



版權(quán)說(shuō)明:本文檔由用戶(hù)提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、實(shí)用文檔Albert Einstein once defined insanity as doing the same thing over and over againand expecting different results. Well, thats what critics accuse the U.S. Departmentof Energy of: making the same mistakes over and over in a project that has alreadysquandered billions of dollars in taxpayers money
2、. But the risk here is far greaterthan financial, since it involves highly toxic nuclear waste.At stake are millions of gallons of radioactive liquid waste left over from the makingof nuclear bombs, including the one that was dropped on Nagasaki. This waste hasbeensittinginundergroundtanksinHanford,
3、Wash.,eversince,whilethegovernment tries to figure out how to clean it up. Ascorrespondent Lesley Stahlreports, the waste is so lethal that a small cup of it would kill everyone in a crowdedrestaurant, in minutes.60 MinutesrecentlyvisitedHanford,wherethewitchesbrewis beingstored.Hanford,locatedalong
4、theColumbiaRiver,is hometothemostcontaminatedpiece of real estate in the world outside of Russia.Itis contaminatedbywasteleftoverfromtheproductionofnuclearweapons.Thereare53milliongallonsofhighlyradioactiveliquidwastestoredinunderground tanks that are now so old they have leaked one million gallons
5、of thestuff.實(shí)用文檔Some of it leaked into the groundwater, and its heading right for the river. With amillion people downstream, theres a sense of urgency about cleaning up the site,which is huge. It takes up 586 square miles in southeastern Washington.But for the Energy Department, which runs the proj
6、ect, its been a case of easiersaid than done. In the nearly 16 years60 Minuteshas been covering this story, itsbeen one foul up after the next.CharlesAnderson,theEnergyDepartmentsofficialoverseeingnuclearcleanup,gave Stahl a tour of what has been built so far at Hanford, starting with a replica ofth
7、e underground tanks.This is a model of tanks that are already built that have waste in them. Be carefulwith your head here as we go in, Anderson told Stahl during the tour.Thetankcanhold750,000gallonsofwaste.Manyofthetanks,builtfortheManhattan Project to develop the first nuclear weapons, are more t
8、han 60 years old.Anderson explains there are a total of 177 tanks holding high-level waste at thissite.The plan is to pump the waste out of the tanks and route it through miles of pipestoayet-to-be-completedpre-treatmentfacility.Theideaistoconverttheradioactive waste into glass logs.This is where th
9、e radioactive waste will come from the tank farms, will come from.實(shí)用文檔those tanks and will come in here and be treated in different chemical processesand be turned into glass logs for final disposition to be disposed of in a landfill,Anderson explains.Stahllastvisitedtheareain 2001,whenthesitewasjus
10、ta field.Andersonsayssignificant progress has been made. The plants 35 percent complete in regard toconstruction, he says.But the place is a total ghost town. What happened?Whathappenedhereis thatafterthreeyearsofwelding,pouringcementandlaying miles of pipes and tons of steel, construction came to a
11、 screeching halt in2005 because the Energy Department underestimated by 40 percent how strongthe building must be to withstand an earthquake. Were talking about a buildingthat would be full of radioactive liquid.In a building like this, you need to build it to ensure that it withstands whatever anea
12、rthquake may pose - if there is one - because we absolutely do not want a breechof this radioactive material in the atmosphere, says Gene Aloise of the GovernmentAccountability Office (GAO), Congress investigative arm.Buthereswhat60Minuteshaslearned:thattheEnergyDepartmentandthecontractor,Bechtel,we
13、ntaheadwiththeplantknowingtheirseismicstandard.實(shí)用文檔might be off. Just as construction was about to begin in July 2002, an independentsafety board sent a letter, warning the department.Energy debated with the safety board for almost two years over the standards,says Aloise.Ok, let me understand this.
