒng)吹掃(清洗)提供指導(dǎo),以檢查管道系統(tǒng)的清潔度的施工質(zhì)量,使系統(tǒng)運(yùn)轉(zhuǎn)能順利進(jìn)行。 To remove the incipient faults, to avoid the unnecessary damages, to give an instru
6、ction for blowing/flushing, to check the cleanness inside piping, and to ensure the System operation successfully, we make this procedure.2 適用范圍 Scope本公司所承建科聚亞高新材料(南通)有限公司年產(chǎn)18500噸聚氨酯彈性體預(yù)聚物、33200噸高性能表面活性油品項(xiàng)目一期工程II階段工程的管道安裝工程管道系統(tǒng)的吹掃(清洗)工序。This procedure is applying to QIAN piping system in CHEMTURA Pr
7、oject Acorn MEI Stage II Works.3 引用標(biāo)準(zhǔn)及編制依據(jù) Standardl 設(shè)計(jì)施工圖說(shuō)明 Specification in the Designing drawing.l GB50235-2010 工業(yè)金屬管道工程施工及驗(yàn)收規(guī)范 Construction Acceptance Code for Industrial Metal Pipe l GB50184-2011工業(yè)金屬管道工程施工質(zhì)量驗(yàn)收規(guī)范Construction Quality Acceptance Code for Industrial Metal Pipe Engineeringl GB50236-
8、2010 現(xiàn)場(chǎng)設(shè)備、工業(yè)管道焊接工程施工及驗(yàn)收規(guī)范 Construction and Acceptance Code for Equipment and Industrial Pipe Welding Engineering on Sitel GB50683-2011現(xiàn)場(chǎng)設(shè)備、工業(yè)管道焊接工程施工及驗(yàn)收規(guī)范Construction and Acceptance Code for Equipment and Industrial Pipe Welding Engineering on Sitel SH3501-2011 石油化工有毒、可燃介質(zhì)管道工程施工及驗(yàn)收規(guī)范 Construction an
9、d Acceptance Code for Toxic and Inflammable Pipe work of Petrochemical Project l 建筑給水排水及采暖工程施工質(zhì)量驗(yàn)收規(guī)范(GB50242-2002 ) Construction Acceptance Code for Archetecutural Water supply & Plumbing and Heating Engineering (GB50242-2002 ) l 壓力管道規(guī)范 工業(yè)管道(GB/T-20801-2006 ) Pressure pipe code: industrial pipe
10、l 特種設(shè)備安全監(jiān)察條例(國(guó)務(wù)院第549號(hào)令)Special Equipment Safety Supervision Rule No. 549 Documentl TSGD0001-2009特種設(shè)備安全技術(shù)規(guī)范Special Equipment Safety Technical Codel 業(yè)主要求及設(shè)計(jì)要求 Requirements of Client and Design 4 工作內(nèi)容及操作流程 Content & Procedure4.1操作流程吹掃(清洗)前系統(tǒng)檢查System inspection prior to blowing/flushing吹掃(清洗)介質(zhì)選定Sel
11、ect and confirm a medium for blowing/flushing管道系統(tǒng)吹掃(清洗)Piping system blowing/flushing管道系統(tǒng)復(fù)原Resume the piping system4.2工作內(nèi)容管道吹掃/沖洗工作根據(jù)試壓包劃分進(jìn)行,管道試壓完成后,吹掃班組對(duì)管道進(jìn)行吹掃/沖洗,II階段壓縮空氣吹掃試壓包103個(gè),蒸汽吹掃10個(gè),水沖洗3個(gè),不吹掃3個(gè),詳見(jiàn)下表。Purge/flush pipe work according to the division test package, after completion of pipeline pr
12、essure test, purging shift to purge/flush pipe, phase II of compressed 103 air purging pressure test package, 10 steam purge, water rinse three, purging 3, see the table below.序號(hào)系統(tǒng)名試壓包號(hào)管道介質(zhì)壓力管道試驗(yàn)壓力區(qū)域吹掃/清洗介質(zhì)備注1S501 儲(chǔ)罐系統(tǒng)S501-001EBON/A15421PA2S501-002EBON/A15421PA3S501-003PAON/A15421PA4S501-004PETN/A15
