工程管理專業(yè)外文文獻(xiàn)及翻譯_第1頁(yè)
工程管理專業(yè)外文文獻(xiàn)及翻譯_第2頁(yè)
工程管理專業(yè)外文文獻(xiàn)及翻譯_第3頁(yè)
工程管理專業(yè)外文文獻(xiàn)及翻譯_第4頁(yè)
工程管理專業(yè)外文文獻(xiàn)及翻譯_第5頁(yè)
已閱讀5頁(yè),還剩20頁(yè)未讀, 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

1、本科畢業(yè)設(shè)計(jì)外文文獻(xiàn)及譯文文獻(xiàn)、資料題目:changing roles of the clients architects and contractors through bim 文獻(xiàn)、資料來(lái)源:engineering, construction, archi-tectual management 文獻(xiàn)、資料發(fā)表(出版)日期:2010.2院 (部): 管理工程學(xué)院專 業(yè): 班 級(jí): 姓 名: 學(xué) 號(hào): 指導(dǎo)教師: 翻譯日期: 2012.6.3外文文獻(xiàn):changing roles of the clients,architects and contractors through bimriza

2、l sebastiantno built environment and geosciences, delft, the netherlandsabstractpurpose this paper aims to present a general review of the practical implications of building information modelling (bim) based on literature and case studies. it seeks to address the necessity for applying bim and re-or

3、ganising the processes and roles in hospital building projects. this type of project is complex due to complicated functional and technical requirements, decision making involving a large number of stakeholders, and long-term development processes.design/methodology/approach through desk research an

4、d referring to the ongoing european research project inpro, the framework for integrated collaboration and the use of bim are analysed. through several real cases, the changing roles of clients, architects, and contractors through bim application are investigated.findings one of the main findings is

5、 the identification of the main factors for a successful collaboration using bim, which can be recognised as “power”: product information sharing (p),organisational roles synergy (o), work processes coordination (w), environment for teamwork (e), and reference data consolidation (r). furthermore, it

6、 is also found that the implementation of bim in hospital building projects is still limited due to certain commercial and legal barriers, as well as the fact that integrated collaboration has not yet been embedded in the real estate strategies of healthcare institutions.originality/value this paper

7、 contributes to the actual discussion in science and practice on the changing roles and processes that are required to develop and operate sustainable buildings with the support of integrated ict frameworks and tools. it presents the state-of-the-art of european research projects and some of the fir

8、st real cases of bim application in hospital building projects.keywords europe, hospitals, the netherlands, construction works, response flexibility, project planningpaper type general review1. introductionhospital building projects, are of key importance, and involve significant investment, and usu

9、ally take a long-term development period. hospital building projects are also very complex due to the complicated requirements regarding hygiene, safety, special equipments, and handling of a large amount of data. the building process is very dynamic and comprises iterative phases and intermediate c

10、hanges. many actors with shifting agendas, roles and responsibilities are actively involved, such as: the healthcare institutions, national and local governments, project developers, financial institutions, architects, contractors, advisors, facility managers, and equipment manufacturers and supplie

11、rs. such building projects are very much influenced, by the healthcare policy, which changes rapidly in response to the medical, societal and technological developments, and varies greatly between countries (world health organization, 2000). in the netherlands, for example, the way a building projec

12、t in the healthcare sector is organised is undergoing a major reform due to a fundamental change in the dutch health policy that was introduced in 2008.the rapidly changing context posts a need for a building with flexibility over its lifecycle. in order to incorporate life-cycle considerations in t

13、he building design, construction technique, and facility management strategy, a multidisciplinary collaboration is required. despite the attempt for establishing integrated collaboration, healthcare building projects still faces serious problems in practice, such as: budget overrun, delay, and sub-o

14、ptimal quality in terms of flexibility, end-users dissatisfaction, and energy inefficiency. it is evident that the lack of communication and coordination between the actors involved in the different phases of a building project is among the most important reasons behind these problems. the communica

15、tion between different stakeholders becomes critical, as each stakeholder possesses different set of skills. as a result, the processes for extraction, interpretation, and communication of complex design information from drawings and documents are often time-consuming and difficult. advanced visuali

16、sation technologies, like 4d planning have tremendous potential to increase the communication efficiency and interpretation ability of the project team members. however, their use as an effective communication tool is still limited and not fully explored (dawood and sikka, 2008). there are also othe

17、r barriers in the information transfer and integration, for instance: many existing ict systems do not support the openness of the data and structure that is prerequisite for an effective collaboration between different building actors or disciplines. building information modelling (bim) offers an i

