1、施工組織設(shè)計施工組織設(shè)計/方案審查意見方案審查意見review comments on construction organization design/method statement承包單位承包單位 contractor: 四川石油天然氣建設(shè)工程有限責任公司(四川石油天然氣建設(shè)工程有限責任公司(spc)監(jiān)理單位監(jiān)理單位 supervision company: 四川華成油氣工程建設(shè)監(jiān)理有限公司(四川華成油氣工程建設(shè)監(jiān)理有限公司(spcs)合同號合同號 contract no.: cw682719 編號編號 no.: cdb-0000-tec-pln-sc2-000-00100-00工程項目
2、名稱 engineering project name:川東北高含硫氣田宣漢開縣區(qū)塊氣田工程內(nèi)部集輸工程internal gathering system of chuandongbei high-sulfur gas field xuanhan/kai block gas field project方案描述 description of ms:站內(nèi)露空管道系統(tǒng)安裝方案method statement for installation of exposed pipeline in well pad and gathering station編制依據(jù) compilation basis:相關(guān)標準
3、、施工圖等relevant standards and construction drawings, etc.編制總說明 compilation instruction:指導內(nèi)輸各井站露空管道系統(tǒng)預制、安裝instruct prefabrication and installation of exposed pipeline in well pad and gathering station承包商報審意見 comment for approval from contractor:承包單位 contractor(章 seal): 項目負責人 project leader: 日 期 date: 審
4、查意見 review comment:項目監(jiān)理機構(gòu)project supervision organizationcdb 專業(yè)工程師cdb disciplined engineercdb qa 工程師cdb qa engineercdb hes 現(xiàn)場經(jīng)理cdb hes site managercdb 現(xiàn)場施工經(jīng)理cdb site construction manager簽字 sign 簽字 sign 簽字 sign 簽字 sign 簽字 sign 日期 date 日期 date 日期 date 日期 date 日期 date cdb-0000-tec-pln-sc2-000-00100-00川
5、東北高含硫氣田宣漢開縣區(qū)塊氣田工程內(nèi)部集輸工程川東北高含硫氣田宣漢開縣區(qū)塊氣田工程內(nèi)部集輸工程internal gathering system of chuandongbei high-sulfur gas field xuanhan/kai block gas field project 站內(nèi)露空管道系統(tǒng)安裝方案站內(nèi)露空管道系統(tǒng)安裝方案method statement for installation of exposed pipeline in well pad and gathering station川慶油建公司川東北高含硫氣田工程施工項目部spc chuandongbei high
6、-sulfur gas field project construction department版次rev.安全 safety日期 date編制 compiled日期 date審核 reviewed日期 datek03批準 approved日期 date站內(nèi)露空管道系統(tǒng)安裝方案method statement for installation of exposed pipeline in well pad and gathering station目目 錄錄 contents1.工作范圍工作范圍 scope of work.11.1.簡介 brief introduction.12.相關(guān)活動
7、和方案相關(guān)活動和方案 related activities & method statements.12.1.相關(guān)程序文件和方案 related procedures and method statements.12.2.相關(guān)設(shè)計文件及規(guī)范 related design documents and specifications.23.健康、安全與環(huán)境健康、安全與環(huán)境 health, safety & environment.23.1.風險評估 risk assessment.23.2.hse 要求 hse requirements.33.3.應急救援 emergency res
8、ponse.44.培訓和人員資質(zhì)培訓和人員資質(zhì) training and competency of personnel.45.工藝工藝 process.55.1.施工準備preparation for construction.55.2.流程 process flow.55.3.材料檢查及驗收 acceptance inspection of check.65.4.管段預制 prefabrication.65.5.焊接 welding.95.6.不銹鋼 stainless steel.115.7.無損檢測 nondestructive test (ndt) .115.8.熱處理 heat t
9、reatment.125.9.現(xiàn)場組裝焊接 assembly & welding.125.10.閥門安裝 valve installation.135.11.與設(shè)備管嘴的連接 connection to equipment nozzle.145.12.法蘭連接 flange connection.145.13.管道支吊架安裝 piping support and hanger installation.155.14.吹掃試壓 blowing and pressure test.166.質(zhì)量監(jiān)視質(zhì)量監(jiān)視 quality surveillance.166.1.一般性檢驗 general i
10、nspection.166.2.質(zhì)量控制及檢查應根據(jù)以下文件進行:qc/qa shall refer to the the following documents:.177.hse 管理管理 hse management .177.1.安全教育 safety education.177.2.施工現(xiàn)場 construction site.187.3.吊裝 lifting.187.4.電、氣焊作業(yè) electrical, gas welding operation.187.5.用電安全 electrical safety.197.6.主要參考文件 main references.198.人員安排人