13、421PA5S501-005EBOGC215421PA6S501-006EBOGC215421PA7S501-007PAOGC215421PA8S501-008PETGC215421PA9S501-009EBON/A15421PA10S501-010EBON/A15421PA11S501-011EBON/A15421PA12S501-012EBON/A15421PA13S501-013EBON/A15421PA14S501-014PETN/A15421PA15S501-015PAON/A15421PA16S501-016PAON/A15421PA17S501-017PAON/A15421PA1
14、8S501-018EBOGC215421PA19S501-019EBOGC215421PA20S501-020EBOGC215421PA21S501-021EBOGC215421PA22S501-022EBOGC215421PA23S501-023PETGC215421PA24S501-024PAOGC215421PA25S501-025PAOGC215421PA26S501-026PAOGC215421PA27S501-027VNTN/AN/A421N/A28S502 冷凍機(jī)潤(rùn)滑油反應(yīng)系統(tǒng)S502-001EBON/A15230PA29S502-002EBOGC215230PA30S502-0
15、03EBOGC215230PA31S502-004EBOGC215230PA32S502-005EBOGC215230PA33S502-006EBOGC215230PA34S502-007EBOGC215230PA35S502-008EBOGC215230PA36S502-009EBOGC215230PA37S502-010EBOGC215230PA38S502-011BEPN/A15230PA39S502-012BEPGC215230PA40S502-013BEPGC215230PA41S502-014BEPGC215230PA42S502-015BEPGC215230PA43S502-01
16、6BEPN/A15230PA44S502-017BEPGC215230PA45S502-018BEPGC215230PA46S502-019BEPGC215230PA47S502-020BEPGC215230PA48S502-021BEPN/A15230PA49S502-022BEPGC215230PA50S502-023BEPGC215230PA51S502-024BEPGC215230PA52S502-025BEPGC215230PA53S502-026BEPN/A15230PA54S502-027BEPGC215230PA55S502-028BEPGC215230PA56S502-029
17、BEPGC215230PA57S502-030BEPGC215230PA58S502-031BEPGC215230PA59S502-032ADDGC215230PA60S502-033ADDGC215230PA61S502-034ADDGC215230PA62S502-035EBON/A15230PA63S502-036EBOGC215230PA64S502-037EBOGC215230PA65S502-038PETGC215230PA66S502-039PAOGC215230PA67S502-040PAOGC215230PA68S502-041PAOGC215230PA69S502-042P
18、AOGC215230PA70S502-043PAOGC215230PA71S502-044FFPN/A15230PA72S502-045FFPGC215230PA73S502-046FFPGC215230PA74S502-048FFPGC215230PA75S502-049FFPGC215230PA76S502-050FFPGC215230PA77S502-051FFPGC215230PA78S502-052PAON/A15230PA79S502-053PAOGC215230PA80S502-054PAOGC215230PA81S502-055PAOGC215230PA82S502-056VN
19、TN/AN/A230N/A83S502-057VNTN/AN/A230N/A84S502-058VNTN/A1.5230PA85S502-059PAOGC215230PA86S601 工藝水、生活水、廢水系統(tǒng)S601-001PWN/A10.5421PA87S601-002PWN/A10.5421PA88S601-003PWN/A10.5421PA89S601-004PWN/A10.5230PA90S601-005PWN/A10.5230PA91S601-006PWN/A10.5230PA92S601-007PWN/A10.5230PA93S601-008PWN/A10.5230PA94S601
20、-009PWN/A10.5230PA95S601-010PWN/A10.5230PA96S601-011DWN/A10.5230water97S601-012WWGC215230PA98S601-013WWGC215230PA99S603 壓縮空氣系統(tǒng)S603-001IAGC315421PA100S603-002IAGC315421PA101S603-003IAGC315230PA102S603-004PAGC315230PA103S603-005PAN/A15421PA104S603-006PAN/A15421PA105S603-007PAN/A15421PA106S604 蒸汽與冷凝水系統(tǒng)
21、S604-001MPSGC215421Steam107S604-002MPCGC215421Steam108S604-003LPSGC35.25421Steam109S604-004LPSGC35.25421Steam110S604-005LPSGC35.25421Steam111S604-006LPSGC35.25421Steam112S604-007LPCN/A5.25421Steam113S604-008MPSGC215230Steam114S604-009MPCGC215230Steam115S604-010LPSGC35.25230Steam116S605 氮?dú)庀到y(tǒng)S605-001N
