錯誤處理 CKMLCP 前期未結(jié)算解決方案_第1頁
錯誤處理 CKMLCP 前期未結(jié)算解決方案_第2頁
錯誤處理 CKMLCP 前期未結(jié)算解決方案_第3頁
錯誤處理 CKMLCP 前期未結(jié)算解決方案_第4頁
錯誤處理 CKMLCP 前期未結(jié)算解決方案_第5頁
已閱讀5頁,還剩3頁未讀, 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡介

1、.CKMLCP前期未結(jié)算_報(bào)錯 解決1:每次結(jié)賬后要檢查物料狀態(tài) S_ALR_87013180 - 根據(jù)期間狀態(tài)的物料,檢查是否有非01狀態(tài)的物料解決2:結(jié)賬后,物料期間不允許前期記賬,防止結(jié)賬后再發(fā)生前期物料移動,導(dǎo)致改變了物料狀態(tài)解決3:手工修改CKMLPP表中物料上一期間的狀態(tài)為已結(jié)算狀態(tài)解決4:如下方法2013-08-09 08:52:08| 分類: SAP_FICO | 標(biāo)簽: |舉報(bào) |字號大中小 訂閱 做7月分的物料分類賬,發(fā)現(xiàn)6月份有三個物料沒有做物料分類賬,在執(zhí)行CKMLCP時系統(tǒng)報(bào)錯如下:計(jì)算出前一期間中物料的期末結(jié)算 消息號:C+805解決方案:1. CKMREP (RC

2、KM_REP_TABI0F通過改標(biāo)準(zhǔn)程序,可以使CKMREP直接保存);2. 直接改表CKMLPP 更新物料的狀態(tài);3. SAP NOTE 361236 見附件:MUST_SETTLE(單級)MUST_MULTI(多級)MUST_COGS(消耗的重估)MUST_WIP(在制品)MUST_CLOSE(結(jié)賬輸入)SAP Note 361236 - CKMLCP: No period-end closingoperations after period shift物料分類賬的產(chǎn)品價格控制更改對于價格控制為S的產(chǎn)品,運(yùn)行物料分類賬后系統(tǒng)會自動修改為V,然后下期的價格控制仍舊為S,那么此時,如果想對該物

3、料做上月的移動,即便會計(jì)期間、物料期間、CO期間均已經(jīng)放開,依舊不能過賬,系統(tǒng)會提示兩個期間的價格控制不一致,解決的辦法是,沖銷上期的物料分類賬的運(yùn)行,那么此時,上期的價格控制會自動變?yōu)镾,這時候就可以做上期的物料移動操作物料帳運(yùn)行過程中出現(xiàn)一個無語的問題,求論壇老師們支招。問題詳情如下:我們這邊物料是按照標(biāo)準(zhǔn)成本核算的,一家分公司在運(yùn)行CKMLCP時做到第三步“單級處理確定”時90%的物料報(bào)紅燈錯誤,錯誤的詳細(xì)信息是計(jì)算出前一期間中物料 1000457 的期末結(jié)算消息號 C+805診斷您想執(zhí)行含有評估范圍HA00中評估類型的物料1000457的單級價格確定。您已經(jīng)輸入了需要確定價格的期間,但

4、是還沒有完成上一期間中物料的期末結(jié)算。上一期間中物料狀態(tài)是已確定價格(單層)。價格確定標(biāo)識3需要您執(zhí)行每一期間和相關(guān)清算條目的單級價格確定(和可能的多級價格確定)。即使沒有輸入物料任何數(shù)據(jù),這也是必要的。系統(tǒng)響應(yīng)系統(tǒng)不允許特定物料的單級價格確定。步驟在進(jìn)行前,您必須執(zhí)行單級價格確定(和可能的多級)和上一期間的清算條目。根據(jù)這些信息我判斷是他們上期物料帳運(yùn)行中,最后一步CKMI沒做。過去一檢查,真的沒做!坑爹?。‖F(xiàn)在系統(tǒng)MMPV已經(jīng)是第4期了,嘗試在MMRV中允許對前期記賬,將OB52賬期開到2月,再重新運(yùn)行2月份的CKMI時提示”您不被允許在期間段002/2013中執(zhí)行結(jié)賬輸入“。有沒有別的什

5、么方法解決這個問題呢?各位老師有沒有遇到過?求支招。sap經(jīng)驗(yàn)分享之物料帳強(qiáng)制結(jié)算(2011-02-09 10:58:27) /s/blog_7383f6690100p3mb.html實(shí)際業(yè)務(wù)中經(jīng)常發(fā)生以前期間或當(dāng)期物料帳無法結(jié)算的情況。notes提供了解決方法,如下SymptomYou are unable to carry out any period-end closing operations for the penultimate period in the material ledger after the period shift in

