1、 帶式輸送機(jī) Blet conveyor 安裝使用說(shuō)明書(shū)Installation and operation instruction 青島永昌泰機(jī)械設(shè)備有限公司一、 帶式輸送機(jī)安裝說(shuō)明書(shū)B(niǎo)elt conveyor installation instruction1. 帶式輸送機(jī)安裝標(biāo)高,均以圖紙為準(zhǔn)。Belt conveyor installation length are with drawings2. 在設(shè)備安裝中如發(fā)現(xiàn)套用圖紙或土建圖紙所注標(biāo)高與工藝布置圖不一致時(shí)需核對(duì)其標(biāo)高。It is necessary to check its standard height when that o

2、f drawings or buider's work drawing are not the same with Process arrangement in process of installation.3. 帶式輸送機(jī)安裝、調(diào)整、試運(yùn)行等內(nèi)容除按本說(shuō)明書(shū)要求進(jìn)行外、設(shè)備安裝手圖及廠家圖紙說(shuō)明書(shū)和技術(shù)要求帶式輸送機(jī)施工及驗(yàn)收技術(shù)規(guī)范進(jìn)行 施工和驗(yàn)收。對(duì)主要設(shè)備應(yīng)建立施工、驗(yàn)收記錄。Belt conveyor in installation, adjustment, commissioning, etc according to the content in addition to

3、 the specifications, equipment installation hand diagram and drawings specifications and technical requirements of the manufacturer of the belt conveyor technology standard construction and acceptance of construction and acceptance. For major equipment shall establish construction and acceptance rec

4、ord.4. 帶式輸送機(jī)安裝前,應(yīng)對(duì)土建施工的建筑物的各層標(biāo)高、基礎(chǔ)、埋件及預(yù)留孔洞等進(jìn)行全面檢查,確認(rèn)符合有關(guān)的質(zhì)量驗(yàn)收標(biāo)準(zhǔn)后方可進(jìn)行安裝。It had better check completely standard height、foundation、built-in and reserve holes of every floor of the building befor installation of belt conveyor, and installation is feasible after confirming that comply with the relevant

5、quality acceptance standard .5. 所有零部件(包括外協(xié)件)必須經(jīng)檢驗(yàn)合格,配套件、外購(gòu)件等必須有合格證書(shū)方可進(jìn)行安裝。 All components (including outsourcing) must be passed the inspection, fittings, purchased components must be qualified certificate for installation.二、 帶式輸送機(jī)安裝的技術(shù)要求及驗(yàn)收的質(zhì)量標(biāo)準(zhǔn).Belt conveyor installation technology requirements an

6、d acceptance standards of quality.1. 驅(qū)動(dòng)裝置Actuating device1.1 傳動(dòng)滾筒中心線與減速器輸出軸中心線同軸度誤差應(yīng)不大于0.1mm.Error from transmission roller center line and reducer output shaft centerline the coaxial tolerance should not be more than 0.1 mm.1.2 減速器輸入軸中心線與電動(dòng)機(jī)軸中心線同軸度誤差應(yīng)不大于0.1mm.Error from reducer input shaft centerli

7、ne and motor shaft centerline the coaxial tolerance should not be more than 0.1 mm.1.3 聯(lián)軸器兩半體安裝時(shí),其端面跳動(dòng)及徑向跳動(dòng)的允許誤差應(yīng)不大于下表所列數(shù)值. when installing Coupling half body, allowed error of the ending beat and radial beat shall not be more than that are listed in the following table.檢驗(yàn)項(xiàng)目Inspection items柱銷聯(lián)軸器Dowe

8、l pin shaft coupling梅花聯(lián)軸器plum blossom coupling端面跳動(dòng)ending beat0.050.10.1徑向跳動(dòng)radial beat0.050.10.15注:按圓周測(cè)定4點(diǎn)以上,有范圍的數(shù)據(jù)下限為目標(biāo)值,上限及無(wú)范圍的數(shù)據(jù)均為允許值.Note: by circumferential determination, above 4 points range of data to target, the lower limit and no range of data are allowable values.1.4 傳動(dòng)裝置支架的水平度0.1mm/n,用水準(zhǔn)