22、SLGC35.25421PA117S605-002NSLGC35.25230PA118S610 循環(huán)水系統(tǒng)S610-001CTWSN/A10.5230Water119S610-002CTWRN/A10.5230Water5. 人力和工機(jī)具計(jì)劃Person and machine plan5.1吹掃氣源Air supply5.1.1租用臨時(shí)空氣壓縮機(jī),經(jīng)過(guò)檢查合格后安裝壓力表(校驗(yàn)合格)并連接儲(chǔ)氣罐,空壓機(jī)和儲(chǔ)氣罐安放在421罐區(qū),用軟管將被吹掃管線連接進(jìn)行吹掃。Hire temporary air compressor, after inspection qualified to instal
23、l pressure gauge (calibrated) and connect air tank, air compressor and air tank placed 421 tank farm, the hose will be venting pipeline connection for purging. 5.2 人力安排Manpower arrangement5.2.1啟安將成立吹掃工作小組,安排經(jīng)驗(yàn)豐富的工人進(jìn)行現(xiàn)場(chǎng)操作,共組小組由施工經(jīng)理?yè)?dān)任組長(zhǎng),全面協(xié)調(diào)工作;管道工程師、質(zhì)量經(jīng)理、安全經(jīng)理?yè)?dān)任副組長(zhǎng),分別對(duì)專業(yè)技術(shù)、質(zhì)量、安全進(jìn)行把控; WPC/TJPM/Chemtura專
24、業(yè)工程師全程對(duì)吹掃工作進(jìn)行把控。QIAN will establish purging work team, experienced workers in the site operation, a total of group by the construction manager or group leader, comprehensive coordination; Piping engineer, quality manager, security manager as deputy team leader, respectively to the professional techn
25、ology, quality and safety control; WPC/TJPM/Chemtura professional engineers to purge all the work for the accused.QIAN:組長(zhǎng): 蔡倪兵 施工經(jīng)理副組長(zhǎng):范本生管道工程師苗武賢質(zhì)量經(jīng)理王 靜安全經(jīng)理組員: 郁錫東、王仲葉、孫長(zhǎng)遠(yuǎn)現(xiàn)場(chǎng)吹掃人員:朱紅飛、楊金茍等WPC:方金彪 質(zhì)量經(jīng)理魏紅軍 管道工程師TJPM:何 華 安裝專業(yè)監(jiān)理工程師6. 操作程序及技術(shù)要求Operating procedure and technology requirements6.1 吹掃(清洗)前系統(tǒng)檢查
26、System inspection prior to blowing/flushing吹掃(清洗)前,經(jīng)監(jiān)檢部門、建設(shè)部門及施工單位對(duì)系統(tǒng)的實(shí)體及資料進(jìn)行全面檢查,確認(rèn)合格后方可進(jìn)行。After Supervision Companies, Client and Contractor fully inspect & check the system and documents, we can blow/flush.6.1.1 完成管道的強(qiáng)度試驗(yàn)和嚴(yán)密性試驗(yàn)。 Shall complete intensity test and tightness test to piping.6.1.2
27、 向參加吹掃工作的人員進(jìn)行技術(shù)交底。 Shall educate and train this procedure to workers who operate the blowing/flushing.6.1.3 壓力試驗(yàn)時(shí),需要裝設(shè)隔斷盲板的地方,壓力的導(dǎo)入口以及拆除的儀表、閥門等附件需裝設(shè)臨時(shí)短管的地方要考慮吹掃工作的需要,不宜馬上復(fù)原,以免造成重復(fù)拆卸與安裝。 During pressure testing, we have installed the blind flanges and temporary pipes and removed the instruments/valve
28、s. To avoid from repeating to install/dismantle them, we will resume them after blowing/flushing.6.1.4 吹掃時(shí)需要拆除的閥門、法蘭、儀表等,事先拆除,并用臨時(shí)短管接通。對(duì)拆除下來(lái)的閥門、法蘭等附件要密封好,妥善保管,以免丟失。管道吹洗作業(yè)前,管線上的儀表盡量避免先行安裝;已安裝的,必須采取隔離措施;已焊接的儀表部件的,需加強(qiáng)保護(hù)措施,避免損壞儀表元器件。 We shall dismantle the components (such as valves, flanges, instrument
29、s, etc.) which should be necessary to remove during blowing/flushing work, and shall install temporary short pipes instead. We should keep and store and protect the dismantled valves, flanges and instruments from damaging or losing.6.1.5 凡用氣體(如氮?dú)狻嚎s空氣)和清水沖洗的管道,在吹掃前先用敲打法,使附著于管壁的雜物脫落下來(lái),已達(dá)到徹底吹除的目的。 To
