1、technical agreement on packaging in gis exportw60000294party a: shanghai siyuan high voltage switchgearco., lid.party b: shanghai xintonglian packaging co., ltd.signature and stampsignature and stampfrom september 2013 to september 2015technical agreement on packaging in gis exportthis agreement is
2、signed and entered by shanghai sieyuan high voltage switchgear co., l(d (buyer) and shanghai xintonglian packaging co., ltd. (supplier) for packaging of 145/252gis export via friendly consultations 1. scope1 1 this technical agreement specifies the scope and requirements for packaging the exported i
3、tems of shanghai sieyuan high voltage switchgear co., l(d1.2 this technical agreement provides the range of services required from shanghai xintonglian packaging co.,ltd. for exported 145/252 gis.1.3 this technical agreement applies only to the acceptance of packaging solutions and inspection of woo
4、denframe cases for 145/252 gis exported by shanghai sieyuan high voltage switchgear co., l【d.2. normative referencesgb/t !91pictorial signs for packaging and transportgb/t 4879 rust-proof packaginggb/t 7284 wooden frame casesgb/t 735() waterproof packaginggb/t 9846.4 plywood- general technical condi
5、tions for plywoodgb/t 13384 technical conditions for packaging electronic productsgb/t 13385 packaging design requirementsq/sj 1405 technical specifications for internal packaging export goods3.3.2.4 technical requirements3.3.3.4 general requirements3.3.4.4 all export items are transported in wooden
6、 packaging frame cases, which shall comply with the relevant requirements of gb/t 7284;3.3.4.4 the wooden frame cases should be suitable for transport by rail, road and sea;3.3.4.4 according to section 3.1in gb/t 13384, under normal storage, handling conditions, it should be ensured that the product
7、s shall be protected from rust, mold, accuracy compromise, damage or loss for inappropriate packaging conditions within at least 2 years from the delivery date;3.3.4.4 the main force bearing component of wooden frame case shall be made with larch, pine, fir, spruce, maple, or woods of the same or gr
8、eater strength;3.3.4.4 spacing packages, lcp cabinets, pt, la boxes should be banned from stacking suitable gaps should be set within the box; other frame box for parts should meet the requirements for at least two layers stacking;3.3.4.4 taking into account the weight, packing size, the component o
9、f packing boxes should take appropriate reinforcement measures; large packages should be provided with protective iron for lifting;3.3.4.4 packing cases shall be equipped with ventilation openings according to the actual needs;3.3.4.4 the strength of wooden pieces for fixing inside the boxes shall m
10、eet the transport requirements;3.3.4.4 the boxes should adopt i to ii class plywood; at the joints of plywood, there should be no gap, and the gap width not more than 3mm.3.3.4.4 packaging protection: according to the modes of transport, the protection methods shall be determined;when you need vacuu
11、m packaging, the built-in sealing bags shall be made with composite film of aluminum foil and vacuumed before sealing the specific production requirements shall be in accordance with the article in 6 q/s j1405.the packaging requirements for various modes of transport are shown in table 1:table 1 pro
12、tection me什lods for packaging boxestransport modeprotection methodsmode 1: roadrust-proof packaging, shockproof packagingmode 2: road and railrust-proof packaging, shockproof packagingmode 3: highway and shipping (transport time within 2 months )vacuum packaging, shockproof packagingmode 4: highway
13、and shipping (two months or more )vacuum packaging, shockproof packaging, waterproof packagingnote: due to the transport and storage time, waterproof packaging can be used in mode 4; and the waterproof packing shall comply with the requirements for packing for class b level 1 and the relevant requir
14、ements of gb/t 7350 standard.3.2 packaging and transportaccording to the requirements of the transport of export items, party b should be able to provide frame wooden packing and packing service according to table 2:table 2 transport and packing requirementstransportpackaging requirementsinterval tr
15、ansport units1 interval/box or 2 intervals/boxtransport of tube3 tubes/ box or 1 tube/box, single layer packinglcp split cabinet1 cabinet/boxbusbar transportation unitsingle or two layers, the quantity determined in accordance with the packing listarrester transportation unitsingle layer package, th
16、e quantity determined in accordance with the packing listvoltage transformer transportation unitsingle layer package, the quantity determined in accordance with the packing listspare parts, instrument and equipmentdetermined in accordance with the packing listparts transportation unitdetermined in a