9、儀測(cè)量.Leveless of transmission device stents 0.1mm/n,measured by suveryors level.1.5 帶式輸送機(jī)的逆止器安裝應(yīng)注意起逆止方向,用手盤(pán)動(dòng)減速器的輸出軸應(yīng)能自由轉(zhuǎn)動(dòng)一周.Installation for non-return ejector of belt conveyor should pay attention to the non-return direction, with the hand shaft reducer output shaft should be able to freely turn for

10、 one week.2. 托輥排列基本原則The basic principle of roller arrangement2.1 均以帶式輸送機(jī)布置圖中要求為準(zhǔn).All are based on requirements from arrangement plan of belt converyor.2.2 弧段上下托輥在布置圖中的排列尺寸均以上下架面為基準(zhǔn). Size in arrangement plan of fluctuation roller from arc section are based on fluctuation frame face.3. 機(jī)架Frame of mac

11、hine3.1 安裝傳動(dòng)滾筒、改向滾筒、增面滾筒及張緊裝置滾筒軸承座的兩個(gè)對(duì)應(yīng)平面應(yīng)在同一平面內(nèi),其平面度、軸承座孔間距的誤差和對(duì)角線長(zhǎng)度應(yīng)不超過(guò)下表規(guī)定.The two corresponding plane of installing transmission roller, redirection roller, increase surface roller and tension device roller bearing should in the same plane,and the error of planeness, housings hole spacingand dia

12、gonal length shall not exceed the regulations below.檢驗(yàn)項(xiàng)目Inspection items 簡(jiǎn) 圖Skecth允許誤差A(yù)llowed error對(duì)應(yīng)平面平面度corresponding plane1.0mm對(duì)應(yīng)孔間距WThe corresponding hole spacingW±1.0mm對(duì)應(yīng)孔對(duì)角線間距差|x-y|Distinction for diagonals of Corresponding hole|x-y|x-y|3.0mm3.2 Car type tension device walk track installa

13、tion allows error press table regulations. 檢驗(yàn)項(xiàng)目Inspection items 簡(jiǎn) 圖Skecth允許誤差A(yù)llowed errors軌距Wtrack gaugeW±1.5mm軌頂高差hhW/6003.3 帶式輸送機(jī)頭架,尾架,中間架,驅(qū)動(dòng)裝置架等應(yīng)校正平值.中間架的直線度誤差應(yīng)不大于1/1000.Belt conveyer frame, tail frame, middle frame, and actuating device etc should be corrected according to average value. T

14、he middle rack of flat straightness error should not be more than 1/1000.4. 整機(jī)的安裝質(zhì)量標(biāo)準(zhǔn)The installation quality standards of machine允許誤差表: 檢驗(yàn)項(xiàng)目Inspection items 簡(jiǎn) 圖Skecth允許誤差A(yù)llowed errors滾筒垂直度Verticality of rollerD(mm) b(mm)1000 1.0檢驗(yàn)項(xiàng)目Inspection items簡(jiǎn) 圖Skecth允許誤差A(yù)llowed errors滾筒水平度Levelness of rolle

15、rD(mm) b(mm)1000 1.0滾筒中心線偏離Roller center deviation A5mm支腿內(nèi)間距Interval in ground jack W±2.0mm架面高差Height difference of frameh600/W上托輥孔 roller hole upon 對(duì)角線差Difference of diagonal |x-y|2mm每50m一個(gè)測(cè)點(diǎn)托輥橫向中心線偏離Deviation of Roller transverse center line D3mm檢驗(yàn)項(xiàng)目Inspection items 簡(jiǎn) 圖 skecth 允許誤差A(yù)llowed err

16、ors托輥上表面高度差Height difference of upper surface of rollerTwo adjacent|h1-h2|2mm每100m|h1-h2|5mm膠帶中心線蛇形度Tape the centerline serpents degreesL100m時(shí)e20mmL=100-300m時(shí)e30mm5. 輸送帶 conveying belt5.1 輸送帶膠接前應(yīng)仔細(xì)對(duì)照每條帶式輸送機(jī)布置圖中的規(guī)格,如上下膠層厚度、層數(shù)、芯層材料、用途要求、強(qiáng)度等.Before conveyingbelt cementing,it should compare specificatio

17、ns in arrangement plan of every belt conveyor carefully, such as the arrangement and the thickness of the fillet, layer number, the core layer materials, the use, requirements, strength, etc.5.2 膠帶應(yīng)平直,無(wú)扭曲、氣泡、坑眼,其蛇行量不應(yīng)大于0.35%.Tape should be straight without distortion,air bubble, pit eyes, and its S-