11、員安排 personnel arragement.198.1.人員 personnel.198.2.溝通 communication.209.設(shè)備設(shè)備 equipments.2010.材料材料 materials.2111.報告和記錄報告和記錄 reporting and records.2112.行動關(guān)閉行動關(guān)閉 close out of activities.21附錄附錄 appendix .21站內(nèi)露空管道系統(tǒng)安裝方案method statement for installation of exposed pipeline in well pad and gathering statio
12、n11.工作范圍工作范圍 scope of work1.1.簡介簡介 brief introduction此方案適用于川東北高含硫氣田內(nèi)部集輸工程各井站露空管道系統(tǒng)的預制和安裝,關(guān)于埋地管道安裝措施詳見站內(nèi)埋地管道施工方案cdb-0000-tec-pln-sc2-000-00083-00。the method statement is applicable to prefabrication and installation of exposed pipeline in all well pads and gathering stations of chuandongbei high-sulf
13、ur gas field internal gathering project. installation measures for underground pipelines see construction method statement for underground pipeline in well pad and gathering station (cdb-0000-tec-pln-sc2-000-00083-00) in details內(nèi)輸工程各井站露空管道涉及以下材質(zhì):a333gr6、316l、l245nb、20#、l360qs、l245ns、a671 cc65、20gk 、
14、q235b+鍍鋅。各種材質(zhì)特性及相關(guān)切割、焊接、熱處理要求詳見 pqr 說明。the materials of exposed pipeline in well pads and stations of internal gathering system are as follows: a333gr6, 316l, l245nb, 20#, l360qs, l245ns, a671 cc65, 20gk and q235b + galvanization. the requirements for characteristics as well as cutting, welding and
15、heat treatment of all kinds of materials see pqr for details. 2.相關(guān)活動和方案相關(guān)活動和方案 related activities & method statements2.1.相關(guān)程序文件和方案相關(guān)程序文件和方案 related procedures and method statements健康環(huán)保和安全管理體系 cdb-0000-hes-pcd-sc2-000-00001-00 hse management system應急救援總預案 cdb-0000-hes-pln-sc2-000-00001-00general
16、emergency plan高處作業(yè)安全管理標準 cdb-0000-hes-pcd-sc2-000-00006-00safety management standard for work at height 交通安全管理標準 cdb-0000-hes-pcd-sc2-00019-0000-00traffic safety management standard高溫作業(yè)安全管理標準 cdb-0000-hes-pcd-sc2-000-00007-00safety management standard for work under high temperature腳手架作業(yè)安全管理標準 cdb-0
17、000-hes-pcd-sc2-000-00010-00safety management standard for scaffold operation 進入受限空間安全管理標準 cdb-0000-hes-pcd-sc2-000-00012-00 safety management standard for entering confined spaces焊接控制程序 cdb-0000-qac-pcd-sc2-000-00015-00welding control procedures 無損檢測控制程序 cdb-0000-qac-pcd-sc2-000-00016-00control pro
18、cedure for non-destructive test熱處理控制程序 cdb-0000-qac-pcd-sc2-000-00017-00heat treatment control procedure物資進場驗收管理辦法 cdb-0000-qac-pcd-sc2-000-00018-00management measures for materials mobilization and acceptance壓力試驗控制程序 cdb-0000-qac-pcd-sc2-000-00019-00control procedure for pressure test焊工上崗考試管理辦法 cdb
19、-0000-qac-pcd-sc2-000-00020-00 management measure for welder job examination管道安裝質(zhì)量控制程序 cdb-0000-qac-pcd-sc2-000-00022-00quality control procedure for pipe installation 設(shè)備、工藝管道、鋼結(jié)構(gòu)制安檢驗試驗計劃cdb-0000-qac-pln-sc2-000-00003-00itp for equipment, processing pipeline, steel structure fabrication and installa
20、tion焊工入場技能考核細則 cdb-0000-qac-pcd-sc2-000-00036-00detail rules and regulations for pre-work skill assessment of welders無損檢測質(zhì)量計劃 cdb-0000-qac-pcd-sc2-000-00037-00站內(nèi)露空管道系統(tǒng)安裝方案method statement for installation of exposed pipeline in well pad and gathering station2quality plan for nondestructive testing無損
21、檢測工藝規(guī)程 cdb-0000-qac-pcd-sc2-000-00038-00 technical specification for nondestructive testing管道、儲罐保溫技術(shù)規(guī)定 cdb-0000-crr-spc-uec-000-00002-22technical specification for insulation of pipeline and storage tank 現(xiàn)場物資質(zhì)量控制管理辦法 cdb-0000-qac-pcd-sc2-000-00039-00implementation of on-site material quality control
