




版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報或認(rèn)領(lǐng)
文檔簡介
1、basat en 1, xiangfu east road, el plec. resum de la q / una sessi 2, xiangfu east road. figura 3, xiangfu est carretera disseny i construcci. 4, enquesta de lloc, responent a preguntes en lloc. 5, conjunt de plnols i detalls del pla. 6, tendra documentaci i relacionats amb els requisits. 7, informes
2、 dinvestigaci denginyeria geotcnica. 8, electricitat temporal en lespecificaci tcnica de construcci lloc seguretat jgj46-2005 9, la carretera urb enginyeria aprovaci de qualitat de construcci estndard cjj1-2008 10, el codi per a la construcci i lacceptaci de laigua de subministrament i drenatge gb50
3、268-97 11, ledifici de canonades de terra fundaci enginyeria codi de laprovaci de qualitat de construcci gb50202-2002 12, drenatge urb, enginyeria dinspecci de qualitat i avaluaci estndards 13 cjj3-90, el prescripcions tcniques per a la construcci destil tanca dacer canonada falsework jgj130-2001 14
4、, construcci lloc ambiental o normes sanitries de 15 jgj146-2004, basada en la situaci actual. 16, lempresa en la capital, personal, equip i altres aspectes de la fora completa. 17, el llarg acumulat experincia de construcci projecte similar. programes 1, segon, enginyeria de la construcci: xiangfu
5、east road (wanjiali-river road) de changsha, wuhan-guangzhou dalta velocitat estaci un de lobra durbanitzaci complementaris, en general de planificaci de ciutat de changsha, s una de la carretera dest a oest. xiangfu east road, el primer tram daquesta gamma dimplementaci, oest de wan jia li lu (k0 +
6、 000), beijing-zhuhai autopista dintercanvi a lest (k2 + 180) i wan jia lai road, sha wan road pas a nivell. primer tram de 2180m, com ara carreteres, drenatge, paisatge, il. luminaci, projectes dinfraestructures de transport. yuhua districte, ciutat de changsha, construt per millorar lestructura de
7、 xarxa de carretera, amb cotxe als voltants de desenvolupament econmic s de gran importncia i xiangfu east road, changsha, lestaci de tren dalta velocitat de wuhan-guangzhou es va construir i enfortir els vincles amb els governs provincials al voltant de la regi. introducci 1.1 disseny: (a) les cond
8、icions naturals (1) loriginal proposta topografia lloc, unitat de paisatge accident geogrfic com una plana dinundaci. dominat per hill, durant quin solc tang, topografia lleugerament ondulada, elevaci canvis en el 49,6-75.6 m del mar groc, muntanyes sn distributs a lhort, jard, lloc demmagatzematge,
9、 cases, lnies denergia enderrocat, distribuci local metro lnia. topografia del lloc en general sn relativament plana. (2) els canvis de climtic, meteorolgic, clid i humit, temporada de mons tropicalsevident. temperatura mitjana anual s a 16.9 c. temperatura mxima extrema de 40.6 c, la temperatura mn
10、ima extrema de 10.1 c, la precipitaci mitjana anual s de 1394.6 mm, 4 mesos dagost s la temporada de pluges, pluja al voltant de lany 80%. mitjana dedelegates, staff: hello! in the run-up to the spring festival, we held one session of four staff representatives conference 2013-workshop, full back in
11、 2012, careful analysis of the current situation, discuss 2013 development plans. here, on behalf of my company 2013 work reports to the general assembly, for consideration. pillar i, 2012 back in 2012, xx power companies adhere to the partys 17 great spirit for guidance, comprehensively implement t
12、he scientific concept of development, promoting cost-leadership strategy, standards, focus on implementation, lean management, continuously improve, smooth present safety situation of enterprise management, business management and control scientific and standardized, and the dedication of staff, man
13、age a harmonious and democratic atmosphere of the good situation. main indicators are as follows:-the battery indicator: power generation totaled 7.815 billion kwh, beyond the annual budget implementation capacity of 315 million kwh, an increase of 757 million kwh. sales totaled 7.425 billion kwh, e