6、 Materials Management (Transaction: MMPV).Example:In plant 1000, you shift the period to 10/2000. You are now only able to carry out period-end closing operations for period 9 in the material ledger. Period-end closing operations are now no longer possible for period 8 and lower.Single-level price d

7、eterminationIf you want to carry out a single-level price determination for 8/2000, the system issues error message:C+712:You cannot perform price determination in period 008/2000.orC+805:Carry out period-end closing for material &1 &2 in the previous period.Multi-level price determinationIf you wan

8、t to carry out a multi-level price determination for 8/2000, the system issues error message:CKMLMV008:You cannot perform price determination in period 8/2000.Closing entryIf you want to execute a closing entry for 8/2000, the system issues error message:C+715You are not allowed to execute closing e

9、ntries in period 8/2000Revaluation of single-level consumption:As of Release Enterprise, Financial Extensions 1.10, the step Revaluation of single-level consumption is integrated in the cost estimate cockpit. If you carry out a revaluation of single-level consumption for 8/2000, the system issues er

10、ror message:CKMLVNB050:You can not revaluate consumption on periods 8/2000WIP-revaluation:As of Release Enterprise, Financial Extensions 2.00, the WIP revaluation step is integrated into the cost estimate cockpit. If you carry out a WIP revaluation for 8/2000, the system issues error message:CKMLWIP

11、050WIP revaluation is not allowed for periods 003/2003 plant &Other termsCKMLCP, CKMI, CKMH, CKMM_RUN, MMPV, CKMLVNB050, CKMLVNB-050 CKMLWIP050, CKMLWIP-050, C+722Reason and PrerequisitesYou use the material ledger.Materials Management does not allow postings to be made to other periods than the cur

12、rent period and the previous period. The closing entry for the actual costing is a posting for the material and therefore is not intended for periods that are older than the previous period.SolutionIf you use the actual costing (material ledger), you must have completely closed all period-end closin

13、g operations in the actual costing for the penultimate period prior to the period shift. Use the Costing Cockpit (Transaction CKMLCP) to make sure that all the materials of the run have status Closing entry performed.The processing of older periods is not supported in the standard system. Particular

14、ly in test systems, however, sometimes the period has been shifted once without all of the period-end closing operations of the penultimate period having been successfully carried out beforehand.You can still carry out period-end closing operations in the previous periods using the following workaro

15、und.Single-level price determination:= Call up Transaction CKMLCP.= Select the costing run and the period for which you want to carry out the period-end closing operation.= Go to the Change parameters screen for the single-level price determination.=Enter MUST_SETTLE in the OK code (Transaction code

16、 field).= Choose ENTER.= A single-level price determination is carried out for the run.Multi-level price determination:= Call up Transaction CKMLCP.= Select the costing run and the period for which you want to carry out the period-end closing operation.= Go to the Change parameters screen for the mu

17、lti-level price determination.=Enter MUST_MULTI in the OK code (Transaction code field).= Choose ENTER.= A multi-level price determination is carried out for the run afterwards.Revaluation of single-level consumption (as of Release Enterprise)= Call up Transaction CKMLCP.= Select the costing run and

18、 the period for which you want to carry out the period-end closing operation.= Go to the Change parameters screen for the revaluation of single-level consumption.=Enter MUST_COGS in the OK code (Transaction code field).= A revaluation of single-level consumption is carried out for the run afterwards

19、.WIP revaluation (as of Release Enterprise, Ext.Set 2.00)= Call up Transaction CKMLCP.= Select the costing run and the period for which you want to carry out the period-end closing operation.= Go to the Change parameters screen for the WIP revaluation.=Enter MUST_WIP in the OK code (Transaction code

20、 field).= A WIP revaluation is carried out for the run afterwards.Closing entry= Call up Transaction CKMLCP.= Select the costing run and the period for which you want to carry out the period-end closing operation.= Go to the Change parameters screen for the closing entry.=Enter MUST_CLOSE in the OK

21、code (Transaction code field).= A closing entry is carried out for the run afterwards.Reversing closing entry= Call up Transaction CKMLCP.= Select the costing run and the period for which you want to carry out the period-end closing operation.= Go to the Change parameters screen for the closing entr

22、y.= Choose Reverse.=Enter MUST_REVERSE in the OK code (Transaction code field).= The closing entry is reversed afterwards.CAUTION: This is a workaround for a function that is not supported. You take full responsibility for using the workaround and SAP does not provide any support in this case. SAP w

23、ill not be responsible for the data integrity if you have carried out period-end closing operations of the material ledger for other periods than for the previous period.If problems arise when you apply the workaround, SAP can only provide help in the form of chargeable consulting.If you use the act

24、ual cost component split, the workaround is only possible for the periods as of the actual cost component split start period as well as their prior period.The following analysis procedure is recommended before applying the workaround: Start Transaction CKM3 beginning from the current period into the past up to the last period record that has the closing entry status (70) or created status (01). If no period has this status, all periods are

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論