預(yù)應(yīng)力混凝土T型梁橋設(shè)計(jì)英語翻譯_第1頁
預(yù)應(yīng)力混凝土T型梁橋設(shè)計(jì)英語翻譯_第2頁
預(yù)應(yīng)力混凝土T型梁橋設(shè)計(jì)英語翻譯_第3頁
預(yù)應(yīng)力混凝土T型梁橋設(shè)計(jì)英語翻譯_第4頁
預(yù)應(yīng)力混凝土T型梁橋設(shè)計(jì)英語翻譯_第5頁
已閱讀5頁,還剩17頁未讀, 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

1、 河北聯(lián)合大學(xué)輕工學(xué)院college of light industry, hebei united university畢業(yè)設(shè)計(jì)說明書英語翻譯設(shè)計(jì)(論文)題目:跨衡昆國(guó)道主干線莊田村段 預(yù)應(yīng)力混凝土t型梁橋設(shè)計(jì)學(xué)生姓名: 學(xué) 號(hào): 2007 專業(yè)班級(jí): 07土木 學(xué) 部: 工程教育 指導(dǎo)教師: 2011年06月10日along with the development of our society and progress and the living standard of the people's increasing, the transportation convenienc

2、e degree and safety got people's extensive concern, bridge modern traffic is the indispensable constituent, at the same time, the construction of bridge got rapid development in our country, whether in the bridge engineering construction scale, or in science and technology level, are already amo

3、ng the most advanced countries in the world. in the highway route is already open to traffic is a ferry, highway bridges and reconstruction of needs with socialist industry, agriculture, national defence and science and technology step by step, also to realize the modernization of the urgent need to

4、 build many roads, railways and bridges, here we the bridge engineering personnel will continue to face all kinds of design and construction of bridges of arduous task.prestressed concrete beam bridge is our country road is widely used and has a long history of a kind of bridge structure type, shape

5、 it grandiose, and durable. in recent years, arch bridge, cable-stayed bridge, such as suspension bridge built in china, but a bridge for quite a long time is not provide lots of steel to build roads and bridges, the prestressed reinforced concrete simply-supported beam bridge high strength steel, t

6、 without crossing ability is bigger, lower cost characteristic, accords with current situation.a, project survey and alternative schemes(a) this this design for flat lock the highway is a main highway gz75 (hengyang nanning to kunming to highway) is located in yunnan province domestic rom village to

7、 kunming. the important paragraph highway it way wenshan honghe river, two ground state, to the far, smiling are mountain etc, guangxi province, city and county east even south by national frontier ports that hair, estuary, the bow, west meets the national highway gz40 and main national highway 326,

8、 national highway 323 line, line in the service of yunnan, east yunnan, yunnan south, southeast yunnan wide region, is the yunnan province out the main channel, edge haitong in yunnan province in southwestern and economic development plays a very important role. route is located in southeastern yunn

9、an, is located in longitude 102 ° and ° to 103 '" 20' 23, 24 ° "north latitude 50 '15" to 25 ° 02' 28 "between. this design sections for flat highway 11 contract section lock zhuangtian section, belong to change local road 1. this bridge is mai

10、nly used to connect panzhihua village hezhuang tiancun.(2) project survey 1. the topographyyunnan flat lock highway route starting point is located in wenshan zhuang and miao minority autonomous prefecture inkstone mountain county town, check point the flat in honghe mile county friends of general t

11、own. administrative districts including the state, by honghe.this route area in the south of yunnan yunnan-guizhou plateau, southeast yunnan basin plateau in the highlands and, according to landform causes can be divided into three small unit of the landscape. this project is located in the third ge

12、omorphic units, namely: in k124 + 100 to k128 + 200 period, this area to surface water and ground water strong dissolition, mainland stagnant water accumulation and surface erosion accumulation effect is given priority to, river presents the dissolution of the basin filling broken landform features.