14、 This is brought up as an issue in 2002. Instead of goingbackrightthen,theydebateuntil2005,duringwhichtimetheyrebuildingthebuilding? Stahl asked Aloise.Theyre building the building, he replied.They were building it using the wrong seismic standard. Because they did factor insomemarginofsafety,thecon
15、tractor,Bechtel,hastoldtheEnergyDepartmentthere is no restructuring required on the foundation or the walls.But Aloise says what they do have to fix are the internal components of the building.Hangers,piping,vesselsupports,allofthisinteriorofthebuilding,wherethetechnologysgoingtorest.Thatall has tob
16、e re-engineered,he explains.Theyhave to re-do tens of thousands of designs.The seismic miscalculation is costing at least $800 million and a two- to four-yeardelay in completing the building. This practice of pushing ahead with constructionbefore the engineering is complete is known as fast track.Th
17、e people in the state of Washington who are living with this thing, they dont.實(shí)用文檔want it to slow down, they want it to speed up, Stahl remarked.But it doesnt work in our view on complex, technical nuclear facilities like the onesin Hanford, Aloise replied.Asked what he would tell the people of Wash
18、ington, Aloise said, That we need todo it right.Fast track was singled out as a major problem five years ago when60 Minuteslastreported on the cleanup.GaryJones,a GAOinvestigatorin 2001,told60 Minutesthattheyhadrushedahead with construction of this building at a similar site in Idaho before the desi
19、gnswere finished. We asked about it back then.Youre saying they went ahead and built the building and then when they werefinished making all the changes, the equipment wouldnt fit in the building? Stahlasked Jones in the report five years ago.Theequipmentforthisparticularprocesswouldnotfitintothebui
20、ldingasdesigned, Jones replied.Fiveyearsago,60Minuteswasassuredthegovernmenthadlearnedfromitsmistakes and things were finally under control. And yet, since then, costs have gonethrough the roof, up more than 150 percent, and the start date for making thoseglasslogshasslippedsevenyears,to2018.Theseis
21、micerrorwasonlyoneof.實(shí)用文檔several snafus.Tom Carpenter of the watchdog group called Government Accountability Projectgotholdof internalEnergyDepartmentandBechteldocumentswhichrevealaseries of problems with a special tank for processing or scrubbing the nuclear waste.The problems began when Bechtel hi
22、red an outside vendor to build it.They gave the wrong design specs to the manufacturer, says Carpenter.Theygave them a less strict nuclear design.According to the documents, when the tank arrived at Hanford it had cracked staywelds. They were fixed. But then different types of weld defects were disc
23、overed.And yet Bechtel went ahead and installed the scrubber tank anyway.They still said, We can fix those when the tanks installed. So they went ahead andinstalled it with defects, all right? Carpenter says. Knowing it, okay. So at this pointthey,Bechtel,demandedandthenreceiveda $15millionbonusform
24、eetingamilestone.Bechtel wouldnt give60 Minutesan on-camera interview, but did say that the $15million wasnt a bonus, it was a fee. In any event, after they got the money, a newdeficiency was discovered by independent inspectors for Washington state.This new deficiency, says Carpenter, was discovere
25、d after the tank was installed.Carpenter says, The red flag goes up and a full inspection is then ordered on the.實(shí)用文檔tank. Well, the full inspection shouldve been done at the factory where they builtthe tank.Asked whether this inspection was part of the contract, Carpenter says, Sure.The full inspec