22、移動式起重機吊裝作業(yè)安全管理標準cdb-0000-hes-pcd-sc2-000-00015-00safety management standard for hoisting operation with mobile crane hse 培訓標準 cdb-0000-hes-pcd-sc2-000-00002-00hes training standard 個人防護用品管理標準 cdb-0000-hes-pcd-sc2-000-00008-00management standard for individual protective article工具箱會議標準 cdb-0000-hes-p
23、cd-sc2-000-00009-00standard for toolbox meeting 雪佛龍 作業(yè)許可管理標準chevrons management standard for work permit 設(shè)備管理辦法(試行) cdb-0000-hes-pcd-sc2-000-00021-00equipment management method (pilot edition)事故管理程序 cdb-0000-hes-pcd-sc2-000-00014-00 accident management procedure質(zhì)量檢驗計劃 cdb-0000-qac-pcd-sc2-000-00032-
24、00quality inspection plan2.2.相關(guān)設(shè)計文件及規(guī)范相關(guān)設(shè)計文件及規(guī)范 related design documents and specifications有效版本施工圖、說明書和 cdb 重要的設(shè)計文件。effective construction drawings, specifications and cdb important design documents.石油天然氣建設(shè)工程施工質(zhì)量驗收規(guī)范 站內(nèi)工藝管道工程(sy4203-2007)code for quality acceptance of oil and gas construction engine
25、ering station procedure pipeline project (sy4203-2007)石油天然氣站內(nèi)工藝管道工程施工及驗收規(guī)范(sy0402-2000)standard for construction and acceptance of oil and natural gas station procedure pipeline project sy0402-2000石油天然氣站內(nèi)工藝管道工程施工規(guī)范 (gb50540-2009)code for construction of pipe process in oil and gas transmission pipel
26、ine station (gb50540-2009)高酸性氣田集輸站場及凈化裝置設(shè)備與管道安裝工程施工及驗收規(guī)范qsy xn2009-2005code for construction and acceptance of gathering transportation facilities, purification unit equipments and pipeline installation of high-sour gas field project qsy xn2009-2005高酸性氣田集輸場站和凈化裝置工程質(zhì)量驗收標準qsy xn2011-2005standard for q
27、uality acceptance of gathering transportation facilities and purification unit engineering project of high-sour gas field qsy xn2011-2005給排水管道工程施工及驗收規(guī)范 (gb50268-2008) code for construction and acceptance of water supply pipelines gb50268-2008現(xiàn)場設(shè)備、工業(yè)管道焊接工程施工及驗收規(guī)范(gb50236-98)code for construction and
28、acceptance of field equipment, industrial pipe welding engineering gb50236-98.工業(yè)金屬管道工程施工及驗收規(guī)范(gb50235-2010)code for construction and acceptance of industrial metallic piping gb50235-2010.工業(yè)設(shè)備及管道絕熱工程施工規(guī)范 (gb50126-2008)code for construction of industrial equipment and pipeline insulation engineering g
29、b50126-20083.健康、安全與環(huán)境健康、安全與環(huán)境 health, safety & environment3.1.風險評估風險評估 risk assessment此方案風險分析詳見附件 1。see to attachment 1 for risk analysis.站內(nèi)露空管道系統(tǒng)安裝方案method statement for installation of exposed pipeline in well pad and gathering station3此方案中的所有單項工作都應與承包商的單項 jsa,風險分析和每天開始工作前進行的工具箱會議相符。all indivi
30、dual tasks mentioned in this method statement will be subject to individual jsa, risk assessments and toolbox talks by contractor in-situ before work commences on a daily basis.3.2.hse 要求要求 hse requirements作業(yè)前應根據(jù)作業(yè)內(nèi)容辦理相關(guān)許可,如綜合作業(yè)許可、熱工作業(yè)許可、受限空間作業(yè)許可、射線作業(yè)許可、開挖作業(yè)許可等。handle relevant ptw before work commen
31、ce, such as general work permit, hot work permit, work permit for work in confined space, work permit for ray operation, excavation work permit, etc.不銹鋼焊接時,應做好預防六價鉻的呼吸道防護(若需要)。when perform stainless steel, make proper respiration protection against chromium vi (if required).所有人員都應參加了適應的安全培訓并佩戴 ppe,如