18、shaped is not greater than 0.35%. 5.3 輸送帶應(yīng)采用硫化接頭,接頭強(qiáng)度不應(yīng)低于膠帶本身強(qiáng)度的90%.Conveyor belt should use vulcanization joint, joint strength should be no less than 90% of the strength of the tape itself.6. 防雨罩Anti-rain cover 6.1 防雨罩安裝之前應(yīng)先安裝防雨罩支撐架,支撐架與中間架之間采用焊接,焊接時(shí)應(yīng)嚴(yán)格按照總裝圖中防雨罩支撐架的位置進(jìn)行焊接。supporting frame should b

19、e first installed before installation, the support frame and middle frame linked by welding,it should be welded strictly according to the position of anti-rain cover frame in general assembly drawing. 6.2 防雨罩安裝時(shí)應(yīng)按照?qǐng)D紙中標(biāo)明的種類進(jìn)行安裝排布,防雨罩之間搭接應(yīng)平整順暢,It should be arranged according to kinds signed in drawing

20、s when installing , lap joint of anti-rain cover should be level and smooth. 6.3 其他安裝要求按照?qǐng)D紙進(jìn)行。Other installation requirements according to drawing7. 其他 others6.1 清掃器的安裝、調(diào)整及接觸壓力等應(yīng)符合廠家說(shuō)明書(shū)的要求.The sweeper installation, adjustment and the contact pressure should comply with the requirements of the specif

21、ication of factory.6.2 帶式輸送機(jī)的拉緊裝置安裝時(shí),必須使用張緊滾筒在初始位置上,以保證最大的行程.Of the belt conveyor tension device installation, it must use a tight roller in the initial position to ensure maximum trip6.3 系統(tǒng)中落料管法蘭接口、人孔門(mén)、檢查門(mén)及漏斗與設(shè)備相接處,均應(yīng)采用橡膠板或其他材料予以密封,以防粉塵飛揚(yáng)污染環(huán)境.Joint of dropping materials tube flange interface , manh

22、ole door, switch of inspection door and funnel with equipment in the system,all should be sealed by rubber or other materials to prevent dust so as not to pollute environment.6.4 導(dǎo)料槽上安裝落料管的孔洞現(xiàn)場(chǎng)割制,安裝完畢后割除落料管在接口處超過(guò)20毫米的余長(zhǎng),并用鋼板將周邊空隙封嚴(yán).The manger falls feed tube mounted on the site of the hole cut, inst

23、alled after the debate after dropping material in more than 20 mm outlet pipe of the long, and will be more than steel surrounding space seal.6.5 各轉(zhuǎn)運(yùn)站頭部漏斗或落料管預(yù)留的孔洞待漏斗或落料管安裝完畢后,周邊應(yīng)砌成護(hù)沿并用鋼板將周邊空隙蓋嚴(yán),鋼板與管道連接處應(yīng)進(jìn)行點(diǎn)焊.低于地(樓)面處,周邊應(yīng)砌成100毫米以上的護(hù)沿. The transfer station head or down feed tube funnel reserved to fu

24、nnel into the holes or feed tube installation is completed, peripheral should build by laying bricks or stones becomes HuYan and steel will cover tightly around space, pipe joints of the steel plate and should be less than to spot welding. (floor) face place, should build by laying bricks or stones

25、becomes around 6 "(100 mm) above the HuYan.三、對(duì)試運(yùn)的要求及運(yùn)行維護(hù)注意事項(xiàng)The commissioning requirements and operation maintenance matters1. 帶式輸送機(jī)必須空轉(zhuǎn)試運(yùn)正常后方可帶負(fù)荷試運(yùn).在設(shè)計(jì)負(fù)荷下輸送帶與驅(qū)動(dòng)滾筒之間不允許打滑.Belt conveyor must work with load after it works normally without load.It isnt allowed skid between conveyingbelt and acuact

26、ing roller with designing load. 2. 系統(tǒng)內(nèi)各設(shè)備試運(yùn)時(shí),應(yīng)按廠家規(guī)定的試運(yùn)大綱或技術(shù)要求進(jìn)行.基本要求是:各轉(zhuǎn)動(dòng)件應(yīng)運(yùn)轉(zhuǎn)平穩(wěn),無(wú)卡磨現(xiàn)象,軸承溫度不超過(guò)允許溫升.Within the system commissioning, should press equipment by a manufacturer of commissioning outline or technical requirement is: basic requirements.Each turn a should operates smoothly, no card grinding