14、xceeding sales of 330 million kwh the annual executive budget, an increase of 729 million kwh. -security measures: unplanned outages 2.5 times. no personal injury accident occurred, no major accident and above, no major fire accidents without environmental pollution accidents, safety for three conse
15、cutive years to maintain stability to good posture. business financial indicators: total profits of 255 million yuan, beyond the annual budget of 207 million yuan, beyond the datang company index 41.89 million yuan, an increase of 1.76 million yuan, fcm assessment at grade four. -energy: power suppl
16、y standard coal completing 312.25 g/kwh, down 0.1 g/kwh; integrated auxiliary power consumption ratio in 5.12%, down 0.26%; pollutant emissions performance greatly reduced compared to last year, carbon 0.09 g/kwh, sulfur dioxide 0.104 g/kwh nox 0.512 g/kwh; dust removal efficiency of more than 99.8%
17、. -reliability index: equivalent availability factor in 93.47%, increased 7.95% from a year earlier. equivalent forced outage rate 0.08%, 0.16% reduction over the same period a year earlier. major achievements: first, we should adhere to the two management system basis, strengthening technological r
18、esearch, strengthen hidden hazards control and intrinsic safety enterprise construction took new steps. -the two management system for improvement. focus on promoting the power of the company management system and the application and implementation of the safety loop five-star management system, imp
19、rove the safety management system, realize the system of safety control. further regulate security routines, safety supervision and management network role to play to achieve closed-loop. strengthening the supervision and management of habitual violation of, strengthening the safety supervision of o
20、utsourcing contractors. carried out in spring and autumn of security inspections, flood control and inspection, safety production month, day supervision of production safety and the olympic games and otherprecipitacions mensuals a 184.5-245mm, dia plujs uns 158 dies lany la tramuntana a lhivern i pr
21、imavera, estiu, el vent de sud; sol durada mitjana hores 1726, un perode de temps-24, mitjana anuals 279.3 dies. (b) enginyeria geologia (1) de les condicions geolgiques(2) anlisi denginyeria geotcnica i lavaluaci basada en investigaci resultats mostren que els efectes de profunditat dinvestigaci sh
22、an trobat a lestabilitat de lloc de construcci del lloc despreniments, collapses, falles i processos geolgics, s estable, adequat per a la construcci de la carretera proposat. planta daigua superficial, aigua ala i porus aigua sense efectes de corrosi en estructura de formig, amb baixa corrosi de ba
23、rres dacer en lestructura de formig, amb baixa corrosi de lestructura dacer. 1.2 disseny carregar el disseny del projecte amb estndards de desdoblament de lurb, disseny velocitat v = 50 km/h, manera de control amplada de 70m, el disseny per carretera que classe. (1) grafisme xiangfu east road, el pr
24、imer tram daquesta gamma de disseny, oest de wan jia li lu (k0 + 000), beijing-zhuhai autopista dintercanvi a lest (k2 + 180) i wan jia lai road, sha wan road pas a nivell. primer tram de 2180m. camins a travs del punt dinflexi conjunt 3, radi mnim de gamma completa de 1500m de corba horitzontal de
25、linealitat, especificacions de disseny de via urbana. (2) disseny de secci vertical carretera de la secci primera de punts de control de lapartat 3: wan jia lai road, sandy bay road, pequn-zhuhai autopista dintercanvi. principals punts que firma 52.95 m, beijing-zhuhai expressway planta elevaci 51,2