13、 2. water systemyunnan flat lock highway route nanpanjiang river system, the area of surface water main have green pool, nanpanjiang river, setting him. green river, pond he are setting a tributary of the essay. according to the survey compiled nanpanjiang river flood of standing material, yangtze r

14、iver street near the station 1954 to 1969 the flow data and friends! stand at the seven largest flow material, nanpan peak flow of 5410 m3 / sec (1910), the most is 21.1 m3 / sec flow (1963), another of the hydrological data according to calculation, nanpanjiang bridge is located in 1/100 of the flo

15、od water level elevation of 1012 meters, 1/300 of the flood water level elevation of 1014 meters. setting a maximum peak flow of him 640 m3 / sec (1915), the most is 0.30 m3 / sec flow (1958). 3. climateyunnan flat lock highway route east longitude 102 ° in the region to 103 ° 43 '20&#

16、39;, 24 ° latitude 50 'to 25 ° 02' between, main subtropical monsoon climate plateau. dry seasons, the wet summer hot and humid, and little rain dry. climate change significantly with altitude, with vertical zoning characteristics. for k94 for rock (+ 000) to check points (zhuangti

17、an section) for, at an altitude of 1000 to 1300 meters river valley and basin area, the average temperature of 19.2 ° c ° c, the highest temperature of 38.2, 2.5 ° c minimum temperature, the average annual rainfall of 795 mm, average annual evaporation 1334.1 millimeter. the route are

18、a rainfall and more focused on from six to nine months, accounts for 66% to 83% of annual rainfall, evaporation in 3 largest to may, the highest temperature is 5 to july, the lowest temperature is from december to february. in general, the route of regional climate characteristics are: plenty of rai

19、n, heat, cold enough, drought and the wind and weather disasters, the light, the less heat, water allocation is reasonable. 4. the earthquakeyunnan flat lock highway route the region seismic activity is frequent, is the main factors of influence of the regional stability. according to historical rec

20、ords, the earthquake destructive earthquakes have nine times. on december 21, 1919, to the far 5.5 earthquake, seismic intensity of 7; march 22, 1929, in the east longitude 103 ° northwest 24 ° latitude, ' '6.3 earthquake, the earthquake intensity 8 degrees; september 13, 1950, a o

21、ld 5.8 earthquake, the earthquake intensity 8 degrees; may 14, 1953, small longtan happened 5 earthquake seismic intensity of 7; on jan. 5, 1970, the earthquake affected farming section, caused part housing craze or destroyed.yunnan flat lock highway route area more than the earthquake happened in t

22、he west, and the east is less. the eastern region seismic intensity generally in 5 to 6 degrees, relatively stable areas of basic. the western region seismic activity, have more frequent seismic time, the decreasing trend, all previous magnitude earthquake intensity of 6 to 8 degrees. according to y

23、unnan province earthquake team material, now the seismological bureau of vertical crust deformation obvious, relative changes of 50 mm, the earth's crust that is still in activities, belong to the unstable areas, and destructive earthquakes may occur.yunnan flat lock highway route in the western

24、 region, the epicenter of the earthquake frequent activity in north and south to fault zone and open the distant parts of the structure of fonts hinged compound, and with hot spring out of the dew.according to the chinese the seismic intensity zoning map "and" different counties in yunnan

25、province, the seismic intensity zoning of highway zhuangtian period of basic seismic intensity for: degrees basic earthquake intensity area.according to the code for seismic design of building (gb50011-2001) regulation, zhuangtian section design basic earthquake acceleration value is 0.15 g. the mos

26、t important purpose by the ministry of highway engineering design code for seismic design. 5. engineering geology and hydrogeology evaluation(1) the geological structureyunnan flat lock highway route through the area duoci structure changes, the duozhong tectonic stack with each other, signs of stru

27、cture is complex, the construction of the regional influence the system basically have: open the distant structure system, sn font structure system, north west to tectonic system.yunnan flat highway route lock k123 + 000 to check point k128 + 200 for north and south region construction area of influ

28、ence. the route area is the north and south to structure fault at the far to friends to old fracture in k124 + 400 through this area, near for quaternary strata covers it. friends of general solution broken for the filling basin namely faults control formation.(2) stratigraphic lithologyyunnan flat

29、lock highway route k124 + 100 by the area to k128 + 200 lakes region distribution in yellow, gray clay (including a gray clay expansion), to black nitantu, sand, gravel soil memory.(3) geotechnical physical mechanics index:the physical and mechanical indexes of rock tab table 1.1rock namedensity(g/c