27、phenomenon, do not exceed the allowable bearing temperature temperature rise.3. 系統(tǒng)中各設(shè)備安裝完畢后,應(yīng)按進(jìn)行如下項(xiàng)目的檢查:After installation of all equpments in the system,it should be checked items below:單機(jī)運(yùn)行Light running空載運(yùn)行No-load running聯(lián)動(dòng)運(yùn)行Ganged ruuning負(fù)荷運(yùn)行Load running4. 運(yùn)行維護(hù)Operation and maintenance4.1 應(yīng)加強(qiáng)設(shè)備的檢

28、查和維修,建立和健全必要的規(guī)章制度,保證設(shè)備的完好狀態(tài).It should take more inspection and maintaince of equpments,establish and improve regulations necessary so as to keep they in a perfect condition.4.2 各條帶式輸送機(jī)的拉緊鋼絲繩應(yīng)經(jīng)常檢查,如發(fā)現(xiàn)異?;蚱茡p要及時(shí)更換.It should inspect constantly the taut wire rope of every conveying belt,it should be chang

29、ed timely when anomalous and broken.4.3 設(shè)備安裝或檢修起吊時(shí),放置設(shè)備處的樓面板應(yīng)采取措施使載荷不超過(guò)允許范圍. When installing of servicing , floor slabs in equipment place should be taken measures to make load not more than allowed scope4.4 凡在轉(zhuǎn)運(yùn)站各層預(yù)留的加設(shè)蓋板的安裝孔洞,檢修時(shí)需將蓋板移開(kāi),孔洞周圍應(yīng)設(shè) 置臨時(shí)欄桿以確保人身安全. And in each layer of the reserved adding

30、transfer station cover installation holes, maintenance should remove cover plate, hole should be set for temporary railings around to ensure the security of person.4.6 運(yùn)行每班交接前,應(yīng)將落料管,導(dǎo)料槽等處的積料清理干凈,以防自燃引起火災(zāi).Before the handover of Each squad,it should clean up dropping material tube and product material

31、 in feed channel to prevent fire hazard.4.7 引起帶式輸送機(jī)故障及跑偏的因素較復(fù)雜,下表給出了常見(jiàn)跑偏和故障現(xiàn)象產(chǎn)生的原因及預(yù)防對(duì)策.It is just due to many factors causing stoppage and wandering,it shows common Reasons and countermeasures against stpppaage and wandering below.序號(hào)Serial number現(xiàn) 象appearance原 因resons對(duì) 策countermessures1整機(jī)膠帶向一個(gè)方向跑偏T

32、he tape of overall unit wandering to a directiona承載托輥,滾筒不在同一直線上,承載托輥安裝不水平.carrying idler ,roller arent on the same line,carrying idler wasnt installed horizontally調(diào)整承載托輥及架構(gòu)Adjust carrying idler and frameb 膠帶邊緣因摩擦而損傷Tape edge broke because of friction清除摩擦障礙,修補(bǔ)或更換膠帶Elimilate friction obstacle,mend or

33、change the tapec 物料偏斜不在受料中心Material is not skewed in materials expected centre調(diào)整物流使其對(duì)中Adjust material flow and make it centered2膠帶在同一托輥處跑偏The tape wandering in the same rollera機(jī)架的一部分不在同一直線上.Parts of frame are not on the same line調(diào)整機(jī)架并使其左右同高Adjust fame and make it the same height of R&Lb 托輥與膠帶的運(yùn)行

34、方向不垂直Running direction of roller is not vertical with tape.空載時(shí)調(diào)整跑偏最大處前23倍托輥間距處的托輥,需經(jīng)二三次調(diào)整,調(diào)正后牢固固定When the wandering no-load adjustment before both 2 3 times the distance between roller in roller, subject to 23 times, after the adjustment is firmlyc 托輥轉(zhuǎn)動(dòng)不良Roller turns no that good更換不良托輥Change the bad rollerd 托輥粘結(jié)物料roller bonds materials清洗粘結(jié)物料Clean the b

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

最新文檔

評(píng)論

0/150

提交評(píng)論