26、 m, alta a travs de alada lliure dalta velocitat de beijing-zhuhai de no menys de 5.5 m. pendent mxim longitudinal s del 3%, corresponent a 230.53 m, queda seccions de pendent s suau. (3) secci disseny hunan casa carretera (milions casa li road est de) planificaci carretera lloc pel control de 70m;
27、seccions generals road lloc per a 61m, composici de secci transversal de 4,5 m (control verd) + 4 m (persones) + 8.0m (carril mixta) +3.0 (verd amb) +11.5 (mquina) + 8 m (centre verd amb) +11.5 (mquina) +3.0 (verd amb) + 8.0m (barrejat lane) + 4 m (persones) 4,5 m (control verd) = 61 m + 9 m = 70 m,
28、 quatre bloc consell; seccions especials de canvis de calada, per eren 70m mplia gamma. (4) disseny a. paviment elevaci de disseny per a lelevaci de paviment en la lnia de la calada subgrade construcci disseny elevaci altitud menys el gruix de les capes destructura de paviment。 pendent de b. subgrad
29、e. elevaci de terrapl s a menys de 8m, vessant omplir s 1:1. 5, quan ms gran que o igual a 8 m, 1:1.75, omplir pendent pendent conjunt canaletes; sl de talla pendent de 1:1. 5, pendent de roca amb 1:1. si la terra o pedra excavat, van establir fins al vessant peu 1m mplia plataforma dalt de 6m 2m se
30、stableix quan altres plataformes, plataformes equipades amb costat rasa. subgrade c. grau de compactaciactivities, comprehensive and tamping safety foundation . troubleshooting, management mechanism, give full play to role of technical supervision and realization of troubleshooting, management, impr
31、oved process management. this year completed the boiler lower header leakage, boiler pressure, a major risk management, completed 29 of great risks and 3 general problems of governance. complete chemistry lab construction, thermal control, and complete the boiler scale integrated management, host sh
32、afting vibration of 10 scientific and technological projects, such as. complete supercritical 630mw on-line simulation system development and application of circulating water mcc standby power transformation, the transformation of desulfurization waste water, the unit water supply system of comprehe
33、nsive treatment and discharge valve modification of coal mill 5 key technological transformation projects, group health is improved. -science and technology innovation is further increased. strengthen the characteristics of supercritical unit major issues, gradually clearing the particularity of sup
34、ercritical unit and regularity. developed motor oil time management, switch action times, statistics, coal-aided measurement software, improves the production level of lean management. increased investment in science and technology, reporting science and technology projects and 14 technical project
35、total cost percentage of the total annual production output of 0.25%. large-scale coal-fired power plant flue gas desulfurization, denitrification complete development and application of key technologies project, won the national science and technology progress second prize. 630mw supercritical unit
36、s optimized control strategies and the 630mw development and application of on-line simulation system for supercritical units, supercritical 600mw units of turbine driven boiler feed pump set of comprehensive treatment of defects datang technology respectively one or two and third. meanwhile, inform
37、ation technology achievements, the company was named china power information technology benchmarking enterprises. -repair and maintenance has improved further. modify the inspection standards and standards on a regular basis, standardizing work procedures, checking and inspection project. deepening
38、the bfs+ system, and implements maintenance information shared. reorganizing rb logic again, and ensure the success of the rb. innovating the mechanism of maintenance management, implemented a project manager system. successful completion of two autonomous maintenance, reliability improved steadily.