30、m3)bibulous rateporosityaverage softening coefficientcompressive strength(mpa)dynamic elastic modulus ed(mpa)move poisson's ratio()wetdrynatural statewater saturationbaiyun limestone2.59-2.762.51-2.740.9- 3.52.3- 8.80.86-0.8732.4-50.620.3- 101.8sandstone 2.65-2.732.62-2.700.7-2.11.8-4.70.82-0.93

31、52.6-107.639.2-109.357134.7-66981.10.28-0.30silty sandstone2.732.62-2.662.8-4.18.6-11.00.726.9-9.12.8-13.136409.60.28shale 2.63-2.822.63-2.742.1-4.95.6-12.40.697.9-11.42.7-11.821667.60.32the soil physical and mechanical indexes tab table 1.2natural density。g/cm3soil grain of proportion gssaturation

32、sr%natural porosity ratio e。water content%plastic limitpliquid limitl%plastic indexipliquid sex indexilcohesiveckpainternal friction angle。compression coefficient a1-2mpacompression modulus es1-2mpafree expansion ratio fs%1.64-2.022.74-2.8685-1000.70-1.6524-5828-5251-11823-51<0-0.4939.6-134.41.9-

33、25.40.09-0.1415.82-21.8020-881.64-1.912.66-2.8588-1000.938-1.6533.6-5836-5472-12834-86<0-0.4967.6-134.41.9-15.00.1-0.1514.86-19.0440-881.77-2.062.72-2.7970-990.63-1.417-3616-2524-418-17<0-0.7654-6221.7-22.60.073-0.08312-13.71.34-1.872.78-2.8685-1001.01-1.3135-8724-6242-10118-39<0-0.647-4916

34、.6-25.10.048-0.2005-216. hydrogeology conditionsthe route regional groundwater types have mainly loose rocks of pore water, bedrock fissure water, karst water three categories. + 100 k124 k128 + 200 sections of the area for friends of general fault basin, filling surface rock have distinguished the

35、groundwater flows through him, shallow buried the body, average 1.27 meters, groundwater types for hco3-ca type, the local water for hco3-ca. mg (making) type water. 7. bad geological areasyunnan flat lock highway route through regional geological location wide distribution, sort is various, major a

36、dverse geological areas have expansive soil types, collapse, debris flow, landslide, lava, weak soil foundation funnel, etc.expansive soil is mainly distributed in far street structure, friends of general dissolution dissolution basin fault basin filling period.collapse is mainly distributed in the

37、flying fish jersey for play.debris flow is mainly distributed in the flying fish jersey for play. landslide is mainly distributed in the flying fish jersey for play. lava mainly distributed in funnel far street-old jade slope section. weak foundation paragraphs main distribution jade friends at faul

38、t basins in filling dissolution. 8. engineering geology and hydrogeology conditions comprehensive evaluation yunnan flat highway route through area lock for friends of general solution filling basin, broken by surface water and groundwater strong dissolition, mainland stagnant water accumulation eff

39、ect and surface erosion accumulation effect mainly river. now with the soil, and clay strata, nitantu, sand and gravel soil primarily. groundwater shallow buried, average 1.27 meters deep foundation bearing capacity, low value. main bad geological phenomenon has soft soil and expansive soil, soft so

40、il paragraphs have k124 + 250 k124 + 400, k124 + 700 k125 + 300, k125 + 700 k126 + 550, k128 + 150 k128 + 940 for four. the first three sections in xihe river flows through him that, because of the rivers change in position, low-lying terrain, groundwater, surface water collection for a long time an

41、d into. the surface is ruansu shape, clay local paragraph, but there nitantu a hard plastic shape, buried deep value, to the subgrade less influence, so this section 3 of the surface water extraction, can fill in rubble, expounds the shallow deposition, and other methods will squeeze. + 150 k128 k12

42、8 + 940 for a swamp facies soft soil, and should do deep treatment. expansive soil paragraphs have k126 + 600 k128 + 200, for a period of lithology red, brown yellow brown gray clay, line k127 clip + 250 k128 + 050 for a grade, do not take feifang area used as filler embankment. + 000 k124 k128 + 20