30、obtain the efficient blowing/flushing purpose, if we use gas (such as Nitrogen and compress air) and water for flushing/blowing pipes, we should take a beat measures to piping before blowing/flushing, so that making the debris inside pipes fallen down.6.1.6 金屬管轉(zhuǎn)子流量計(jì)、玻璃管轉(zhuǎn)子流量計(jì)、電磁流量計(jì)、容積式流量計(jì)、調(diào)節(jié)閥、彈簧管壓力表、
31、視鏡、流量孔板、過(guò)濾器、隔膜閥、聚四氟乙烯閥等拆除,用臨時(shí)短管和孔板代替。安全閥應(yīng)拆除或插入盲板予以隔離。 We shall dismantle the metallic piping rotormeter, vitreous piping rotormeter, electrical flowmeter, volumetric flowmeter, adjust valve, spring piping pressure gauge, sight glass, flow orifice, strainer, diaphragm valve, PTFE valve and so on, the
32、n install temporary pipes and orifices instead. We should dismantle the safety valve or insert a blind plate to separate, too.6.1.7 儀表導(dǎo)壓管、PH計(jì)主閥關(guān)閉,下方側(cè)打開;鐵殼溫度計(jì)、液面開關(guān)不拆;液面調(diào)節(jié)計(jì)、液面計(jì)主閥關(guān)閉。 Shall close the instrument pressure transmit pipe and PH indicator valve and open the downside of them; dont need to dis
33、mantle the metalclad temperature gauge and level switch; close the level adjust indicator and level indication valve.6.1.8 應(yīng)有完善的已經(jīng)批準(zhǔn)的吹掃(清洗)方案,并已向操作人員進(jìn)行了技術(shù)及安全交底。 Shall have a completed and approved procedure for blowing/flushing, and train to operators.6.2 吹掃(清洗)介質(zhì)選定Select and confirm a medium for bl
34、owing/flushing6.2.1 管道系統(tǒng)吹掃(清洗)介質(zhì)應(yīng)按設(shè)計(jì)規(guī)定執(zhí)行。當(dāng)設(shè)計(jì)無(wú)規(guī)定時(shí),可按下屬原則結(jié)合現(xiàn)場(chǎng)具體情況選用吹掃(清洗)介質(zhì): We must use the medium for blowing/flushing as per Design requirements. If no design provision, we shall consider the site actual conditions and follow:6.2.1 DN600的管道宜用人工清理; Shall clean up the DN600 pipes by manpower;6.2.2 DN
35、600的液體管道宜用水沖洗; Shall use water for flushing DN600 liquid piping.6.2.3 DN600的氣體管道宜用空氣吹掃; Shall use air for blowing DN600 air piping.6.2.4 蒸汽管道應(yīng)用蒸汽吹掃; Steam pipes should be blew with steam.6.2.5 水管道應(yīng)用清潔水; Water pipe should be flushed with water.6.2.6 堿液管道應(yīng)用清水; Use water for flushing the alkali liquid
36、pipes.6.2.7 一般壓縮空氣管道應(yīng)用一般空氣; Use air for blowing the general compress air pipes.6.2.8 儀表壓縮空氣管道應(yīng)用干燥的無(wú)油壓縮空氣; Instrument compress air pipe should be blew with dry oil-free compress air.6.2.9 酸液、油管道等物料管道應(yīng)用壓縮空氣;6.2.10 純水管道應(yīng)用工業(yè)水或純水; Use industrial water or pureness water for flushing DI water pipe.6.2.11 排
37、氣(汽)管道可不沖洗,但應(yīng)檢查管路是否暢通; Vent pipe doesnt need to be flushed, but should be checked whether free or not.6.2.12 設(shè)計(jì)有規(guī)定時(shí)應(yīng)按設(shè)計(jì)文件規(guī)定的吹掃或清洗介質(zhì)及方法進(jìn)行吹掃或沖洗。 If Designing document has the provision of medium to flushing/blowing, we shall flush/blow with that medium.6.3 管道系統(tǒng)吹掃(清洗)Piping system blowing/flushing6.3.1