18、ntegrated solution to the previously mentioned problems. therefore, bim is increasingly used as an ict support in complex building projects. an effective multidisciplinary collaboration supported by an optimal use of bim require changing roles of the clients, architects, and contractors; new contrac

19、tual relationships; and re-organised collaborative processes. unfortunately, there are still gaps in the practical knowledge on how to manage the building actors to collaborate effectively in their changing roles, and to develop and utilise bim as an optimal ict support of the collaboration.this pap

20、er presents a general review of the practical implications of building information modelling (bim) based on literature review and case studies. in the next sections, based on literature and recent findings from european research project inpro, the framework for integrated collaboration and the use o

21、f bim are analysed. subsequently, through the observation of two ongoing pilot projects in the netherlands, the changing roles of clients, architects, and contractors through bim application are investigated. in conclusion, the critical success factors as well as the main barriers of a successful in

22、tegrated collaboration using bim are identified.2. changing roles through integrated collaboration and life-cycle design approachesa hospital building project involves various actors, roles, and knowledge domains. in the netherlands, the changing roles of clients, architects, and contractors in hosp

23、ital building projects are inevitable due the new healthcare policy. previously under the healthcare institutions act (wtzi), healthcare institutions were required to obtain both a license and a building permit for new construction projects and major renovations. the permit was issued by the dutch m

24、inistry of health. the healthcare institutions were then eligible to receive financial support from the government. since 2008, new legislation on the management of hospital building projects and real estate has come into force. in this new legislation, a permit for hospital building project under t

25、he wtzi is no longer obligatory, nor obtainable (dutch ministry of health, welfare and sport, 2008). this change allows more freedom from the state-directed policy, and respectively, allocates more responsibilities to the healthcare organisations to deal with the financing and management of their re

26、al estate. the new policy implies that the healthcare institutions are fully responsible to manage and finance their building projects and real estate. the governments support for the costs of healthcare facilities will no longer be given separately, but will be included in the fee for healthcare se

27、rvices. this means that healthcare institutions must earn back their investment on real estate through their services. this new policy intends to stimulate sustainable innovations in the design, procurement and management of healthcare buildings, which will contribute to effective and efficient prim

28、ary healthcare services.the new strategy for building projects and real estate management endorses an integrated collaboration approach. in order to assure the sustainability during construction, use, and maintenance, the end-users, facility managers, contractors and specialist contractors need to b

29、e involved in the planning and design processes. the implications of the new strategy are reflected in the changing roles of the building actors and in the new procurement method.in the traditional procurement method, the design, and its details, are developed by the architect, and design engineers.

30、 then, the client (the healthcare institution) sends an application to the ministry of health to obtain an approval on the building permit and the financial support from the government. following this, a contractor is selected through a tender process that emphasises the search for the lowest-price

31、bidder. during the construction period, changes often take place due to constructability problems of the design and new requirements from the client. because of the high level of technical complexity, and moreover, decision-making complexities, the whole process from initiation until delivery of a h

32、ospital building project can take up to ten years time. after the delivery, the healthcare institution is fully in charge of the operation of the facilities. redesigns and changes also take place in the use phase to cope with new functions and developments in the medical world (van reedt dortland, 2

33、009).the integrated procurement pictures a new contractual relationship between the parties involved in a building project. instead of a relationship between the client and architect for design, and the client and contractor for construction, in an integrated procurement the client only holds a cont

34、ractual relationship with the main party that is responsible for both design and construction ( joint contracts tribunal, 2007). the traditional borders between tasks and occupational groups become blurred since architects, consulting firms, contractors, subcontractors, and suppliers all stand on th

35、e supply side in the building process while the client on the demand side. such configuration puts the architect, engineer and contractor in a very different position that influences not only their roles, but also their responsibilities, tasks and communication with the client, the users, the team a

36、nd other stakeholders.the transition from traditional to integrated procurement method requires a shift of mindset of the parties on both the demand and supply sides. it is essential for the client and contractor to have a fair and open collaboration in which both can optimally use their competencie

37、s. the effectiveness of integrated collaboration is also determined by the clients capacity and strategy to organize innovative tendering procedures (sebastian et al., 2009).a new challenge emerges in case of positioning an architect in a partnership with the contractor instead of with the client. i

38、n case of the architect enters a partnership with the contractor, an important issues is how to ensure the realisation of the architectural values as well as innovative engineering through an efficient construction process. in another case, the architect can stand at the clients side in a strategic