43、0 a embankment packing available k124 + 000 place deep excavation and the nearby yard, panzhihua village houshan shiliaochang filling the gravel soils.(3) the alternative schemes 1. the main standard than the alternative: from bridge stress system can be divided into beam bridge type bridge, arch br

44、idge, suspension bridge, cable-stayed bridge and bridge, from safety, just apply, economic and beautiful four aspects analysis. among them with security and economic oriented. at the same time, the choice of the form should give full consideration to the construction and maintenance convenience prog

45、ram. the past to the function of the bridge structure enough attention, now shipping, rapid development of the cause of the bridge obstacle clearance often becomes the transport bottlenecks, such as nanjing yangtze river bridge, the bridge obstacle clearance is too small, leading to high tonnage lev

46、el ships impassable, affect the upper reaches of yangtze river, the development of the city. -in bridge beautiful, depends on the economic and environmental conditions and decide. 2. proposals(1) cantilever bridge figure 1.1(2) t steel structure bridge figure 1.2(3) prestressed concrete simply-suppo

47、rted t shape beam bridge figure 1.3(4) cable-stayed bridge figure 1.43. the alternative schemes the alternative schemes table table 1.3cantilever bridget shape rigid framethe prestressed concrete simply-supported t shape beam bridgecable-stayed bridgeapplicability1piers for single row bearing, can r

48、educe the size 2. the bridge girder height can be small, reduce weight, constant load structure internal force reductionthe static structure susceptible to set shrinkage, creep, basic function of uneven settlement, as a result of the easy to cause the traffic is not suitable1. construction is conven

49、ient. 2. for small and medium-sized span. 3. structure size standardization.across the abilitysafety1the cantilever beam in connection with the hang of buckling line fold point adverse driving. 2. liangyi margin, easy to crack the tension, the rain dipped into the beam body a safety hazardin the ear

50、ly days of the largeat present domestic adopt a large number of, security, convenient traffic.1. smooth driving 2. the adjustment process cable force compares heavy and complicated, construction high technical requirementsbeautiful make it become beam is more beautifulstructure beautifulstructure be

51、autifulhas the modern breath, the structure is lightsome and beautiful. economystents expensive, the high cost of maintenancecost is low, short construction periodsecond, the cost of large amount of steelhighest costin the development of the bridge, cantilever not using the bridge had been basic, be

52、cause it is not big, cable-stayed bridge, span commonly used for big span of cross-sea bridge across the river, and t shape steel structure bridge are vulnerable to earthquakes, as a result of the earthquake in yunnan province, and after the above the comparison of the scheme, decided to adopt prest

53、ressed concrete t shape beam bridge.second, girders design(a) the survey and design of construction layout 1. design material(1) design span: standard span 23.00 m (pier center distance), simple calculation span adjacent bearing center (distance) 22.50 m, the 22.96 m girder.(2) load: 2004 bridge sta

54、ndard: highway-level ii load, the crowd: 3 kn/m2; each side of the weight of the roof, the pavement are 1.52 kn/m and 3.6 kn/m. the driveway load uniformly distributed load standard; the concentration of lane load load standard; vehicle load 550 n.(3) material and process:concrete girder, with 40: c

55、oncrete, the pavement, railing and bridge deck pavement with 25 th.prestressed steel beam with yb255 metallurgical department by 64 standard of carbon steel wire, s5mm phi each beam consists of six strands of composition, the beam with 5 beam. ordinary steel than and 12 mm in diameter is equal to th

56、e r235 with reinforced; less than 12 mm in diameter of all by hot rolling steel grade light.steel plate and angle steel: making the anchor head bearing pad, bearing pad, etc all use ordinary a3 carbon steel, the connection between girder with 16 mn low alloy steel plate.after making a method accordi

57、ng to the main girder, prefabricated, reserved by 70 mm diameter through 77 mm diameter of corrugated metal pipe forming, buries the strand double role at both ends by td jack and tension, the anchorage the clip of chip anchor. be in place at the girder after 600 mm wide wet juncture, finally construction concrete bridge deck pavement layer.(2) cross section layout 1. the main girder spacing and number of piecesusually with high beam

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

最新文檔

評(píng)論

0/150

提交評(píng)論