38、 水沖洗 water flushing6.3.1.1 水沖洗應(yīng)用臨時(shí)水泵來(lái)供沖洗水,當(dāng)使用工程正式泵時(shí),應(yīng)在泵的入口前加裝臨時(shí)過(guò)濾器,以防止管路中的雜質(zhì)進(jìn)入泵體內(nèi)造成設(shè)備損傷。當(dāng)被沖洗管道直徑較小且附近又能提供足夠流量和壓力的自來(lái)水管時(shí),可以采用自來(lái)水直接進(jìn)行沖洗。 General, water flushing shall be supplied water by temporary pumps. When we use the formal ones, we should install the temporary strainer in front of pump inlet to av
39、oid pump damaged by debris inside pipes. When diameter of flushed pipe is smaller and water supply pipe (near flushed pipe) has adequate flow and pressure, we can use water of supply pipe to flush straightly.6.3.1.2 系統(tǒng)沖洗用臨時(shí)供水管道及排水管道應(yīng)按沖洗(吹掃)方案進(jìn)行安裝。水源應(yīng)從管道系統(tǒng)的高處接入,在底處排放,并將沖洗水引入下水道或溝渠。 Water supply pipe
40、and drain pipe shall be installed for piping system flushing as per flushing/blowing procedure. Water supply should be connected in high point of piping system, and drain water in low point. Flushing water shall be drained to sewer or ditch.6.3.1.3 水沖洗管道應(yīng)用潔凈水,沖洗不銹鋼管所用水的氯離子濃度必須小于25ppm。 Use cleanness
41、water for flushing. Stainless steel pipe should be flushed with water witch contains less than 25ppm consistency of chloride ion. 6.3.1.4 沖洗流速不低于1.5m/s或者水壓不低于0.5MPa/cm2。 Flow/speed of flushing shall be more than 1.5m/s or water pressure is more than 0.5MPa/cm2.6.3.1.5 水沖洗應(yīng)連續(xù)進(jìn)行,以排出口的水色透明度與入口水目測(cè)一致為合格。
42、 Water flushing shall be done continuously. When cleanness degree of drain water is same to water supply, that is to say, flushing work is finished.6.3.1.6 排放管的截面積被沖洗管道截面積的60%,排水時(shí),應(yīng)注意不能形成負(fù)壓。 Diameter of drain pipe shall be more than 60% diameter of flushed pipe. Pay attention to negative pressure du
43、ring drain water.6.3.1.7 如果需要通過(guò)設(shè)備進(jìn)行沖洗時(shí),在爭(zhēng)得有關(guān)人員的同意后,才可這樣做,這時(shí)應(yīng)該先沖洗設(shè)備上游側(cè)的管道,上游側(cè)管道沖洗基本干凈后再連通設(shè)備沖洗下游側(cè)的管道。 If we need flush piping system through the equipments, we must get the approval from correlative personnel. In that case, we should flush pipe of upside of equipment first. After pipe of upside is cle
44、an, we can connect to the equipment and continue to flush pipe of downside.6.3.1.8 如果不允許設(shè)備沖洗時(shí),應(yīng)安裝臨時(shí)旁通管,繞過(guò)設(shè)備對(duì)管道系統(tǒng)沖洗。 If it is not allowable to flush pipe through equipment, we should install a by-pass pipe to flush piping system.6.3.1.9 沖洗泵類的冷卻水管時(shí),要與泵斷開。 Shall separate from pump when we flush chillin
45、g water system.6.3.1.10 管道系統(tǒng)進(jìn)行水沖洗時(shí)必須在環(huán)境溫度5以上。若在冬季沖洗,應(yīng)采取加溫措施,在下班前,應(yīng)將管道通向大氣,排盡管內(nèi)的水,需要時(shí)可用壓縮空氣吹干,以防管道及閥門等部件凍裂。 When we flush the piping system, the environment temperature must be more than 5. In winter, we shall take heating/warming measures to flush. Before off duty, we must drain out water inside pip