32、作為最低要求的安全帽,鋼頭鞋,安全眼鏡和工作服以及根據(jù)具體情況需要穿戴的安全手套、高亮背心以及面罩等。all personnel participating will take appropriate safety training and properly wear ppe as minimum requirements as hard helmet, steel toe boots, safety glasses and coverall. safety gloves, high visibility vest and facial shield will be required for
33、specific works. 起重作業(yè)應根據(jù)項目安全工作規(guī)范手冊第 6.4 條之規(guī)定,制定起重計劃。起重吊裝作業(yè)應當根據(jù)現(xiàn)場的實際情況考慮吊車、運輸車輛的站位以及是否影響道路交通安全。lift plan will be prepared in accordance with sec. 6.4 in safe work specification manual. lift operation should consider whether the standing position of cranes and transportation vehicles will impact traffi
34、c safety based on site condition.動火作業(yè)點設(shè)監(jiān)護人、配備消防器材、設(shè)置遮擋電焊弧光措施、周圍無易燃易爆物品。禁止在下雨露天進行焊接作業(yè)。watch men will be set at hot work locations, as well as firefighting equipments. certain measures will be taken to sheld welding arc. surrounding should free from explosive and combustibles. no open welding operatio
35、n in rainy day.腳手架/平臺的搭拆必須由取得搭設(shè)資格的人員進行施工。腳手架/平臺搭設(shè)完畢經(jīng)檢查驗收,掛牌后才能使用。erection and dismantlement of scaffold/ platform should be worked by competent personnel. the scaffold can not be used unless it is inspected, accepted and tagged after erection.高處作業(yè)點設(shè)監(jiān)護人,工作人員必須穿戴全身式安全帶并堅持高掛低用的原則,工作區(qū)域和安全帶系掛點需在作業(yè)前檢查確認。f
36、orman will be assign for work at height. workers must wear full body harness and keep the principle of hang-high use low being followed. work zone and body harness hanging points should be checked and confirmed before operation.臨時用電安全措施,配電箱布置。安排專人負責管理(持證電工)發(fā)電機、配電箱等,并有日檢查記錄。safety measures for tempor
37、ary power use and arrangement of distribution box. assign people (certified electrician) to manage the generator and distribution boxes, etc. and have daily inspection records.工作場所應設(shè)置警示、標識牌,必要時設(shè)置硬維護以防止擅自入內(nèi)。warning sign, tag board will be set up at work area; hard barricade maybe required when it is
38、necessary to avoid accessing into it without permit.作業(yè)現(xiàn)場必須按照每“50 名作業(yè)人員:1 名安全員的比例進行配備,以保證現(xiàn)場人員、物資的安全。provide safety officer in a proportion of “50 workers: 1 safety officer” on worksite to ensure safety of personnel and material.作業(yè)過程中,每名員工有權(quán)利且有義務對不安全行為 “叫?!?。during working, every employee has right and
39、 responsibility to “stop” the unsafe behaviors.現(xiàn)場文明施工管理,需要規(guī)劃臨時設(shè)施、管道堆放地點并有序擺放。house keeping on site. make plan for temporary facilities and pipe laydown area and make sure they are placed orderly.作業(yè)現(xiàn)場非指定區(qū)域禁止吸煙,現(xiàn)場設(shè)置吸煙點。no smoking in operation area, except the designated smoking area which will be set
40、on site.廢物的管理,包括防腐涂料、液體清潔劑的使用與回收,需設(shè)置垃圾回收箱,按照 cdb 廢物管理要求處理到指定地點,確保環(huán)境不受污染。站內(nèi)露空管道系統(tǒng)安裝方案method statement for installation of exposed pipeline in well pad and gathering station4waste management, including use and recycle of anticorrosion paint and liquid cleaning agent. garbage tin should be provided. th
41、e waste should be disposed at designated location according to cdb waste management requirements to ensure no pollution to the environment.物料的搬運,按照 cdb安全工作規(guī)范手冊要求,超過 20 公斤的物料或設(shè)備不能用人工搬運,應使用機械搬運。transportation of materials. materials or equipments exceed 20kg can not be manually hauled but by mechanica