39、 implementing two c-level maintenance, project themselves 48.7% and 42.3%, respectively. accomplish two circulating pumps repair and overhaul of four mills, maintenance teams to get exercise. promote the work of energy saving and consumption reducing, complete the unit energy consumption diagnosis,
40、plant water balance test, 10 energy-saving projects. second, we should adhere to three on the economic benefits of improving, outreach目目 錄錄第一章第一章 陜西陜西 vpdnvpdn 網(wǎng)上報稅系統(tǒng)概述網(wǎng)上報稅系統(tǒng)概述.11.1 概況.11.2 vpdn 網(wǎng)上報稅前期準(zhǔn)備.1第二章第二章 vpdn 安裝使用安裝使用.32.1 vpdn 帳號申請開通.32.2 vpdn 的安裝.3第三章第三章 vpdnvpdn 網(wǎng)上報稅使用說明網(wǎng)上報稅使用說明.83.1 申報流程
41、.83.2 填表說明.153.2.1 小規(guī)模納稅人的填表說明及注意事項(xiàng).153.2.2 一般納稅人的填表說明及注意事項(xiàng).203.2.3 四小票的錄入申報.273.2.4 不抵扣發(fā)票錄入.303.2.5 其它稅種的報表填寫.313.3 出口退稅申報.31第四章第四章 技術(shù)支持和服務(wù)技術(shù)支持和服務(wù).35附一:附一: 常見問題及解決常見問題及解決.36vpdn 連接常見問題 .36網(wǎng)上報稅常見問題 .39附二:附二: 網(wǎng)上電子報稅簡易流程網(wǎng)上電子報稅簡易流程.41basat en 1, xiangfu east road, el plec. resum de la q / una sessi 2,
42、xiangfu east road. figura 3, xiangfu est carretera disseny i construcci. 4, enquesta de lloc, responent a preguntes en lloc. 5, conjunt de plnols i detalls del pla. 6, tendra documentaci i relacionats amb els requisits. 7, informes dinvestigaci denginyeria geotcnica. 8, electricitat temporal en lesp
43、ecificaci tcnica de construcci lloc seguretat jgj46-2005 9, la carretera urb enginyeria aprovaci de qualitat de construcci estndard cjj1-2008 10, el codi per a la construcci i lacceptaci de laigua de subministrament i drenatge gb50268-97 11, ledifici de canonades de terra fundaci enginyeria codi de
44、laprovaci de qualitat de construcci gb50202-2002 12, drenatge urb, enginyeria dinspecci de qualitat i avaluaci estndards 13 cjj3-90, el prescripcions tcniques per a la construcci destil tanca dacer canonada falsework jgj130-2001 14, construcci lloc ambiental o normes sanitries de 15 jgj146-2004, bas
45、ada en la situaci actual. 16, lempresa en la capital, personal, equip i altres aspectes de la fora completa. 17, el llarg acumulat experincia de construcci projecte similar. programes 1, segon, enginyeria de la construcci: xiangfu east road (wanjiali-river road) de changsha, wuhan-guangzhou dalta ve
46、locitat estaci un de lobra durbanitzaci complementaris, en general de planificaci de ciutat de changsha, s una de la carretera dest a oest. xiangfu east road, el primer tram daquesta gamma dimplementaci, oest de wan jia li lu (k0 + 000), beijing-zhuhai autopista dintercanvi a lest (k2 + 180) i wan j
47、ia lai road, sha wan road pas a nivell. primer tram de 2180m, com ara carreteres, drenatge, paisatge, il. luminaci, projectes dinfraestructures de transport. yuhua districte, ciutat de changsha, construt per millorar lestructura de xarxa de carretera, amb cotxe als voltants de desenvolupament econmi
48、c s de gran importncia i xiangfu east road, changsha, lestaci de tren dalta velocitat de wuhan-guangzhou es va construir i enfortir els vincles amb els governs provincials al voltant de la regi. introducci 1.1 disseny: (a) les condicions naturals (1) loriginal proposta topografia lloc, unitat de pai
49、satge accident geogrfic com una plana dinundaci. dominat per hill, durant quin solc tang, topografia lleugerament ondulada, elevaci canvis en el 49,6-75.6 m del mar groc, muntanyes sn distributs a lhort, jard, lloc demmagatzematge, cases, lnies denergia enderrocat, distribuci local metro lnia. topog
50、rafia del lloc en general sn relativament plana. (2) els canvis de climtic, meteorolgic, clid i humit, temporada de mons tropicalsevident. temperatura mitjana anual s a 16.9 c. temperatura mxima extrema de 40.6 c, la temperatura mnima extrema de 10.1 c, la precipitaci mitjana anual s de 1394.6 mm, 4