46、es, even use compress air to blow out, in order to avoiding pipes and valves from freezing.6.3.2 空氣吹掃 Air blowing6.3.2.1 首先將壓力源接到被吹掃的管道上,接入點(diǎn)應(yīng)盡可能選區(qū)本系統(tǒng)的較高位置,這樣可以自上而下的吹掃,以獲得較好的效果。 First, we should connect air supply to blew pipes and keep the connect point in high point of system so that blow pipe from
47、 up to down.6.3.2.2 吹掃時(shí),空氣的流速較大,空氣帶著雜物通過(guò)被吹洗的管道內(nèi)表面,所以襯里管道需用低流速,以免損傷管道的襯里。 General, air speed is quickly during blowing. So liner pipe need to be blew with low speed to avoid from damaging by debris inside pipes.6.3.2.3 空氣吹掃流速20m/s,吹掃壓力不大于0.6MPa,且不得超過(guò)管道的設(shè)計(jì)壓力。 Keep a speed of more than 20m/s and pressu
48、re is less than 0.6MPa and design pressure.6.3.2.4 吹掃時(shí)用錘(不銹鋼管用木錘或塑料錘)輕敲管壁,對(duì)焊縫、死角和管底部位重點(diǎn)敲打,但不得損傷管子。 When we need blow piping system, we can use a hammer (wooden hammer or plastic hammer for SS pipes) to beat pipe (especially, in the point of welding joint, dead leg and bottom of pipes) lightly, but d
49、on't damage pipes. 6.3.2.5 空氣吹掃時(shí)應(yīng)盡可能連續(xù)吹掃,當(dāng)管徑較大,氣源不能保證足夠的吹掃流速時(shí)可以采取間斷吹掃的方法進(jìn)行系統(tǒng)吹掃,即向系統(tǒng)充入空氣時(shí)先關(guān)閉排出口的閥門,待系統(tǒng)達(dá)到預(yù)定的壓力時(shí),快速打開排出閥門,使系統(tǒng)內(nèi)的氣體流速達(dá)到吹掃的要求。如此反復(fù)進(jìn)行,直至吹掃合格。 We should try to blow piping system continuously. If the diameter of pipe is big and air supply cant keep the adequate air to blow continuously,
50、we shall blow piping system discontinuously. That is, close valve in drain point first, then charge the air, when the pressure goes up to a scheduled pressure, we shall open drain valve quickly. We can do like this again and again.6.3.2.6 當(dāng)目測(cè)排氣無(wú)煙塵時(shí),應(yīng)在排氣口處用白布或用涂白漆的木板檢驗(yàn),5分鐘內(nèi)白布上無(wú)明顯可見(jiàn)的鐵銹、塵土、水分及其它雜物為合格。W
51、hen no dust drained by visual, we should use a target of white cloth or white painted plate to check in outlet of drain. If no debris, rust, dust or sundries drained within 5 minutes, we can complete the blowing work.6.3.2.7吹掃空氣排出口的周圍,要采取防護(hù)措施,掛上明顯的標(biāo)志牌。排氣口處的管道必須采取有效措施固定牢固。 Shall take protection measures and put up an obvious nameplate around drain area, and must fix the drain pipe.6.3.3 蒸汽吹掃 Steam blowing6.3
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 家庭網(wǎng)絡(luò)智能設(shè)備使用合同
- 2024年金剛石膜工具項(xiàng)目發(fā)展計(jì)劃
- 加工模具保密協(xié)議(2024版)
- 四年級(jí)數(shù)學(xué)(四則混合運(yùn)算)計(jì)算題專項(xiàng)練習(xí)與答案匯編
- 美金購(gòu)銷合同范本
- 2024年地質(zhì)勘探和地震專用儀器項(xiàng)目合作計(jì)劃書
- 2024年紫外光固化油墨項(xiàng)目合作計(jì)劃書
- 郵品代銷合同范本
- 幼兒園小班音樂(lè)《可愛(ài)的小螞蟻》教案
- 電爐維修合同范本
- GB/T 22838.6-2024卷煙和濾棒物理性能的測(cè)定第6部分:硬度
- 期中 (試題) -2024-2025學(xué)年譯林版(三起)英語(yǔ)四年級(jí)上冊(cè)
- 2024年新版全員消防安全知識(shí)培訓(xùn)
- 鐵路交通安全主題班會(huì)課件
- 2024年輔警考試公基常識(shí)300題(附解析)
- 西方發(fā)愿文是一篇圓滿的作品它包括了初中后三階段最
- 檁條規(guī)格選用表
- 圖形推理100道(附答案)
- 俄語(yǔ)視聽說(shuō)基礎(chǔ)教程1
- 群青生產(chǎn)工藝過(guò)程
- 集團(tuán)審計(jì)指令函
評(píng)論
0/150
提交評(píng)論