42、l means according to cdb safe work specification manual.在任何有運輸車輛進出的施工地點,設(shè)置車輛監(jiān)護員,特別是在倒車、卸貨時。any transportation vehicle entering or exiting construction location should have vehicle guardian, especially when backing or unloading.確保在實施前所有的相關(guān)活動和方案都已獲批準,否則應立即停止。ensure all relevant activities and method s
43、tatements be approved before execution, otherwise they will be stopped at once.承包商應負責此方案中所描述活動的執(zhí)行。contractor shall be responsible for execution of activities described in this method statement.現(xiàn)場應安排專職安全檢查員,應制定警戒線和樹立警示牌,并安排現(xiàn)場巡查。the site should arrange full time safety inspectors, set up warning line
44、and warning signs. site patrol inspection is required.檢查施工的電源線應完好無損,布置合理,固定牢固。 check the power cable in good condition and arrange it properly on site.工作場所應設(shè)置警示、標識牌,必要時設(shè)置硬維護以防止擅自入內(nèi)。禁止在同一施工區(qū)域同時進行兩項作業(yè)。warning sign, tag board will be set up at work area; hard barricade maybe required when it is necessa
45、ry to avoid accessing into it without permit. forbid performing two items of work simultaneously in one construction area. 3.3.應急救援應急救援 emergency response施工作業(yè)現(xiàn)場配備急救箱。急救箱內(nèi)包含的內(nèi)容應符合川東北項目要求。first-aid kit will be needed on construction site. the articles in first-aid kit will be conforming to requirement
46、s of chuandongbei project.在施工中若發(fā)生緊急事件,按照事故管理程序cdb-0000-hes-pcd-sc2-000-00014-00 進行上報。if emergency happens in construction, report procedure will be accordance with accident management procedure cdb-0000-hes-pcd-sc2-000-00014-00.應急救援按照應急總預案cdb-0000-hes-pln-sc2-000-00001-00 執(zhí)行。execute emergency respon
47、se in accordance with general plan of emergency rescue cdb-0000-hes-pln- sc2-000-00001-00.如遇到任何醫(yī)療、安保意外或安全事件、事故,工作人員應按照相關(guān)程序聯(lián)系以下人員。聯(lián)系人先后順序的選擇應本著對處理事件或傷者最有利的方式。workers will contact following personnel in accordance with corresponding procedures if any unexpected medical, security incidents or accidents
48、 happen. the sequence of contact shall be based on the best interest of handling the incidents or the injured.聯(lián)系單位(所在地址)contact (location)聯(lián)系電話tel numbercdb 南壩安全控制中心nanba safety control cente0818-3951111救護中心聯(lián)系電話(南壩境內(nèi))emergency center( in nanba0818-5520999救護中心聯(lián)系電話(開縣境內(nèi))emerge
49、ncy center (in kai county023-526632224.培訓和人員資質(zhì)培訓和人員資質(zhì) training and competency of personnel承包商應對方案里描述的工作執(zhí)行情況負責。contractor shall be responsible for execution of the activities described in this method statement.承包商為所有人(包括其分包商人員)提供所有的監(jiān)督人員和必要的 hse 培訓。并且按照所有人員在進場施工前都必須經(jīng)過入場訓且合格。站內(nèi)露空管道系統(tǒng)安裝方案me
50、thod statement for installation of exposed pipeline in well pad and gathering station5contractor shall provide all supervisors, the required hse training to all personnel including subcontractor personnel. all personnel shall have an hse passport prior to mobilization to site.特殊工種作業(yè)人員必須取得相應工作的資質(zhì)證件,且
51、報審合格。operators of special works must obtain relevant qualification certification of corresponding works and qualified in verification before work.操作人員進場施工前應參加 cdb 的 hse 培訓,并取得相關(guān)證件。operator should attend the hse training by cdb and obtain relevant vouchers before operation.為了提高所有人員的環(huán)保意識,將進行班前講話和必要的培訓
52、課程。all personnel will be made aware of the environmental aspects of the works through toolbox talks and where necessary training sessions on the certain aspects of the works affected by the environment.5.工藝工藝 process5.1.施工準備施工準備 preparation for construction施工機具和人員的準備:所有機具設(shè)備齊全完好,經(jīng)過 cdb 檢查合格且報審后方可進場使用