26、tion finally led Bechtel to realize the tank was not up to specification.But Carpenter says thats not all.The designflawsthat led tothistankbeingdeficientappliedto 66othervessels, Carpenter explains. Seven of which had already been built. And theyhad to go and redesign the ones that had not been bui
27、lt, and fix the ones that hadbeen built. It really raises a big question about, well, what have they not caught outthere? What other equipment or tools, or machine, is installed maybe under feet ofconcrete that these programs failed to catch? Because their programs failed. Thecontractorfailed.TheDep
28、artmentofEnergyfailed.Ittook anindependentinspectortofindnewdeficiencies.Whereistheadultsupervisionhere?Weretalking a nuclear facility handling some of the worst waste in the world, and theyrefast tracking it? Excuse me.60 Minutesasked Charles Anderson of the Department of Energy about this.Whenyouh
29、eartheygavethewrongdesignspecifications youalmostcantbelieve it on one piece of equipment, and then when you hear its been repeatedoverandover,Imean,thatdoesntsoundliketheDepartmentofEnergyismanaging the situation very well, Stahl said.實(shí)用文檔Theresa numberofthoseidentifiedandcorrectedbutwherethespecsh
30、avebeencorrectly, Anderson replied.issuesthathaveoccurred.Thoseissueshavebeentheresalsoa large,largepercentageofequipmentcorrectlygiven,theequipmentsbeenpurchasedBut there shouldnt be mistakes like that in a plant like this, should there? Stahlasked.Well, Lesley, in a large complex facility, a proje
31、ct like this, you do have mistakes,he replied.Anderson acknowledged they are big mistakes. I would agree that there are bigmistakes here that we are taking control of and were correcting, he says.You know, Im getting a little deja vu here because when we were here in 2001 itwas the same thing. We fi
32、gured it out. Its better now. No problem any more. Doyou think, being candid with us, that the departments up to this? Stahl asked.Well heres whats different now. Weve taken steps to provide increased oversight,to reach out for increased external reviews, Anderson replied. To complete thisimportant
33、work of disposing of, stabilizing and then disposing of this waste.Anderson says that the leaking tanks have been stabilized and that theres virtuallyno chance of further seepage. But Christine Gregoire, the governor of WashingtonState, who has worked on this issue from the beginning, doesnt believe that f
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶(hù)所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶(hù)上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶(hù)上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶(hù)因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 新興藥物市場(chǎng)動(dòng)態(tài)分析試題及答案
- 2024年汽車(chē)維修工技術(shù)標(biāo)準(zhǔn)與法規(guī)試題及答案
- 2025公司安全管理人員安全培訓(xùn)考試試題a4版
- 2024-2025項(xiàng)目部安全管理人員安全培訓(xùn)考試試題及答案完整
- 2024-2025職工安全培訓(xùn)考試試題答案參考
- 藥物作用與機(jī)制試題及答案
- 二手車(chē)評(píng)估在環(huán)保中的實(shí)踐作用試題及答案
- 二手車(chē)評(píng)估中的數(shù)據(jù)安全與隱私問(wèn)題試題及答案
- 澄清古代文學(xué)史知識(shí)考核試題及答案
- 2024年汽車(chē)維修工考試環(huán)境與安全要求試題及答案
- 利用DeepSeek優(yōu)化水資源管理
- DeepSeek人工智能語(yǔ)言模型探索AI世界科普課件
- 牛橋水庫(kù)現(xiàn)代化水庫(kù)運(yùn)行管理矩陣建設(shè)探討
- 2024年晉中職業(yè)技術(shù)學(xué)院?jiǎn)握新殬I(yè)技能測(cè)試題庫(kù)附解析答案
- DB32∕T 2677-2014 公路涉路工程安全影響評(píng)價(jià)報(bào)告編制標(biāo)準(zhǔn)
- 2025年北京鐵路局集團(tuán)招聘筆試參考題庫(kù)含答案解析
- 食品中蠟樣芽孢桿菌的檢驗(yàn)課件
- 食為天:2024中國(guó)食品飲料行業(yè)白皮書(shū)
- 2025南水北調(diào)東線山東干線限責(zé)任公司人才招聘30人管理單位筆試遴選500模擬題附帶答案詳解
- 電力行業(yè)電力調(diào)度培訓(xùn)
- 2024-2030年中國(guó)乳腺疾病預(yù)防與治療行業(yè)深度調(diào)查及投資價(jià)值研究報(bào)告版
評(píng)論
0/150
提交評(píng)論