17、ccordance with the packing listsf6 gassingle layer package, the quantity determined in accordance with the packing list33 packing requirementsa) intervals331 .ithe bottom frames of intervals shall be fixed with box bottom of package (bolt holes shall be provided on the h steel or channel steel of in
18、tervals), while a wooden stopper shall be provided at the front, rear, left and right of bottom frame3.5.1 components above the bottom frame of interval shall be prohibited to be fixed with battens. 3.3.1.3 before sealing, a sealing bag should be used for protection of the interval, while according
19、to the actual needs, placing the appropriate number of desiccant in the relevant locations.b) voltage transformers, surge arresters transportation4.3.2 they must be delivered in upright position;6.4.4 on the bottom bracket, mounting holes shall be provided, and the bottom bracket shall be fixed with
20、 the bottom of packing boxes with screws;6.4.5 battens shall be used on the cover of package of voltage transformers, surge arresters, or when battens can not be fixed above, complementary reinforcement shall be given at bottombefore sealing boxes, sealing bags shall be used for protection, while ac
21、cording to the actual needs, placing the appropriate number of desiccant in the relevant locationsc) ceramic bushing transportationceramic section of bushings can not be used as a limit or stress points, which should be on the outer surface of the upper and lower flanges;the limit position should be
22、 on both ends of the upper and lower flanges or patch panels of flanges;3.3.33 at all of the limit position, foam sponge shall be provided to prevent direct contact with the wooden items; 3334 sealing bags shall be adopted to protect bushings before sealing the case, while according to the actual ne
23、eds, placing the appropriate number of desiccant in the relevant locations.d) busbar transportation unit:the busbars shall be placed horizontally in the box;triangular wooden blocks or wooden stoppers can be used to limit position, with battens used to fix and prevent the goods from getting up and d
24、own during transport;at the locations on the surface in contact with the busbars, foam sponge should be added in order to prevent direct contact with the wooden items;before sealing boxes, sealing bags shall be adopted for the busbars for protection inside, but according to the actual needs, placing
25、 the appropriate number of desiccant in the relevant locations3.3.5 parts:packing parts shall be strictly in accordance with the contents of packing list;before the items are placed in the box, first put the sealing in the box; after completion of the packing, seal the sealing bags and place the app
26、ropriate number of desiccant, and the sealing bags in the packing process must not be damaged;335.3 in case the sizes of spare parts are too small, and the items on the packing list can not fill box to a certain extent, the party a shall promptly adjust items, and the packing list be revised and imp
27、roved;when packing, party a shall be responsible for checking the inventory items, and party b shall be responsible for packing;packing should follow the following principles:before packing, party a confirms: documents, drawings having separate waterproof packages; wearing parts in spare parts, such
28、 as insulation pot, density relay, closing coil, etc., in the packaging needs to be checked for waterproof measures;secondaiy components, sealing rings, paints, density meter, adsorbents, measuring instruments should be placed in separate areas in the spare part boxes to avoid contact with steel par
29、ts (such as: standard parts, support, etc.), that is, mutual isolation in between shall be done for protection against bump;the items needing layering in the box should be isolated with protective plywood, whose performance parameters should be consistent with the relevant provisions of gb/t 9846.4;
30、the gaps between of parts in the box should be filled with foam sponges to cushion articles against bump;to prevent goods from getting up and down during transport, battens should be used prior to sealing to prevent goods from moving around the battens shall be able to be fixed by nails with the sid
31、e of the column.technical documentsparty a shall provide accurate, detailed packing list and parts dimensions, weight, center of gravity to party b; except for parts, the soft copy of drawings of dimensions of the rest transport units should also be provided to party b;party b shall design drawings
32、based on the packing list and dimensions provided by party;party b shall provide the confirmation drawing of boxes containing the following:packing box drawing should contain: general assembly drawings, bottom packing diagram, side plate packing diagram, end plate packing diagram, cover packing diag