53、;施工人員必須經(jīng)過入場培訓合格且報審后才能進場施工。preparation of construction machine and personnel: all machinery equipments shall be complete and intact, it only can be used after passing cdb inspection and being reported; construction personnel must pass orientation training, certified and be reported prior to work on s
54、ite. 施工技術(shù)準備:按施工程序要求先后完成施工圖會審、設(shè)計交底和施工技術(shù)交底,并組織相關(guān)人員熟悉設(shè)計要求和相關(guān)技術(shù)質(zhì)量標準與規(guī)范。construction technical preparation: according to requirements of construction procedure, it should complete ifc drawing review, design clarification and construction technical clarification firstly, and organize relevant personnel to
55、 learn about the design requirements and related technical quality standards and specifications. 施工材料的準備:根據(jù)本工程的實物工程量和施工計劃要求,提出工程材料供貨計劃和領(lǐng)料使用計劃,并落實有關(guān)消耗材料和加工件。材料報審合格后才能使用。construction material preparation: according to physical work quantity and construction plan requirements of this project, it will p
56、ropose material supply plan and material withdrawal plan and get the relevant consumables and processed members done. materials can not be used unless been reported, inspected and qualified.施工關(guān)系協(xié)調(diào):施工前會同 cdb 和監(jiān)理單位以及有關(guān)協(xié)作單位對本工程的施工范圍、施工作業(yè)區(qū)域、施工作業(yè)界限以及其它特殊事項進行確定,從而確保工程的順利開展和交接。construction relationship coo
57、rdination: prior to start of construction, it will confirm with cdb, supervision unit and other co-working unit on construction scope, construction operation area, construction operation boundary and other especial issues, so as to guarantee successfully development and shift of this project. 落實現(xiàn)場的用
58、水用電以及施工場地的平整,施工區(qū)域的清理等。carry out site water and power supply, construction site preparation and construction area cleaning etc. 5.2.流程流程 process flow管道系統(tǒng)施工流程如下:construction flow of pipeline system is as below:站內(nèi)露空管道系統(tǒng)安裝方案method statement for installation of exposed pipeline in well pad and gathering
59、station6 材料的檢查及驗收 acceptance inspection of materials管段預制prefabrication運到現(xiàn)場delivery to the site現(xiàn)場組裝焊接assembly & welding無損檢測ndt管道試壓pressuretesting管道吹掃blowing熱處理hw熱處理hw無損檢測ndt5.3.材料材料檢查及驗收檢查及驗收 acceptance inspection of check 材料到場后,spc 會同 spcs、cdb 質(zhì)量工程師進行驗收檢驗,如下列材料: when materials arriving on site,
60、spc, spcs and cdb quality engineers jointly inspect and accept them. materials are as following:(1)鋼管 steel pipe鋼管尺寸和形位應符合其產(chǎn)品標準的要求,抽查比例為 10%,且不少于 1 件,若有不合格,應全部檢查。size, form and position of steel pipe should be consistent with the requirements of product standards, sampling ratio is 10% as well as at least one piece, if t
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- Unit 2 More than fun:Understanding ideas (Grammar) 教學設(shè)計 2024-2025學年外研版(2024年)英語七年級 上冊
- 2025年度勞動合同解除終止證明書模板設(shè)計與員工離職后續(xù)支持合同
- 2025年度拖欠工資問題解決與勞動權(quán)益保障合同
- 2025年度家居裝修安全責任協(xié)議書
- 2025年度房產(chǎn)證辦理完畢后購房合同保管期限與責任合同
- 2025年度抵押車買賣合同車輛交易稅費繳納及返還協(xié)議
- 2025年度餐飲公司合伙人合作協(xié)議及知識產(chǎn)權(quán)保護合同
- 2025年度臨時炊事員餐飲服務與管理合作協(xié)議
- 2025年度個人水泥品牌授權(quán)與推廣合作協(xié)議
- 2025年度體育場地租賃及健身課程開發(fā)合同
- 2024年山東司法警官職業(yè)學院高職單招(英語/數(shù)學/語文)筆試歷年參考題庫含答案解析
- 物業(yè)客服課件培訓模板
- 人教版PEP四年級英語下冊全冊教學設(shè)計表格教案
- 制造業(yè)面臨的挑戰(zhàn)與發(fā)展對策
- 高速公路綠化工程施工
- 發(fā)展?jié)h語-初級讀寫-第一課-你好
- 化工公司原址污染場地污染土壤治理修復方案
- 法蘭標準尺寸表(美標、日標、德標)
- 施工技術(shù)管理項總體思路、方式和方法解析
- 《大學生安全教育》課件-第一課 國家安全
- 城市規(guī)劃與建筑學專業(yè)英語
評論
0/150
提交評論