51、 mesos dagost s la temporada de pluges, pluja al voltant de lany 80%. mitjana dedelegates, staff: hello! in the run-up to the spring festival, we held one session of four staff representatives conference 2013-workshop, full back in 2012, careful analysis of the current situation, discuss 2013 develo
52、pment plans. here, on behalf of my company 2013 work reports to the general assembly, for consideration. pillar i, 2012 back in 2012, xx power companies adhere to the partys 17 great spirit for guidance, comprehensively implement the scientific concept of development, promoting cost-leadership strat
53、egy, standards, focus on implementation, lean management, continuously improve, smooth present safety situation of enterprise management, business management and control scientific and standardized, and the dedication of staff, manage a harmonious and democratic atmosphere of the good situation. mai
54、n indicators are as follows:-the battery indicator: power generation totaled 7.815 billion kwh, beyond the annual budget implementation capacity of 315 million kwh, an increase of 757 million kwh. sales totaled 7.425 billion kwh, exceeding sales of 330 million kwh the annual executive budget, an inc
55、rease of 729 million kwh. -security measures: unplanned outages 2.5 times. no personal injury accident occurred, no major accident and above, no major fire accidents without environmental pollution accidents, safety for three consecutive years to maintain stability to good posture. business financia
56、l indicators: total profits of 255 million yuan, beyond the annual budget of 207 million yuan, beyond the datang company index 41.89 million yuan, an increase of 1.76 million yuan, fcm assessment at grade four. -energy: power supply standard coal completing 312.25 g/kwh, down 0.1 g/kwh; integrated a
57、uxiliary power consumption ratio in 5.12%, down 0.26%; pollutant emissions performance greatly reduced compared to last year, carbon 0.09 g/kwh, sulfur dioxide 0.104 g/kwh nox 0.512 g/kwh; dust removal efficiency of more than 99.8%. -reliability index: equivalent availability factor in 93.47%, incre
58、ased 7.95% from a year earlier. equivalent forced outage rate 0.08%, 0.16% reduction over the same period a year earlier. major achievements: first, we should adhere to the two management system basis, strengthening technological research, strengthen hidden hazards control and intrinsic safety enter
59、prise construction took new steps. -the two management system for improvement. focus on promoting the power of the company management system and the application and implementation of the safety loop five-star management system, improve the safety management system, realize the system of safety contr
60、ol. further regulate security routines, safety supervision and management network role to play to achieve closed-loop. strengthening the supervision and management of habitual violation of, strengthening the safety supervision of outsourcing contractors. carried out in spring and autumn of security
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 鐵路貨運(yùn)站貨場服務(wù)企業(yè)縣域市場拓展與下沉戰(zhàn)略研究報告
- 2025年年云服務(wù)合作協(xié)議書
- 2025年冶煉助劑項(xiàng)目合作計劃書
- 勞動合同續(xù)簽后的法律保障
- 二零二五年度海洋資源開發(fā)分紅合作協(xié)議合同模板
- 二零二五年度游泳池培訓(xùn)班水上健身課程設(shè)計與培訓(xùn)協(xié)議
- 二零二五年度資質(zhì)共享與產(chǎn)業(yè)協(xié)同合作協(xié)議
- 2025年度日用品電商平臺數(shù)據(jù)分析與用戶增長合同
- 二零二五年度司機(jī)安全責(zé)任與權(quán)益保障協(xié)議
- 反饋工作機(jī)制協(xié)議
- 【課件】2.1.1植物細(xì)胞工程的基本技術(shù)課件-2021-2022學(xué)年高二下學(xué)期生物人教版選擇性必修3
- 35kV集電線路直埋施工組織設(shè)計方案
- 客戶來訪登記表
- 日產(chǎn)新軒逸電子手冊cvt
- 人教八年級下冊英語U5Do-you-remember-what-you-were-doing?課件
- 小學(xué)人教版四年級下冊數(shù)學(xué)租船問題25題
- 大連市小升初手冊
- 醫(yī)療垃圾管理及手衛(wèi)生培訓(xùn)PPT課件
- 嚇數(shù)基礎(chǔ)知識共20
- 鋰電池安全知識培訓(xùn)-課件
- 電子產(chǎn)品高可靠性裝聯(lián)工藝下
評論
0/150
提交評論