33、ram;parts list shall be given in general assembly drawings and split drawings;a description of fixing method in drawings inside the box should be given;in the general assembly schedule, there should have accessories such as: beams, battens, foam sponge, partitions, nails, iron guard, ventilation ope
34、ning, sealing bags, desiccant, and other details of items.party b should send the packing drawings to party a for confirmation at the agreed time;package design drawing should meet the related requirements in gb/t 13385packaging signspackaging signs contain signs for packaging and transport, shippin
35、g mark, company logo and other signs, among which the shipping mark shall be made and printed by the party a in accordance with the project requirements with plastic rainproof processing;packaging logo color: color of signs shall be black, with company logo nsieyuanh blue, which must be clear, eye-c
36、atching, without fading special requirements shall be given according to actual requirements;packaging and storing signs, company logo is sprayed, and shipping mark is attached using nails;packaging and storing signs: signs should be selected based on product characteristics of the product according
37、 to gb/t 191, generally including:"up", "protected from rain ", " fragile ”,"no roll " and " stacking limits" or "prohibit stacking " for packages requiring one-piece lifting and gravity center deviating significantly from the center, they shoul
38、d be marked with ”lifting at this pointu and center of gravity0 signs and frame size can be adjusted according to the box dimensions;packaging and storing signs, company logo logo under normal circumstances should be sprayed on the side of the box (in longitudinal direction), transport signs (marks)
39、 and packing list attached to the end plate; specific locations of packaging signs shall be determined based on the actual packaging boxes3.3.2.5 packaging services scope3.3.3.5 for items in first cooperation or some special packaging not clearly stated in 3.3, party b in the course of packaging sha
40、ll provide technical guidance;3.3.3.5 for each item, party b should send at least one highly experienced personnel responsible for specific packaging of each item;3.3.3.5 boxing business division:4.3party a is responsible for placing the finished product to be packed in the designated packing area;p
41、arty a is responsible for lifting finished products in packaging and provide some special appliances;party a is responsible for checking that the appearance of packaged goods are in good condition;party a is responsible for pasting movement indicator before packaging;party a is responsible for fixin
42、g the packing list on the outer surface of box and plastic processing;party b is responsible for fixing the packaging, protection, packing;437 party b is responsible for spraying and fixing the transportation signs, shipping marks sieyuan logo signs, and responsible for spraying shipping marks neede
43、d3.3.2.6 rights and responsibilities3.3.3.6 party b shall ensure that the package provided shall damage during lifting, transport and packaging and willnot have impact on the product;3.3.3.6 party b when providing packaging services to party a, should be strictly in accordance with established packa
44、ging fixing solutions during protection and packing; when the bottom provided by party a does not meet the requirements of fixing to the box bottom row, party b has the right to refuse to carry out the packaging;3.3.3.6 party b shall provide packing and packaging services at agreed time, and provide
45、 proof of fumigation crates. the valid period of fumigation is 21 days. if the uncertainty in shipment cause fumigation failure and lead to further re- fumigation unpacking, the expenses incurred shall be borne by party a;3.3.3.6 the failure in packaging or rework caused by mismatching size of the b
46、ox shall be the responsibility of the responsible party;3.3.3.6 party b during packaging services shall be responsible for the security of party a,s personnel.3.3.2.7 acceptance3.3.3.7 during delivery of packaging boxes, party a shall inspect the appearance and dimensions in accordance with the draw
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 高速公路CFG樁基礎(chǔ)施工合同
- 鐵路綠化帶苗木種植合同
- 醫(yī)療器械公司租賃協(xié)議
- 超市廢油回收合同范例
- 金杯投資合同三篇
- 海關(guān)監(jiān)管員勞動合同三篇
- 解除物業(yè)服務(wù)合同(2篇)
- 外雇電工短期出差協(xié)議書
- 公積金三方扣款協(xié)議辦理流程
- 土地轉(zhuǎn)讓合同范例格式
- DL-T5434-2021電力建設(shè)工程監(jiān)理規(guī)范
- 青海省西寧市2023-2024學(xué)年七年級上學(xué)期期末英語試題(含答案)
- 眼的解剖結(jié)構(gòu)與生理功能課件
- 網(wǎng)絡(luò)服務(wù)器搭建、配置與管理-LinuxRHEL8CentOS8(第4版)-課后習(xí)題答案
- 國開本科《中國當(dāng)代文學(xué)專題》形考任務(wù)2試題及答案
- 土木工程試驗與檢測考試題題庫
- 統(tǒng)部編版語文三年級上學(xué)期期末真題模擬試卷(含答案解析)
- 土木工程制圖(黑龍江聯(lián)盟)智慧樹知到期末考試答案2024年
- DL-T 572-2021電力變壓器運行規(guī)程-PDF解密
- 2024年貴州貴安新區(qū)產(chǎn)業(yè)發(fā)展控股集團有限公司招聘筆試參考題庫含答案解析
- RBA-6.0-培訓(xùn)教材課件
評論
0/150
提交評論