39、advisory role instead of being the designer. in this case, the architects responsibility is translating clients requirements and wishes into the architectural values to be included in the design specification, and evaluating the contractors proposal against this. in any of this new role, the archite

40、ct holds the responsibilities as stakeholder interest facilitator, custodian of customer value and custodian of design models.the transition from traditional to integrated procurement method also brings consequences in the payment schemes. in the traditional building process, the honorarium for the

41、architect is usually based on a percentage of the project costs; this may simply mean that the more expensive the building is, the higher the honorarium will be. the engineer receives the honorarium based on the complexity of the design and the intensity of the assignment. a highly complex building,

42、 which takes a number of redesigns, is usually favourable for the engineers in terms of honorarium. a traditional contractor usually receives the commission based on the tender to construct the building at the lowest price by meeting the minimum specifications given by the client. extra work due to

43、modifications is charged separately to the client. after the delivery, the contractor is no longer responsible for the long-term use of the building. in the traditional procurement method, all risks are placed with the client.in integrated procurement method, the payment is based on the achieved bui

44、lding performance; thus, the payment is non-adversarial. since the architect, engineer and contractor have a wider responsibility on the quality of the design and the building, the payment is linked to a measurement system of the functional and technical performance of the building over a certain pe

45、riod of time. the honorarium becomes an incentive to achieve the optimal quality. if the building actors succeed to deliver a higher added-value that exceed the minimum clients requirements, they will receive a bonus in accordance to the clients extra gain. the level of transparency is also improved

46、. open book accounting is an excellent instrument provided that the stakeholders agree on the information to be shared and to its level of detail (inpro, 2009).next to the adoption of integrated procurement method, the new real estate strategy for hospital building projects addresses an innovative p

47、roduct development and life-cycle design approaches. a sustainable business case for the investment and exploitation of hospital buildings relies on dynamic life-cycle management that includes considerations and analysis of the market development over time next to the building life-cycle costs (inve

48、stment/initial cost, operational cost, and logistic cost). compared to the conventional life-cycle costing method, the dynamic life-cycle management encompasses a shift from focusing only on minimizing the costs to focusing on maximizing the total benefit that can be gained. one of the determining f

49、actors for a successful implementation of dynamic life-cycle management is the sustainable design of the building and building components, which means that the design carries sufficient flexibility to accommodate possible changes in the long term (prins, 1992).designing based on the principles of li

50、fe-cycle management affects the role of the architect, as he needs to be well informed about the usage scenarios and related financial arrangements, the changing social and physical environments, and new technologies. design needs to integrate people activities and business strategies over time. in

51、this context, the architect is required to align the design strategies with the organisational, local and global policies on finance, business operations, health and safety, environment, etc. (sebastian et al., 2009).the combination of process and product innovation, and the changing roles of the bu

52、ilding actors can be accommodated by integrated project delivery or ipd (aia california council, 2007). ipd is an approach that integrates people, systems, business structures and practices into a process that collaboratively harnesses the talents and insights of all participants to reduce waste and

53、 optimize efficiency through all phases of design, fabrication and construction. ipd principles can be applied to a variety of contractual arrangements. ipd teams will usually include members well beyond the basic triad of client, architect, and contractor. at a minimum, though, an integrated projec

54、t should include a tight collaboration between the client, the architect, and the main contractor ultimately responsible for construction of the project, from the early design until the project handover. the key to a successful ipd is assembling a team that is committed to collaborative processes an

55、d is capable of working together effectively. ipd is built on collaboration. as a result, it can only be successful if the participants share and apply common values and goals.3. changing roles through bim applicationbuilding information model (bim) comprises ict frameworks and tools that can suppor

56、t the integrated collaboration based on life-cycle design approach. bim is a digital representation of physical and functional characteristics of a facility. as such it serves as a shared knowledge resource for information about a facility forming a reliable basis for decisions during its lifecycle

57、from inception onward (national institute of building sciences nibs, 2007). bim facilitates time and place independent collaborative working. a basic premise of bim is collaboration by different stakeholders at different phases of the life cycle of a facility to insert, extract, update or modify inf

58、ormation in the bim to support and reflect the roles of that stakeholder. bim in its ultimate form, as a shared digital representation founded on open standards for interoperability, can become a virtual information model to be handed from the design team to the contractor and subcontractors and the

59、n to the client (sebastian et al., 2009).bim is not the same as the earlier known computer aided design (cad). bim goes further than an application to generate digital (2d or 3d) drawings (bratton, 2009). bim is an integrated model in which all process and product information is combined, stored, elaborated, and interactively distributed to all relevant building actors. as a central model for all involved actors throughou

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論